CN214658658U - Hard protector in clearance between steel platform and fire control vestibule - Google Patents

Hard protector in clearance between steel platform and fire control vestibule Download PDF

Info

Publication number
CN214658658U
CN214658658U CN202120003730.2U CN202120003730U CN214658658U CN 214658658 U CN214658658 U CN 214658658U CN 202120003730 U CN202120003730 U CN 202120003730U CN 214658658 U CN214658658 U CN 214658658U
Authority
CN
China
Prior art keywords
steel pipe
steel
fire control
platform
clearance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120003730.2U
Other languages
Chinese (zh)
Inventor
李芳芳
张静
王鐘基
李延京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd, Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN202120003730.2U priority Critical patent/CN214658658U/en
Application granted granted Critical
Publication of CN214658658U publication Critical patent/CN214658658U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a hard protector in clearance between steel platform and fire control vestibule, including pipe support system, the steel pipe of encorbelmenting, vertical steel pipe, horizontal steel pipe, steel platform, short reinforcing bar, KTZ-brace, square timber, wood-cement board, protection network, slant steel pipe, KTC-brace and fire control vestibule. On the whole square timber is paved with the wood plywood, be convenient for improve barrier propterty, the short steel bar rod evenly is provided with a plurality of, and be provided with the screens screw thread on the short steel bar rod, for the convenience of fixing, horizontal steel pipe all adopts cross fastener to connect into protection canopy main frame, and it is fixed to pull back through vertical steel pipe and slant steel pipe, be convenient for improve the holding power of this support frame, horizontal hole mouth space region between the inboard of steel platform and the fire control vestibule outside structure is provided with overhanging type steel pipe protection canopy, be convenient for carry out totally closed operation protection, guarantee that construction operation process can the safety work, the square timber is taken and is established on protection canopy main frame, just with the stability that improves this frame.

Description

Hard protector in clearance between steel platform and fire control vestibule
Technical Field
The utility model relates to a protector specifically is a hard protector in clearance between steel platform and fire control vestibule belongs to construction technical field.
Background
The steel structure platform is also called a working platform. Modern steel structure platform structural style is various, and the function should also be complete. The structure of the storage device is characterized by a full-assembly structure, flexible design and wide application in modern storage. Engineering structures made of steel, generally consisting of beams, columns, plates, etc. made of section steel, steel plates, etc.; connect with welding seam, screw or rivet etc. between each part, if adopt shaped steel to encorbelment this roof beam of steel pipe frame construction, because of according to unified standard of construction scaffold safety technique (GB 51210-2016)' -8.2.1: the width of the working scaffold is not more than 1.2 m; the width requirement of the operation frame required to be erected on the beam is 6.27 m; so the safety aspect is not very feasible.
If need to construct this unsettled limit alone roof beam that transfinites safely high-efficiently, traditional construction measure scheme is not very feasible, and stability is relatively poor, consequently needs a new style of path, and based on this, the application provides a steel platform and clearance protector firmly between fire control vestibule.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a hard protector in clearance between steel platform and fire control vestibule just for solving above-mentioned problem.
The utility model discloses a following technical scheme realizes above-mentioned purpose: a hard protection device for a gap between a steel platform and a fire-fighting corridor comprises a steel pipe support system, an overhanging steel pipe, a longitudinal steel pipe, a transverse steel pipe, a steel platform, a short steel bar rod, a KTZ-30 support, square wood, a wood plywood, a protective net, an oblique steel pipe, a KTC-30 support and a fire-fighting corridor; the steel pipe supporting system and the fire-fighting corridor form a main body structure of the device, the steel pipe supporting system comprises an overhanging steel pipe, the overhanging steel pipe is buckled with a transverse steel pipe, the transverse steel pipe is welded with a longitudinal steel pipe, the lower end of the longitudinal steel pipe is sleeved with a short steel bar rod, the short steel bar rod is welded on the steel platform, the upper surface of one side of the steel platform is fixedly connected with the transverse steel pipe, one end of the upper side of the longitudinal steel pipe is fixedly connected with a square timber, the square timber is provided with a protective net, the upper side of the square timber is provided with a wood plywood, the other end of the transverse steel pipe is fixedly connected with the fire-fighting corridor, one side of the fire-fighting corridor, which is close to the transverse steel pipe, is fixedly connected with a KTZ-support, the upper end of the KTZ-support is fixedly connected with the longitudinal steel pipe, the other end of the longitudinal steel pipe is fixedly connected with a KTC-support, and the upper end of the KTC-support is fixedly connected with the fire-fighting corridor, and is reversely pulled and fixed through the oblique steel pipe.
Preferably, in order to improve the protection performance, the wood veneer is paved on the whole square timber.
Preferably, for the convenience of fixing to prevent the uneven outwards or the inside slip of steel platform atress, the short steel bar rod evenly is provided with a plurality of, and is provided with the screens screw thread on the short steel bar rod.
Preferably, in order to improve the supporting force of the supporting frame, the transverse steel pipes are connected into a main framework of the protective shed by cross fasteners and are reversely pulled and fixed through the longitudinal steel pipes and the steel pipe main keels.
Preferably, in order to facilitate the totally-enclosed operation protection and ensure the safe operation of the construction operation process, a cantilever type steel pipe protection shed is arranged in a horizontal hole opening gap area between the inner side of the steel platform and the outer structure of the fire-fighting corridor.
Preferably, in order to improve the stability of the framework, the square timber is erected on the main framework of the shelter, and the distance between the square timber and the main framework is 200 mm.
The utility model has the advantages that: this kind of hard protector in clearance between steel platform and fire control vestibule reasonable in design, the wood plywood is paved on whole square timber, be convenient for improve barrier propterty, the short steel bar rod evenly is provided with a plurality of, and be provided with the screens screw thread on the short steel bar rod, be convenient for fix, in order to prevent the uneven outside or inside slip of steel platform atress, horizontal steel pipe all adopts cross fastener to connect into the protection canopy main frame, and it is fixed to pull back through vertical steel pipe and slant steel pipe, be convenient for improve the holding power of this support frame, horizontal hole mouth space region between the inboard of steel platform and the fire control vestibule outside structure is provided with overhanging type steel pipe protection canopy, be convenient for carry out totally enclosed operation protection, guarantee that construction operation process can the safety work, the square timber is taken and is established on the protection canopy main frame, and the interval is 200mm, just with the stability that improves this frame.
Drawings
FIG. 1 is a schematic view of the connection structure of the hard protection device of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 3 is an enlarged schematic structural diagram of the point B in fig. 1 according to the present invention.
In the figure: 1. the steel pipe support system comprises a steel pipe support system 2, a cantilever steel pipe 3, a longitudinal steel pipe 4, a transverse steel pipe 5, a steel platform 6, a short steel bar, 7, a KTZ-30 support, 8, a square timber 9, a wood plywood 10, a protective net 11, an oblique steel pipe 12, a KTC-30 support and 13 and a fire control corridor.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, a hard protection device for a gap between a steel platform and a fire-fighting corridor comprises a steel pipe support system 1, an overhanging steel pipe 2, a longitudinal steel pipe 3, a transverse steel pipe 4, a steel platform 5, a short steel bar rod 6, a KTZ-30 support 7, a square timber 8, a wood plywood 9, a protective net 10, an inclined steel pipe 11, a KTC-30 support 12 and a fire-fighting corridor 13; the steel pipe supporting system 1 and the fire-fighting corridor 13 form a main structure of the device, the steel pipe supporting system 1 comprises an overhanging steel pipe 2, a transverse steel pipe 4 is buckled on the overhanging steel pipe 2, a longitudinal steel pipe 3 is welded on the transverse steel pipe 4, a short steel bar 6 is sleeved at the lower end of the longitudinal steel pipe 3, the short steel bar 6 is welded on the steel platform 5, the transverse steel pipe 4 is fixedly connected to the upper surface of one side of the steel platform 5, a square timber 8 is fixedly connected to one end of the upper side of the longitudinal steel pipe 3, a protective screen 10 is arranged on the square timber 8, a wood-rubber plate 9 is paved on the square timber 8, the other end of the transverse steel pipe 4 is fixedly connected with the fire-fighting corridor 13, one side of the fire-fighting corridor 13, which is close to the transverse steel pipe 4, is fixedly connected with a KTZ-30 supporting 7, the upper end of the KTZ-30 supporting 7 is fixedly connected with the longitudinal steel pipe 3, the other end of the longitudinal steel pipe 3 is fixedly connected with a KTC-30 supporting 12, the upper end of the KTC-30 support 12 is fixedly connected with a fire control corridor 13 and is reversely pulled and fixed through an inclined steel pipe 11.
On wood-based plywood 9 paved whole square timber 8, be convenient for improve barrier propterty, short reinforcing bar 6 evenly is provided with a plurality of, and is provided with the screens screw thread on the short reinforcing bar 6, for the ease of fixing to prevent the uneven outside or inside slip of steel platform atress, horizontal steel pipe 4 all adopts cross fastener to connect into the protection canopy main frame, and reverses through vertical steel pipe 3 and slant steel pipe 11 and draws fixedly, is convenient for improve the holding power of this support frame, horizontal hole mouth space region between the inboard of steel platform 5 and 13 outside structures of fire control vestibule is provided with overhanging type steel pipe protection canopy, is convenient for carry out totally closed operation protection, guarantees that construction operation process can the safety work, square timber 8 is set up on the protection canopy main frame, and the interval is 200mm, just with the stability that improves this frame.
The working principle is as follows: when the hard protection device for the gap between the steel platform and the fire-fighting corridor is used, firstly, a transverse steel pipe 4 (phi 48mm multiplied by 2.9mm) is assembled on the overhanging steel pipe 2 by a fastener, and the distance is 500mm one; the transverse steel pipes 4 are connected into a main framework of the protective shed by cross fasteners and are reversely pulled and fixed through oblique steel pipes 11 with an oblique and vertical interval of 1m and longitudinal steel pipes 3; then, square timbers 8 with the size of 40mm multiplied by 90mm are erected on the main frame of the protection shed, and the distance between the square timbers 8 and the main frame is 200 mm; and finally, paving a protective net 10 and a 15mm wood plywood 9 on the square timber 8 for full-closed protection, and arranging a cantilever type steel pipe protective shed in a horizontal tunnel opening gap area between the inner side of the steel platform 5 and the outer side structure of the fire-fighting corridor 13 for full-closed operation protection in order to ensure that the construction operation process can be safely operated.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a hard protector in clearance between steel platform and fire control vestibule which characterized in that: the steel pipe supporting system comprises a steel pipe supporting system (1), an overhanging steel pipe (2), a longitudinal steel pipe (3), a transverse steel pipe (4), a steel platform (5), a short steel bar rod (6), a KTZ-30 supporting brace (7), a square timber (8), a wood plywood (9), a protective net (10), an inclined steel pipe (11), a KTC-30 supporting brace (12) and a fire control corridor (13); the steel pipe supporting system (1) and the fire control corridor (13) form a main body structure of the device, the steel pipe supporting system (1) comprises an overhanging steel pipe (2), the overhanging steel pipe (2) is buckled with a transverse steel pipe (4), the transverse steel pipe (4) is welded with a longitudinal steel pipe (3), a short steel bar (6) is sleeved at the lower end of the longitudinal steel pipe (3), the short steel bar (6) is welded on the steel platform (5), the transverse steel pipe (4) is fixedly connected to the upper surface of one side of the steel platform (5), a square timber (8) is fixedly connected to one end of the upper side of the longitudinal steel pipe (3), a protective net (10) is arranged on the square timber (8), a wood rubber plate (9) is arranged on the square timber (8), the other end of the transverse steel pipe (4) is fixedly connected with a fire control corridor (13), and a KTZ-30 support (7) is fixedly connected to one side of the fire control corridor (13) close to the transverse steel pipe (4), the upper end rigid coupling that KTZ-30 propped (7) has vertical steel pipe (3), the other end rigid coupling of vertical steel pipe (3) has KTC-30 to prop (12), the upper end rigid coupling that KTC-30 propped (12) has fire control vestibule (13), and just counter-draws fixedly through slant steel pipe (11).
2. The hard protection device in clearance between steel platform and fire control corridor of claim 1, characterized in that: the wood veneer (9) is paved on the whole square wood (8).
3. The hard protection device in clearance between steel platform and fire control corridor of claim 1, characterized in that: the short steel bar (6) are evenly provided with a plurality of short steel bar rods, and the short steel bar rods (6) are provided with clamping threads.
4. The hard protection device in clearance between steel platform and fire control corridor of claim 1, characterized in that: the transverse steel pipes (4) are connected into a main frame of the protective shed by cross fasteners and are fixed by reverse pulling through the longitudinal steel pipes (3) and the oblique steel pipes (11).
5. The hard protection device in clearance between steel platform and fire control corridor of claim 1, characterized in that: and a cantilever type steel pipe protection shed is arranged in a horizontal hole gap area between the inner side of the steel platform (5) and the outer structure of the fire control corridor (13).
6. The hard protection device in clearance between steel platform and fire control corridor of claim 4, characterized in that: the square timber (8) is erected on the main frame of the protective shed, and the distance is 200 mm.
CN202120003730.2U 2021-01-04 2021-01-04 Hard protector in clearance between steel platform and fire control vestibule Active CN214658658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120003730.2U CN214658658U (en) 2021-01-04 2021-01-04 Hard protector in clearance between steel platform and fire control vestibule

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120003730.2U CN214658658U (en) 2021-01-04 2021-01-04 Hard protector in clearance between steel platform and fire control vestibule

Publications (1)

Publication Number Publication Date
CN214658658U true CN214658658U (en) 2021-11-09

Family

ID=78506922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120003730.2U Active CN214658658U (en) 2021-01-04 2021-01-04 Hard protector in clearance between steel platform and fire control vestibule

Country Status (1)

Country Link
CN (1) CN214658658U (en)

Similar Documents

Publication Publication Date Title
CN109629810B (en) Closed type overhanging scaffold and construction method
CN105257009B (en) Device for anti-falling partition in elevator shaft
CN211736345U (en) Basement outer wall unilateral template strutting arrangement
CN214658658U (en) Hard protector in clearance between steel platform and fire control vestibule
CN217998091U (en) Fixed staple bolt device of steel shotcrete
CN214273045U (en) Steel pipe support frame on steel platform
CN215212320U (en) Wall form support system
CN108678424A (en) A kind of the steel latticework support device and method for supporting of super-heavy component
CN211597657U (en) Elevator shaft operation supporting and protecting structure
CN211774540U (en) Steel structure beam convenient to disassemble
CN208122242U (en) A kind of shrinkable steel building platform device for high-altitude operation
CN222275763U (en) Large-span assembled steel structure convenient to dismantle
CN207739606U (en) A kind of packaged type Bailey bracket support platform
CN206071020U (en) A kind of architectural engineering Portable support
CN212613649U (en) Scaffold structure is restoreed to slope roofing
CN221837861U (en) Mounting anti-supporting platform and roof cornice aluminum plate structure
CN208184274U (en) A kind of wood roof truss endpoint node ruggedized construction
CN215107168U (en) High-rise building elevator shaft safety protection platform
CN217999593U (en) Simple and easy platform instrument that can stretch out and draw back in a flexible way
CN214658649U (en) Large-span construction operation platform for mounting super high-rise special-shaped curtain wall
CN216197063U (en) Detachable shed house
CN215670944U (en) A operation platform that is used for high altitude to encorbelment roofing framework beam veneer construction
CN221032621U (en) A from removing brill explodes platform truck for tunnel excavation
CN221957294U (en) Wood-plastic swimming pool
CN220620957U (en) High-safety scaffold for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant