CN214654130U - Sewage pool sludge pump overload prevention device in white carbon black production - Google Patents

Sewage pool sludge pump overload prevention device in white carbon black production Download PDF

Info

Publication number
CN214654130U
CN214654130U CN202120324115.1U CN202120324115U CN214654130U CN 214654130 U CN214654130 U CN 214654130U CN 202120324115 U CN202120324115 U CN 202120324115U CN 214654130 U CN214654130 U CN 214654130U
Authority
CN
China
Prior art keywords
sewage
sedimentation tank
pump
sludge pump
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120324115.1U
Other languages
Chinese (zh)
Inventor
黄永生
曾志恩
檀东宇
温秋镇
俞漳林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN ZHENGSHENG INORGANIC MATERIAL CO LTD
Original Assignee
FUJIAN ZHENGSHENG INORGANIC MATERIAL CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN ZHENGSHENG INORGANIC MATERIAL CO LTD filed Critical FUJIAN ZHENGSHENG INORGANIC MATERIAL CO LTD
Priority to CN202120324115.1U priority Critical patent/CN214654130U/en
Application granted granted Critical
Publication of CN214654130U publication Critical patent/CN214654130U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses an overload prevention device for a sludge pump in a sewage tank in the white carbon black production, which comprises a sewage sedimentation tank, a movable sludge pump, a transition groove with a stirring device, a pressure pump and a filter-pressing plate frame; the sewage sedimentation tank comprises a water inlet channel arranged at the sewage inlet at the left side, a middle multi-stage sedimentation tank and a water outlet channel with a sewage tank outlet at the right side; an inlet pipe of a sludge pump of the movable sludge pump extends into the primary sedimentation tank, and an outlet pipe of the sludge pump is connected to the transition tank; the transition groove is provided with an overflow port and is connected to the secondary sedimentation tank through an overflow pipe, one path of the outlet at the bottom of the transition groove is connected with an inlet pipe of the pressure pump, and the other path of the outlet is connected with a sewage discharge pipe; and an outlet pipeline of the booster pump is connected to a filter pressing plate frame through a pressure gauge, and a water outlet pipe of the filter pressing plate frame is connected to the final-stage sedimentation tank. The utility model provides an in the current white carbon black production process sewage pump cause the overload of sludge pump motor and burn out and the pump wearing and tearing seriously cause the problem that equipment cost of maintenance is high because of blockking up.

Description

Sewage pool sludge pump overload prevention device in white carbon black production
Technical Field
The utility model relates to a technical field of precipitation method white carbon black production facility, concretely relates to effluent water sump sludge pump overload prevention device in white carbon black production.
Background
The current production flow of the white carbon black by the precipitation method comprises precipitation reaction, aging, filter pressing, washing, pulping and spray drying. The washed waste water enters a sewage sedimentation tank together with some filtered fine materials, in addition, other production sewage such as filter residue mud water, water glass dissolution sedimentation sewage and the like also sequentially flow through a plurality of sewage sedimentation tanks connected in series, solid materials in the sewage naturally settle in the tanks due to slow flow velocity, and the clarified waste water is discharged after reaching the standard after neutralization and filtration. In the existing situation, after sludge precipitated in a pool is manually washed and stirred by high-pressure water, slurry is pumped out by a sludge pump and pumped to a filter plate frame for squeezing and dehydration, the sludge pump not only pumps out the sludge, but also requires that the pressure of the outlet of the sludge pump is kept above 0.6Mpa so as to meet the squeezing and dehydration requirements of the filter plate frame, and the sludge pump has two functions; the fallen sludge is transported outside, and the filtrate still flows back to the sewage sedimentation tank for treatment. The existing problems are that the particles in the slurry are fine and have strong cohesiveness, part of the slurry is blocky during pumping, the slurry is pumped into the filter and needs to keep higher pressure, the motor works under high current, the motor of the sludge pump is often overloaded and burnt out due to blockage, or the pump is seriously abraded, the equipment maintenance amount is large, the normal operation of the environmental protection facility is seriously influenced, and the treatment cost is increased.
Disclosure of Invention
An object of the utility model is to provide an equipment long service life, operation maintenance cost are low, use high-efficient reliable white carbon black in-production effluent water sump sludge pump overload prevention device to effectual assurance equipment normal use and processing system normally go on, ensure to satisfy environmental protection requirement discharge to reach standard, solve in the current white carbon black production process sewage pump cause the overload of sludge pump motor and burn out and the pump wearing and tearing seriously cause the problem that equipment cost of maintenance is high because of stopping up.
In order to realize the purpose, the overload prevention device for the sludge pump of the sewage tank in the production of the white carbon black comprises a sewage sedimentation tank 3, a movable sludge pump 4, a transition groove 6 with a stirring device 7, a pressure pump 8 and a filter pressing plate frame 14; the sewage sedimentation tank 3 comprises a water inlet channel arranged at the sewage inlet 2 at the left side, a middle multi-stage sedimentation tank and a water outlet channel arranged at the sewage outlet 11 at the right side; an inlet pipe 1 of a sludge pump of the movable sludge pump 4 extends into the primary sedimentation tank, and an outlet pipe is connected to a transition tank 6; the transition groove 6 is provided with an overflow port and is connected to a secondary sedimentation tank through an overflow pipe 5, one path of the outlet at the bottom of the transition groove 6 is connected with a booster pump inlet pipe 9, and the other path is connected with a sewage discharge pipe 10; an outlet pipeline of the booster pump 8 is connected to a filter pressing plate frame 14 through a pressure gauge 13, and a filter pressing plate frame water outlet pipe 12 is connected to a final-stage sedimentation tank.
The middle multi-stage sedimentation tank of the sewage sedimentation tank 3 is four stages.
A sludge pump, a transition tank, a stirring device, a pressure pump and a filtering plate frame. The sludge pump be movable mortar pump or three-phase immersible pump, and its liquid suction pipe is rubber inside lining wire hose, the flexible removal is used. The transition groove is a steel self-made container with the diameter of 1.6 mm. The booster pump is a commercial mortar pump.
The utility model discloses effluent water sump sludge pump overload prevention device in white carbon black production beneficial effect as follows:
(1) the problems that a sewage pump is burnt due to overload of a motor of the sludge pump caused by blockage and equipment maintenance cost is high due to serious pump abrasion in the existing white carbon black production process are solved, and the normal environmental protection of enterprises is ensured to reach the standard;
(2) the manufacturing and maintenance cost is low, the use is efficient and reliable, and the popularization is convenient.
Drawings
FIG. 1 is the schematic structural diagram of the overload protection device for sewage tank sludge pump in white carbon black production.
Reference numerals: sludge pump import pipe 1, sewage import 2, sewage sedimentation tank 3, movable sludge pump 4, overflow pipe 5, transition groove 6, agitating unit 7, force (forcing) pump 8, force (forcing) pump import pipe 9, blow off pipe 10, effluent water sump export 11, filter-pressing sheet frame outlet pipe 12, manometer 13, filter-pressing sheet frame 14.
Detailed Description
The anti-overload device for the sewage tank sludge pump in the white carbon black production of the present invention is further described in detail with reference to the accompanying drawings and the specific implementation mode.
As shown in fig. 1, the overload prevention device for the sludge pump in the sewage tank in the production of white carbon black of the utility model comprises a sewage sedimentation tank 3, a movable sludge pump 4, a transition groove 6 with a stirring device 7, a pressure pump 8 and a filter pressing plate frame 14; the sewage sedimentation tank 3 comprises a water inlet channel arranged at the left side with the sewage inlet 2, a middle four-stage sedimentation tank and a water outlet channel arranged at the right side with the sewage tank outlet 11; an inlet pipe 1 of a sludge pump of the movable sludge pump 4 extends into the primary sedimentation tank, and an outlet pipe is connected to a transition tank 6; the transition groove 6 is provided with an overflow port and is connected to a secondary sedimentation tank through an overflow pipe 5, one path of the outlet at the bottom of the transition groove 6 is connected with a booster pump inlet pipe 9, and the other path is connected with a sewage discharge pipe 10; an outlet pipeline of the booster pump 8 is connected to a filter pressing plate frame 14 through a pressure gauge 13, and a filter pressing plate frame water outlet pipe 12 is connected to a final-stage sedimentation tank.
Sewage from production enters a sewage tank 3 through a sewage inlet 2, and is discharged from a sewage tank outlet 11 after reaching the standard through fractional precipitation and neutralization treatment; the settled sludge and slurry are pumped into a transition tank 6 from a movable sludge pump 4 through a sludge pump inlet pipe 1, and if excessive slurry exists, the sludge and the slurry return to a sewage pool through an overflow pipe 5; under the action of the stirring device 7, the more homogenized sludge slurry enters a booster pump 8 through a booster pump inlet pipe 9 and is pumped into a filter pressing plate frame 14 with a pressure gauge 13, the filtered clean filtrate enters a front-stage tank, namely a final-stage sedimentation tank, of a sewage tank outlet 11 from a filter pressing plate frame water outlet pipe 12 and then flows through a water outlet channel for neutralization treatment; the transition tank 6 is periodically cleaned and discharged through a sewage discharge pipe 10. Because the movable sludge pump 4 directly pumps the slurry and the block-shaped sludge which are flushed by high-pressure water into the transition slot 6, the required lift is low, the load of the motor cannot be quickly increased to exceed the limit even if the motor is blocked, the motor protection action can work in time, and the condition that the motor is damaged due to overload is avoided. The transition tank 6 can well homogenize the slurry-containing water and the block-shaped mud into a uniform liquid fluid under the action of the stirring device 7, thereby ensuring the stable operation of the pressure pump 8 and ensuring that the mud is easy to disperse and filter when entering the filter press plate frame 14.

Claims (2)

1. The utility model provides a effluent water sump sludge pump overload prevention device in white carbon black production which characterized by: the device comprises a sewage sedimentation tank (3), a movable sludge pump (4), a transition groove (6) with a stirring device (7), a pressure pump (8) and a filter-pressing plate frame (14); the sewage sedimentation tank (3) comprises a water inlet channel arranged at the left side with a sewage inlet (2), a middle multi-stage sedimentation tank and a water outlet channel arranged at the right side with a sewage tank outlet (11); an inlet pipe (1) of a sludge pump of the movable sludge pump (4) extends into the primary sedimentation tank, and an outlet pipe is connected to the transition groove (6); the transition groove (6) is provided with an overflow port which is connected to the secondary sedimentation tank through an overflow pipe (5), one path of the outlet at the bottom of the transition groove (6) is connected with a booster pump inlet pipe (9), and the other path is connected with a sewage discharge pipe (10); an outlet pipeline of the booster pump (8) is connected to a filter pressing plate frame (14) through a pressure gauge (13), and a filter pressing plate frame water outlet pipe (12) is connected to a final-stage sedimentation tank.
2. The anti-overloading device for sewage sludge pump in white carbon black production as claimed in claim 1, wherein: the middle multi-stage sedimentation tank of the sewage sedimentation tank (3) is four stages.
CN202120324115.1U 2021-02-04 2021-02-04 Sewage pool sludge pump overload prevention device in white carbon black production Active CN214654130U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120324115.1U CN214654130U (en) 2021-02-04 2021-02-04 Sewage pool sludge pump overload prevention device in white carbon black production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120324115.1U CN214654130U (en) 2021-02-04 2021-02-04 Sewage pool sludge pump overload prevention device in white carbon black production

Publications (1)

Publication Number Publication Date
CN214654130U true CN214654130U (en) 2021-11-09

Family

ID=78446294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120324115.1U Active CN214654130U (en) 2021-02-04 2021-02-04 Sewage pool sludge pump overload prevention device in white carbon black production

Country Status (1)

Country Link
CN (1) CN214654130U (en)

Similar Documents

Publication Publication Date Title
CN101134150B (en) Screening and sieving apparatus for water treatment
CN111097215A (en) High-precision solid-liquid separation equipment
CN214654130U (en) Sewage pool sludge pump overload prevention device in white carbon black production
CN211998979U (en) Full-automatic intelligent sewage treatment system
CN208234672U (en) Grinding water self-loopa utilizes Zero discharging system
CN113521808A (en) New process for treating tail water of tap water
CN206660687U (en) A kind of filter-pressing device
CN210506015U (en) Semiconductor material grinding wastewater sludge treatment system
CN111890146A (en) Grinding fluid automatic circulation and physical and chemical precipitation filter pressing purification device for centerless grinding machine
CN202876508U (en) Ceramic vacuum filter
CN214861463U (en) Salt mud dewatering system of plate and frame filter press
CN112225425B (en) Power station chemical cleaning sludge reduction treatment system and reduction treatment method
CN210825741U (en) Sewage treatment system for water glass waste sand washing device
CN2650844Y (en) Automatic acid supplier of ceramic filter
CN201899910U (en) Stripping liquid filtering system and stripping liquid filtering device
CN219186185U (en) Filter cloth soaking and washing device
CN111285495A (en) Integrated sewage collecting and treating device
CN216582107U (en) Integrative thick liquids storage device of multiple effect
CN219423811U (en) Pneumatic turning plate water receiving tank of plate filter press
CN215916554U (en) Online belt cleaning device of plate and frame filter press backward flow
CN218403706U (en) Stirring station car washer waste water zero discharge system
CN211170202U (en) Sewage treatment device
CN217526473U (en) Sedimentation tank is used in polyferric sulfate production
CN220907172U (en) Device for treating mud water for cleaning mine car
CN220223755U (en) Sand washing slurry water treatment system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant