CN214662478U - Building pipeline lays fixing device among hydraulic engineering - Google Patents

Building pipeline lays fixing device among hydraulic engineering Download PDF

Info

Publication number
CN214662478U
CN214662478U CN202120978827.5U CN202120978827U CN214662478U CN 214662478 U CN214662478 U CN 214662478U CN 202120978827 U CN202120978827 U CN 202120978827U CN 214662478 U CN214662478 U CN 214662478U
Authority
CN
China
Prior art keywords
fixedly connected
hydraulic engineering
sleeve
shaped supporting
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120978827.5U
Other languages
Chinese (zh)
Inventor
赵培博
李国旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Zhongnan Standard Quality Scientific Research Institute Co ltd
Original Assignee
Hainan Zhongnan Standard Quality Scientific Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Zhongnan Standard Quality Scientific Research Institute Co ltd filed Critical Hainan Zhongnan Standard Quality Scientific Research Institute Co ltd
Priority to CN202120978827.5U priority Critical patent/CN214662478U/en
Application granted granted Critical
Publication of CN214662478U publication Critical patent/CN214662478U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a building pipeline lays fixing device among hydraulic engineering, the on-line screen storage device comprises an installation base, the top of installation base is rotated through the pivot and is connected with height adjusting mechanism, arc die-pin sleeve under height adjusting mechanism's the top fixedly connected with, arc die-pin sleeve top joint has last arc die-pin sleeve down, the equal fixedly connected with joint pole in both sides of going up arc die-pin sleeve bottom, the joint hole of joint pole looks adaptation is all seted up to the both sides at arc die-pin sleeve top down, and the installation cavity has all been seted up to the inside of arc die-pin sleeve down and be located one side that two joint holes deviate from mutually, the utility model relates to a hydraulic engineering technical field. This fixing device is laid to building pipeline among hydraulic engineering has replaced traditional threaded bolt with ejector pin and joint groove and has connected, and convenient and fast more is dismantled in the installation, very big reduction installer's work load, labour saving and time saving has improved pipeline installation's efficiency, has effectively shortened pipeline installation's engineering time.

Description

Building pipeline lays fixing device among hydraulic engineering
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a building pipeline lays fixing device among hydraulic engineering.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production. Hydraulic engineering needs to build various types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transition troughs, rafts, fishways and the like so as to achieve the aims.
At present, hydraulic engineering building pipeline need fix the pipeline in the use, and current pipe laying fixing device structure is too simple, in the installation fixed process of pipeline, often fixes the pipeline through the bolt, and the operation is very loaded down with trivial details, and the work amount of labour is big, has taken more amount of labour, greatly reduced the piping erection efficiency.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a building pipeline lays fixing device among hydraulic engineering, the installation fixed operation who has solved the pipeline is very loaded down with trivial details, and the work amount of labour is big, has taken more amount of labour, greatly reduced the problem of pipeline installation efficiency.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a fixing device for laying a building pipeline in hydraulic engineering comprises an installation base, wherein the top of the installation base is rotatably connected with a height adjusting mechanism through a rotating shaft, the top end of the height adjusting mechanism is fixedly connected with a lower arc-shaped supporting sleeve, the top of the lower arc-shaped supporting sleeve is clamped with an upper arc-shaped supporting sleeve, clamping and connecting rods are fixedly connected with both sides of the bottom of the upper arc-shaped supporting sleeve, clamping and connecting holes matched with the clamping and connecting rods are formed in both sides of the top of the lower arc-shaped supporting sleeve, the inner part of the lower arc-shaped supporting sleeve and one side of the lower arc-shaped supporting sleeve, which is opposite to the two clamping holes, are provided with mounting cavities, the top and the bottom of the inner wall of the mounting cavity are both fixedly connected with slide rails, a slide block is connected between the two slide rails in a sliding way, the left side fixedly connected with ejector pin of slider, the left end of ejector pin runs through installation cavity and joint hole and extends to the inside in joint hole, the joint groove with ejector pin looks adaptation is seted up on the surface of joint pole.
Preferably, the right side of the sliding block is fixedly connected with a pull rod, the right end of the pull rod penetrates through the installation cavity and the lower arc-shaped supporting sleeve and extends to the outside of the lower arc-shaped supporting sleeve, and the right end of the pull rod is fixedly connected with a pull ring.
Preferably, the right side of slider just is located the fixed surface of pull rod and is connected with reset spring, reset spring's right-hand member and the right side fixed connection of installation cavity inner wall.
Preferably, the height adjusting mechanism comprises a threaded sleeve, the bottom end of the threaded sleeve is rotatably connected with the top of the mounting base through a rotating shaft, a threaded rod is connected to the inner wall of the threaded sleeve in a threaded manner, and the top end of the threaded rod is fixedly connected with the bottom of the lower arc-shaped supporting sleeve.
Preferably, go up the equal fixedly connected with fixed establishment of arc die-sleeve and lower arc die-sleeve, fixed establishment includes the lead screw, lead screw and last arc die-sleeve threaded connection, the one end of lead screw is rotated and is connected with the limiting plate, the other end fixedly connected with adjusting handle of threaded rod.
Preferably, four corners of the mounting base are all penetrated and provided with mounting holes.
Advantageous effects
The utility model provides a building pipeline lays fixing device among hydraulic engineering. Compared with the prior art, the method has the following beneficial effects:
(1) the top of the mounting base is rotatably connected with a height adjusting mechanism through a rotating shaft, the top end of the height adjusting mechanism is fixedly connected with a lower arc-shaped supporting sleeve, the top of the lower arc-shaped supporting sleeve is clamped with an upper arc-shaped supporting sleeve, two sides of the bottom of the upper arc-shaped supporting sleeve are fixedly connected with clamping rods, two sides of the top of the lower arc-shaped supporting sleeve are respectively provided with a clamping hole matched with the clamping rods, the inner part of the lower arc-shaped supporting sleeve and the side, which is opposite to the two clamping holes, are respectively provided with a mounting cavity, the top and the bottom of the inner wall of the mounting cavity are respectively fixedly connected with a slide rail, a slide block is slidably connected between the two slide rails, the left side of the slide block is fixedly connected with an ejector rod, the left end of the ejector rod penetrates through the mounting cavity and the clamping hole and extends to the inside of the clamping hole, the surface of the clamping rod is provided with a clamping groove matched with the ejector rod, and the clamping groove are used for replacing the traditional threaded bolt connection, the installation is dismantled convenient and fast more, very big reduction installer's work load, and labour saving and time saving has improved pipeline installation's efficiency, has effectively shortened pipeline installation's engineering time.
(2) This fixing device is laid to building pipeline among hydraulic engineering, include threaded sleeve through high adjustment mechanism, threaded sleeve's bottom is rotated through the pivot and is connected with the top of installation base, threaded sleeve's inner wall threaded connection has the threaded rod, the top of threaded rod and the bottom fixed connection of lower arc die-sleeve, rotate the height of arc die-sleeve down of threaded sleeve regulation, make adjacent lower arc die-sleeve be in same height, make things convenient for laying of pipeline, go up the equal fixedly connected with fixed establishment of arc die-sleeve and lower arc die-sleeve, fixed establishment includes the screw pole, screw pole and last arc die-sleeve threaded connection, the one end of screw pole is rotated and is connected with the limiting plate, the other end fixedly connected with adjusting handle of threaded rod, distance between the limiting plate is adjusted to rotatory hand wheel, the pipeline of convenient fixed different pipe diameters, therefore, the clothes hanger is strong in practicability, wide application scope.
Drawings
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is a left side view of the structure of the present invention;
fig. 3 is a partially enlarged view of a portion a in fig. 1 according to the present invention.
In the figure: the device comprises a mounting base 1, a height adjusting mechanism 2, a threaded sleeve 21, a threaded rod 22, a lower arc supporting sleeve 3, an upper arc supporting sleeve 4, a fixing mechanism 5, a screw rod 51, a limiting plate 52, an adjusting hand wheel 53, a clamping rod 6, a clamping hole 7, a mounting cavity 8, a sliding rail 9, a sliding block 10, an ejector rod 11, a clamping groove 12, a pull rod 13, a pull ring 14 and a return spring 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a building pipeline laying fixing device in hydraulic engineering comprises an installation base 1, installation holes are formed in four corners of the installation base 1 in a penetrating mode, the device is conveniently fixed to the surface of a body of a building, a height adjusting mechanism 2 is connected to the top of the installation base 1 in a rotating mode through a rotating shaft, the height adjusting mechanism 2 comprises a threaded sleeve 21, anti-skid grains are arranged on the surface of the threaded sleeve 21, the threaded sleeve 21 is convenient to rotate, the bottom end of the threaded sleeve 21 is rotatably connected with the top of the installation base 1 through the rotating shaft, a threaded rod 22 is connected to the inner wall of the threaded sleeve 21 in a threaded mode, the top end of the threaded rod 22 is fixedly connected with the bottom of a lower arc-shaped supporting sleeve 3, fixing mechanisms 5 are fixedly connected to an upper arc-shaped supporting sleeve 4 and the lower arc-shaped supporting sleeve 3, 3 annular structures formed by the upper arc-shaped supporting sleeve 4 and the lower arc-shaped supporting sleeve 3 are arranged at equal intervals along the circumferential direction, each fixing mechanism 5 comprises a screw rod 51, a screw rod 51 is in threaded connection with an upper arc-shaped supporting sleeve 4, one end of the screw rod 51 is rotatably connected with a limiting plate 52, a damping gasket is fixed on the surface of the limiting plate 52, the other end of a threaded rod 22 is fixedly connected with an adjusting hand wheel 53, the top end of a height adjusting mechanism 2 is fixedly connected with a lower arc-shaped supporting sleeve 3, the top of the lower arc-shaped supporting sleeve 3 is clamped with the upper arc-shaped supporting sleeve 4, two sides of the bottom of the upper arc-shaped supporting sleeve 4 are fixedly connected with clamping rods 6, two sides of the top of the lower arc-shaped supporting sleeve 3 are respectively provided with a clamping hole 7 matched with the clamping rods 6, an installation cavity 8 is arranged in the lower arc-shaped supporting sleeve 3 and is positioned at one side opposite to the two clamping holes 7, the top and the bottom of the inner wall of the installation cavity 8 are respectively and fixedly connected with slide rails 9, a slide block 10 is slidably connected between the two slide rails 9, the right side of the slide block 10 is fixedly connected with a pull rod 13, the right end of the pull rod 13 penetrates through the installation cavity 8 and the lower arc-shaped supporting sleeve 3 and extends to the outside of the lower arc-shaped supporting sleeve 3, the right-hand member fixedly connected with pull ring 14 of pull rod 13, the right side of slider 10 and the fixed surface that is located pull rod 13 are connected with reset spring 15, reset spring 15 is in compression state, reset spring 15's right-hand member and the right side fixed connection of the 8 inner walls of installation cavity, the left side fixedly connected with ejector pin 11 of slider 10, the left end of ejector pin 11 runs through installation cavity 8 and joint hole 7 and extends to the inside in joint hole 7, joint groove 12 with 11 looks adaptations of ejector pin is seted up on the surface of joint pole 6.
During installation, firstly, the installation base 1 is fixedly installed on the surface of a building wall body needing to be provided with a pipeline, when the pipeline is fixed, the pipeline to be fixed is placed on the surface of the lower arc-shaped supporting sleeve 3, then the upper arc-shaped supporting sleeve 4 is connected with the lower arc-shaped supporting sleeve 3 through the clamping rod 6, the ejector rod 11 is clamped into the clamping groove 12 under the action of the reset spring 15, the upper arc-shaped supporting sleeve 4 and the lower arc-shaped supporting sleeve 3 are fixed together, the pipeline is limited between the upper arc-shaped supporting sleeve 4 and the lower arc-shaped supporting sleeve 3, the height of the threaded rod 22 is changed by rotating the threaded sleeve 21, the height of the lower arc-shaped supporting sleeve 3 is adjusted, the adjacent lower arc-shaped supporting sleeves 3 are enabled to be at the same height, then the adjusting hand wheel 53 is rotated, the adjusting hand wheel 53 is rotated to drive the limiting plates 52 to rotate together, the distance between the limiting plates 52 is adjusted, and pipelines with different pipe diameters are conveniently fixed.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building pipe lays fixing device among hydraulic engineering, includes installation base (1), the top of installation base (1) is rotated through the pivot and is connected with height adjusting mechanism (2), its characterized in that: the top end of the height adjusting mechanism (2) is fixedly connected with a lower arc-shaped supporting sleeve (3), the top of the lower arc-shaped supporting sleeve (3) is clamped with an upper arc-shaped supporting sleeve (4), two sides of the bottom of the upper arc-shaped supporting sleeve (4) are fixedly connected with clamping rods (6), two sides of the top of the lower arc-shaped supporting sleeve (3) are respectively provided with a clamping hole (7) matched with the clamping rods (6), an installation cavity (8) is respectively arranged in the lower arc-shaped supporting sleeve (3) and on the side opposite to the two clamping holes (7), the top and the bottom of the inner wall of the installation cavity (8) are respectively and fixedly connected with a sliding rail (9), a sliding block (10) is connected between the two sliding rails (9) in a sliding manner, the left side of the sliding block (10) is fixedly connected with a push rod (11), and the left end of the push rod (11) penetrates through the installation cavity (8) and the clamping holes (7) and extends to the inside of the clamping holes (7), the surface of the clamping rod (6) is provided with a clamping groove (12) matched with the ejector rod (11).
2. The building pipe laying fixing device in the hydraulic engineering according to claim 1, characterized in that: the right side fixedly connected with pull rod (13) of slider (10), the right-hand member of pull rod (13) runs through installation cavity (8) and lower arc support cover (3) and extends to the outside of lower arc support cover (3), the right-hand member fixedly connected with pull ring (14) of pull rod (13).
3. The building pipe laying fixing device in the hydraulic engineering according to claim 1, characterized in that: the right side of slider (10) just is located the fixed surface of pull rod (13) and is connected with reset spring (15), the right-hand member of reset spring (15) and the right side fixed connection of installation cavity (8) inner wall.
4. The building pipe laying fixing device in the hydraulic engineering according to claim 1, characterized in that: height adjusting mechanism (2) include threaded sleeve (21), the bottom of threaded sleeve (21) is rotated through the pivot and is connected with the top of installation base (1), the inner wall threaded connection of threaded sleeve (21) has threaded rod (22), the top of threaded rod (22) and the bottom fixed connection of arc support sleeve (3) down.
5. The building pipe laying fixing device in the hydraulic engineering according to claim 4, characterized in that: go up arc support sleeve (4) and the equal fixedly connected with fixed establishment (5) of arc support sleeve (3) down, fixed establishment (5) include lead screw (51), lead screw (51) and last arc support sleeve (4) threaded connection, the one end of lead screw (51) is rotated and is connected with limiting plate (52), the other end fixedly connected with adjusting hand wheel (53) of threaded rod (22).
6. The building pipe laying fixing device in the hydraulic engineering according to claim 1, characterized in that: four corners of the mounting base (1) are all penetrated and provided with mounting holes.
CN202120978827.5U 2021-05-10 2021-05-10 Building pipeline lays fixing device among hydraulic engineering Active CN214662478U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120978827.5U CN214662478U (en) 2021-05-10 2021-05-10 Building pipeline lays fixing device among hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120978827.5U CN214662478U (en) 2021-05-10 2021-05-10 Building pipeline lays fixing device among hydraulic engineering

Publications (1)

Publication Number Publication Date
CN214662478U true CN214662478U (en) 2021-11-09

Family

ID=78476005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120978827.5U Active CN214662478U (en) 2021-05-10 2021-05-10 Building pipeline lays fixing device among hydraulic engineering

Country Status (1)

Country Link
CN (1) CN214662478U (en)

Similar Documents

Publication Publication Date Title
CN213393849U (en) Pipeline connecting device for hydraulic engineering
CN214662478U (en) Building pipeline lays fixing device among hydraulic engineering
CN212455768U (en) A pipeline fixing device for water conservancy construction
CN217998942U (en) Hydroelectric sleeve pipe pre-embedding device
CN217108508U (en) Pipe burying and line fixing device for water conservancy construction
CN214466644U (en) Hydraulic pipeline supporting and connecting device for hydraulic engineering
CN211371547U (en) Pipeline connecting device for pipeline engineering
CN113605308B (en) Cut-off equipment for hydraulic engineering and use method thereof
CN213393888U (en) Water supply and drainage pipe supporting device used on construction site
CN211286733U (en) Shear force wall bearing diagonal
CN215673960U (en) Pipeline laying equipment for water conservancy construction
CN112833266A (en) Pipeline connecting device for pipeline engineering
CN213871605U (en) Pipeline connecting device for drainage engineering
CN217149914U (en) Green energy-conserving bridge cantilever steel form of high strength
CN212203380U (en) Water conservancy construction pipeline fixing device
CN217634279U (en) Adjustable supporting structure for mounting water conservancy pipelines of water conservancy projects
CN211289417U (en) Mounting bracket is used in hydraulic engineering construction
CN213236426U (en) High-strength concrete drain pipe
CN214093361U (en) Building water supply and drainage pipeline penetrating plate fixing structure
CN216692419U (en) Supporting device for pipeline connection
CN220539178U (en) Elevator shaft construction derrick
CN220851013U (en) Long-distance pipeline construction pipe stabilizing mechanism
CN218783552U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN210266176U (en) Pipeline fixing device for water conservancy construction
CN217203848U (en) Portable breakwater for hydraulic engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant