Slurry pump suspension type fixing device for slurry retaining wall construction
Technical Field
The utility model relates to a mud pump accessory technical field is used in the construction of mud dado, specifically is a floated fixing device of mud pump is used in mud dado construction.
Background
The mud dado is under the mixed solution of other admixtures such as being full of water and bentonite and CMC, to underground continuous wall grooving, engineering such as drilling bored concrete pile drilling, because the mud is to the mud skin that the static pressure that the cell wall produced and form on the cell wall, can prevent the groove effectively, the pore wall collapses, need adopt the slush pump to carry out the construction during current mud dado construction, current slush pump mostly is fixed, from this slush pump can not remove on the surface of water, in addition because the water level is too high submerges the slush pump easily, thereby lead to the slush pump to take place the blocking phenomenon, reduce the work efficiency of slush pump.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a floated fixing device of slush pump is used in construction of mud dado has solved current slush pump and has mostly been fixed, and the slush pump can not remove on the surface of water from this, because the water level is too high submerges the slush pump easily in addition to lead to the slush pump to take place blocking phenomenon, reduce the technical problem of the work efficiency of slush pump.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a floated fixing device of slush pump for mud dado construction, includes a pair of structure is the same floats the bucket, and is a pair of floating the bucket between fixed mounting have a pair of structure is the same connecting rod, and is a pair of float between the bucket and be located a pair of fixed mounting has the fixed plate between the connecting rod, and is a pair of install adjusting device between the fixed plate, the last slush pump of installing of adjusting device, fixed mounting has the mounting panel on the slush pump, the department that meets with adjusting device is located to the mounting panel.
Preferably, adjusting device includes the opening, the opening is seted up in a pair of on the fixed plate, slidable mounting has the same pin of a pair of structure between the opening, and is a pair of the pin meets the department with the mounting panel, and is a pair of fixed mounting has the bracing piece on the pin, install the expansion plate between the bracing piece, the through-hole has been seted up on the expansion plate, wall fixed mounting has the lead screw on the slush pump, the lead screw runs through the through-hole, the lead screw top spin has connect fastening nut.
Preferably, the expansion plate includes the loading board, set up flutedly on the loading board both sides wall face, the regulating plate is equipped with in the recess interpolation, regulating plate exposes end and bracing piece fixed connection, the spout has been seted up on the recess side wall face, slidable mounting has the slider in the spout, slider and regulating plate fixed connection, the through-hole is seted up on the loading board, wall open screw hole on the recess, the threaded hole internal rotation has the lead screw, wall movable mounting has the clamp plate under the lead screw, the clamp plate meets department with the regulating plate.
Preferably, a pair of limiting plates are fixedly mounted at two ends of the stop lever and at one side of the fixing plate.
Preferably, a bearing rod is fixedly installed between the front wall surfaces of the pair of floating barrels, a rope is fixedly installed on the bearing rod, and a balancing weight is fixedly installed at the lower end of the rope.
Preferably, a water inlet is formed in each pair of floating barrels, and a cover body is arranged on the water inlet in a covering mode.
Advantageous effects
The utility model provides a floated fixing device of slush pump for mud dado construction has solved current slush pump and has mostly been fixed, and the slush pump can not remove on the surface of water from this, because the too high easy slush pump that floods of water level in addition to lead to the slush pump to take place blocking phenomenon, reduce the technical problem of the work efficiency of slush pump, the utility model discloses a float the bucket and make the slush pump can suspend on the surface of water, thereby make the slush pump go up and down along with the lift of liquid level, and can remove on the surface of water, can carry on spacingly to the slush pump through adjusting device, prevent that the slush pump from falling into the aquatic, prevent that the slush pump from taking place blocking phenomenon, thereby improve the work efficiency of slush pump.
Drawings
Fig. 1 is the utility model discloses a mud pump suspension fixing device's for mud dado construction main view structure schematic diagram.
Fig. 2 is the utility model discloses a mud pump suspension fixing device's for mud dado construction overlook schematic structure diagram.
Fig. 3 is the utility model relates to a mud is floated fixing device's of slush pump telescopic plate structure sketch map for dado construction.
Figure 4 is the utility model discloses a mud is floated fixing device's of slush pump expansion plate side view structure sketch map for dado construction.
In the figure: 1. a flotation tank; 2. a connecting rod; 3. a fixing plate; 4. a slurry pump; 5. mounting a plate; 6. an opening; 7. a stop lever; 8. a support bar; 9. a lead screw; 10. fastening a nut; 11. a carrier plate; 12. a groove; 13. an adjusting plate; 14. a chute; 15. a slider; 16. a screw rod; 17. pressing a plate; 18. a limiting plate; 19. a carrier bar; 20. a rope; 21. a balancing weight; 22. a water inlet; 23. a cover body.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a slurry pump suspension type fixing device for slurry retaining wall construction comprises a pair of floating barrels 1 with the same structure, a pair of connecting rods 2 with the same structure are fixedly installed between the floating barrels 1, the floating barrels are located between the floating barrels 1 and are located in a pair, fixing plates 3 are fixedly installed between the connecting rods 2, an adjusting device is installed between the fixing plates 3, a slurry pump 4 is installed on the adjusting device, an installation plate 5 is fixedly installed on the slurry pump 4, the installation plate 5 is connected with the adjusting device, the adjusting device comprises an opening 6, the opening 6 is arranged on the fixing plates 3 in a pair, a pair of stop levers 7 with the same structure are slidably installed between the opening 6, the stop levers 7 are connected with the installation plate 5 in a pair, a pair of support rods 8 are fixedly installed on the stop levers 7, and a telescopic plate is installed between the support rods 8, the mud pump is characterized in that the telescopic plate is provided with a through hole, the upper wall surface of the mud pump 4 is fixedly provided with a lead screw 9, the lead screw 9 penetrates through the through hole, the lead screw 9 is screwed with a fastening nut 10, the telescopic plate comprises a bearing plate 11, two side wall surfaces of the bearing plate 11 are provided with grooves 12, adjusting plates 13 are inserted in the grooves 12, the exposed ends of the adjusting plates 13 are fixedly connected with a support rod 8, side wall surfaces of the grooves 12 are provided with sliding grooves 14, sliding blocks 15 are slidably mounted in the sliding grooves 14, the sliding blocks 15 are fixedly connected with the adjusting plates 13, the through holes are formed in the bearing plate 11, the upper wall surface of the grooves 12 is provided with threaded holes, the threaded holes are screwed with lead screws 16, the lower wall surfaces of the lead screws 16 are movably provided with pressing plates 17, the pressing plates 17 are connected with the adjusting plates 13, and limiting plates 18 are fixedly mounted at two ends of a pair of the stop rods 7 and positioned at one side of a pair of the fixing plates 3, a bearing rod 19 is fixedly installed between the front wall surfaces of the pair of floating barrels 1, a rope 20 is fixedly installed on the bearing rod 19, a balancing weight 21 is fixedly installed at the lower end of the rope 20, a water inlet 22 is formed in the pair of floating barrels 1, and a cover body 23 is covered on the water inlet 22.
The detailed connection means is a technique known in the art, and the following mainly describes the working principle and process, and the specific operation is as follows.
Example (b): according to the attached drawings of the specification, when the mud pump is used, a lead screw 9 on the mud pump 4 penetrates through a through hole, the stop lever 7 is adjusted at the moment, the stop lever 7 moves oppositely under the limiting effect of the opening 6, the stop lever 7 is prevented from moving out by the limiting plates 18 at the two ends of the stop lever 7, the stop lever 7 moves oppositely at the moment until the stop lever 7 is connected with the mounting plate 5, in the moving process of the stop lever 7, the stop lever 7 drives the support rod 8 to move, so that the support rod 8 pushes the adjusting plate 13 to move, the adjusting plate 13 moves along the chute 14 path in the groove 12 under the action of the sliding block 15, the adjusting plate 13 stretches in the groove 12 of the bearing plate 11, at the moment, the lead screw 16 is rotated, the lead screw 16 pushes the pressing plate 17 downwards, the pressing plate 17 limits the adjusting plate 13, at the moment, the fastening nut 10 is screwed on the lead screw 9 to realize the fixation of the mud pump 4, and when the mud pump 4 is used, the mud pump 4 is placed in water, at this time, the mud pump 4 is suspended on the water surface by the floating tub 1, the weight 21 prevents the mud pump 4 from moving excessively on the water surface, and the floating height of the floating tub 1 is adjusted by filling water into the floating tub 1.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions.