Fixed hanging arm type construction hanging basket
Technical Field
The utility model relates to a fixed string arm formula construction hanging flower basket technical field, concretely relates to fixed string arm formula construction hanging flower basket.
Background
The hanging basket is a kind of construction machinery for high-altitude operation in building construction. The existing hanging basket body for building construction is formed by welding steel bars and is hung on a truss circular tube through a steel wire rope when in use. Because the construction hanging flower basket is in unsettled state when using, stability is relatively poor, and the quality of hanging flower basket main part is lighter moreover, meets and produces easily under the windy condition and rocks, has great potential safety hazard.
To sum up, current construction hanging flower basket quality is lighter, is in unsettled state when using, has the installation poor stability, has the problem of great potential safety hazard.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving current construction hanging flower basket quality and lighter, be in unsettled state when using, there is the installation stability poor, has the problem of great potential safety hazard, and then provides a fixed hanging arm formula construction hanging flower basket.
The technical scheme of the utility model is that:
a fixed hanging arm type construction hanging basket comprises a left hanging basket body 1, a right hanging basket body 2, a left hanging arm 3, a right hanging arm 4, a hinge connecting piece 5 and a locking component 6, wherein the left hanging basket body 1 and the right hanging basket body 2 are oppositely arranged at the left side and the right side of a truss circular tube 10, the left hanging arm 3 is arranged at the upper part of one side, close to the truss circular tube 10, of the left hanging basket body 1, a first arc-shaped groove matched with the truss circular tube 10 is formed in the middle of the inner side end face of the left hanging arm 3, the right hanging arm 4 is arranged at the upper part of one side, close to the truss circular tube 10, of the right hanging basket body 2, a second arc-shaped groove matched with the truss circular tube 10 is formed in the middle of the inner side end face of the right hanging arm 4, the hinge connecting piece 5 is arranged between the left hanging arm 3 and the right hanging arm 4 below the first arc-shaped groove and the second arc-shaped groove, the bottom of the left hanging arm 3 is hinged with the bottom of the right hanging arm 4 through the hinge connecting piece 5, locking Assembly 6 sets up between first arc recess and the left string of arm 3 and the right string of arm 4 of second arc recess top, and the upper portion of hanging arm 3 on a left side is passed through locking Assembly 6 and is dismantled on the upper portion of hanging arm 4 on a right side and be connected.
Further, the left basket body 1 comprises a steel structure frame a11, a bottom plate a12, a fixed cross beam a13, a lifting ring a14 and a lifting rope a15, the steel structure frame a11 is a cuboid frame structure, the bottom plate a12 is installed at the bottom of the steel structure frame a11, a fixed cross beam a13 is connected between two vertical rods of the steel structure frame a11 close to one side of the left hanging arm 3, the fixed cross beam a13 is connected with the left hanging arm 3, the middle part of an upper cross rod of the steel structure frame a11 far away from one side of the left hanging arm 3 is connected with a lifting ring a14, and the lifting rope a15 is connected to the lifting ring a 14;
the right basket body 2 comprises a steel structure frame b21, a bottom plate b22, a fixed cross beam b23, a lifting ring b24 and a lifting rope b 25; the steel structure frame b21 is a cuboid frame structure, the bottom plate b22 is installed at the bottom of the steel structure frame b21, a fixed cross beam b23 is connected between two vertical rods of the steel structure frame b21 near one side of the right hanging arm 4, the fixed cross beam b23 is connected with the right hanging arm 4, a hanging ring b24 is connected to the middle part of an upper cross rod of the steel structure frame b21 far away from one side of the right hanging arm 4, and a hanging rope b25 is connected to the hanging ring b 24.
Further, the left hanging arm 3 comprises a front arm plate a31, a rear arm plate a32 and a middle transverse plate a33, the front arm plate a31 and the rear arm plate a32 are identical in structure, the front arm plate a31 and the rear arm plate a32 are arranged on one side, close to the truss round pipe 10, of the steel structure frame a11 side by side, a first arc-shaped groove is formed in the end face, close to the truss round pipe 10, of one side of the front arm plate a31 and the end face, close to the truss round pipe 10, of the rear arm plate a32, and the middle transverse plate a33 is arranged at one end, away from the left hanging basket body 1, of the front arm plate a31 and the end face, away from the left hanging basket body 32, of the middle transverse plate a 32;
the right hanging arm 4 comprises a front arm plate b41, a rear arm plate b42 and a middle transverse plate b43, the structures of the front arm plate b41 and the rear arm plate b42 are the same, the front arm plate b41 and the rear arm plate b42 are arranged on one side of the steel structure frame b21 close to the truss round pipe 10 side by side, a second arc-shaped groove is formed in the end face of one side of the front arm plate b41 and the rear arm plate b42 close to the truss round pipe 10, and the middle transverse plate b43 is arranged at one end of the front arm plate b41 and the rear arm plate b42 far away from the right hanging basket body 2.
Further, the hinge joint 5 includes a front hinge plate 51, a rear hinge plate 52, the left long bolt 53 and the right long bolt 54 are arranged on the left arm plate a31 and the rear arm plate a32 below the first arc-shaped groove, the two opposite inner side round holes a are formed on the front arm plate b41 and the rear arm plate b42 below the second arc-shaped groove, the two ends of the front hinge plate 51 are respectively provided with outer side round holes a matched with the inner side round holes a and the inner side round holes b, the two ends of the rear hinge plate 52 are respectively provided with outer side round holes b matched with the inner side round holes a and the inner side round holes b, the front hinge plate 51 and the rear hinge plate 52 are oppositely arranged on the front side and the rear side of the left hanging arm 3 and the right hanging arm 4, the left ends of the front hinge plate 51 and the rear hinge plate 52 are connected with the front arm plate a31 and the rear arm plate a32 through the left long bolt 53, and the right ends of the front hinge plate 51 and the rear hinge plate 52 are connected with the front arm plate b41 and the rear arm plate b42 through the right long bolt 54.
Further, locking Assembly 6 includes otic placode connecting bolt 61, two interior otic placodes 62 and two outer otic placodes 63, two interior otic placodes 62 set up side by side in the middle diaphragm a33 a side end face middle part of keeping away from left hanging flower basket main part 1, two interior otic placodes 62 set up side by side in the middle diaphragm b43 a side end face middle part of keeping away from right hanging flower basket main part 2, two interior otic placodes 62 are located the front and back both sides of two interior otic placodes 62 respectively, two interior otic placodes 62 are connected with two outer otic placodes 63 through otic placode connecting bolt 61.
Further, the fixed hanging arm type construction hanging basket further comprises a tool barrel 7, the tool barrel 7 is of a cylindrical structure, and the tool barrel 7 is installed on a bottom plate b22 inside the steel structure frame b 21.
Further, the fixed hanging arm type construction hanging basket further comprises four horizontal reinforcing rib plates 8, and the four horizontal reinforcing rib plates 8 are horizontally arranged between the front arm plate a31 and the steel structure frame a11, between the rear arm plate a32 and the steel structure frame a11, between the front arm plate b41 and the steel structure frame b21, and between the rear arm plate b42 and the steel structure frame b21 respectively.
Further, the fixed hanging arm type construction hanging basket further comprises four inclined reinforcing rib plates 9, and the four inclined reinforcing rib plates 9 are obliquely arranged between the front arm plate a31 and the steel structure frame a11, between the rear arm plate a32 and the steel structure frame a11, between the front arm plate b41 and the steel structure frame b21, and between the rear arm plate b42 and the steel structure frame b21 respectively.
Compared with the prior art, the utility model has the following effect:
1. the utility model discloses a fixed string arm-type construction hanging flower basket hangs arm 3 and right string 4 spiral-lock of arm through a left side on truss pipe 10, and the bottom of hanging arm 3 and right string arm 4 on a left side is articulated mutually through hinge connecting piece 5, and the connection can be dismantled through locking Assembly 6 on the upper portion of hanging arm 3 and right string arm 4 on a left side, the dismouting of being convenient for. The construction hanging basket has better stability after being installed, and effectively reduces potential safety hazards.
2. The utility model discloses a fixed string arm-type construction hanging flower basket when the installation, at first adopt hinge joint spare 5 to hang the bottom hinge of arm 3 and right string arm 4 on a left side and connect, use the hoist engine to promote the construction hanging flower basket through lifting rope a15 and lifting rope b25 and be close to truss pipe 10, operating personnel stands on the truss in advance, the upper portion of hanging arm 3 and right string arm 4 on a left side this moment is the open mode, when hanging arm 3 and right string arm 4 on a left side and being located truss pipe 10's both sides, adopt locking Assembly 6 to hang arm 3 and the upper portion of hanging arm 4 on a left side and connect. The installation is convenient, and the time and the labor are saved.
3. The utility model discloses a fixed hanging arm formula construction hanging flower basket's left side hanging arm 3 is through the cooperation of the outer face of cylinder of first arc recess and truss pipe 10, and right hanging arm 4 has guaranteed the unseen stability after the assembly effectively through the cooperation of the outer face of cylinder of second arc recess and truss pipe 10.
Drawings
FIG. 1 is a schematic structural view of the fixed hanging arm type construction hanging basket of the present invention;
FIG. 2 is a diagram showing the working state of the fixed hanging arm type construction hanging basket of the present invention;
fig. 3 is a top view of fig. 2.
Detailed Description
The first embodiment is as follows: the present embodiment is described with reference to fig. 1 to 3, and the fixed hanging arm type construction hanging basket of the present embodiment includes a left hanging basket body 1, a right hanging basket body 2, a left hanging arm 3, a right hanging arm 4, a hinge connector 5 and a locking assembly 6, the left hanging basket body 1 and the right hanging basket body 2 are oppositely disposed at the left and right sides of a truss round tube 10, the left hanging arm 3 is installed at the upper portion of one side of the left hanging basket body 1 close to the truss round tube 10, the middle portion of the inner side end surface of the left hanging arm 3 is provided with a first arc-shaped groove matched with the truss round tube 10, the right hanging arm 4 is installed at the upper portion of one side of the right hanging basket body 2 close to the truss round tube 10, the middle portion of the inner side end surface of the right hanging arm 4 is provided with a second arc-shaped groove matched with the truss round tube 10, the hinge connector 5 is disposed between the left hanging arm 3 and the right hanging arm 4 below the first arc-shaped groove and the second arc-shaped groove, the bottom of the left hanging arm 3 is hinged with the bottom of the right hanging arm 4 through a hinge connecting piece 5, the locking assembly 6 is arranged between the left hanging arm 3 and the right hanging arm 4 above the first arc-shaped groove and the second arc-shaped groove, and the upper portion of the left hanging arm 3 is detachably connected with the upper portion of the right hanging arm 4 through the locking assembly 6.
The second embodiment is as follows: the left basket body 1 of the present embodiment is described with reference to fig. 1 to 3, and includes a steel structural frame a11, a bottom plate a12, a fixed cross beam a13, a hanging ring a14 and a hanging rope a15, where the steel structural frame a11 is a rectangular parallelepiped frame structure, the bottom plate a12 is installed at the bottom of the steel structural frame a11, a fixed cross beam a13 is connected between two vertical rods of the steel structural frame a11 on the side close to the left hanging arm 3, the fixed cross beam a13 is connected with the left hanging arm 3, a hanging ring a14 is connected to the middle of an upper cross rod of the steel structural frame a11 on the side far from the left hanging arm 3, and a hanging rope a15 is connected to the hanging ring a 14;
the right basket body 2 comprises a steel structure frame b21, a bottom plate b22, a fixed cross beam b23, a lifting ring b24 and a lifting rope b 25; the steel structure frame b21 is a cuboid frame structure, the bottom plate b22 is installed at the bottom of the steel structure frame b21, a fixed cross beam b23 is connected between two vertical rods of the steel structure frame b21 near one side of the right hanging arm 4, the fixed cross beam b23 is connected with the right hanging arm 4, a hanging ring b24 is connected to the middle part of an upper cross rod of the steel structure frame b21 far away from one side of the right hanging arm 4, and a hanging rope b25 is connected to the hanging ring b 24. So set up, steel construction frame a11 and steel construction frame b21 have great rigidity, can guarantee operating personnel's safety. Other components and connections are the same as in the first embodiment.
The third concrete implementation mode: the left hanging arm 3 of the present embodiment is described with reference to fig. 1 to 3, and includes a front arm plate a31, a rear arm plate a32 and a middle cross plate a33, the front arm plate a31 and the rear arm plate a32 have the same structure, the front arm plate a31 and the rear arm plate a32 are arranged side by side on the steel structural frame a11 near the round truss tube 10, the front arm plate a31 and the rear arm plate a32 have first arc grooves on their end faces near the round truss tube 10, and the middle cross plate a33 is arranged at the end of the front arm plate a31 and the rear arm plate a32 far from the left basket body 1;
the right hanging arm 4 comprises a front arm plate b41, a rear arm plate b42 and a middle transverse plate b43, the structures of the front arm plate b41 and the rear arm plate b42 are the same, the front arm plate b41 and the rear arm plate b42 are arranged on one side of the steel structure frame b21 close to the truss round pipe 10 side by side, a second arc-shaped groove is formed in the end face of one side of the front arm plate b41 and the rear arm plate b42 close to the truss round pipe 10, and the middle transverse plate b43 is arranged at one end of the front arm plate b41 and the rear arm plate b42 far away from the right hanging basket body 2. Other compositions and connections are the same as in the first or second embodiments.
The fourth concrete implementation mode: as the present embodiment is described with reference to fig. 1 to 3, the hinge joint 5 of the present embodiment includes a front hinge plate 51 and a rear hinge plate 52, the left long bolt 53 and the right long bolt 54 are arranged on the left arm plate a31 and the rear arm plate a32 below the first arc-shaped groove, the two opposite inner side round holes a are formed on the front arm plate b41 and the rear arm plate b42 below the second arc-shaped groove, the two ends of the front hinge plate 51 are respectively provided with outer side round holes a matched with the inner side round holes a and the inner side round holes b, the two ends of the rear hinge plate 52 are respectively provided with outer side round holes b matched with the inner side round holes a and the inner side round holes b, the front hinge plate 51 and the rear hinge plate 52 are oppositely arranged on the front side and the rear side of the left hanging arm 3 and the right hanging arm 4, the left ends of the front hinge plate 51 and the rear hinge plate 52 are connected with the front arm plate a31 and the rear arm plate a32 through the left long bolt 53, and the right ends of the front hinge plate 51 and the rear hinge plate 52 are connected with the front arm plate b41 and the rear arm plate b42 through the right long bolt 54. So arranged, the hinge joint 5 is used for the hinge joint between the lower parts of the left and right suspension arms 3 and 4. Other compositions and connection relationships are the same as in the first, second or third embodiment.
The fifth concrete implementation mode: referring to fig. 1 to 3, the locking assembly 6 of the present embodiment includes an ear plate connecting bolt 61, two inner ear plates 62 and two outer ear plates 63, the two inner ear plates 62 are disposed side by side in the middle of one side end surface of the middle cross plate a33 away from the left basket body 1, the two inner ear plates 62 are disposed side by side in the middle of one side end surface of the middle cross plate b43 away from the right basket body 2, the two inner ear plates 62 are respectively located at the front and rear sides of the two inner ear plates 62, and the two inner ear plates 62 are connected with the two outer ear plates 63 through the ear plate connecting bolt 61. So set up, locking Assembly 6 is used for the detachable connection between left string of arm 3 and the upper portion of right string of arm 4. Other compositions and connection relationships are the same as those in the first, second, third or fourth embodiment.
The sixth specific implementation mode: the present embodiment is described with reference to fig. 1 to 3, and the fixed boom type construction basket of the present embodiment further includes a tool barrel 7, the tool barrel 7 has a cylindrical structure, and the tool barrel 7 is mounted on a bottom plate b22 inside a steel structure frame b 21. So set up, tool holder 7 is used for depositing the instrument, and is convenient safety. Other compositions and connection relationships are the same as in the first, second, third, fourth or fifth embodiment.
The seventh embodiment: the present embodiment is described with reference to fig. 1 to 3, and the fixed hanging arm type construction hanging basket of the present embodiment further includes four horizontal reinforcing rib plates 8, and the four horizontal reinforcing rib plates 8 are horizontally disposed between the front arm plate a31 and the steel structure frame a11, between the rear arm plate a32 and the steel structure frame a11, between the front arm plate b41 and the steel structure frame b21, and between the rear arm plate b42 and the steel structure frame b21, respectively. So set up, four horizontal deep floor 8 play the effect that increases the joint strength between the part. Other compositions and connection relationships are the same as in the first, second, third, fourth, fifth or sixth embodiment.
The specific implementation mode is eight: the present embodiment is described with reference to fig. 1 to 3, and the fixed hanging arm type construction hanging basket of the present embodiment further includes four diagonal reinforcing rib plates 9, and the four diagonal reinforcing rib plates 9 are respectively and obliquely disposed between the front arm plate a31 and the steel structure frame a11, between the rear arm plate a32 and the steel structure frame a11, between the front arm plate b41 and the steel structure frame b21, and between the rear arm plate b42 and the steel structure frame b 21. So set up, four diagonal reinforcement plates 9 play the effect that increases the joint strength between the part. Other compositions and connection relationships are the same as those of embodiment one, two, three, four, five, six or seven.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.
Principle of operation
The working principle of the fixed hanging arm type construction hanging basket of the utility model is described with reference to fig. 1 to 3: during installation, the bottoms of the left hanging arm 3 and the right hanging arm 4 are hinged through the hinge connecting piece 5, the building construction hanging basket is lifted by the winch through the hanging rope a15 and the hanging rope b25 and is close to the round truss pipe 10, an operator stands on the truss in advance, the upper portions of the left hanging arm 3 and the right hanging arm 4 are in an open state at the moment, when the left hanging arm 3 and the right hanging arm 4 are located on two sides of the round truss pipe 10, the upper portions of the left hanging arm 3 and the right hanging arm 4 are connected through the locking assembly 6, the first arc-shaped groove of the left hanging arm 3 is buckled on the left side of the outer cylindrical surface of the round truss pipe 10, the second arc-shaped groove of the right hanging arm 4 is buckled on the right side of the outer cylindrical surface of the round truss pipe 10, and installation of the building construction hanging basket is completed.