CN214696777U - Device for fixing attached lifting scaffold of high-rise building - Google Patents
Device for fixing attached lifting scaffold of high-rise building Download PDFInfo
- Publication number
- CN214696777U CN214696777U CN202120216229.4U CN202120216229U CN214696777U CN 214696777 U CN214696777 U CN 214696777U CN 202120216229 U CN202120216229 U CN 202120216229U CN 214696777 U CN214696777 U CN 214696777U
- Authority
- CN
- China
- Prior art keywords
- auxiliary
- support column
- nut
- support
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model provides a device for a fixed attached lifting scaffold of a high-rise building, which comprises an auxiliary bracket, wherein the auxiliary bracket is arranged at the edge part of a floor; the bottom of the auxiliary support is fixedly connected with the floor ground concrete slab, one side, close to the floor edge, of the auxiliary support is connected with a support of the lifting scaffold through an attached support, and the auxiliary support is used for fixing the lifting scaffold. The utility model discloses beneficial effect: a device for fixed inserted lift scaffold of high-rise high building be favorable to adhering to the lifting scaffold when the floor is too high, a stabilizing measure during inconvenient installation fixing support is favorable to adhering to the lifting scaffold stability when carrying, ensures the security when carrying.
Description
Technical Field
The utility model belongs to the technical field of the building, especially, relate to a device that is used for high-rise high building fixed attached lift scaffold.
Background
Present building industry uses the inserted lift scaffold to carry out the protection in the main part construction mostly, but the condition that often exists 5.3 meters layer height among the major structure, and the interval that leads to upper and lower fixed point is too big, is not conform to the standard requirement, is unfavorable for the fixed of attached lift scaffold, can't ensure the security of attached lift scaffold, causes the potential safety hazard to the construction.
SUMMERY OF THE UTILITY MODEL
In view of this, the present invention is directed to a device for fixing and attaching a lifting scaffold to a high-rise building, so as to solve the above-mentioned problems.
In order to achieve the above purpose, the technical scheme of the utility model is realized like this:
a device for fixing an attached lifting scaffold of a high-rise building comprises an auxiliary support, wherein the auxiliary support is arranged at the edge part of a floor;
the bottom of the auxiliary support is fixedly connected with the floor ground concrete slab, one side, close to the floor edge, of the auxiliary support is connected with a support of the lifting scaffold through an attached support, and the auxiliary support is used for fixing the lifting scaffold.
Further, the auxiliary stand includes support column and down tube, support column bottom and floor ground concrete slabs fixed connection, down tube one end and floor ground concrete slabs fixed connection, the other end is connected with the support column top.
Furthermore, the top of the support column is provided with a connecting plate, and the diagonal rod is connected with the support column through the connecting plate.
Furthermore, the number of the inclined rods is two, the number of the connecting plates is two, the tops of the two inclined rods are correspondingly connected with one connecting plate respectively, and a certain included angle is formed between the two connecting plates.
Furthermore, a pre-buried hole for fixing the support column and the inclined rod is arranged on the floor ground concrete slab.
Furthermore, the support column bottom inwards extends and is provided with square pipe, square pipe is last to be provided with vertical perforating hole, through set up the fixed realization of wall bolt and concrete slabs in square pipe to the fixed of support column.
Furthermore, the bottom of the diagonal rod is also provided with a hinged plate, and the hinged plate is connected with the concrete plate through a wall-penetrating bolt.
Further, a nut is further arranged at the top of the wall penetrating bolt for fixing the support column, and an auxiliary rotating rod is arranged at the top of the nut.
Furthermore, the auxiliary rotating rod comprises a short steel pipe sleeved on the nut, and a clamping part is arranged in the short steel pipe and used for clamping the nut;
the top of the short steel pipe is provided with an insertion hole, an auxiliary rotating bolt is arranged in the insertion hole, and the nut is screwed up by rotating the auxiliary rotating bolt.
Furthermore, supplementary bull stick includes the short steel pipe of fixed connection on the nut, and the short steel pipe top is provided with the patchhole, is provided with supplementary rotatory bolt in the patchhole, screws up the nut through rotating supplementary rotatory bolt.
Compared with the prior art, a device for high-rise building fixed attached lifting scaffold has following beneficial effect:
(1) a device for fixed inserted lift scaffold of high-rise high building be favorable to adhering to the lifting scaffold when the floor is too high, a stabilizing measure during inconvenient installation fixing support is favorable to adhering to the lifting scaffold stability when carrying, ensures the security when carrying.
(2) A device that is used for high-rise building fixed attached lifting scaffold frame
(3) A device that is used for high-rise building fixed attached lifting scaffold frame
(4) A device that is used for high-rise building fixed attached lifting scaffold frame
(5) A device that is used for high-rise building fixed attached lift scaffold, overlap short steel pipe on the nut, when preventing fastening bolt, nut spanner collides with the bracing piece, can't fasten.
Drawings
The accompanying drawings, which form a part hereof, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention without undue limitation. In the drawings:
fig. 1 is a general schematic view of a device for a high-rise building fixed attached lifting scaffold according to an embodiment of the present invention;
fig. 2 is a schematic side view of a support pillar according to an embodiment of the present invention;
fig. 3 is a schematic top view of a support pillar according to an embodiment of the present invention;
figure 4 is a schematic top view of a concrete slab according to an embodiment of the present invention;
fig. 5 is a schematic view of a through-wall bolt according to an embodiment of the present invention.
Description of reference numerals:
1-an auxiliary support; 11-a support column; 111-a connection plate; 112-square tube; 12-a diagonal rod; 121-hinged plate; 13-through-wall bolts; 131-a nut; 132-short steel pipe; 133-an insertion hole; 134-auxiliary rotation bolt; 2-concrete slabs; 21-pre-buried holes; 3-attaching a support; 4-lifting scaffold.
Detailed Description
It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict.
The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
As shown in fig. 1 to 5, the device for fixing and attaching a lifting scaffold 4 to a high-rise building comprises an auxiliary support 1, wherein the auxiliary support 1 is arranged at the edge part of a floor;
the bottom of the auxiliary support 1 is fixedly connected with the floor ground concrete slab 2, one side, close to the floor edge, of the auxiliary support 1 is connected with a support of the lifting scaffold 4 through the attached support 3, and the auxiliary support 1 is used for fixing the lifting scaffold 4.
The top of the support column 11 is provided with a connecting plate 111, and the diagonal rod 12 is connected with the support column 11 through the connecting plate 111.
The utility model discloses a portable electric bicycle, including down tube, down tube 12, connecting plate 111, two connecting plate 111 is equipped with two to down tube 12, two connecting plate 111 is connected to the 12 tops of down tube respectively correspondingly, two have certain contained angle between the connecting plate 111.
The floor surface concrete slab 2 is provided with a pre-buried hole 21 for fixing the support column 11 and the diagonal rod 12.
The bottom of the support column 11 is inwards extended to form a square pipe 112, the square pipe 112 is provided with a vertical through hole, and the support column 11 is fixed by arranging a wall bolt 13 in the square pipe 112 and fixing the concrete plate 2.
The bottom of the diagonal rod 12 is also provided with a hinged plate 121, and the hinged plate 121 is connected with the concrete plate 2 through a wall bolt 13.
A nut 131 is further arranged at the top of the wall bolt 13 for fixing the support column 11, and an auxiliary rotating rod is arranged at the top of the nut 131.
The auxiliary rotating rod comprises a short steel pipe 132 sleeved on the nut 131, and a clamping part is arranged in the short steel pipe 132 and used for clamping the nut 131;
the short steel pipe 132 is provided at the top thereof with an insertion hole 133, and an auxiliary rotation bolt 134 is inserted into the insertion hole 133, and the nut 131 is tightened by rotating the auxiliary rotation bolt 134.
The auxiliary rotating rod comprises a short steel pipe 132 fixedly connected to the nut 131, an insertion hole 133 is formed in the top of the short steel pipe 132, an auxiliary rotating bolt 134 is arranged in the insertion hole 133, and the nut 131 is screwed by rotating the auxiliary rotating bolt 134.
In the specific implementation process, the technical scheme is as follows:
(1) mode of manufacture
Firstly, preparing an auxiliary support column 11 with the height of 2.5 meters, and preparing 2 pull rods (namely inclined rods 12) with the length of 3 meters, a screw rod and a screw cap.
Secondly, PVC pre-buried bolt holes are installed at the edge of the floor and 1.5 meters away from the edge of the floor according to the position of the attachment point of the attached lifting scaffold 4 on the floor with the height of 5.3 meters.
After the attached lifting scaffold 4 is lifted, the auxiliary support 1 is fixed on the concrete slab 2 and is fixed with the lifting scaffold 4 through the attached support, so that the safety after lifting is ensured; and fastening the fixing bolt at the bottom of the pull rod.
(2) Application method
Before 4 promotion of inserted lift scaffold, utilize bolt and preformed hole to fix 2.5 meters high auxiliary stay post 11 at the floor edge, utilize the cap on the auxiliary stay post 11 and the pre-buried bolt hole of floor to carry out the fixed of pull rod simultaneously to be connected fixing support and auxiliary stay post 11, ensure to adhere to 4 stability of lift scaffold.
The fixing bolts for the support columns 11 and the pull rods collide with the base when being fastened, so that the fixing cannot be fastened in place, the short steel pipes 132 and the nuts 131 are adopted for welding and fixing, and when the fixing device is used, the fastening steel pipes are adopted to drive the nuts 131 to rotate, so that the fastening in place is ensured.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention, and they should be construed as being included in the following claims and description.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (10)
1. The utility model provides a device that is used for high-rise building fixed attached lift scaffold which characterized in that: the auxiliary support (1) is arranged at the edge part of a floor;
auxiliary stand (1) bottom and floor ground concrete slabs (2) fixed connection, auxiliary stand (1) are close to floor edge one side and pass through the leg joint of adhering to support (3) and lift scaffold (4), auxiliary stand (1) are used for fixed lift scaffold (4).
2. The apparatus of claim 1, wherein the apparatus comprises: auxiliary stand (1) includes support column (11) and down tube (12), support column (11) bottom and floor ground concrete slabs (2) fixed connection, down tube (12) one end and floor ground concrete slabs (2) fixed connection, the other end is connected with support column (11) top.
3. The apparatus of claim 2, wherein the apparatus comprises: the top of the support column (11) is provided with a connecting plate (111), and the inclined rod (12) is connected with the support column (11) through the connecting plate (111).
4. The apparatus of claim 3, wherein the apparatus comprises: the utility model discloses a portable electric bicycle, including down tube, connecting plate (111), down tube (12) are equipped with two, and connecting plate (111) are equipped with two, two down tube (12) top corresponds respectively connects a connecting plate (111), two have certain contained angle between connecting plate (111).
5. The apparatus of claim 2, wherein the apparatus comprises: the floor ground concrete slab (2) is provided with pre-buried holes (21) for fixing the support columns (11) and the inclined rods (12).
6. The apparatus of claim 2, wherein the apparatus comprises: the bottom of the support column (11) extends inwards to form a square pipe (112), the square pipe (112) is provided with a vertical through hole, and the support column (11) is fixed by arranging a wall penetrating bolt (13) in the square pipe (112) and fixing the concrete plate (2).
7. The apparatus of claim 2, wherein the apparatus comprises: the bottom of the diagonal rod (12) is also provided with a hinged plate (121), and the hinged plate (121) is connected with the concrete plate (2) through a wall bolt (13).
8. The apparatus of claim 6, wherein the apparatus comprises: a nut (131) is further arranged at the top of the wall penetrating bolt (13) for fixing the support column (11), and an auxiliary rotating rod is arranged at the top of the nut (131).
9. The apparatus of claim 8, wherein the apparatus comprises: the auxiliary rotating rod comprises a short steel pipe (132) sleeved on the nut (131), and a clamping part is arranged in the short steel pipe (132) and used for clamping the nut (131);
the top of the short steel pipe (132) is provided with an insertion hole (133), an auxiliary rotating bolt (134) is arranged in the insertion hole (133), and the nut (131) is screwed by rotating the auxiliary rotating bolt (134).
10. The apparatus of claim 8, wherein the apparatus comprises: the auxiliary rotating rod comprises a short steel pipe (132) fixedly connected to the nut (131), an insertion hole (133) is formed in the top of the short steel pipe (132), an auxiliary rotating bolt (134) is arranged in the insertion hole (133), and the nut (131) is screwed up by rotating the auxiliary rotating bolt (134).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120216229.4U CN214696777U (en) | 2021-01-26 | 2021-01-26 | Device for fixing attached lifting scaffold of high-rise building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120216229.4U CN214696777U (en) | 2021-01-26 | 2021-01-26 | Device for fixing attached lifting scaffold of high-rise building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214696777U true CN214696777U (en) | 2021-11-12 |
Family
ID=78564803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120216229.4U Active CN214696777U (en) | 2021-01-26 | 2021-01-26 | Device for fixing attached lifting scaffold of high-rise building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214696777U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116136122A (en) * | 2023-03-28 | 2023-05-19 | 中建二局第三建筑工程有限公司 | Integrated attached type inclined lifting climbing frame system and use method thereof |
-
2021
- 2021-01-26 CN CN202120216229.4U patent/CN214696777U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116136122A (en) * | 2023-03-28 | 2023-05-19 | 中建二局第三建筑工程有限公司 | Integrated attached type inclined lifting climbing frame system and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211622528U (en) | Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam | |
CN208734109U (en) | A kind of steel roof joist safety rope hanging apparatus | |
CN206428956U (en) | Driven hanging basket and its fixing device | |
CN214696777U (en) | Device for fixing attached lifting scaffold of high-rise building | |
CN212428048U (en) | Outer scaffold base device of slipform construction storehouse top | |
CN210289148U (en) | Be used for building aluminium template bracing piece iron pipe | |
CN219034132U (en) | Multilayer full-assembled building construction limb protection system | |
CN218581152U (en) | Integrated support device attached to lifting scaffold | |
CN106049849B (en) | A kind of adjustable drawbar attached plate stand apparatus and construction method | |
CN212745338U (en) | Vertical pump pipe fixer | |
CN209618738U (en) | The light and small vertical auxiliary stand of heavy-duty hoisting equipment | |
CN206438757U (en) | A kind of building curtain wall construction scaffolding | |
CN219528364U (en) | Climbing frame adhesion enhancing device | |
CN220100639U (en) | Large cantilever template for construction of water tower of pumped storage power station | |
CN214828176U (en) | Large-span attached wall connecting device of construction elevator | |
CN207079615U (en) | A kind of roller-coaster built-in fitting support system | |
CN221095940U (en) | Construction elevator platform protector | |
CN220377808U (en) | External triangular support frame fixing device of assembled building | |
CN216921348U (en) | Super high-rise reinforced concrete core tube aluminum mould climbing frame | |
CN221073439U (en) | Reinforced attaching device for guide frame climbing type working platform and working platform | |
CN209760853U (en) | Telescopic stair limb protective rail | |
CN219431561U (en) | Airport enclosure stand column for installing integrated monitoring equipment | |
CN218379307U (en) | Lamp bracket for water conservancy construction site | |
CN221343670U (en) | Wall-attached auxiliary device of construction lifter | |
CN216238149U (en) | Tripod supporting device for pouring overhanging concrete panels on two sides of bridge |
Legal Events