CN214698176U - Wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo - Google Patents
Wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo Download PDFInfo
- Publication number
- CN214698176U CN214698176U CN202120788777.4U CN202120788777U CN214698176U CN 214698176 U CN214698176 U CN 214698176U CN 202120788777 U CN202120788777 U CN 202120788777U CN 214698176 U CN214698176 U CN 214698176U
- Authority
- CN
- China
- Prior art keywords
- thick bamboo
- tower
- tower section
- bearing structure
- generating set
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
The utility model discloses a wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo, including supporting the base, the both sides surface of supporting the base all is provided with stabilizing mean, the middle part of supporting the base is provided with concrete embedded structure, stabilizing mean includes blotter, mounting hole, connecting piece and steadying frame, the lower extreme external surface fixed connection of connecting piece has the steadying frame. Wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo, be equipped with firm mechanism and concrete embedded mechanism, can improve the stability of placing of a tower section of thick bamboo when a tower section of thick bamboo bearing structure uses, can also improve the area of contact of a tower section of thick bamboo bearing structure and ground, and then reinforcing a tower section of thick bamboo bearing structure places stably, the concrete embedded mechanism of setting can increase a tower section of thick bamboo bearing structure and concrete placement pile's area of contact to it is stable with concrete placement pile's being connected to improve a tower section of thick bamboo bearing structure, brings better use prospect.
Description
Technical Field
The utility model relates to a aerogenerator field, in particular to wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo.
Background
The tower drum supporting structure is a structure convenient for people to fix the wind generating set, can be convenient for people to use, and is simple in structure and convenient to operate.
According to wind generating set's in patent No. 201521140504.X tower section of thick bamboo bearing structure and a tower section of thick bamboo through set up a plurality of strengthening ribs as the loading end on the flange of tower section of thick bamboo section, and set up the load piece correspondingly on the strengthening rib, set up at the strengthening rib lower extreme and tower section of thick bamboo section inner wall connection auxiliary stay spare, realize the outrigger to strengthening rib and load piece, and make a tower section of thick bamboo receive less fatigue damage, however, whole tower section of thick bamboo bearing structure steadiness is relatively poor, and bearing structure bottom area of contact is less, have certain inconvenience, secondly, whole tower section of thick bamboo bearing structure is relatively poor with concrete placement pile connection stability, for this reason, we propose wind generating set's tower section of thick bamboo bearing structure and a tower section of thick bamboo, in order to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo, can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo, including supporting the base, the both sides surface of supporting the base all is provided with stabilizing mean, the middle part of supporting the base is provided with concrete embedded mechanism, stabilizing mean includes blotter, mounting hole, connecting piece and steady rest, the lower extreme external surface fixedly connected with steady rest of connecting piece, the mounting hole has all been seted up to the upper end both sides of steady rest, the lower extreme surface of steady rest can be dismantled and is connected with the blotter.
The stabilizing mechanism is mainly beneficial to improving the stability of the whole tower drum supporting structure.
The concrete pre-buried mechanism is mainly beneficial to improving the connection stability of the tower drum supporting structure and the concrete pouring pile.
Preferably, the outer surface of the upper end of the supporting base is provided with a connecting piece, and the outer surface of the upper end of the connecting piece is provided with a tower barrel.
Preferably, the concrete pre-buried mechanism includes connecting hole, vice pre-buried pole, mounting and main pre-buried pole, the front end surface fixedly connected with of mounting is main pre-buried pole, the connecting hole has been seted up to the front end surface of main pre-buried pole, the vice pre-buried pole of outer wall fixedly connected with of main pre-buried pole.
Preferably, the outer surface of one side of the stabilizing mechanism is fixedly connected with the outer surface of one side of the supporting base through a connecting piece, and the number of the stabilizing mechanisms is two.
Preferably, the outer surface of the rear end of the concrete embedding mechanism is detachably connected with the middle of the supporting base through a fixing piece, and the number of the concrete embedding mechanisms is two.
Preferably, the outer surface of the lower end of the tower cylinder is fixedly connected with the outer surface of the upper end of the connecting piece, and the outer surface of the lower end of the connecting piece is detachably connected with the outer surface of the upper end of the supporting base.
Compared with the prior art, the utility model discloses following beneficial effect has: this wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo, stabilizing mean through setting up, when a tower section of thick bamboo bearing structure used, the steady rest can improve the stability of placing of a tower section of thick bamboo, can also improve the area of contact of a tower section of thick bamboo bearing structure and ground, and then reinforcing a tower section of thick bamboo bearing structure places stably, be favorable to people's use, concrete embedded structure through setting up, when a tower section of thick bamboo bearing structure is connected with concrete pouring stake, main embedded pole and vice embedded pole can increase the area of contact of a tower section of thick bamboo bearing structure and concrete pouring stake, thereby improve a tower section of thick bamboo bearing structure and concrete pouring stake and be connected stably, be favorable to bearing structure's stability, whole wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo simple structure, and convenient operation, the effect of use is better for traditional mode.
Drawings
Fig. 1 is the overall structure schematic diagram of the tower drum supporting structure and the tower drum of the wind generating set of the present invention.
Fig. 2 is an enlarged view of the tower supporting structure of the wind turbine generator system and the supporting base 3 in fig. 1 of the tower.
Fig. 3 is an enlarged view of the tower supporting structure of the wind turbine generator system and the securing mechanism 1 in fig. 1 of the tower of the present invention.
Fig. 4 is the enlarged view of the concrete embedded mechanism 2 in fig. 1 of tower drum supporting structure and tower drum of the wind generating set of the utility model.
In the figure: 1. a stabilizing mechanism; 2. a concrete pre-embedding mechanism; 3. a support base; 4. a tower drum; 5. a connecting member; 101. a cushion pad; 102. mounting holes; 103. a connecting member; 104. a stabilizer frame; 201. connecting holes; 202. auxiliary pre-buried rods; 203. a fixing member; 204. and (5) main pre-buried rods.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The first embodiment is as follows:
as shown in fig. 1-4, the tower supporting structure and the tower of the wind generating set include a supporting base 3, the outer surfaces of both sides of the supporting base 3 are provided with stabilizing mechanisms 1, the middle of the supporting base 3 is provided with a concrete pre-embedded mechanism 2, the outer surface of the upper end of the supporting base 3 is provided with a connecting piece 5, and the outer surface of the upper end of the connecting piece 5 is provided with a tower 4.
Example two:
on the basis of the first embodiment, as shown in fig. 1, the outer surface of the lower end of the tower drum 4 is fixedly connected with the outer surface of the upper end of the connecting piece 5, and the outer surface of the lower end of the connecting piece 5 is detachably connected with the outer surface of the upper end of the supporting base 3, so that the overall stability of the tower drum supporting structure is facilitated.
Example three:
on the basis of the first embodiment, as shown in fig. 3, the stabilizing mechanism 1 includes a cushion pad 101, mounting holes 102, a connecting member 103 and a stabilizing frame 104, the stabilizing frame 104 is fixedly connected to the outer surface of the lower end of the connecting member 103, the mounting holes 102 are respectively formed in both sides of the upper end of the stabilizing frame 104, and the cushion pad 101 is detachably connected to the outer surface of the lower end of the stabilizing frame 104, which is beneficial to the structural stability of the stabilizing mechanism 1.
Example four:
on the basis of the first embodiment, as shown in fig. 4, the concrete embedded mechanism 2 includes a connecting hole 201, an auxiliary embedded rod 202, a fixing member 203 and a main embedded rod 204, the main embedded rod 204 is fixedly connected to the outer surface of the front end of the fixing member 203, the connecting hole 201 is formed in the outer surface of the front end of the main embedded rod 204, and the auxiliary embedded rod 202 is fixedly connected to the outer wall of the main embedded rod 204, which is beneficial to the structural stability of the concrete embedded mechanism 2.
Example five:
on the basis of the first and third embodiments, as shown in fig. 1 and 3, the outer surface of one side of the stabilizing mechanism 1 is fixedly connected with the outer surface of one side of the supporting base 3 through the connecting member 103, and the number of the stabilizing mechanisms 1 is two, which is beneficial to the stable connection of the stabilizing mechanisms 1.
Example six:
on the basis of the first embodiment and the fourth embodiment, as shown in fig. 1 and 4, the outer surface of the rear end of the concrete embedded mechanism 2 is detachably connected with the middle part of the supporting base 3 through the fixing piece 203, and the number of the concrete embedded mechanisms 2 is two, which is beneficial to the stable connection of the concrete embedded mechanisms 2.
It should be noted that, the utility model relates to a tower drum supporting structure and a tower drum of a wind generating set, when installing, can install the supporting base 3 to the ground through the stabilizing mechanism 1, pour concrete into the concrete pouring pile inside, seal the supporting base 3, just can accomplish the installation of the whole tower drum supporting structure, the stabilizing mechanism 1 that is arranged, when the tower drum supporting structure is used, the stabilizing frame 104 can improve the placing stability of the tower drum, and can also improve the contact area between the tower drum supporting structure and the ground, and further enhance the placing stability of the tower drum supporting structure, which is beneficial to people to use, the concrete embedded mechanism 2 that is arranged, when the tower drum supporting structure is connected with the concrete pouring pile, the main embedded rod 204 and the auxiliary embedded rod 202 can increase the contact area between the tower drum supporting structure and the concrete pouring pile, thereby improving the stability of the connection between the tower drum supporting structure and the concrete pouring pile, is favorable for the stability of the supporting structure and is relatively practical.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (6)
1. Wind generating set's tower section of thick bamboo bearing structure and tower section of thick bamboo, including supporting base (3), its characterized in that: the utility model discloses a concrete stabilization mechanism, including support base (3), the both sides surface of support base (3) all is provided with stabilizing mean (1), the middle part of supporting base (3) is provided with concrete embedded structure (2), stabilizing mean (1) is including blotter (101), mounting hole (102), connecting piece (103) and steady rest (104), the outer fixed surface of lower extreme of connecting piece (103) is connected with steady rest (104), mounting hole (102) have all been seted up to the upper end both sides of steady rest (104), the lower extreme surface of steady rest (104) can be dismantled and is connected with blotter (101).
2. The tower supporting structure and tower of a wind generating set of claim 1, wherein: the outer surface of the upper end of the supporting base (3) is provided with a connecting piece (5), and the outer surface of the upper end of the connecting piece (5) is provided with a tower barrel (4).
3. The tower supporting structure and tower of a wind generating set of claim 1, wherein: concrete embedded mechanism (2) are including connecting hole (201), vice pre-buried pole (202), mounting (203) and main pre-buried pole (204), the front end surface fixed connection of mounting (203) has main pre-buried pole (204), connecting hole (201) have been seted up to the front end surface of main pre-buried pole (204), the vice pre-buried pole (202) of outer wall fixed connection of main pre-buried pole (204).
4. The tower supporting structure and tower of a wind generating set of claim 1, wherein: the outer surface of one side of the stabilizing mechanism (1) is fixedly connected with the outer surface of one side of the supporting base (3) through a connecting piece (103), and the number of the stabilizing mechanisms (1) is two.
5. The tower supporting structure and tower of a wind generating set of claim 1, wherein: the rear end outer surface of the concrete embedded mechanism (2) is detachably connected with the middle of the supporting base (3) through a fixing piece (203), and the number of the concrete embedded mechanisms (2) is two.
6. The tower supporting structure and tower of a wind generating set of claim 1, wherein: the outer surface of the lower end of the tower barrel (4) is fixedly connected with the outer surface of the upper end of the connecting piece (5), and the outer surface of the lower end of the connecting piece (5) is detachably connected with the outer surface of the upper end of the supporting base (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120788777.4U CN214698176U (en) | 2021-04-16 | 2021-04-16 | Wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120788777.4U CN214698176U (en) | 2021-04-16 | 2021-04-16 | Wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214698176U true CN214698176U (en) | 2021-11-12 |
Family
ID=78531918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120788777.4U Active CN214698176U (en) | 2021-04-16 | 2021-04-16 | Wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214698176U (en) |
-
2021
- 2021-04-16 CN CN202120788777.4U patent/CN214698176U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214698176U (en) | Wind generating set's a tower section of thick bamboo bearing structure and a tower section of thick bamboo | |
CN115001363A (en) | Photovoltaic module's mounting system | |
CN109577323B (en) | Tubular pile reinforcing method | |
CN215797893U (en) | Side cover plate for marble assembly | |
CN215256617U (en) | Wind driven generator cabin base with high static strength and rigidity | |
CN216077425U (en) | Wind power generation support column | |
CN218509169U (en) | Wind-resistant reinforced electric power tower | |
CN218292022U (en) | High-stability building fixing base | |
CN214463095U (en) | Build firm electric power iron tower | |
CN220745090U (en) | Wind-powered electricity generation blade hoist device | |
CN214170742U (en) | Cabin cover jacking mechanism for aerial hoisting system | |
CN217266898U (en) | Spherical support convenient to installation | |
CN216516088U (en) | Container board house base strutting arrangement | |
CN215880531U (en) | Two-sided welding position frock of wind-powered electricity generation jacket | |
CN219710252U (en) | Fixing device for wind measuring tower of offshore wind farm | |
CN218407672U (en) | Novel wind power generation device for new energy power generation | |
CN220934923U (en) | Marine generator set | |
CN214941048U (en) | Garbage classification room with assembled structure | |
CN218665121U (en) | Hydrogen fuel engine hoist and mount pulls support | |
CN220205303U (en) | Urban road traffic noise detection device | |
CN216130173U (en) | Effective reinforcing apparatus of power transmission tower foundation construction | |
CN209760867U (en) | Ring beam underpinning and reinforcing structure of brick-concrete structure building | |
CN211366688U (en) | Novel photovoltaic installation high strength platform sling | |
CN216194785U (en) | Foundation pit support deformation template support reinforcing structure | |
CN211119243U (en) | Folding lever lamp pole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Tower supporting structure and tower of wind turbine Effective date of registration: 20221014 Granted publication date: 20211112 Pledgee: Hengshui Bank Co.,Ltd. Ronghua Sub branch Pledgor: JIELV HEAVY INDUSTRY CO.,LTD. Registration number: Y2022980018358 |