CN214667119U - Novel water level sighting rod that water conservancy water and electricity was used - Google Patents

Novel water level sighting rod that water conservancy water and electricity was used Download PDF

Info

Publication number
CN214667119U
CN214667119U CN202121255033.2U CN202121255033U CN214667119U CN 214667119 U CN214667119 U CN 214667119U CN 202121255033 U CN202121255033 U CN 202121255033U CN 214667119 U CN214667119 U CN 214667119U
Authority
CN
China
Prior art keywords
wall
water level
water conservancy
water
protective frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121255033.2U
Other languages
Chinese (zh)
Inventor
彭佳
张利霞
蔡函静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Zhanghe Civil Engineering Design Institute
Original Assignee
Hubei Zhanghe Civil Engineering Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Zhanghe Civil Engineering Design Institute filed Critical Hubei Zhanghe Civil Engineering Design Institute
Priority to CN202121255033.2U priority Critical patent/CN214667119U/en
Application granted granted Critical
Publication of CN214667119U publication Critical patent/CN214667119U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model discloses a novel water level sighting rod that water conservancy water and electricity was used, including the bearer bar, bearer bar bottom outer wall four corners position is provided with four bracing pieces, and four bracing piece one side outer walls are provided with two side shields, and side shield one side outer wall is provided with level sensor, and bearer bar bottom inner wall is provided with the battery piece, and bearer bar bottom inner wall is provided with two electric putter. The utility model discloses a set up the bearer bar, the roof, LED display screen and electric putter, electric putter can send water level sensor for control panel's real-time water level data display on the screen, thereby make things convenient for the staff to take notes water level data and look over, the staff still can see the number that shows on the LED display screen under the lower condition of surface of water visibility simultaneously, constantly rise and when will overflowing the bearer bar when the water level, control panel can control electric putter and drive the installation piece and move down this moment, thereby it is inside to let the LED display screen can get into the bearer bar.

Description

Novel water level sighting rod that water conservancy water and electricity was used
Technical Field
The utility model relates to a water conservancy water and electricity technical field especially relates to a novel water level sighting rod that water conservancy water and electricity was used.
Background
The water conservancy and hydropower mainly comprises large and medium-sized water conservancy and hydropower hubs and buildings thereof (including dams, hydropower station plants, gates, water inlet, water diversion, water discharge buildings and the like) and industrial hydraulic buildings, and the planning, design, construction and management of the industrial hydraulic buildings.
Through the retrieval, chinese patent application number is CN 202020648848.6's patent, discloses a water conservancy water and electricity water level sighting rod, including the gravity piece, the middle part fixedly connected with solid fixed cylinder of gravity piece upper surface, the surface of solid fixed cylinder is provided with first scale mark, peg graft at the top of solid fixed cylinder has a lift section of thick bamboo, the surface of lift section of thick bamboo is provided with the second scale mark, the top fixedly connected with level sensor of lift section of thick bamboo, but above-mentioned technical scheme still need the staff to know present water level data through observing the scale, consequently still exists when surface of water visibility is lower, the unable clear problem of observing the scale on the water level scale of staff.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a novel water level marker post for water conservancy and hydropower.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a novel water level sighting rod that water conservancy water and electricity was used, including the bearer bar, bearer bar bottom outer wall four corners position is provided with four bracing pieces, four bracing piece one side outer walls are provided with two side shields, side shield one side outer wall is provided with level sensor, bearer bar bottom inner wall is provided with the battery piece, bearer bar bottom inner wall is provided with two electric putter, two electric putter top outer walls are provided with the installation piece, installation piece top outer wall is provided with two LED display screens, two LED display screen top outer walls are provided with the mount pad, mount pad top outer wall is provided with the roof, battery piece one side outer wall is provided with control panel, electric putter and level sensor respectively with control panel electric connection.
As a further aspect of the present invention: the outer wall of the bottom of the top plate is provided with a sealing groove, and the outer wall of the top of the protective frame is provided with a sealing bulge.
As a further aspect of the present invention: the outer wall of the top of the mounting block is fixed with a T-shaped supporting block, and the outer wall of the top of the T-shaped supporting block is fixed on the outer wall of the bottom of the mounting seat.
As a further aspect of the present invention: the outer wall of the top of the protection frame is fixed with four telescopic guide rods, and the outer wall of the top of the four telescopic guide rods is arranged on the outer wall of the bottom of the installation block.
As a further aspect of the present invention: and a buffer cushion is arranged on the outer wall of the top of the storage battery block.
As a further aspect of the present invention: and the outer wall of the top of the protection frame is provided with a solar cell panel.
As a further aspect of the present invention: roof top outer wall is provided with the warning light, warning light and control panel electric connection.
As a further aspect of the present invention: and the outer wall of the top plate is provided with a receiving and transmitting antenna which is electrically connected with the control panel.
As a further aspect of the present invention: the outer wall of two sides of the protective frame is provided with two second scales, and the outer wall of one side of the two side baffles is provided with two first scales.
As a further aspect of the present invention: four the outer wall of bracing piece bottom is provided with four fixed plates, and four fixed plate bottom outer walls are provided with four inserted blocks, and the fender bracket both sides outer wall is provided with two handles.
The utility model has the advantages that:
1. through setting up the bearer bar, the roof, LED display screen and electric putter, electric putter can send water level sensor for control panel's real-time water level data display on the screen, thereby make things convenient for the staff to take notes and look over water level data, the staff still can see the figure that shows on the LED display screen under the lower condition of surface of water visibility simultaneously, when the water level constantly rises and will overflow the bearer bar, control panel can control electric putter and drive the installation piece downstream this moment, thereby let the LED display screen can get into inside the bearer bar, just in time when the roof card is in the bearer bar top, control panel control electric putter stall, the roof can seal the top of bearer bar, bearer bar and roof can carry out effectual protection to the LED display screen, the life of LED display screen has been improved.
2. Through setting up handle, fixed plate and inserted block, when installing the sighting rod, staff's accessible handle hoists the whole sighting rod, then inserts four inserted blocks of four bracing pieces bottom in submarine earth to accomplish the preliminary installation of sighting rod, when follow-up equipment is consolidated the bracing piece, the fixed plate can improve the holistic stability of bracing piece.
3. Through setting up sealed arch and sealed recess, when the roof card was in the top outer wall of bearer bar, sealed recess just in time the joint was in the same place with sealed arch to improved the sealed effect of roof to the bearer bar, avoided inside outside rivers entering bearer bar that have overflowed the bearer bar.
Drawings
Fig. 1 is a schematic view of a main view structure of a novel water level marker post for water conservancy and hydropower provided by the utility model;
FIG. 2 is a schematic view of the internal structure of a protective frame of a novel water level marker post for water conservancy and hydropower provided by the utility model;
fig. 3 is a schematic view of the structure of the bottom of the top plate of the novel water level marker post for water conservancy and hydropower provided by the utility model;
FIG. 4 is a schematic view of a protective frame of a novel water level marker post for water conservancy and hydropower provided by the utility model;
fig. 5 is the utility model provides a novel water level marker post's that water conservancy water and electricity was used circuit flow schematic diagram.
In the figure: 1-a protective frame, 2-a handle, 3-a first scale, 4-a water level sensor, 5-an insert block, 6-a fixing plate, 7-a supporting rod, 8-a second scale, 9-an LED display screen, 10-a mounting seat, 11-a solar panel, 12-a warning lamp, 13-a receiving and transmitting antenna, 14-a top plate, 15-a side baffle, 16-T-shaped supporting blocks, 17-a mounting block, 18-a buffer pad, 19-a telescopic guide rod, 20-an electric push rod, 21-a storage battery block, 22-a sealing groove, 23-a control panel and 24-a sealing bulge.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1
A novel water level marker post for water conservancy and hydropower is shown in figures 1-5 and comprises a protective frame 1, four support rods 7 are fixed at four corners of the outer wall of the bottom of the protection frame 1, two side baffles 15 are fixed on the outer wall of one side of each support rod 7, a water level sensor 4 is arranged on the outer wall of one side of each side baffle 15, a storage battery block 21 is arranged on the inner wall of the bottom of the protection frame 1, two electric push rods 20 are arranged on the inner wall of the bottom of the protection frame 1, an installation block 17 is connected with the outer wall of the top of each electric push rod 20, two LED display screens 9 are fixed on the outer wall of the top of each installation block 17, an installation seat 10 is fixed on the outer wall of the top of each LED display screen 9, a top plate 14 is fixed on the outer wall of the top of each installation seat 10, a control panel 23 is arranged on the outer wall of one side of each storage battery block 21, the electric push rods 20 and the water level sensors 4 are respectively electrically connected with the control panel 23, and the water level sensors 4 are AL-530AE in type; by arranging the protective frame 1, the top plate 14, the LED display screen 9 and the electric push rod 20, the electric push rod 20 can display the real-time water level data sent by the water level sensor 4 to the control panel 23 on the screen, thereby facilitating the recording and checking of the water level data by the working personnel, simultaneously, the working personnel can still see the numbers displayed on the LED display screen 9 under the condition of lower visibility of the water surface, when the water level rises continuously and the water level is about to overflow the protection frame 1, the control panel 23 controls the electric push rod 20 to drive the mounting block 17 to move downwards, so that the LED display screen 9 can enter the inside of the protective frame 1, when the top plate 14 is just clamped on the top of the protective frame 1, the control panel 23 controls the electric push rod 20 to stop running, the top plate 14 can seal the top of the protection frame 1, the protection frame 1 and the top plate 14 can effectively protect the LED display screen 9, and the service life of the LED display screen 9 is prolonged.
In order to improve the sealing effect of the top plate 14 on the protective frame 1; as shown in fig. 3 and 4, the outer wall of the bottom of the top plate 14 is provided with a sealing groove 22, and the outer wall of the top of the protective frame 1 is provided with a sealing protrusion 24; through setting up sealed protruding 24 and sealed recess 22, when roof 14 card when the top outer wall of protective frame 1, sealed recess 22 just in time the joint together with sealed protruding 24 to improved the sealed effect of roof 14 to protective frame 1, avoided inside the outside rivers entering protective frame 1 of overflowing protective frame 1.
In order to enable effective support of the mounting stock 10; as shown in fig. 2, a T-shaped support block 16 is fixed on the outer wall of the top of the mounting block 17, and the outer wall of the top of the T-shaped support block 16 is fixed on the outer wall of the bottom of the mounting seat 10; by providing the T-shaped support block 16, the T-shaped support block 16 can support and fix the mounting seat 10, thereby improving the stability of the internal overall structure of the bezel 1.
In order to be able to guide the movement of the mounting block 17; as shown in fig. 2, four telescopic guide rods 19 are fixed on the outer wall of the top of the protective frame 1, and the outer wall of the top of each telescopic guide rod 19 is arranged on the outer wall of the bottom of the mounting block 17; through setting up flexible guide bar 19, flexible guide bar 19 can carry out effectual direction to the reciprocating of installation piece 17 to improve the holistic stability of installation piece 17 when removing.
In order to avoid hard contact between the mounting block 17 and the battery block 21 when falling; as shown in fig. 2, the top outer wall of the storage battery block 21 is provided with a buffer pad 18; by arranging the buffer cushion 18, the buffer cushion 18 can provide certain buffer between the mounting block 17 and the storage battery block 21, and the problem that the mounting block 17 is in hard contact with the storage battery block 21 when falling to cause equipment damage is avoided.
In order to increase the service life of the stored electric energy in the storage battery block 21; as shown in fig. 1, a solar panel 11 is arranged on the outer wall of the top of the protection frame 1; through setting up solar cell panel 11, solar cell panel 11 can utilize the sunlight to generate electricity, and the electric energy that solar cell panel 11 produced can be stored inside battery block 21 to improve battery block 21's power supply time, let the water level sighting rod can last work for a long time under the condition not connected with the commercial power.
In order to effectively remind the staff that the water level exceeds a set value; as shown in the protection frame 1, a warning light 12 is arranged on the outer wall of the top plate 14, and the warning light 12 is electrically connected with a control panel 23; by arranging the warning lamp 12, when the water level data exceeds the set value, the control panel 23 controls the warning lamp 12 to light up, thereby rapidly reminding surrounding workers that the water level exceeds the warning water level.
In order to be able to remotely transmit the real-time data detected by the water level sensor 4; as shown in fig. 1, a transceiver antenna 13 is disposed on an outer wall of the top plate 14, and the transceiver antenna 13 is electrically connected to the control panel 23; through setting up receiving and dispatching antenna 13, control panel 23 accessible receiving and dispatching antenna 13 sends out the data that water level sensor 4 detected fast to let the staff can know the water level condition around the sighting rod constantly.
In order to improve the functionality of the post; as shown in fig. 1, two second scales 8 are arranged on the outer walls of two sides of the protective frame 1, and two first scales 3 are arranged on the outer wall of one side of each of the two side baffles 15; through setting up second scale 8 and first scale 3, at the better weather of visibility, real-time water level is observed to staff's accessible second scale 8 and first scale 3, and staff's accessible receiving and dispatching antenna 13 and control panel 23 control LED display screen 9 are closed this moment to practice thrift the use of electric energy.
The working principle is as follows: the supporting rod 7 can support the protection frame 1, so that the protection frame 1 can be stably fixed on the water surface, the water level sensor 4 can transmit the real-time water level of an external water source to the control panel 23, the electric push rod 20 can display the real-time water level data sent by the water level sensor 4 to the control panel 23 on the screen, so that a worker can conveniently record and check the water level data, meanwhile, the worker can still see the numbers displayed on the LED display screen 9 under the condition of low visibility of the water surface, when the water level continuously rises and is about to overflow the protection frame 1, the control panel 23 can control the electric push rod 20 to drive the mounting block 17 to move downwards, so that the LED display screen 9 can enter the protection frame 1, when the top plate 14 is just clamped at the top of the protection frame 1, the control panel 23 controls the electric push rod 20 to stop running, the top plate 14 can seal the top of the protection frame 1, the protection frame 1 and the top plate 14 can effectively protect the LED display screen 9, and the service life of the LED display screen 9 is prolonged.
When the top plate 14 is clamped on the outer wall of the top of the protection frame 1, the sealing groove 22 and the sealing protrusion 24 are just clamped together, so that the sealing effect of the top plate 14 on the protection frame 1 is improved, the T-shaped supporting block 16 can support and fix the mounting seat 10, so that the stability of the whole structure in the protection frame 1 is improved, the telescopic guide rod 19 can effectively guide the up-and-down movement of the mounting block 17, so that the whole stability of the mounting block 17 is improved when moving, the buffer cushion 18 can provide certain buffer between the mounting block 17 and the storage battery block 21, the problem that the equipment is damaged due to hard contact between the mounting block 17 and the storage battery block 21 when falling is avoided, the solar cell panel 11 can utilize sunlight to generate electricity, the electric energy generated by the solar cell panel 11 can be stored in the storage battery block 21, so that the power supply time of the storage battery block 21 is prolonged, let the water level marker post can be not lasting work for a long time under the circumstances of commercial power connection, when water level data surpassed the setting value, control panel 23 can control warning light 12 and light, thereby remind staff's water level on every side to have surpassed the warning water level rapidly, control panel 23 accessible receiving and dispatching antenna 13 sends away the data that level sensor 4 detected fast, in the better weather of visibility, staff's accessible second scale 8 and first scale 3 observe real-time water level, staff's accessible receiving and dispatching antenna 13 and control panel 23 control LED display screen 9 close this moment, thereby practice thrift the use of electric energy.
Example 2
A novel water level sighting rod that water conservancy water and electricity was used, as shown in figure 1, in order to can be convenient to the sighting rod install, this embodiment makes following improvement on the basis of embodiment 1: four fixing plates 6 are arranged on the outer walls of the bottoms of the four supporting rods 7, four inserting blocks 5 are arranged on the outer walls of the bottoms of the four fixing plates 6, and two handles 2 are arranged on the outer walls of the two sides of the protective frame 1; through setting up handle 2, fixed plate 6 and inserted block 5, when installing the sighting rod, staff's accessible handle 2 hoists the sighting rod wholly, then inserts four inserted blocks 5 of four bracing pieces 7 bottoms in submarine earth to accomplish the preliminary installation of sighting rod, when follow-up rethread equipment is consolidated bracing piece 7, fixed plate 6 can improve the holistic stability of bracing piece 7.
The working principle is as follows: when installing the sighting rod, staff's accessible handle 2 hoists the whole sighting rod, then inserts four inserted blocks 5 of four bracing pieces 7 bottoms in submarine earth to accomplish the preliminary installation of sighting rod, when follow-up rethread equipment is consolidated bracing piece 7, fixed plate 6 can improve the holistic stability of bracing piece 7.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (10)

1. A novel water level marker post for water conservancy and hydropower comprises a protective frame (1) and is characterized in that four support rods (7) are arranged at four corners of the outer wall of the bottom of the protective frame (1), two side baffles (15) are arranged on the outer wall of one side of each support rod (7), a water level sensor (4) is arranged on the outer wall of one side of each side baffle (15), a storage battery block (21) is arranged on the inner wall of the bottom of the protective frame (1), two electric push rods (20) are arranged on the inner wall of the bottom of the protective frame (1), an installation block (17) is arranged on the outer wall of the top of each electric push rod (20), two LED display screens (9) are arranged on the outer wall of the top of each installation block (17), an installation seat (10) is arranged on the outer wall of the top of each LED display screen (9), a top plate (14) is arranged on the outer wall of the top of each installation seat (10), and a control panel (23) is arranged on the outer wall of one side of each storage battery block (21), the electric push rod (20) and the water level sensor (4) are respectively electrically connected with the control panel (23).
2. A novel water level post for water conservancy and hydropower according to claim 1, wherein the outer wall of the bottom of the top plate (14) is provided with a sealing groove (22), and the outer wall of the top of the protective frame (1) is provided with a sealing bulge (24).
3. A novel water level post for water conservancy and hydropower according to claim 1, wherein a T-shaped supporting block (16) is fixed on the outer wall of the top of the mounting block (17), and the outer wall of the top of the T-shaped supporting block (16) is fixed on the outer wall of the bottom of the mounting seat (10).
4. The novel water level marker post for water conservancy and hydropower according to claim 1, wherein four telescopic guide rods (19) are fixed on the outer wall of the top of the protection frame (1), and the outer wall of the top of each telescopic guide rod (19) is arranged on the outer wall of the bottom of the mounting block (17).
5. A novel water marker post for water conservancy and hydropower according to claim 1, characterized in that a cushion pad (18) is arranged on the outer wall of the top of the storage battery block (21).
6. A novel water level post for water conservancy and hydropower according to claim 1, characterized in that a solar panel (11) is arranged on the outer wall of the top of the protective frame (1).
7. A novel water level post for water conservancy and hydropower according to claim 1, characterized in that a warning lamp (12) is arranged on the outer wall of the top plate (14), and the warning lamp (12) is electrically connected with the control panel (23).
8. The novel water level post for water conservancy and hydropower according to claim 7, wherein a transceiving antenna (13) is arranged on the outer wall of the top plate (14), and the transceiving antenna (13) is electrically connected with the control panel (23).
9. A novel water level post for water conservancy and hydropower according to claim 4, wherein two second scales (8) are arranged on the outer walls of two sides of the protective frame (1), and two first scales (3) are arranged on the outer wall of one side of the two side baffles (15).
10. A novel water level marker post for water conservancy and hydropower according to claim 1, characterized in that four fixing plates (6) are arranged on the outer walls of the bottoms of the four supporting rods (7), four inserting blocks (5) are arranged on the outer walls of the bottoms of the four fixing plates (6), and two handles (2) are arranged on the outer walls of two sides of the protective frame (1).
CN202121255033.2U 2021-06-07 2021-06-07 Novel water level sighting rod that water conservancy water and electricity was used Active CN214667119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121255033.2U CN214667119U (en) 2021-06-07 2021-06-07 Novel water level sighting rod that water conservancy water and electricity was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121255033.2U CN214667119U (en) 2021-06-07 2021-06-07 Novel water level sighting rod that water conservancy water and electricity was used

Publications (1)

Publication Number Publication Date
CN214667119U true CN214667119U (en) 2021-11-09

Family

ID=78487047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121255033.2U Active CN214667119U (en) 2021-06-07 2021-06-07 Novel water level sighting rod that water conservancy water and electricity was used

Country Status (1)

Country Link
CN (1) CN214667119U (en)

Similar Documents

Publication Publication Date Title
CN210166017U (en) Water level monitoring device for hydraulic engineering
CN214667119U (en) Novel water level sighting rod that water conservancy water and electricity was used
CN210296925U (en) Mechanical equipment and electrical equipment integrated electrical cabinet
CN210513192U (en) Bridge safety monitoring device based on big dipper high accuracy
CN216517712U (en) Automatic lifting type flood-proof baffle plate for subway tunnel portal
CN215417324U (en) Land utilization protection propaganda device
CN213740849U (en) Ecological wall of hydraulic engineering
CN211202053U (en) Water collection protective device for mine
CN209471683U (en) A kind of wind resisting structure of large LED display screen
CN210321860U (en) Cableway type ADCP (advanced digital content control protocol) cable way type automatic flow measuring device for vertical line method
CN220359479U (en) Intelligent operation and maintenance device for distributed photovoltaic power station
CN212901293U (en) Waterproof battery box for solar street lamp
CN210111410U (en) Outdoor distribution box with safety protection structure
CN218633425U (en) Meteorological observation equipment convenient to adjust
CN210561977U (en) General flood control that easily assembles keeps off
CN218330158U (en) Reservoir water level safety monitoring equipment
CN214279449U (en) Agricultural economic information display device
CN214313388U (en) Lithium battery applied to solar off-grid energy storage system
CN215524770U (en) Water level detection device for hydraulic engineering design
CN219009774U (en) Overhauling platform of ship unloader
CN217924385U (en) Movable nucleic acid sampling station is with strengthening bottom plate
CN210766522U (en) Road and bridge adjustable stop device
CN218779416U (en) Flood control facility
CN218584154U (en) Fire control water level monitoring device
CN220284826U (en) Protective net structure for high-rise building deep foundation pit supporting engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant