CN214658829U - Be arranged in civil engineering installation underwater electric pre-buried sleeve fixer - Google Patents

Be arranged in civil engineering installation underwater electric pre-buried sleeve fixer Download PDF

Info

Publication number
CN214658829U
CN214658829U CN202120157567.5U CN202120157567U CN214658829U CN 214658829 U CN214658829 U CN 214658829U CN 202120157567 U CN202120157567 U CN 202120157567U CN 214658829 U CN214658829 U CN 214658829U
Authority
CN
China
Prior art keywords
clamping seat
clamping
side wall
slot
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120157567.5U
Other languages
Chinese (zh)
Inventor
邱映燕
王维萍
李祖来
鲜和财
赵聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120157567.5U priority Critical patent/CN214658829U/en
Application granted granted Critical
Publication of CN214658829U publication Critical patent/CN214658829U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a be used for pre-buried sleeve fixer of civil engineering installation in-process water and electricity, including first cassette, second cassette and articulated elements, the upper surface of first cassette is equipped with first draw-in groove and first cutting respectively, and first slot has been seted up to the left side wall of first cassette, and the right side wall of first cassette is provided with the second cutting, and the upper surface of second cassette is equipped with second draw-in groove and second slot respectively, and the third slot has been seted up to the left side wall of second cassette, and the right side wall of second cassette is provided with the third cutting. When a single sleeve needs to be fixed, the sleeve is placed into the first clamping seat or the second clamping seat, the second clamping seat or the first clamping seat is rotated, the sleeve is fixed in the circle, when a plurality of sleeves need to be fixed, the second inserting strip on the first clamping seat can be inserted into the third inserting groove of the second clamping seat, any plurality of sleeves can be fixed according to civil engineering installation requirements, and the sleeve fixing device has the characteristics of flexible structure, convenience and reliability in use and small occupied space.

Description

Be arranged in civil engineering installation underwater electric pre-buried sleeve fixer
Technical Field
The utility model relates to a building engineering construction auxiliary assembly technical field especially relates to a be arranged in civil engineering installation hydroelectric pre-buried sleeve pipe fixer.
Background
Hydroelectricity is a decoration, and in fact, the most important thing, except for the most basic electric wire, water pipe, is just a sleeve.
The sleeve pipe plays an important role in the pre-buried installation of water pipe and electric wire: 1. the drawing and pulling of the wire is convenient for subsequent replacement; 2. the water pipe and the electric wire are protected to prevent from being damaged; 3. the wiring design of regular water pipes or electric wires avoids the phenomenon that the water pipes or the electric wires are disorderly and staggered. Along with the development of decoration trade, the water and electricity work progress is also more and more strict by people's requirement, requires to avoid the water pipe or electric wire to be in disorder to draw when the installation is under construction, requires that the water pipe is the same with the electric wire in the same place mounting height moreover, and the purpose is when guaranteeing the ground level and not playing the package in order to follow-up laying ceramic tile. The fixer of water and electricity pipe has appeared on the market at present, and the structure of most fixer is that square box lateral wall has seted up a plurality of holes that are used for blocking the sheathed tube, passes the hole through the sleeve pipe and realizes fixed sleeve pipe, but, the problem that the fixer of this kind of structure exists is: the square box structure is quite rigid, each fixer can only fix a few sleeves, if more sleeves need to be fixed, the fixers need to be arranged side by side, the occupied area is large, if one sleeve needs to be fixed, a complete fixer is still needed, the occupied area is large, other holes of the fixer are wasted, and the waste of the fixer is large.
Therefore, the prior art has the following problems: the structure is rigid, the occupied area is large, and the waste is large.
SUMMERY OF THE UTILITY MODEL
To the technical problem, the utility model provides a be arranged in civil engineering installation the pre-buried sleeve pipe fixer of water and electricity realizes fixed single sleeve pipe or a plurality of sleeve pipe through first cassette and second cassette transform connected mode.
In order to achieve the purpose, the utility model is realized by the following technical scheme:
the utility model provides a pre-buried sleeve fixer of water and electricity for civil engineering installation in-process, including first cassette, second cassette and articulated elements, the right side wall of first cassette is pegged graft with the left side wall of second cassette, the height of first cassette is the same with the height of second cassette, the articulated elements sets up the upper surface at first cassette and the upper surface of second cassette respectively, the left end bottom surface of articulated elements and the upper surface connection of first cassette, the right-hand member bottom surface of articulated elements and the upper surface connection of second cassette, first cassette uses the articulated elements to rotate as the center and pegs graft with the second cassette.
The upper surface of the first clamping seat is provided with a first clamping groove and a first inserting strip respectively, the first clamping groove is arc-shaped, and the first clamping groove is used for clamping a sleeve. The first inserting strip is arranged at the left end of the first clamping groove, and the bottom surface of the first inserting strip is fixedly connected with the upper surface of the first clamping seat. A first slot is formed in the left side wall of the first clamping seat, a second inserting strip is arranged on the right side wall of the first clamping seat, and the second inserting strip is fixedly connected with the right side wall of the first clamping seat.
The upper surface of the second clamping seat is provided with a second clamping groove and a second slot respectively, the second clamping groove is arc-shaped, the size of the second clamping groove is equal to that of the first clamping groove, and the second clamping groove is used for clamping the sleeve. The second plug is plugged with the first plug strip. A third slot is formed in the left side wall of the second clamping seat and is matched with the second inserting strip, a third inserting strip is arranged on the right side wall of the second clamping seat, the bottom surface of the third inserting strip is fixedly connected with the right side wall of the second clamping seat, and the third inserting strip is connected with the first slot in an inserting mode.
Compared with the prior art, the utility model has the advantages of it is following: when a single sleeve needs to be fixed, the sleeve is placed into the first clamping seat or the second clamping seat, the second clamping seat or the first clamping seat is rotated, the first inserting strip is inserted into the second inserting groove, the first clamping groove and the second clamping groove form a complete circle, the sleeve is fixed in the circle, fixing is completed, the occupied space of the fixing device is reduced, and waste is reduced. When a plurality of sleeves need to be fixed, the second inserting strip on the first clamping seat can be inserted into the third inserting groove of the second clamping seat, the third inserting strip of the second clamping seat is connected with the first inserting groove of the next first clamping seat, and the like in sequence, so that any plurality of sleeves can be fixed according to the civil engineering installation requirement.
More preferably: the bottom surface of the left end of the articulated element is detachably connected with the upper surface of the first clamping seat.
Adopt above-mentioned technical scheme, conveniently dismantle articulated elements and first cassette.
More preferably: the bottom surface of the right end of the hinged part is detachably connected with the upper surface of the second clamping seat.
By adopting the technical scheme, the articulated element and the second clamping seat are conveniently detached.
More preferably: the first slot and the third slot are both concave.
By adopting the technical scheme, the concave first slot can be firmly spliced with the third inserting strip of the other second clamping seat, and similarly, the concave third slot can be firmly spliced with the second inserting strip of the first clamping seat.
The method is further optimized as follows: the bottom surface of the first inserting strip and the upper surface of the first clamping seat are integrally formed.
By adopting the technical scheme, the first inserting strip and the first clamping seat can form seamless connection, and the first inserting strip is prevented from falling off from the first clamping seat in the processes of inserting and pulling out the first inserting strip and the second inserting groove, so that the device has the effects of simple structure, compactness and firmness.
The method is further optimized as follows: the second inserting strip and the right side wall of the first clamping seat are integrally formed.
By adopting the technical scheme, when the second inserting strip is inserted into and pulled out of the third slot, the second inserting strip is directly prevented from falling off from the first clamping seat, so that the structure is firm and reliable, and the novel plug-in connector has the characteristics of firmness and durability.
The method is further optimized as follows: the bottom surface of the third inserting strip is fixedly connected with the right side wall of the second clamping seat.
By adopting the technical scheme, when the third inserting strip is inserted into the first slot of the next first card seat, the third inserting strip is prevented from falling off from the second card seat, and the novel plug-in connector has the characteristics of simple structure, firmness and durability.
The method is further optimized as follows: the length of the third inserting strip is equal to the length of the right side wall of the second clamping seat.
By adopting the technical scheme, the second clamping seat can be firmly connected with the next first clamping seat.
The method is further optimized as follows: the length of the first slot is equal to that of the left side wall of the first clamping seat.
By adopting the technical scheme, the first clamping seat and the last second clamping seat can be firmly connected together.
The method is further optimized as follows: the first clamping seat and the second clamping seat are made of polypropylene plastics.
By adopting the technical scheme, the first clamping seat and the second clamping seat which are supported by the polypropylene material have better corrosion resistance and long service life.
Drawings
FIG. 1 is a schematic structural diagram of the present embodiment;
FIG. 2 is a schematic view of the present embodiment with a single cannula secured;
reference numerals: 1-a first card holder; 11-a first card slot; 12-a first cutting; 13-a second cutting; 14-a first slot; 2-a second card holder; 21-a second card slot; 22-a second slot; 23-a third cutting; 24-a third slot; 3-a hinge; 4-sleeve.
Detailed Description
The present invention will be described in further detail with reference to fig. 1 and 2.
The utility model provides a be used for pre-buried sleeve 4 fixer of civil engineering installation in-process water and electricity, a fixed sleeve 4 when pre-buried water pipe or electric wire when the civil engineering installation, as shown in figure 1, including first cassette 1, second cassette 2 and articulated elements 3, the right side wall of first cassette 1 is pegged graft with the left side wall of second cassette 2, the height of first cassette 1 is the same with the height of second cassette 2, articulated elements 3 set up the upper surface at first cassette 1 and the upper surface of second cassette 2 respectively, the left end bottom surface of articulated elements 3 and the upper surface of first cassette 1 are connected, the right-hand member bottom surface of articulated elements 3 and the upper surface of second cassette 2 are connected, first cassette 1 uses articulated elements 3 to rotate as the center and peg graft with second cassette 2.
The upper surface of the first clamping seat 1 is respectively provided with a first clamping groove 11 and a first inserting strip 12, the first clamping groove 11 is arc-shaped, and the first clamping groove 11 is used for clamping the sleeve 4. The first slip 12 is arranged at the left end of the first clamping groove 11, and the bottom surface of the first slip 12 is fixedly connected with the upper surface of the first clamping seat 1. The left side wall of the first clamping seat 1 is provided with a first slot 14, the right side wall of the first clamping seat 1 is provided with a second inserting strip 13, and the second inserting strip 13 is fixedly connected with the right side wall of the first clamping seat 1.
The upper surface of the second clamping seat 2 is respectively provided with a second clamping groove 21 and a second slot 22, the second clamping groove 21 is arc-shaped, the size of the second clamping groove 21 is equal to that of the first clamping groove 11, and the second clamping groove 21 is used for clamping the sleeve 4. The second plug is plugged with the first plug strip 12. A third slot 24 is formed in the left side wall of the second card holder 2, the third slot 24 is matched with the second insert 13, a third insert 23 is arranged on the right side wall of the second card holder 2, the bottom surface of the third insert 23 is fixedly connected with the right side wall of the second card holder 2, and the third insert 23 is inserted into the first slot 14.
Referring to fig. 1 and 2, the following is a process for fixing the fixator, which is illustrated by fixing a single cannula 4 and a plurality of cannulas 4, respectively, and is described as follows:
firstly, the hinge member 3 is respectively installed together with the first clamping seat 1 and the second clamping seat 2, so that the first clamping seat 1 or the second clamping seat 2 can rotate up and down through the hinge member 3. Then, the second insert 13 is inserted into the third insert 23, tightly coupling the first cartridge 1 and the second cartridge 2 together.
When a single sleeve 4 needs to be fixed, the sleeve 4 is placed into the first clamping seat 1 or the second clamping seat 2, the second clamping seat 2 or the first clamping seat 1 is rotated, the first clamping seat 1 is in butt joint with the second clamping seat 2, the first inserting strip 12 is inserted into the second inserting groove 22, a complete circular cavity is formed in the space after the first clamping groove 11 and the second clamping groove 21 are buckled, the sleeve 4 is fixed in the circle, the occupied space of a fixer is reduced, and waste is reduced.
When a plurality of sleeves 4 need to be fixed, after the first clamping seat 1 and the second clamping seat 2 are connected, the second insert strip 13 on the first clamping seat 1 is inserted into the third slot 24 of the second clamping seat 2, the third insert strip 23 of the second clamping seat 2 is connected with the first slot 14 of the next first clamping seat 1, and the like in sequence, the plurality of sleeves 4 are respectively and sequentially placed into the first clamping groove 11 and the second clamping groove 21, so that any plurality of sleeves 4 can be fixed according to the civil engineering installation requirement.
Specifically, the left end bottom surface of articulated elements 3 is connected with the upper surface dismantlement of first cassette 1 in this embodiment, when needs are dismantled, conveniently dismantles articulated elements 3 and first cassette 1.
Specifically, the right-hand member bottom surface of articulated elements 3 is connected with the upper surface dismantlement of second cassette 2 in this embodiment, when needs are dismantled, conveniently dismantles articulated elements 3 and second cassette 2.
Specifically, in this embodiment, the first slot 14 and the third slot 24 are both concave, the concave first slot 14 can be firmly inserted into the third insert 23 of another second card holder 2, and similarly, the concave third slot 24 and the second insert 13 of the first card holder 1 can be firmly inserted into each other.
Specifically, in the embodiment in this market, the bottom surface of the first slip 12 and the upper surface of the first card holder 1 are integrally formed, so that the first slip 12 and the first card holder 1 can form a seamless connection, and the first slip 12 is prevented from falling off from the first card holder 1 in the process of being plugged into and pulled out of the second slot 22, and the first slip has the advantages of simple structure, compactness, firmness and firmness.
Specifically, in this embodiment, the second insert 13 and the right side wall of the first card holder 1 are integrally formed, so that the second insert 13 is directly prevented from falling off from the first card holder 1 in the process of inserting and pulling out the second insert 13 and the third slot 24, and the structure is firm and reliable, and the device has the characteristics of firmness and durability.
Specifically, in this embodiment, the bottom surface of the third insert 23 is fixedly connected to the right side wall of the second card holder 2, and when the third insert 23 is inserted into the first slot 14 of the next first card holder 1, the third insert 23 is prevented from falling off from the second card holder 2, so that the plug-in connector has the characteristics of simple structure, firmness and durability.
Specifically, in this embodiment, the length of the third insert 23 is equal to the length of the right side wall of the second cartridge 2, so that the second cartridge 2 and the next first cartridge 1 can be firmly connected together.
Specifically, in this embodiment, the length of the first slot 14 is equal to the length of the left sidewall of the first card holder 1, so that the first card holder 1 and the previous second card holder 2 can be firmly connected together.
Specifically, in this embodiment, the first card holder 1 and the second card holder 2 are made of polypropylene plastics, and the first card holder 1 and the second card holder 2 supported by polypropylene materials have better corrosion resistance and long service life.
In summary, when a single sleeve 4 needs to be fixed, the sleeve 4 is placed into the first clamping seat 1 or the second clamping seat 2, the second clamping seat 2 or the first clamping seat 1 is rotated, and the first insert 12 is inserted into the second slot 22, so that the first slot 11 and the second slot 21 form a complete circle, and the sleeve 4 is fixed in the circle, thereby completing the fixation, reducing the occupied space of the fixator, and reducing the waste. When a plurality of sleeves 4 need to be fixed, the second inserting strip 13 on the first clamping seat 1 can be connected with the third inserting groove 24 of the second clamping seat 2 in an inserting mode, the third inserting strip 23 of the second clamping seat 2 is connected with the first inserting groove 14 of the next first clamping seat 1 in an analogizing mode, any plurality of sleeves 4 can be fixed according to civil engineering installation requirements, and the novel sleeve fixing device has the advantages of being flexible in structure, convenient and reliable to use, small in occupied space and capable of reducing waste of a fixer and solving the problems existing in the prior art.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the present invention.

Claims (9)

1. The utility model provides a be arranged in civil engineering installation underwater electric pre-buried sleeve fixer which characterized in that: the clamping device comprises a first clamping seat, a second clamping seat and an articulated piece, wherein the right side wall of the first clamping seat is spliced with the left side wall of the second clamping seat, the height of the first clamping seat is the same as that of the second clamping seat, the articulated piece is respectively arranged on the upper surface of the first clamping seat and the upper surface of the second clamping seat, the bottom surface of the left end of the articulated piece is connected with the upper surface of the first clamping seat, the bottom surface of the right end of the articulated piece is connected with the upper surface of the second clamping seat, and the first clamping seat rotates by taking the articulated piece as the center to be spliced with the second clamping seat;
a first clamping groove and a first inserting strip are respectively arranged on the upper surface of the first clamping seat, the first clamping groove is arc-shaped, and the first clamping groove is used for clamping the sleeve; the first inserting strip is arranged at the left end of the first clamping groove, and the bottom surface of the first inserting strip is fixedly connected with the upper surface of the first clamping seat; a first slot is formed in the left side wall of the first clamping seat, a second inserting strip is arranged on the right side wall of the first clamping seat, and the second inserting strip is fixedly connected with the right side wall of the first clamping seat;
a second clamping groove and a second slot are respectively formed in the upper surface of the second clamping seat, the second clamping groove is arc-shaped, the size of the second clamping groove is equal to that of the first clamping groove, and the second clamping groove is used for clamping the sleeve; the second slot is spliced with the first inserting strip; the left side wall of the second clamping seat is provided with a third inserting groove, the third inserting groove is matched with the second inserting strip, the right side wall of the second clamping seat is provided with a third inserting strip, the bottom surface of the third inserting strip is fixedly connected with the right side wall of the second clamping seat, and the third inserting strip is connected with the first inserting groove in an inserting mode.
2. The hydropower embedded casing fixer used in civil engineering installation process according to claim 1, which is characterized in that: the bottom surface of the left end of the hinged part is detachably connected with the upper surface of the first clamping seat.
3. The hydropower embedded casing fixer used in civil engineering installation process according to claim 1, which is characterized in that: the bottom surface of the right end of the hinged part is detachably connected with the upper surface of the second clamping seat.
4. The hydropower embedded casing fixer used in civil engineering installation process according to claim 1, which is characterized in that: the first slot and the third slot are both concave.
5. The hydropower embedded casing fixer used in civil engineering installation process according to claim 1, which is characterized in that: the bottom surface of the first insert is integrally formed with the upper surface of the first clamping seat.
6. The hydropower embedded casing fixer used in civil engineering installation process according to claim 1, which is characterized in that: the second insert strip and the right side wall of the first clamping seat are integrally formed.
7. The hydropower embedded casing fixer used in civil engineering installation process according to claim 1, which is characterized in that: the length of the third inserting strip is equal to the length of the right side wall of the second clamping seat.
8. The hydropower embedded casing fixer used in civil engineering installation process according to claim 1, which is characterized in that: the length of the first slot is equal to that of the left side wall of the first clamping seat.
9. The hydropower embedded casing fixer used in civil engineering installation process according to claim 1, which is characterized in that: the first clamping seat and the second clamping seat are made of polypropylene plastics.
CN202120157567.5U 2021-01-20 2021-01-20 Be arranged in civil engineering installation underwater electric pre-buried sleeve fixer Expired - Fee Related CN214658829U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120157567.5U CN214658829U (en) 2021-01-20 2021-01-20 Be arranged in civil engineering installation underwater electric pre-buried sleeve fixer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120157567.5U CN214658829U (en) 2021-01-20 2021-01-20 Be arranged in civil engineering installation underwater electric pre-buried sleeve fixer

Publications (1)

Publication Number Publication Date
CN214658829U true CN214658829U (en) 2021-11-09

Family

ID=78517672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120157567.5U Expired - Fee Related CN214658829U (en) 2021-01-20 2021-01-20 Be arranged in civil engineering installation underwater electric pre-buried sleeve fixer

Country Status (1)

Country Link
CN (1) CN214658829U (en)

Similar Documents

Publication Publication Date Title
CN102792204A (en) Terminal enclosure with extractable fiber organizer tray
CN206360298U (en) Architecture indoor cable system
WO2006014226A3 (en) Removable cartridge storage devices and methods
US5877451A (en) Flanged conduit and insulation for electric wires and method of use
CN214658829U (en) Be arranged in civil engineering installation underwater electric pre-buried sleeve fixer
US6329599B1 (en) Flanged conduit and insulation for electric wires and method of use
CN102841416A (en) Wall-mounted optical splitter cabinet and using method thereof
US6055789A (en) Tool for installing flanged conduit and insulation for electric wires
CN103872631B (en) A kind of fast wiring system
KR20080005384U (en) Mold for cable arrangement
CN202102155U (en) Wall-hanging optical divider case
ES2347040T3 (en) DEVICE FOR SUPPORT OR DRIVING LINES IN CHANNELS.
JP7092367B2 (en) Plumbing trough device
CN215670316U (en) A water and electricity wallboard for assembly type structure construction
US6902406B1 (en) Cable plug connector
CN109038411B (en) Multipurpose tooth-shaped opening wiring groove
JP2005016161A (en) Floor material for cable wiring
CN211530348U (en) Socket and plug are plugged into to electric power of skirting line
JP2975095B2 (en) Optical fiber cable branch structure
CN218386019U (en) Anti-drop cable joint with fixed buckle structure
US20080203244A1 (en) Radiant floor tubing collector and organizer
CN212387453U (en) Cable collecting device for communication engineering
JP3842020B2 (en) Sheet circuit device and wiring method for sheet circuit device
CN213879094U (en) Portable wiring ware of light current construction
CN212766989U (en) Automatic device of wrapping of building engineering cable conductor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211109

CF01 Termination of patent right due to non-payment of annual fee