CN214657731U CN202023233170.4U CN202023233170U CN214657731U CN 214657731 U CN214657731 U CN 214657731U CN 202023233170 U CN202023233170 U CN 202023233170U CN 214657731 U CN214657731 U CN 214657731U
Authority
CN
China
Prior art keywords
supporting
square pipe
fixed
support
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023233170.4U
Other languages
Chinese (zh)
Inventor
廖倪沛
曾令桃
曹洋
唐婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Xinzhu Zhanbo Housing Industry Co ltd
Original Assignee
Sichuan Xinzhu Zhanbo Housing Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Xinzhu Zhanbo Housing Industry Co ltd filed Critical Sichuan Xinzhu Zhanbo Housing Industry Co ltd
Priority to CN202023233170.4U priority Critical patent/CN214657731U/en
Application granted granted Critical
Publication of CN214657731U publication Critical patent/CN214657731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a novel steel construction supports connection structure belongs to building engineering technical field, including the square tubular column, the top and the bottom of square tubular column all are fixed with the fixed plate, the top of square tubular column is provided with supporting beam, and the bottom of square tubular column is provided with the support floorbar. The utility model discloses a square tubular column uses as the support column, the cross-sectional width that utilizes square tubular column is the same with the cylinder width, reduced and the fixed plate between welding area, it is more convenient to weld, and need not the field weld, and simultaneously, utilize fixed plate and supporting beam, support floorbar bolted connection, high durability and convenient installation, and pass through the first connecting plate of welded fixed steel sheet cooperation on the square tubular column, first support side pipe, the locating plate, the second connecting plate, the bearing structure of second support side pipe group one-tenth, the stability of support has been improved, and adopt bolted connection between bearing structure and the fixed steel sheet, high durability and convenient installation, and the operation is simple, the quality of connection has been ensured.

Description

Novel steel structure support connection structure
Technical Field
The utility model relates to a coupling mechanism especially relates to a novel steel construction supports connection structure, belongs to building engineering technical field.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and rust removing and preventing processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted. The components or parts are typically joined by welds, bolts or rivets. Because of its light dead weight and simple construction, it is widely used in the fields of large-scale factory buildings, venues, super high-rise buildings, etc.;
but traditional steel construction supports big cross-section shaped steel such as adopting H shaped steel, angle steel more, and the connected mode adopts field weld more, and not only the construction progress is slow, and the construction degree of difficulty is big, consequently, the utility model provides a novel steel construction supports connection structure in order to solve the problem that exists among the prior art.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims at providing a novel steel construction supports connection structure to it is inconvenient to connect among the solution prior art, influences the problem of rate of use.
The purpose of the utility model can be achieved by adopting the following technical scheme:
the utility model provides a novel steel structure supports connection structure, includes the square tubular column, the top and the bottom of square tubular column all are fixed with the fixed plate, the top of square tubular column is provided with supporting beam, and the bottom of square tubular column is provided with the support floorbar, the fixed plate passes through the bolt and is connected with supporting beam, support floorbar respectively, the inboard top of square tubular column and bottom all weld have fixed steel sheet, and are two sets of the slope is provided with first support side pipe between the square tubular column, and the both ends of first support side pipe all are fixed with first connecting plate, first connecting plate all is through bolt and fixed steel sheet fixed connection, the intermediate position department of first support side pipe is pegged graft and is had the locating plate, be provided with second support side pipe between locating plate and the fixed steel sheet, the both ends of second support side pipe all are fixed with the second connecting plate, the second connecting plate passes through the bolt respectively with locating plate, The fixed steel plates are fixedly connected.
Preferably: first draw-in groove has all been seted up at the both ends of second support side's pipe, second support side's pipe is connected with the second connecting plate through first draw-in groove.
Preferably: second clamping grooves are formed in two ends of the first supporting square pipe, and the first supporting square pipe is connected with the first connecting plate through the second clamping grooves.
Preferably: connecting through holes are formed in the middle of the first supporting square pipe, and the positioning plate penetrates through the first supporting square pipe through the connecting through holes.
Preferably: the square pipe column is made of a galvanized square pipe.
Preferably: the width of the supporting cross section of the supporting cross beam and the supporting bottom beam is the same as that of the cross section of the square tubular column.
The utility model has the advantages that:
the utility model provides a novel steel structure supporting and connecting structure, which uses a square pipe column as a supporting column, utilizes the section width of the square pipe column to be the same as the column width, reduces the welding area between the square pipe column and a fixed plate, is more convenient to weld, does not need on-site welding, simultaneously utilizes the fixed plate to be connected with a supporting beam and a supporting bottom beam through bolts, is convenient to install, and utilizes a supporting structure consisting of a fixed steel plate welded on the square pipe column and a first connecting plate, a first supporting square pipe, a positioning plate, a second connecting plate and a second supporting square pipe to improve the supporting stability, and adopts bolts between the supporting structure and the fixed steel plate for connection, is convenient to install and simple to operate, ensures the quality of connection, in addition, the supporting beam, the supporting bottom beam section width is consistent with the square pipe column section, is convenient for maintaining an outer wall, and can directly seal a base plate on the surface of a supporting component, no separate component filling is required.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a view of a first square support tube of the present invention;
fig. 3 is a second square tube supporting diagram of the present invention.
In the figure: 1. a square pipe column; 2. a fixing plate; 3. a support beam; 4. supporting the bottom beam; 5. fixing a steel plate; 6. a first connecting plate; 7. a first support square tube; 8. positioning a plate; 9. a second connecting plate; 10. a second supporting square tube; 11. a first card slot; 12. a second card slot; 13. and connecting the through holes.
Detailed Description
In order to make the technical solutions of the present invention clearer and clearer for those skilled in the art, the present invention will be described in further detail with reference to the following embodiments and drawings, but the embodiments of the present invention are not limited thereto.
As shown in fig. 1-3, the present embodiment provides a novel steel structure supporting and connecting structure, which comprises a square pipe column 1, wherein a fixing plate 2 is fixed at both the top end and the bottom end of the square pipe column 1, a supporting beam 3 is arranged at the top of the square pipe column 1, a supporting bottom beam 4 is arranged at the bottom of the square pipe column 1, the fixing plate 2 is connected with the supporting beam 3 and the supporting bottom beam 4 respectively through bolts, fixing steel plates 5 are welded at both the top and the bottom of the inner side of the square pipe column 1, a first supporting square pipe 7 is obliquely arranged between two groups of square pipe columns 1, first connecting plates 6 are fixed at both ends of the first supporting square pipe 7, the first connecting plates 6 are fixedly connected with the fixing steel plates 5 through bolts, a positioning plate 8 is inserted at the middle position of the first supporting square pipe 7, a second supporting square pipe 10 is arranged between the positioning plate 8 and the fixing steel plates 5, and second connecting plates 9 are fixed at both ends of the second supporting square pipe 10, the second connecting plate 9 is fixedly connected with the positioning plate 8 and the fixed steel plate 5 through bolts.
In this embodiment, as shown in fig. 3, first clamping grooves 11 have been all seted up at the both ends of second support square pipe 10, and second support square pipe 10 is connected with second connecting plate 9 through first clamping groove 11, inserts respectively in the inside of second support square pipe 10 through two sets of second connecting plates 9, then is passing through the welding, has improved the stability of connecting, and conveniently fixes a position.
In this embodiment, as shown in fig. 2, the second clamping grooves 12 are disposed at two ends of the first supporting square tube 7, the first supporting square tube 7 is connected to the first connecting plate 6 through the second clamping grooves 12, the first supporting square tube 7 is inserted into the first supporting square tube 7 through the two sets of first connecting plates 6, and the connection stability of the first supporting square tube 7 is improved by welding.
In this embodiment, as shown in fig. 2, a connecting through hole 13 has been seted up to the intermediate position of first support side's pipe 7, and locating plate 8 runs through first support side's pipe 7 through connecting through hole 13, conveniently carries on spacingly, conveniently installs locating plate 8.
In the embodiment, as shown in fig. 1, the square pipe column 1 is made of a galvanized square pipe, so that the support strength and toughness of the steel structure are improved.
In this embodiment, as shown in fig. 1, the support cross-sectional widths of the support beams 3 and the support bottom beams 4 are the same as the cross-sectional width of the square pipe column 1, which facilitates the maintenance of the exterior wall sealing plate, and can directly seal the base plate on the surface of the support member without separately adding member filling.
As shown in fig. 1 to 3, the working process of the novel steel structure supporting and connecting structure provided by the embodiment is as follows:
step 1: when the square tubular column is used, the fixing plate 2 at the end part of the square tubular column 1 is welded in a project, the fixing plate 2 is provided with a mounting hole, and meanwhile, the inner side of the square tubular column 1 is provided with a groove and a fixing steel plate 5 is welded;
step 2: in the installation, install first connecting plate 6 in first support side's pipe 7 both ends through the bolt slope earlier on two sets of fixed steel sheet 5, then pass the connecting hole 13 on first support side's pipe 7 with locating plate 8, connect the second connecting plate 9 at second support side's pipe 10 both ends on fixed steel sheet 5 and locating plate 8 again, accomplish the concatenation of steel construction.
The above description is only a further embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, and any person skilled in the art can replace or change the technical solution and the concept of the present invention within the scope of the present invention.

Claims (6)

1. The utility model provides a novel steel construction supports connection structure which characterized in that: comprises a square pipe column (1), wherein fixed plates (2) are fixed at the top end and the bottom end of the square pipe column (1), a supporting cross beam (3) is arranged at the top of the square pipe column (1), a supporting bottom beam (4) is arranged at the bottom of the square pipe column (1), the fixed plates (2) are respectively connected with the supporting cross beam (3) and the supporting bottom beam (4) through bolts, fixed steel plates (5) are welded at the top and the bottom of the inner side of the square pipe column (1), a first supporting square pipe (7) is obliquely arranged between the two groups of square pipe columns (1), first connecting plates (6) are fixed at two ends of the first supporting square pipe (7), the first connecting plates (6) are fixedly connected with the fixed steel plates (5) through bolts, a positioning plate (8) is inserted at the middle position of the first supporting square pipe (7), and a second supporting square pipe (10) is arranged between the positioning plate (8) and the fixed steel plates (5), the two ends of the second supporting square pipe (10) are both fixed with second connecting plates (9), and the second connecting plates (9) are fixedly connected with the positioning plates (8) and the fixing steel plates (5) through bolts respectively.
2. The novel steel structure support connection structure of claim 1, wherein: first draw-in groove (11) have all been seted up at the both ends of second support side pipe (10), second support side pipe (10) are connected with second connecting plate (9) through first draw-in groove (11).
3. The novel steel structure support connection structure of claim 1, wherein: second draw-in groove (12) have all been seted up at the both ends of first support side pipe (7), first support side pipe (7) are connected with first connecting plate (6) through second draw-in groove (12).
4. A novel steel structural support connection structure according to claim 1 or 3, wherein: connecting through hole (13) have been seted up to the intermediate position of first support side pipe (7), locating plate (8) run through first support side pipe (7) through connecting through hole (13).
5. The novel steel structure support connection structure of claim 1, wherein: the square pipe column (1) is made of a galvanized square pipe.
6. The novel steel structure support connection structure of claim 1, wherein: the supporting cross section widths of the supporting cross beam (3) and the supporting bottom beam (4) are the same as the cross section width of the square pipe column (1).
CN202023233170.4U 2020-12-29 2020-12-29 Novel steel structure support connection structure Active CN214657731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023233170.4U CN214657731U (en) 2020-12-29 2020-12-29 Novel steel structure support connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023233170.4U CN214657731U (en) 2020-12-29 2020-12-29 Novel steel structure support connection structure

Publications (1)

Publication Number Publication Date
CN214657731U true CN214657731U (en) 2021-11-09

Family

ID=78504054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023233170.4U Active CN214657731U (en) 2020-12-29 2020-12-29 Novel steel structure support connection structure

Country Status (1)

Country Link
CN (1) CN214657731U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116944723A (en) * 2023-07-31 2023-10-27 广船国际有限公司 Welding method of pipe inserting plate structure and pipe inserting plate structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116944723A (en) * 2023-07-31 2023-10-27 广船国际有限公司 Welding method of pipe inserting plate structure and pipe inserting plate structure

Similar Documents

Publication Publication Date Title
CN214657731U (en) Novel steel structure support connection structure
CN111894130B (en) Modularized multi-high-rise assembled steel structure frame body
CN219632904U (en) Steel structure welding jig
CN111962668A (en) Assembled square steel pipe-H shaped steel beam column connected node
CN217630530U (en) Special-shaped cold-formed thin-wall steel pipe concrete column-steel beam frame node structure
CN216108977U (en) Assembled square steel pipe column-H shaped steel roof beam-baffle link up node
CN213014676U (en) Steel support frame of prefabricated building
CN214461167U (en) Novel steel structure beam column connection structure
CN219794237U (en) Steel construction assembled connected node
CN213448905U (en) Diversified assembled installation strenghthened type steel construction
CN214738816U (en) Assembled steel construction beam column node
CN211735761U (en) Steel structure column
CN220117442U (en) Connection structure of steel structure post and steel structure roof beam
CN221221722U (en) Assembled bridge type bracket of portal frame type steel structure
CN115262754B (en) Outer strengthening ring bolt rigid joint of H-shaped steel beam of assembled steel tube concrete column
CN221030686U (en) Building steel structure connection reinforcing apparatus
CN218580875U (en) Beam column connecting structure suitable for H-shaped steel column
CN221073336U (en) Outdoor installation well steel construction of no welding
CN221664021U (en) Building steel construction building ridge
CN216156797U (en) Reinforced structure for steel structure connection
CN220414499U (en) Girder steel post node convenient to assemble fast
CN211923026U (en) CRC unit type steel skeleton plate structure for fabricated building
CN215888573U (en) Connection node of assembled steel structure steel-pipe column and H shaped steel roof beam
CN218346410U (en) Energy-saving side-by-side connection steel structure
CN221001410U (en) Reinforced steel structure at joint of steel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant