CN214691001U - Pile foundation geology sediment appearance storage device - Google Patents

Pile foundation geology sediment appearance storage device Download PDF

Info

Publication number
CN214691001U
CN214691001U CN202120778064.XU CN202120778064U CN214691001U CN 214691001 U CN214691001 U CN 214691001U CN 202120778064 U CN202120778064 U CN 202120778064U CN 214691001 U CN214691001 U CN 214691001U
Authority
CN
China
Prior art keywords
slag sample
slag
storage device
pile foundation
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120778064.XU
Other languages
Chinese (zh)
Inventor
胡刚
裴安印
谢显龙
杨寰
陈处桥
刘立员
冷际鹏
刘衍君
邱永生
许伟
阮忠栎
雍婷婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Erju 1st Engineering Co Ltd
Original Assignee
China Railway Erju 1st Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju 1st Engineering Co Ltd filed Critical China Railway Erju 1st Engineering Co Ltd
Priority to CN202120778064.XU priority Critical patent/CN214691001U/en
Application granted granted Critical
Publication of CN214691001U publication Critical patent/CN214691001U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model provides a pile foundation geology slag sample storage device, including the support with along transversely being fixed in the slag appearance box on the support in proper order, equally divide on the slag appearance box and do not make the mark in order to distinguish, the top of support is fixed with the canopy, the canopy is located slag appearance box directly over to it is comparatively inconvenient to solve traditional storage mode, and the slag sample of storing obscures easily, influences reconnaissance designer's recheck. Belongs to the field of geological rechecking of construction pile foundations and underground continuous walls.

Description

Pile foundation geology sediment appearance storage device
Technical Field
The utility model relates to a pile foundation geology sediment appearance storage device belongs to building pile foundation and underground continuous wall construction geology recheck field.
Background
With the development of the traffic field in China, in order to meet the requirement of convenience in traffic trip, road construction is accelerated in some remote areas, but aiming at geological conditions, sampling is often performed through a drill core in a design stage, the geological conditions cannot be comprehensively mastered, corresponding slag samples need to be reserved when concrete construction is performed, rechecking is performed for geological prospecting personnel, and next procedure construction can be performed after rechecking. This geology recheck is crucial, and the bearing capacity of direct relation pile foundation also must strictly be stored as required to drilling the sediment appearance in the work progress, avoids influencing reconnaissance of reconnaissance designer, for this reason, has designed a pile foundation geology sediment appearance storage device.
Disclosure of Invention
The utility model provides a pile foundation geology sediment appearance storage device, traditional storage mode relatively, it is convenient, simultaneously can effectually avoid storing the sediment appearance and obscure.
In order to realize the purpose, the pile foundation geology slag sample storage device is planned to adopt, including the support with along transversely being fixed in the slag sample box on the support in proper order, divide equally on the slag sample box and do not make the mark in order to distinguish, the top of support is fixed with the canopy, the canopy is located the slag sample box directly over.
In the pile foundation geological slag sample storage device, the support comprises two upright posts which are fixedly connected through a transverse connecting rod arranged transversely, the lower ends of the two upright posts are both fixed with support legs arranged longitudinally, and inclined struts are further fixed between the lower parts of the support legs and the upright posts;
in the pile foundation geological slag sample storage device, the supporting legs, the inclined struts, the upright posts and the transverse connecting rods are all steel pipes;
in the pile foundation geological slag sample storage device, the slag sample boxes are sequentially marked with serial numbers for distinguishing;
in the pile foundation geological slag sample storage device, the three rows of slag sample boxes are arranged, and the three slag sample boxes are vertically distributed and fixed between the two upright columns;
in the pile foundation geological slag sample storage device, the slag sample boxes are formed by cutting and welding sheet iron, adjacent slag sample boxes are fixedly welded to be distributed in rows, and the slag sample boxes at two ends of each slag sample box are fixedly welded with the two upright columns respectively;
the basic principle is as follows: the corresponding pile foundation geological slag sample storage device is processed through the square steel pipe, the sheet iron and the plastic plate which are abandoned on site, and the slag sample is stored in the slag sample box in the drilling construction process so as to be prepared for design and reconnaissance personnel to carry out geological recheck on site.
Compared with the prior art, the utility model has the advantages of as follows:
1) the cost is reduced: the residual waste raw materials of the field construction are adopted and formed by cutting, the waste materials are recycled, and meanwhile, the slag sample device can be recycled, so that the cost is reduced.
2) The operation is convenient and fast: through pasting corresponding figure on the slag sample box surface, field management personnel can be according to the drilling depth with the slag sample dress in proper order in the box, avoided appearing the chaotic scene of storage.
3) Simple and practical: the device is durable, and the top has set up the canopy simultaneously, compares with traditional mode, can avoid the rainwater to get into in the sediment appearance box, invades wet sediment appearance.
4) Environmental protection and energy conservation: the environment-friendly energy-saving plastic is processed by waste materials, can be repeatedly used, and is environment-friendly and energy-saving.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a side view of fig. 1.
Detailed Description
To further clarify the objects, technical solutions and advantages of the present invention, a more particular description of the invention will be rendered by reference to the appended drawings, which are illustrated in the appended drawings.
Examples
Referring to fig. 1 and 2, this embodiment provides a pile foundation geology sediment appearance storage device, including the support with along transversely being fixed in the sediment appearance box 3 on the support in proper order, mark the sequence number in order to distinguish in proper order on the sediment appearance box 3, the top of support is fixed with canopy 4, canopy 4 is located sediment appearance box 3 directly over.
The support includes two stands 5, 6 fixed connection of transverse connection pole that two stands 5 pass through horizontal setting, the lower extreme of two stands 5 all is fixed with landing leg 1 of vertical setting, and still be fixed with bracing 2 between the lower part of landing leg 1 and the stand 5, landing leg 1, bracing 2, stand 5 and transverse connection pole 6 are the steel pipe, sediment appearance box 3 forms through sheet iron cutting welding, welded fastening distributes with the in bank between the adjacent sediment appearance box 3, sediment appearance box 3 is total three rows, sediment appearance box 3 is fixed in between two stands 5 along vertical distribution to three, sediment appearance box 3 at both ends respectively with two stands 5 welded fastening in every sediment appearance box 3 of arranging.
The concrete manufacturing and using method of the pile foundation geological slag sample storage device is as follows:
the skeleton adopts on-spot discarded square steel tube cutting welding to form, and wherein landing leg 1, bracing 2, stand 5, transverse connection pole 6 adopt 40 x 50mm discarded square steel tube cutting to form, and wherein stand 5 length 1200mm, landing leg 1 length 600mm, the angle between bracing 2 and stand 5 and landing leg 1 is 45 degrees, and the contact position adopts the welding mode.
The slag sample boxes 3 are formed by cutting and welding field waste sheet iron (with the thickness of 1mm), the size of each single slag sample box 3 is 100 multiplied by 100mm, 10 slag sample boxes are arranged in a row (row), 3 slag sample boxes are arranged in 3 rows, and the total number of the slag sample boxes 3 is 30. The outer surface of the slag sample box 3 is stuck with a digital label printed by a computer. The canopy 4 is formed by processing a plastic plate and mainly used for shielding rainwater.
Before pile foundation construction is carried out, preparing corresponding slag sample boxes 3 in advance, placing the slag sample boxes 3 to corresponding hole sites, and making corresponding marks;
arranging mechanical equipment for drilling construction, simultaneously taking part of the slag sample for flushing according to the actual drilling condition, and storing the flushed slag sample in the corresponding slag sample box 3;
after the completion drilling slag sample is stored, design and investigation personnel are informed to carry out geological slag sample examination recheck in advance, and after the completion of the process is confirmed, the next process can be carried out, and meanwhile, a specially-assigned person is arranged to clean the slag sample box 3 for the next drilling construction.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (6)

1. The utility model provides a pile foundation geology sediment appearance storage device which characterized in that: including the support with along transversely being fixed in slag appearance box (3) on the support in proper order, equally divide on slag appearance box (3) and do not mark in order to distinguish, the top of support is fixed with canopy (4), canopy (4) are located slag appearance box (3) directly over.
2. The pile foundation geological slag sample storage device of claim 1, characterized in that: the support comprises two stand columns (5), the two stand columns (5) are fixedly connected through transverse connecting rods (6) which are transversely arranged, the lower ends of the two stand columns (5) are fixedly provided with support legs (1) which are longitudinally arranged, and inclined struts (2) are further fixed between the lower portions of the support legs (1) and the stand columns (5).
3. The pile foundation geological slag sample storage device of claim 2, characterized in that: the supporting legs (1), the inclined struts (2), the upright posts (5) and the transverse connecting rods (6) are all steel pipes.
4. The pile foundation geological slag sample storage device of claim 1, characterized in that: the slag sample boxes (3) are sequentially marked with serial numbers for distinguishing.
5. The pile foundation geological slag sample storage device of claim 1, characterized in that: the slag sample boxes (3) are arranged in three rows, and the three slag sample boxes (3) are vertically distributed and fixed between the two upright columns (5).
6. The pile foundation geological slag sample storage device of claim 5, characterized in that: the slag sample boxes (3) are formed by cutting and welding sheet iron, adjacent slag sample boxes (3) are fixedly welded to be distributed in rows, and the slag sample boxes (3) at two ends of each slag sample box (3) are fixedly welded to the two upright columns (5) respectively.
CN202120778064.XU 2021-04-16 2021-04-16 Pile foundation geology sediment appearance storage device Active CN214691001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120778064.XU CN214691001U (en) 2021-04-16 2021-04-16 Pile foundation geology sediment appearance storage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120778064.XU CN214691001U (en) 2021-04-16 2021-04-16 Pile foundation geology sediment appearance storage device

Publications (1)

Publication Number Publication Date
CN214691001U true CN214691001U (en) 2021-11-12

Family

ID=78531616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120778064.XU Active CN214691001U (en) 2021-04-16 2021-04-16 Pile foundation geology sediment appearance storage device

Country Status (1)

Country Link
CN (1) CN214691001U (en)

Similar Documents

Publication Publication Date Title
CN101851922B (en) Method for eliminating underground anchor rope/rod by using all casing drill
CN210917458U (en) City utility tunnel unilateral side mould frock subassembly
CN214691001U (en) Pile foundation geology sediment appearance storage device
CN107059846A (en) Coordinate the super large draw ratio filling pile cage of reinforcement and drilling core checking method of drilling core checking
CN106759444A (en) One kind draws digging formula hyollow foundation
CN206593659U (en) A kind of base station for global navigation satellite system
CN114045856B (en) Photovoltaic power station integrated piling and drilling mechanism and construction method
CN206308700U (en) A kind of Traffic Engineering Construction slope protection device
CN201671103U (en) Integral construction forming platform of underwater pier cap drilled pile
CN210888274U (en) Turnover base of steel pipe upright post frame
CN206616553U (en) Coordinate the super large draw ratio filling pile cage of reinforcement of drilling core checking
CN204212319U (en) A kind of screw-in greenhouse pillar
CN203452068U (en) Concrete cast-in-place pile base expanding construction device
CN219547790U (en) Pile foundation construction auxiliary table for foundation engineering
CN220414217U (en) Mountain region photovoltaic module support construction concrete pile construction mould
CN207633149U (en) A kind of auxiliary system of underpass construction
CN206784371U (en) Cast-in-situ bored pile building mortion under a kind of Karst Geology
CN220869021U (en) Assembled construction fence
CN220889766U (en) Just, tear stable portable river course flexible guardrail open
CN218667533U (en) Underground continuous wall steel reinforcement cage centering and elevation control system
CN209841425U (en) On-spot sampling tool of building composite reinforcement ground quality testing
CN218322683U (en) Foundation ditch excavation deformation characteristic research experimental apparatus
CN215367241U (en) Bored concrete pile reinforcing apparatus
CN216739741U (en) Short formwork support for cover-excavation top-down construction method station floor construction
CN218861528U (en) Protective device for hole opening of cast-in-situ bored pile

Legal Events

Date Code Title Description
GR01 Patent grant