CN214693080U - Stringing construction device for power equipment installation - Google Patents

Stringing construction device for power equipment installation Download PDF

Info

Publication number
CN214693080U
CN214693080U CN202120756029.8U CN202120756029U CN214693080U CN 214693080 U CN214693080 U CN 214693080U CN 202120756029 U CN202120756029 U CN 202120756029U CN 214693080 U CN214693080 U CN 214693080U
Authority
CN
China
Prior art keywords
power equipment
bottom plate
equipment installation
construction device
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120756029.8U
Other languages
Chinese (zh)
Inventor
王亮
刘洋
舒童
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUZHOU TRANSMISSION AND DISTRIBUTION CO Ltd
Original Assignee
XUZHOU TRANSMISSION AND DISTRIBUTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU TRANSMISSION AND DISTRIBUTION CO Ltd filed Critical XUZHOU TRANSMISSION AND DISTRIBUTION CO Ltd
Priority to CN202120756029.8U priority Critical patent/CN214693080U/en
Application granted granted Critical
Publication of CN214693080U publication Critical patent/CN214693080U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an overhead line construction equipment is used in power equipment installation, including bottom plate, hoist engine and delivery board, the top of bottom plate is connected with the support frame that two symmetries set up, two the top of support frame all is connected with the pulley, two through the link the side of support frame all is provided with the hoist engine, the top at the bottom plate is installed to the hoist engine, two be connected with the delivery board between the support frame, the top of delivery board is connected with four lugs, the periphery of lug is connected with wire rope, and lies in the wire rope of two lugs with one side and pass through connecting piece fixed connection, and the mounting top is connected with another wire rope, wire rope is connected with the hoist engine after with the pulley solderless wrapped connection. This overhead line construction equipment for power equipment installs, promotes simple and stable strong of transport structure, can adjust the angle of delivery box, is convenient for take out power equipment and installs at relevant position.

Description

Stringing construction device for power equipment installation
Technical Field
The utility model belongs to the technical field of the power equipment installation, concretely relates to overhead line construction equipment for power equipment installation.
Background
The power equipment mainly comprises power generation equipment and power supply equipment, wherein the power generation equipment mainly comprises a power station boiler, a steam turbine, a gas turbine, a water turbine, a generator, a transformer and the like, and the power supply equipment mainly comprises power transmission lines, mutual inductors, contactors and the like with various voltage grades.
Chinese patent document discloses an overhead line construction equipment for power equipment installation (No. CN211579406U is announced to grant), its include the mounting bracket, with mounting bracket sliding connection's place basket and a control system, its characterized in that, the mounting bracket contains horizontal pole, sheer pole, two montants and two slide bars, the montant the slide bar both ends respectively with go up the horizontal pole the sheer pole tip is connected, just the slide bar is parallel the montant sets up two between the montant, place basket movable mounting two on the slide bar, the benefit lies in: the limit in the horizontal direction and the vertical direction is realized when the power equipment is installed, and the stability and the precision are high when the power equipment is installed; but has the disadvantages that: the angle of the placing basket can not be adjusted, and in the actual installation and construction process, due to the problems of site environment, installation and the like, the angle of the transportation structure for transporting the power equipment is often required to be adjusted, and the transported power equipment is conveniently taken out and installed at a corresponding position.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a stringing construction device for power equipment installation to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a stringing construction device for mounting power equipment comprises a bottom plate, a winch and a conveying plate, wherein the top end of the bottom plate is connected with two symmetrically arranged supporting frames, the top ends of the two supporting frames are both connected with pulleys through connecting frames, the sides of the two supporting frames are both provided with the winch, the winch is mounted at the top end of the bottom plate, the conveying plate is connected between the two supporting frames, the top end of the conveying plate is connected with four lifting lugs, the peripheries of the lifting lugs are connected with steel wire ropes, the steel wire ropes of the two lifting lugs positioned on the same side are fixedly connected through a connecting piece, the top end of a fixing piece is connected with another steel wire rope, and the steel wire ropes are connected with the winch after being wound with the pulleys;
the connecting groove has been seted up on the top of delivery board, installs motor in the connecting groove, the top of motor is connected with the delivery box, the arc wall that two symmetries set up is still seted up on the top of delivery board, and the arc wall inner wall has seted up the tooth's socket, the bottom of delivery box is connected with the connecting axle that two symmetries set up, the periphery of connecting axle all is connected with the gear, and the gear is connected with the tooth's socket meshing.
Preferably, the top of bottom plate is connected with the electronic telescopic link of two symmetry settings, the top of telescopic link is connected with the fixed plate, the bottom of fixed plate is connected with motor two, the bottom of the output shaft of motor two is connected with the fixed column.
Preferably, the bottom of bottom plate is connected with the bracing piece, the spread groove has been seted up to the bottom of bracing piece, and spread groove inner wall connection has the spring, and the bottom of spring is connected with the connecting rod, the bottom of connecting rod is connected with the gyro wheel that has braking capacity.
Preferably, both sides face of delivery board all is provided with the guide block, two the adjacent side of support frame all seted up with guide block assorted guide way, two the guide block respectively with two guide way inner wall sliding contact.
Preferably, two vertical inner walls of delivery box all are connected with buffer spring, buffer spring keeps away from the one end of the vertical inner wall of delivery box and is connected with the buffer board.
Preferably, the side of the conveying box is hinged with a box door, and the box door is connected with the conveying box through a lock catch.
Preferably, the fixing column is composed of an upper half cylinder and a lower half cone, a thread groove is formed in the periphery of the upper half cylinder of the fixing column, a threaded through hole is formed in the bottom plate, and the fixing column is in threaded connection with the bottom plate.
The utility model discloses a technological effect and advantage: according to the stringing construction device for mounting the power equipment, the first motor can drive the conveying box to rotate to adjust the angle, the connecting shaft rotates along the arc-shaped groove of the conveying plate while the conveying box rotates, and the gear is meshed with the tooth grooves of the arc-shaped groove, so that the stability of the conveying box during rotation can be effectively improved; the winch winds or unwinds the steel wire rope to enable the conveying plate to move upwards or downwards, the lifting and conveying structure is simple, and the guide block moves along the guide groove of the support frame in the moving process of the conveying plate, so that the stability of the whole power equipment which is transported upwards or downwards can be effectively improved; the motor I is matched with the telescopic rod for use, so that the fixing column can move downwards and prick into the ground, and the stability of the whole use is improved; the spring arranged between the support rod and the connecting rod can effectively buffer the impact force applied when the whole body moves, thereby being beneficial to protecting the whole body; this overhead line construction equipment for power equipment installs, promotes simple and stable strong of transport structure, can adjust the angle of delivery box, is convenient for take out power equipment and installs at relevant position.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a cross-sectional view of a conveyor plate and a conveyor box of the present invention;
fig. 3 is a schematic structural view of a fixing plate and a fixing column of the present invention;
FIG. 4 is a schematic structural view of the support rod and the roller of the present invention;
fig. 5 is a schematic structural view of the conveying plate of the present invention.
In the figure: the device comprises a base plate 1, a winch 2, a conveying plate 3, a supporting frame 4, a pulley 5, a lifting lug 6, a steel wire rope 7, a first motor 8, a conveying box 9, a connecting shaft 10, an expansion link 11, a fixing plate 12, a second motor 13, a fixing column 14, a supporting rod 15, a connecting rod 16, a roller 17, a guide block 18, a buffer spring 19 and a buffer plate 20.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
In order to transport electric power equipment, as shown in fig. 1 and 5, the stringing construction device for electric power equipment installation provided by this embodiment includes a bottom plate 1, a winch 2 and a conveying plate 3, two symmetrically arranged support frames 4 are fixedly welded on the top end of the bottom plate 1, pulleys 5 are connected on the top ends of the two support frames 4 through a connecting frame, the winch 2 is arranged on the side surfaces of the two support frames 4, the winch 2 is fixedly installed on the top end of the bottom plate 1 through bolts, the conveying plate 3 is movably connected between the two support frames 4, guide blocks 18 are integrally formed on the two side surfaces of the conveying plate 3, guide grooves matched with the guide blocks 18 are formed on the adjacent side surfaces of the two support frames 4, the two guide blocks 18 are respectively in sliding contact with the inner walls of the two guide grooves, four lifting lugs 6 are fixedly welded on the top end of the conveying plate 3, the periphery of the lifting lugs 6 is fixedly tied with a steel wire rope 7, the steel wire ropes 7 of the two lifting lugs 6 positioned on the same side are fixedly connected through a connecting piece, the top end of the fixing piece is fixedly tied with another steel wire rope 7, and the steel wire rope 7 is connected with the winch 2 after being wound and connected with the pulley 5.
In order to conveniently take out and install the transported power equipment at a corresponding position, angle adjustment is carried out on the conveying box 9, as shown in fig. 1, fig. 2 and fig. 5, a connecting groove is formed in the top end of the conveying plate 3, a motor 8 is installed in the connecting groove through a bolt, the conveying box 9 is installed on the top end of the motor 8 through a bolt fixed connection, two arc-shaped grooves which are symmetrically arranged are further formed in the top end of the conveying plate 3, a tooth socket is formed in the inner wall of each arc-shaped groove, two connecting shafts 10 which are symmetrically arranged are welded at the bottom end of the conveying box 9, gears are fixedly welded on the peripheries of the connecting shafts 10, and the gears are meshed with the tooth sockets.
In order to ensure the stability of the whole device during use, as shown in fig. 1 and 3, the top end of the bottom plate 1 is connected with two symmetrically arranged electric telescopic rods 11 through bolts, the top end of each telescopic rod 11 is fixedly welded with a fixed plate 12, the bottom end of each fixed plate 12 is fixedly connected with a second motor 13 through bolts, the bottom end of an output shaft of each second motor 13 is fixedly welded with a fixed column 14, each fixed column 14 consists of an upper half cylinder and a lower half cone, the periphery of the upper half cylinder of each fixed column 14 is provided with a thread groove, the bottom plate 1 is provided with a thread through hole, and each fixed column 14 is in threaded connection with the bottom plate 1; when the whole body is moved, in order to facilitate the whole body movement and reduce the whole impact force, as shown in fig. 1 and 4, a support rod 15 is fixedly welded at the bottom end of the bottom plate 1, a connecting groove is formed in the bottom end of the support rod 15, a spring (not shown in the figure) is fixedly inserted into the inner wall of the connecting groove, the bottom end of the spring is connected with the top end of a connecting rod 16 in a fixed inserting mode, and the bottom end of the connecting rod 16 is connected with a roller 17 with braking capacity through a screw.
At power transmission equipment's in-process, power equipment can take place to collide with inevitably, in order to reduce the probability that power equipment collided with, as shown in fig. 1 and fig. 2, buffer spring 19 has all been welded to two vertical inner walls of delivery box 9, buffer spring 19 keeps away from the one end welding of the vertical inner wall of delivery box 9 and has buffer board 20, the bottom of buffer board 20 and the horizontal inner wall sliding contact of delivery box 9.
The working principle is that the stringing construction device for mounting the electric power equipment pushes the whole body to a corresponding construction point through the roller 17 when in use, then starting a second motor 13, driving the fixed column 14 to rotate by the second motor 13, adjusting the telescopic rod 11 to enable the telescopic rod to move towards the ground by shortening the length of the fixed column and driving the second motor 13 and the fixed column 14, stopping the second motor 13 and the telescopic rod 11 when the fixed column 14 penetrates into the ground to a proper depth, then, the electric equipment to be transported is placed in the delivery box 9, and the two buffer plates 20 are made to fix the electric equipment from both sides, and the winch 2 is started, the winch 2 winds the steel wire rope 7, the conveying plate 3 and the conveying box 9 are conveyed to a proper height, then according to the concrete construction condition, the first motor 8 is adjusted, the first motor 8 drives the conveying box 9 to rotate, meanwhile, gears on the periphery of the connecting shaft 10 are meshed with tooth grooves of the conveying plates 3, and the connecting shaft 10 rotates along the arc-shaped grooves of the conveying plates.

Claims (7)

1. The utility model provides a stringing construction equipment for power equipment installation, includes bottom plate (1), hoist engine (2) and delivery board (3), its characterized in that: the top end of the bottom plate (1) is connected with two symmetrically arranged support frames (4), the top ends of the two support frames (4) are connected with pulleys (5) through connecting frames, the side faces of the two support frames (4) are provided with hoists (2), the hoists (2) are installed at the top end of the bottom plate (1), a conveying plate (3) is connected between the two support frames (4), the top end of the conveying plate (3) is connected with four lifting lugs (6), the peripheries of the lifting lugs (6) are connected with steel wire ropes (7), the steel wire ropes (7) of the two lifting lugs (6) positioned on the same side are fixedly connected through connecting pieces, the top end of each fixing piece is connected with another steel wire rope (7), and the steel wire ropes (7) are connected with the hoists (2) after being in winding connection with the pulleys (5);
the connecting groove has been seted up on the top of delivery board (3), installs motor (8) in the connecting groove, the top of motor (8) is connected with delivery box (9), the arc wall that two symmetries set up is still seted up on the top of delivery board (3), and the tooth's socket has been seted up to the arc wall inner wall, the bottom of delivery box (9) is connected with connecting axle (10) that two symmetries set up, the periphery of connecting axle (10) all is connected with the gear, and the gear is connected with the tooth's socket meshing.
2. The trolley wire construction device for electric power equipment installation according to claim 1, wherein: the top of bottom plate (1) is connected with electronic telescopic link (11) of two symmetry settings, the top of telescopic link (11) is connected with fixed plate (12), the bottom of fixed plate (12) is connected with motor two (13), the bottom of the output shaft of motor two (13) is connected with fixed column (14).
3. The trolley wire construction device for electric power equipment installation according to claim 1, wherein: the bottom of bottom plate (1) is connected with bracing piece (15), the spread groove has been seted up to the bottom of bracing piece (15), and spread groove inner wall connection has the spring, and the bottom of spring is connected with connecting rod (16), the bottom of connecting rod (16) is connected with gyro wheel (17) that have braking capacity.
4. The trolley wire construction device for electric power equipment installation according to claim 1, wherein: the two side faces of the conveying plate (3) are provided with guide blocks (18), the adjacent side faces of the two support frames (4) are provided with guide grooves matched with the guide blocks (18), and the guide blocks (18) are in sliding contact with the inner walls of the two guide grooves respectively.
5. The trolley wire construction device for electric power equipment installation according to claim 1, wherein: two vertical inner walls of delivery box (9) all are connected with buffer spring (19), the one end that the vertical inner wall of delivery box (9) was kept away from in buffer spring (19) is connected with buffer board (20).
6. The trolley wire construction device for electric power equipment installation according to claim 1, wherein: the side of the conveying box (9) is hinged with a box door, and the box door is connected with the conveying box (9) through a lock catch.
7. The trolley wire construction device for electric power equipment installation according to claim 2, wherein: the fixing column (14) is composed of an upper half cylinder and a lower half cone, a thread groove is formed in the periphery of the upper half cylinder of the fixing column (14), a threaded through hole is formed in the bottom plate (1), and the fixing column (14) is in threaded connection with the bottom plate (1).
CN202120756029.8U 2021-04-12 2021-04-12 Stringing construction device for power equipment installation Active CN214693080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120756029.8U CN214693080U (en) 2021-04-12 2021-04-12 Stringing construction device for power equipment installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120756029.8U CN214693080U (en) 2021-04-12 2021-04-12 Stringing construction device for power equipment installation

Publications (1)

Publication Number Publication Date
CN214693080U true CN214693080U (en) 2021-11-12

Family

ID=78531123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120756029.8U Active CN214693080U (en) 2021-04-12 2021-04-12 Stringing construction device for power equipment installation

Country Status (1)

Country Link
CN (1) CN214693080U (en)

Similar Documents

Publication Publication Date Title
CN112744739B (en) Stringing construction device for power equipment installation
CN110284703A (en) A kind of light-duty climbing form system of screw rod promotion
CN214693080U (en) Stringing construction device for power equipment installation
CN112919361B (en) Pipeline vertical hoisting device
CN212384494U (en) Wind-powered electricity generation crab-bolt thread rolling fixing device
CN213037282U (en) Nuclear power station steam generator overturning and hoisting device
CN219031512U (en) Engine hoisting conveying device
CN109292660B (en) Manual and electric dual-purpose electric hoist
CN215402697U (en) Trackless rubber-tyred single-double speed electric hoist gantry crane
CN217516506U (en) Auxiliary device for dense gas ground gathering and transporting maintenance
CN116513978A (en) Floor rocker arm holding pole lifting device for electric power construction and use method thereof
CN206915629U (en) A kind of cable cover apparatus for placing
CN216377369U (en) Auxiliary device for installing and maintaining fan frequency converter
CN115057375A (en) Hoisting device for 220 KV transformer substation engineering and using method
CN213171186U (en) Hoist gate-type lifting equipment for speed reducer
CN209193389U (en) A kind of loop wheel machine structure of shield machine segment
CN209635828U (en) A kind of concrete prefabricated board die station piler door-opening mechanism
CN211255000U (en) Single-girder gantry crane
CN219839383U (en) Explosion-proof type electric double-beam bridge crane
CN210419154U (en) Special equipment for mounting and dismounting construction gantry crane in tunnel
CN214989760U (en) Anti-deviation device of trolley
CN216662281U (en) Self-maintenance lifting device for underneath type fan cabin
CN214359823U (en) Explosion-proof electric double-beam crane
CN214989988U (en) Power equipment installs and lifts device
CN215733100U (en) Be used for subway to become distribution with removing operation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant