CN214697673U - Drilling equipment for geotechnical engineering - Google Patents

Drilling equipment for geotechnical engineering Download PDF

Info

Publication number
CN214697673U
CN214697673U CN202121069645.2U CN202121069645U CN214697673U CN 214697673 U CN214697673 U CN 214697673U CN 202121069645 U CN202121069645 U CN 202121069645U CN 214697673 U CN214697673 U CN 214697673U
Authority
CN
China
Prior art keywords
positioning
drilling
fixedly connected
geotechnical engineering
bevel gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121069645.2U
Other languages
Chinese (zh)
Inventor
王永成
王健勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Geophysical And Geochemical Exploration Institute
Original Assignee
Zhejiang Geophysical And Geochemical Exploration Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Geophysical And Geochemical Exploration Institute filed Critical Zhejiang Geophysical And Geochemical Exploration Institute
Priority to CN202121069645.2U priority Critical patent/CN214697673U/en
Application granted granted Critical
Publication of CN214697673U publication Critical patent/CN214697673U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction equipment technical field, and a drilling equipment for geotechnical engineering is disclosed, including the work box, work box left side fixedly connected with handle, the motor room has been seted up in the work box, the motor room bottom is provided with drilling mechanism, work box bottom middle fixedly connected with connecting block, the drilling hole chamber has been seted up in the connecting block, the connecting block right side is provided with positioning mechanism, positioning mechanism is including the locating plate, the locating piece, positioning spring and location case, locating plate fixed connection is in connecting block right side middle part, locating piece threaded connection is on locating plate bottom right side, positioning spring fixed connection is in the middle of the locating piece bottom, bottom fixed connection is in the positioning spring bottom in the location case. This drilling equipment for geotechnical engineering aims at the drill bit needs the drilling position, and the case of fixing a position simultaneously supports the rock both sides, through the positioning spring who sets up, can make the location case slide on the locating piece, can make the device more laminate the rock surface.

Description

Drilling equipment for geotechnical engineering
Technical Field
The utility model relates to a construction equipment technical field specifically is a drilling equipment for geotechnical engineering.
Background
Geotechnical engineering is a new technical system established in civil engineering practice in 60's of the 20 th century in the countries of the Europe and the America. Geotechnical engineering is to solve the problems of rock and soil engineering, including foundation and foundation, slope, underground engineering and the like, and is used as a research object of the geotechnical engineering.
Often need drill to geotechnical ground when carrying out geotechnical engineering, and current drilling equipment can't fix a position when drilling, need improve to this problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a drilling equipment for geotechnical engineering to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a drilling equipment for geotechnical engineering, includes the work box, work box left side fixedly connected with handle, the motor room has been seted up in the work box, motor room bottom is provided with drilling mechanism, the middle fixedly connected with connecting block in the bottom of the work box, the drilling hole chamber has been seted up in the connecting block, the connecting block right side is provided with positioning mechanism.
Positioning mechanism is including locating plate, locating piece, positioning spring and location case, locating plate fixed connection is in connecting block right side middle part, locating piece threaded connection is in locating plate bottom right side, positioning spring fixed connection is in the middle of the locating piece bottom, bottom fixed connection is in the positioning spring bottom in the location case.
Preferably, drilling mechanism is including motor, first bevel gear, second bevel gear, dwang, installation pole, installation piece, connecting rod and drill bit, motor fixed connection is in the middle of the motor room bottom, the motor has the output shaft, first bevel gear fixed connection is in motor output shaft bottom, second bevel gear meshes in first bevel gear left side, dwang fixed connection is in the middle of second bevel gear bottom, installation pole fixed connection is in the dwang bottom, installation piece threaded connection is in installation pole left side bottom, connecting rod fixed connection is in installation piece right side bottom, drill bit fixed connection is in the connecting rod bottom.
Preferably, the number of the handles is two, and the two handles are symmetrically distributed on the left side and the right side of the work box.
Preferably, the top of the left side and the top of the positioning block are in threaded connection with second fixing bolts, the bottom of the positioning plate is provided with second thread grooves corresponding to the second fixing bolts, and the positioning block is in threaded connection with the positioning plate through the second fixing bolts, so that the drill bit can be conveniently detached.
Preferably, the top of the left side of the mounting block is in threaded connection with a first fixing bolt, the left side of the mounting rod is provided with a first thread groove corresponding to the first fixing bolt, and the mounting block is in threaded connection with the mounting rod through the first fixing bolt, so that the positioning block can be conveniently detached.
Preferably, the left side and the right side of the drilling cavity are close to the bottom fixedly connected with supporting plate, and the supporting plate is rotatably connected with the middle part of the rotating rod and can support the second bevel gear.
Preferably, locating plate, locating piece, positioning spring, location case, second bevel gear, dwang, installation pole, connecting rod and drill bit quantity are two locating plate, locating piece, positioning spring, location case, second bevel gear, dwang, installation pole, connecting rod and drill bit symmetric distribution are in the first bevel gear left and right sides.
Compared with the prior art, the utility model provides a drilling equipment for geotechnical engineering possesses following beneficial effect:
1. this drilling equipment for geotechnical engineering aims at the drill bit needs the drilling position, and the case of fixing a position simultaneously supports the rock both sides, through the positioning spring who sets up, can make the location case slide on the locating piece, can make the device more laminate the rock surface.
2. This drilling equipment for geotechnical engineering through setting up first fixing bolt and second fixing bolt and does not, can change the drill bit, can take off the locating piece simultaneously to reduce the device volume, made the device have be convenient for change with portable's function.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic sectional front view of the present invention;
FIG. 3 is an enlarged view of the structure at A in FIG. 2;
fig. 4 is the utility model discloses the structure schematic diagram is looked to the right side of locating piece intercepting department.
In the figure: 1. a work box; 2. a grip; 3. a start button; 4. a motor chamber; 5. a drilling mechanism; 501. a motor; 502. a first bevel gear; 503. a second bevel gear; 504. rotating the rod; 505. mounting a rod; 506. mounting blocks; 507. a connecting rod; 508. a drill bit; 6. connecting blocks; 7. drilling a hole cavity; 8. a positioning mechanism; 801. positioning a plate; 802. positioning blocks; 803. a positioning spring; 804. and a positioning box.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1-4, the present invention provides a technical solution: a drilling device for geotechnical engineering comprises a working box 1, wherein handles 2 are fixedly connected to the left side of the working box 1, the number of the handles 2 is two, the two handles 2 are symmetrically distributed on the left side and the right side of the working box 1, a motor chamber 4 is formed in the working box 1, a drilling mechanism 5 is arranged at the bottom of the motor chamber 4, the drilling mechanism 5 comprises a motor 501, a first bevel gear 502, a second bevel gear 503, a rotating rod 504, an installation rod 505, an installation block 506, a connecting rod 507 and a drill bit 508, the motor 501 is fixedly connected to the middle of the bottom of the motor chamber 4, the motor 501 is provided with an output shaft, the first bevel gear 502 is fixedly connected to the bottom end of the output shaft of the motor 501, the second bevel gear 503 is meshed with the left side of the first bevel gear 502, the rotating rod 504 is fixedly connected to the middle of the bottom of the second bevel gear 503, the installation rod 505 is fixedly connected to the bottom of the left side of the installation rod 505 in a threaded manner, installation piece 506 left side top threaded connection has first fixing bolt, first thread groove has been seted up to installation pole 505 left side corresponding first fixing bolt, installation piece 506 is through first fixing bolt threaded connection installation pole 505, locating piece 802 convenient to detach can, connecting rod 507 fixed connection is in installation piece 506 right side bottom, drill bit 508 fixed connection is in connecting rod 507 bottom, fixedly connected with connecting block 6 in the middle of the 1 bottom of work box, drilling chamber 7 has been seted up in connecting block 6, the 7 left and right sides in drilling chamber is close to bottom fixedly connected with backup pad, the backup pad rotates and connects dwang 504 middle part, can support second bevel gear 503, 6 right sides in connecting block are provided with positioning mechanism 8.
The positioning mechanism 8 comprises a positioning plate 801, a positioning block 802, a positioning spring 803 and a positioning box 804, the positioning plate 801 is fixedly connected to the middle part of the right side of the connecting block 6, the positioning block 802 is in threaded connection with the right side of the bottom of the positioning block 801, the tops of the left side and the right side of the positioning block 802 are in threaded connection with second fixing bolts, a second thread groove is formed in the bottom of the positioning plate 801 corresponding to the second fixing bolts, the positioning block 802 is in threaded connection with the positioning plate 801 through the second fixing bolts, the drill bit 508 can be conveniently detached, the positioning spring 803 is fixedly connected to the middle of the bottom of the positioning block 802, the bottom of the positioning box 804 is fixedly connected to the bottom end of the positioning spring 803, the positioning plate 801, the positioning block 802, the positioning box 804, the second bevel gear 503, the rotating rod 504, the mounting rod 505, the connecting rods 507 and the drill bits 508 are two in number, two positioning plates 801, the positioning block 802, the positioning spring 803, the positioning box 804, and the positioning box 804, The second bevel gear 503, the rotating rod 504, the mounting rod 505, the connecting rod 507 and the drill 508 are symmetrically distributed on the left and right sides of the first bevel gear 502.
In actual operation, when the device is in use, the worker holds both hands on the grip 2, aligns the drill bit 508 to the desired drilling location, meanwhile, the positioning box 804 is propped against the two sides of the rock, the positioning box 804 can slide on the positioning block 802 through the arranged positioning spring 803, so that the device can be more attached to the outer surface of the rock, meanwhile, the motor 501 is started by dialing the starting button 3, so that the motor 501 drives the first bevel gear 502 to rotate, meanwhile, the second bevel gear 503 engaged with the first bevel gear 502 rotates, so as to drive the mounting rod 505 at the bottom end of the second bevel gear 503 to rotate, meanwhile, the drill bit 508 arranged at the bottom end of the rod 505 drills the surface of the rock, the drill bit 508 can be replaced by arranging the first fixing bolt and the second fixing bolt, and the positioning block 802 can be taken down, thereby reducing the volume of the device and leading the device to have the functions of convenient replacement and convenient carrying.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. The term "comprising", without further limitation, means that the element so defined is not excluded from the group consisting of additional identical elements in the process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a drilling equipment for geotechnical engineering, includes work box (1), its characterized in that: the left side of the working box (1) is fixedly connected with a handle (2), a motor chamber (4) is arranged in the working box (1), a drilling mechanism (5) is arranged at the bottom of the motor chamber (4), the middle of the bottom of the working box (1) is fixedly connected with a connecting block (6), a drilling cavity (7) is arranged in the connecting block (6), and a positioning mechanism (8) is arranged on the right side of the connecting block (6);
positioning mechanism (8) are including locating plate (801), locating piece (802), positioning spring (803) and location case (804), locating plate (801) fixed connection is in connecting block (6) right side middle part, locating piece (802) threaded connection is in locating plate (801) bottom right side, positioning spring (803) fixed connection is in the middle of locating piece (802) bottom, bottom fixed connection is in positioning spring (803) bottom in location case (804).
2. The drilling device for geotechnical engineering according to claim 1, wherein: the drilling mechanism (5) comprises a motor (501), a first bevel gear (502), a second bevel gear (503), a rotating rod (504), a mounting rod (505), a mounting block (506), a connecting rod (507) and a drill bit (508), the motor (501) is fixedly connected to the middle of the bottom of the motor chamber (4), the motor (501) is provided with an output shaft, the first bevel gear (502) is fixedly connected to the bottom end of the output shaft of the motor (501), the second bevel gear (503) is meshed with the left side of the first bevel gear (502), the rotating rod (504) is fixedly connected to the middle of the bottom of the second bevel gear (503), the mounting rod (505) is fixedly connected with the bottom end of the rotating rod (504), the mounting block (506) is in threaded connection with the bottom of the left side of the mounting rod (505), connecting rod (507) fixed connection is in installation piece (506) right side bottom, drill bit (508) fixed connection is in connecting rod (507) bottom.
3. The drilling device for geotechnical engineering according to claim 1, wherein: the number of the handles (2) is two, and the two handles (2) are symmetrically distributed on the left side and the right side of the work box (1).
4. The drilling device for geotechnical engineering according to claim 1, wherein: the top parts of the left side and the right side of the positioning block (802) are in threaded connection with second fixing bolts, the bottom of the positioning plate (801) is provided with second threaded grooves corresponding to the second fixing bolts, and the positioning block (802) is in threaded connection with the positioning plate (801) through the second fixing bolts.
5. The drilling device for geotechnical engineering according to claim 2, wherein: the top of the left side of the mounting block (506) is in threaded connection with a first fixing bolt, the left side of the mounting rod (505) is provided with a first thread groove corresponding to the first fixing bolt, and the mounting block (506) is in threaded connection with the mounting rod (505) through the first fixing bolt.
6. The drilling device for geotechnical engineering according to claim 2, wherein: the left side and the right side of the drilling cavity (7) are close to the bottom and are fixedly connected with supporting plates, and the supporting plates are rotatably connected with the middle part of the rotating rod (504).
7. The drilling device for geotechnical engineering according to claim 2, wherein: the number of the positioning plates (801), the positioning blocks (802), the positioning springs (803), the positioning boxes (804), the second bevel gears (503), the rotating rods (504), the mounting rods (505), the connecting rods (507) and the drill bits (508) is two, and the positioning plates (801), the positioning blocks (802), the positioning springs (803), the positioning boxes (804), the second bevel gears (503), the rotating rods (504), the mounting rods (505), the connecting rods (507) and the drill bits (508) are symmetrically distributed on the left side and the right side of the first bevel gears (502).
CN202121069645.2U 2021-05-19 2021-05-19 Drilling equipment for geotechnical engineering Active CN214697673U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121069645.2U CN214697673U (en) 2021-05-19 2021-05-19 Drilling equipment for geotechnical engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121069645.2U CN214697673U (en) 2021-05-19 2021-05-19 Drilling equipment for geotechnical engineering

Publications (1)

Publication Number Publication Date
CN214697673U true CN214697673U (en) 2021-11-12

Family

ID=78553024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121069645.2U Active CN214697673U (en) 2021-05-19 2021-05-19 Drilling equipment for geotechnical engineering

Country Status (1)

Country Link
CN (1) CN214697673U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114113542A (en) * 2021-11-19 2022-03-01 湖南科技学院 Rock soil and underground engineering model test traffic dynamic load simulation device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114113542A (en) * 2021-11-19 2022-03-01 湖南科技学院 Rock soil and underground engineering model test traffic dynamic load simulation device
CN114113542B (en) * 2021-11-19 2023-11-14 湖南科技学院 Rock-soil and underground engineering model test traffic dynamic load simulation device

Similar Documents

Publication Publication Date Title
CN214697673U (en) Drilling equipment for geotechnical engineering
CN207802720U (en) It is transformed with double drill bit puncheres in a kind of gardens convenient for adjusting spacing
CN210061613U (en) Drilling equipment for building
CN212865894U (en) Foundation tamping device for refuge
CN214040735U (en) Soil sampler for environmental geological survey
CN211762040U (en) Multistation drilling equipment for construction
CN210340222U (en) Deviation adjusting equipment for civil engineering equipment
CN217712540U (en) Portable soil drilling machine
CN216839784U (en) High-efficient drainage structures for municipal building
CN216707942U (en) Green energy-saving building construction equipment
CN210829066U (en) Drilling equipment is used in construction
CN213714783U (en) High-efficient sampling device of ecological environment monitoring
CN215239337U (en) Drill bit clamp for multi-spindle drilling machine
CN215241949U (en) Perforating device that indoor construction was used
CN211973432U (en) Water conservancy trash cleaning machine
CN210137608U (en) Transplanting device for garden engineering
CN210789442U (en) Steel pipe cutting device for construction
CN211289007U (en) Water conservancy pipeline construction fastener
CN215065350U (en) Geological drilling sampling device
CN212764107U (en) Drilling machine for building construction
CN220378196U (en) Drilling machine
CN220522471U (en) Phosphorite rock drill convenient to dismouting
CN215845952U (en) Vertical milling machine with cutter head storage structure
CN216517792U (en) Portable drilling device for rock and soil construction
CN211889068U (en) Drilling equipment for aluminum profile machining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant