CN214696768U - Triangular steel cantilever frame for assembling wall - Google Patents

Triangular steel cantilever frame for assembling wall Download PDF

Info

Publication number
CN214696768U
CN214696768U CN202120452992.7U CN202120452992U CN214696768U CN 214696768 U CN214696768 U CN 214696768U CN 202120452992 U CN202120452992 U CN 202120452992U CN 214696768 U CN214696768 U CN 214696768U
Authority
CN
China
Prior art keywords
hoop
rod
main frame
hoop body
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120452992.7U
Other languages
Chinese (zh)
Inventor
胡庆龙
吕伟
孙志发
张雪飞
许莹莹
李建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202120452992.7U priority Critical patent/CN214696768U/en
Application granted granted Critical
Publication of CN214696768U publication Critical patent/CN214696768U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a triangular steel cantilever frame for assembling a wall body, which relates to the field of construction equipment, and adopts the technical scheme that the triangular steel cantilever frame comprises a main frame body, wherein a vertical rod of the main frame body is fixedly connected with the wall body through a plurality of bolts, and a plurality of hoop bodies are sleeved on a horizontal rod of the main frame body; the lower part of the hoop body is connected with the horizontal rod of the main frame body in a sliding way, and the upper part of the hoop body is provided with a slot; one end of the horizontal rod, which is far away from the vertical rod, is provided with a limiting groove, and the distance between the two limiting plates corresponds to the outer diameter of the steel wire rope; one end of the steel wire rope is hung in the limiting groove, and the other end of the steel wire rope is fixedly connected with the wall body. The utility model has the advantages that: this scheme combines assembled wall body characteristics according to current cantilever frame's construction methods, and the innovation improves cantilever frame integrated configuration and connected mode, adopts right angled triangle's the body frame body and prefabricated wall body bolted connection on the one hand, and on the other hand adopts the hoop body and the fixed vertical I-steel in upper portion of the connection structure of splice bar, and this device simple structure can be at the prefabricated shaping of mill, batch production, the site operation of being convenient for.

Description

Triangular steel cantilever frame for assembling wall
Technical Field
The utility model relates to a architectural equipment field, in particular to join in marriage dress wall body with triangle-shaped steel cantilever frame.
Background
The overhanging scaffold is a simple device used in buildings and is divided into one overhanging layer and multiple overhanging layers. It is suitable for the wall body with multi-story and high-rise concrete structure. Traditional high-rise scaffold frame of encorbelmenting adopts oblique-pulling I-steel or props the I-steel down, and the I-steel need bury the piece with indoor floor or wall body and be connected, buries a lot of, and processing, arranging work load are big, increase process flow and time cost, and the productivity can not keep up with even lead to the nest worker phenomenon. On the other hand, traditional I-steel is encorbelmented and is leaded to the structure dead weight great, and the dismouting is complicated, and I-steel fixed stability is not enough, and the construction method is single, has the support body structure and transports, increases the time limit for a project phenomenon.
SUMMERY OF THE UTILITY MODEL
To the technical problem, the utility model provides an it hangs outrigger with triangle-shaped steel to join in marriage dress wall body.
The technical scheme is that the main frame comprises a main frame body, wherein the main frame body is a right-angled triangle frame, a vertical rod of the main frame body is fixedly connected with a wall body through a plurality of bolts, and a plurality of hoop bodies are sleeved on a horizontal rod of the main frame body;
the lower part of the hoop body is connected with the horizontal rod of the main frame body in a sliding way, and the upper part of the hoop body is provided with a slot;
one end of the horizontal rod, which is far away from the vertical rod, extends to the outer side of the inclined rod at the lower part of the main frame body, two limiting plates are fixedly arranged on the lower side surface of the horizontal rod, which is positioned at the outer side end part of the inclined rod, a spacing is reserved between the two limiting plates to form a limiting groove, and the spacing between the two limiting plates corresponds to the outer diameter of the steel wire rope;
one end of the steel wire rope is hung in the limiting groove, the other end of the steel wire rope is fixedly connected with the hanging ring, and the hanging ring is fixedly connected with the wall body.
Preferably, the vertical rod is provided with at least three bolt holes corresponding to the bolts, and when the floor structure is used, two bolt holes are located above a floor slab, and the other bolt hole is located below the floor slab.
Preferably, a rubber pad is fixedly connected to one side, facing the wall body, of the vertical rod. The rubber pad is a wear-resistant rubber pad.
Preferably, the slot of the hoop body is I-shaped, and the lower part of the hoop body is provided with a limiting frame which is connected with the horizontal rod in a sliding manner.
Preferably, the limiting frame comprises two U-shaped frames which are arranged in parallel, the lower parts of the two U-shaped frames are fixedly connected through a connecting rod, and the long axis of the connecting rod is perpendicular to the projection of the long axis of the horizontal rod on the horizontal plane;
the inserting direction of the inserting slot is parallel to the long axis direction of the connecting rod.
Preferably, the top end of the vertical rod extends to the upper side of the horizontal rod, the vertical rod is provided with a fixed sleeve towards the hoop body, and the two sides of the hoop body are respectively fixedly connected with the hoop body sleeve;
the fixed sleeves are connected with the hoop body sleeves through connecting ribs, and the hoop body sleeves of two adjacent hoop bodies are connected through the connecting ribs.
Preferably, only one side of the hoop body located at an end away from the vertical rod is provided with the hoop body sleeve.
Preferably, the connecting bar comprises a movable sleeve positioned at the middle part, two ends of the movable sleeve are respectively in threaded connection with one section of threaded steel bar, the threaded steel bar is far away from one section of the movable sleeve and is provided with an external thread, internal threads are arranged in the fixed sleeve and the hoop body sleeve, and the fixed sleeve and the hoop body sleeve are in threaded connection with the threaded steel bar.
The embodiment of the utility model provides a beneficial effect that technical scheme brought is: this scheme combines assembled wall body characteristics according to current cantilever frame's construction methods, and the innovation improves cantilever frame integrated configuration and connected mode, adopts right angled triangle's the body frame body and prefabricated wall body bolted connection on the one hand, and on the other hand adopts the hoop body and the fixed vertical I-steel in upper portion of the connection structure of splice bar, and this device simple structure can be at the prefabricated shaping of mill, batch production, the site operation of being convenient for.
Drawings
Fig. 1 is a schematic view of the overall structure of the embodiment of the present invention.
Fig. 2 is a partially enlarged view a of fig. 1.
Fig. 3 is an enlarged view of the hoop body according to the embodiment of the present invention.
Wherein the reference numerals are: 100. a wall body; 1. a main frame body; 11. a vertical rod; 12. a horizontal bar; 13. a diagonal bar; 14. a limiting plate; 2. a bolt; 3. a hoop body; 31. a slot; 32. a limiting frame; 321. a U-shaped frame; 322. a connecting rod; 33. a ferrule sleeve; 4. a wire rope; 5. hanging a ring; 6. a rubber pad; 7. fixing the sleeve; 8. and connecting ribs.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. Of course, the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
It should be noted that the embodiments and features of the embodiments of the present invention can be combined with each other without conflict.
In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the invention, unless otherwise specified, "a plurality" means two or more.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the creation of the present invention can be understood by those of ordinary skill in the art through specific situations.
Example 1
Referring to fig. 1 to 3, the utility model provides a triangular steel cantilever for assembling a wall, which comprises a main frame body 1, wherein the main frame body 1 is a right-angled triangular frame, a vertical rod 11 of the main frame body 1 is fixedly connected with a wall 100 through a plurality of bolts 2, and a plurality of hoop bodies 3 are sleeved on a horizontal rod 12 of the main frame body 1; the bolt 2 is a high-strength bolt, penetrates through a reserved bolt hole of the wall body through the bolt 2 and is fixedly connected with the wall body;
the lower part of the hoop body 3 is connected with the horizontal rod 12 of the main frame body 1 in a sliding way, and the upper part is provided with a slot 31;
one end of the horizontal rod 12, which is far away from the vertical rod 11, extends to the outer side of the diagonal rod 13 at the lower part of the main frame body 1, two limiting plates 14 are fixedly arranged on the lower side surface of the horizontal rod 12, which is positioned at the outer side end part of the diagonal rod 13, a spacing is reserved between the two limiting plates 14 to form a limiting groove, and the spacing between the two limiting plates 14 corresponds to the outer diameter of the steel wire rope 4;
one end of the steel wire rope 4 is hung in the limiting groove, the other end of the steel wire rope is fixedly connected with the hanging ring 5, and the hanging ring 5 is fixedly connected with the wall body 100. The steel wire rope 4 plays an unloading role, and the steel wire rope is prevented from being separated by the aid of the limiting plate 14.
The vertical rod 11 is provided with at least three bolt holes corresponding to the bolts 2, and when the vertical rod is used, two bolt holes are located above a floor slab, and the other bolt hole is located below the floor slab. The main frame body 1 is connected through the bolts 2, and the strength and the structural stability of the assembled wall body are fully utilized.
The vertical rod 11 is fixedly connected with a rubber pad 6 at one side facing the wall 100. The rubber pads 6 are wear-resistant rubber pads, and in order to prevent the main frame body 1 from being rigidly connected with the wall body to damage the wall body, the rubber pads 6 are laid on the contact surface of the vertical rod 11 and the wall body.
The slot 31 of the hoop body 3 is I-shaped, the lower part of the hoop body 3 is provided with a limit frame 32, and the limit frame 32 is connected with the horizontal rod 12 in a sliding way.
The limiting frame 32 comprises two U-shaped frames 321 which are arranged in parallel, the lower parts of the two U-shaped frames 321 are fixedly connected through a connecting rod 322, and the long axis of the connecting rod 322 is perpendicular to the projection of the long axis of the horizontal rod 12 on the horizontal plane;
the insertion direction of the slot 31 is parallel to the long axis direction of the connecting rod 322.
The top end of the vertical rod 11 extends to the upper side of the horizontal rod 12, the vertical rod 11 is provided with a fixed sleeve 7 towards the hoop body 3, and two sides of the hoop body 3 are respectively fixedly connected with a hoop body sleeve 33; the fixed sleeve 7 and the main frame body 1 are integrally prefabricated and molded;
the fixing sleeve 7 and the hoop body sleeves 33 are connected through the connecting ribs 8, the hoop body sleeves 33 of two adjacent hoop bodies 3 are connected through the connecting ribs 8, and the position of the hoop body 3 is fixed through the structure, so that the I-shaped steel beam inserted into the slot 31 of the hoop body 3 is positioned.
Only one side of the hoop body 3 located at the end far away from the vertical rod 11 is provided with a hoop body sleeve 33.
The splice bar 8 is including the movable sleeve that is located the middle part, one section screw-thread reinforcement of threaded connection respectively at the movable sleeve both ends, and one section external screw thread that sets up of movable sleeve is kept away from to the screw-thread reinforcement, all sets up the internal thread in adapter sleeve 7 and hoop body sleeve pipe 33, adapter sleeve 7 and hoop body sleeve pipe 33 and screw-thread reinforcement threaded connection.
Adopt hoop body 3 as the connection structure of on-spot I-steel roof beam, realize the mutual top connection of drawing of hoop body 3 and body frame body 1 with the help of the structure of splice bar 8 self, and with the help of this scheme splice bar 8's structure, can conveniently cup joint its whole length to form the hoop body 3 rigidity of different intervals. Simple accurate and guarantee that superstructure stability is strong when this device uses, and the wholeness is good, can parallel operation simultaneously, and integral hoisting practices thrift the time limit for a project, also is favorable to green construction operation simultaneously, accords with five sections one environmental protection system constructions.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (8)

1. A triangular steel cantilever frame for assembling a wall body is characterized by comprising a main frame body (1), wherein the main frame body (1) is a right-angled triangular frame, a vertical rod (11) of the main frame body (1) is fixedly connected with the wall body (100) through a plurality of bolts (2), and a plurality of hoop bodies (3) are sleeved on a horizontal rod (12) of the main frame body (1);
the lower part of the hoop body (3) is connected with the horizontal rod (12) of the main frame body (1) in a sliding way, and the upper part of the hoop body is provided with a slot (31);
one end, far away from the vertical rod (11), of the horizontal rod (12) extends to the outer side of an inclined rod (13) at the lower part of the main frame body (1), two limiting plates (14) are fixedly arranged on the lower side face, located at the outer side end part of the inclined rod (13), of the horizontal rod (12), a spacing is reserved between the two limiting plates (14) to form a limiting groove, and the spacing between the two limiting plates (14) corresponds to the outer diameter of the steel wire rope (4);
one end of the steel wire rope (4) is hung in the limiting groove, the other end of the steel wire rope is fixedly connected with the hanging ring (5), and the hanging ring (5) is fixedly connected with the wall body (100).
2. The triangular steel cantilever for the assembled wall according to claim 1, wherein the vertical rod (11) is provided with at least three bolt holes corresponding to the bolts (2), two of the bolt holes are located above the floor slab, and the other bolt hole is located below the floor slab.
3. The triangular steel cantilever for the assembled wall according to claim 1, wherein the vertical rod (11) is fixedly connected with a rubber pad (6) on the side facing the wall (100).
4. The triangular steel cantilever for the assembled wall according to claim 1, wherein the slot (31) of the hoop body (3) is I-shaped, and a limit frame (32) is arranged at the lower part of the hoop body (3) and is connected with the horizontal rod (12) in a sliding way through the limit frame (32).
5. The triangular steel cantilever for the assembled wall according to claim 4, wherein the limiting frame (32) comprises two U-shaped frames (321) arranged in parallel, the lower parts of the two U-shaped frames (321) are fixedly connected through a connecting rod (322), and the long axis of the connecting rod (322) is perpendicular to the projection of the long axis of the horizontal rod (12) on the horizontal plane;
the plugging direction of the slot (31) is parallel to the long axis direction of the connecting rod (322).
6. The triangular steel cantilever for the assembled wall according to claim 1, wherein the top end of the vertical rod (11) extends to the upper side of the horizontal rod (12), the vertical rod (11) is provided with a fixing sleeve (7) towards the hoop body (3), and two sides of the hoop body (3) are fixedly connected with hoop body sleeves (33) respectively;
the fixed sleeves (7) are connected with the hoop body sleeves (33) through connecting ribs (8), and the hoop body sleeves (33) of two adjacent hoop bodies (3) are connected through the connecting ribs (8).
7. Triangular steel cantilever for fitted walls according to claim 6, characterized in that the hoop body (3) at the end away from the vertical rod (11) is provided with the hoop body bushing (33) on only one side.
8. The triangular steel cantilever for the assembled wall according to claim 6, wherein the connection rib (8) comprises a movable sleeve located in the middle, two ends of the movable sleeve are respectively in threaded connection with a section of threaded steel bar, the section of the threaded steel bar far away from the movable sleeve is provided with external threads, internal threads are arranged in the fixed sleeve (7) and the hoop body sleeve (33), and the fixed sleeve (7) and the hoop body sleeve (33) are in threaded connection with the threaded steel bar.
CN202120452992.7U 2021-03-02 2021-03-02 Triangular steel cantilever frame for assembling wall Active CN214696768U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120452992.7U CN214696768U (en) 2021-03-02 2021-03-02 Triangular steel cantilever frame for assembling wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120452992.7U CN214696768U (en) 2021-03-02 2021-03-02 Triangular steel cantilever frame for assembling wall

Publications (1)

Publication Number Publication Date
CN214696768U true CN214696768U (en) 2021-11-12

Family

ID=78569426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120452992.7U Active CN214696768U (en) 2021-03-02 2021-03-02 Triangular steel cantilever frame for assembling wall

Country Status (1)

Country Link
CN (1) CN214696768U (en)

Similar Documents

Publication Publication Date Title
CN214696768U (en) Triangular steel cantilever frame for assembling wall
CN103075001A (en) Steel tube fastener slip form platform system
CN108221702B (en) Integral lifting device for arch rib of inward-tilting steel box arch bridge
CN214658655U (en) Adjustable overhanging type scaffold
CN215167862U (en) Be used in no counter weight hanging flower basket of parapet
CN215330816U (en) Steel bar truss floor support plate supporting structure
CN213329975U (en) Steel pull rod hanging and pulling overhanging bearing steel beam structure
CN210482577U (en) A prop up top circulation system for three-dimensional prefabricated full assembled concrete structure
CN212507295U (en) Overhanging steel platform
CN211597087U (en) Beam and plate connecting node structure of assembled framework plate building
CN214785897U (en) Mount for construction
CN103088998B (en) Combination palace lattice scaffold and installing and dismantling method thereof
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
CN102454295B (en) Large-scale cantilever beam at ultrahigh position construction method
CN213927416U (en) Attached lifting scaffold
CN110344505B (en) Mortise and tenon self-locking connection structure for upper and lower layers of steel concrete combined pipe
CN216196883U (en) Simple and easy interim cat ladder combination of outrigger
CN214531877U (en) Building template for shear wall concrete construction
CN214272993U (en) Stride empty formula strutting arrangement that encorbelments
CN216810947U (en) Pier stud connects high light modularization equipment template under confined space
CN212405472U (en) Cross node connection structure of assembled frame structure
CN216041703U (en) Non-connection steel rib beam positioning and mounting device
CN214994867U (en) Assembled light wall structure
CN212105059U (en) Light truss of high formwork
CN212712346U (en) Super high-rise steel beam hoisting sling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant