CN214651184U - Conveying belt excess material recovery device for recovering construction waste - Google Patents

Conveying belt excess material recovery device for recovering construction waste Download PDF

Info

Publication number
CN214651184U
CN214651184U CN202120802831.6U CN202120802831U CN214651184U CN 214651184 U CN214651184 U CN 214651184U CN 202120802831 U CN202120802831 U CN 202120802831U CN 214651184 U CN214651184 U CN 214651184U
Authority
CN
China
Prior art keywords
support frame
fixedly connected
construction waste
conveying belt
conveyer belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120802831.6U
Other languages
Chinese (zh)
Inventor
耿庆三
李喜庆
高玉浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Guanglianfa Concrete Co ltd
Original Assignee
Qingdao Guanglianfa Concrete Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Guanglianfa Concrete Co ltd filed Critical Qingdao Guanglianfa Concrete Co ltd
Priority to CN202120802831.6U priority Critical patent/CN214651184U/en
Application granted granted Critical
Publication of CN214651184U publication Critical patent/CN214651184U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Combined Means For Separation Of Solids (AREA)

Abstract

The utility model discloses a building waste retrieves and uses conveyer belt clout recovery unit relates to building waste recovery technical field, including support frame, headstock and switch board, the top of support frame is provided with the headstock, the top of support frame is provided with the switch board, the upper end fixedly connected with vibrations mechanism of support frame, the output shaft of headstock and vibrations mechanism's positive swing joint. The utility model discloses a setting of conveyer belt, vibrations machine and transmission piece, through the setting of vibrations machine and transmission piece, can make the conveyer belt vibrate, through the setting of a N utmost point magnetic path and No. two N utmost point magnetic paths again, the frequency of conveyer belt vibrations can be increased to the repellent principle between the utilization to can carry out effectual screening to the building rubbish on the conveyer belt, avoid the building rubbish after the breakage not to sieve, comparatively troublesome problem when leading to recycling.

Description

Conveying belt excess material recovery device for recovering construction waste
Technical Field
The utility model relates to a recovery unit relates to building waste recovery technical field, concretely relates to conveyer belt clout recovery unit for building waste recovery.
Background
The construction waste refers to the general name of dregs, waste concrete, waste bricks and other wastes generated in the production activities of the construction industry such as demolition, construction, decoration, repair and the like, and is classified according to the production source, and the construction waste can be divided into engineering dregs, decoration waste, demolition waste, engineering mud and the like; the construction waste can be classified into slag, concrete blocks, broken stones, broken bricks and tiles, waste mortar, slurry and the like according to the composition. The following problems exist in the prior art:
1. the general construction waste is large stones and needs to be crushed before transportation, and in the construction waste after crushing, due to limited crushing conditions, large and small blocks need to be screened, and the screening which is not crushed is selected for crushing again, so that the construction waste is troublesome and has problems when being used if not being screened;
2. because the weight of the construction waste after crushing is also very heavy, if the support of this conveyer belt is not consolidated, this weight can not be born to this support, causes whole conveyer belt to collapse, and the transport of follow-up construction waste is directly influenced, has the problem.
SUMMERY OF THE UTILITY MODEL
The utility model provides a surplus material recovery device of a conveying belt for recovering construction wastes, which aims to have the functional characteristics of screening broken construction wastes and solve the problems of uneven breaking and more trouble in recycling; wherein another purpose is in order to solve the relatively poor problem of whole conveyer belt bearing to reach the best firm transport effect.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides a building waste retrieves and uses conveyer belt clout recovery unit, includes a support frame, headstock and switch board, the top of a support frame is provided with the headstock, the top of a support frame is provided with the switch board, the upper end fixedly connected with vibrations mechanism of a support frame, the output shaft of headstock and vibrations mechanism's positive swing joint, the front of switch board and vibrations mechanism's back fixed connection.
The first support frame comprises a support transverse plate, and the support transverse plate is arranged above the first support frame.
The vibration mechanism comprises a vibration machine, and the vibration machine is arranged in the vibration mechanism.
The utility model discloses technical scheme's further improvement lies in: the utility model discloses a support diaphragm, including support frame, upper end fixedly connected with movable platform, the inner wall both sides fixed connection of support diaphragm, No. two support frames of middle part fixedly connected with of support frame, the upper end fixedly connected with movable platform of a support frame, movable platform's upper end fixedly connected with baffle, the both ends of support diaphragm and No. two support frames.
Adopt above-mentioned technical scheme, the setting of the baffle in this scheme can block that the building rubbish after the breakage drops from the conveyer belt.
The utility model discloses technical scheme's further improvement lies in: the conveying belt is arranged in the vibration mechanism, and two sides of the conveying belt are movably connected with the inner wall of the vibration mechanism.
Adopt above-mentioned technical scheme, the setting of the conveyer belt in this scheme can transport the screening to building rubbish.
The utility model discloses technical scheme's further improvement lies in: the inner wall of the conveying belt is fixedly connected with a first N-pole magnetic block, and the upper end of the supporting transverse plate is fixedly connected with a second N-pole magnetic block.
By adopting the technical scheme, the arrangement of the first N pole magnetic block and the second N pole magnetic block in the scheme can increase the vibration frequency of the conveyor belt by utilizing the repulsion principle between the first N pole magnetic block and the second N pole magnetic block.
The utility model discloses technical scheme's further improvement lies in: the upper end swing joint of supporting the diaphragm has the movable rod, the one end swing joint of movable rod has the elasticity connecting block, the lower extreme and the fixedly connected with spring of elasticity connecting block, the lower extreme and the upper end fixed connection who supports the diaphragm of spring.
By adopting the technical scheme, the arrangement of the movable rod in the scheme ensures the stability of the elastic connecting block in use.
The utility model discloses technical scheme's further improvement lies in: the upper end of the vibrating machine is fixedly connected with a transmission block, the lower end of the vibrating machine is bonded with a shock pad, and the vibrating machine is arranged on one side of the movable rod.
By adopting the technical scheme, the transmission block in the scheme is arranged, so that the N pole magnetic block can not influence the rotation of the conveyor belt when passing through the upper part of the vibrating machine.
The utility model discloses technical scheme's further improvement lies in: the upper end fixedly connected with activity storehouse of elasticity connecting block, the inner wall in activity storehouse is provided with the gasbag, the front of shock pad is provided with the shock attenuation hole.
By adopting the technical scheme, the shock absorption holes in the scheme can reduce the shock of the shock machine to the support frame.
Owing to adopted above-mentioned technical scheme, the utility model discloses relative prior art, the technological progress who gains is:
1. the utility model provides a building waste retrieves and uses conveyer belt clout recovery unit, through the conveyer belt, the setting of vibrations machine and transmission piece, through the setting of vibrations machine and transmission piece, can make the conveyer belt vibrate, again through the setting of a N utmost point magnetic path and No. two N utmost point magnetic paths, the principle of repelling between the utilization, can increase the frequency of conveyer belt vibrations, can increase the frequency of vibrations, thereby can carry out effectual screening to the building rubbish on the conveyer belt, the building rubbish after having avoided the breakage does not sieve, lead to recycling comparatively trouble problem when.
2. The utility model provides a building waste retrieves and uses conveyer belt clout recovery unit, through the setting of a support frame, can be for playing the effect of support at whole transfer apparatus, the setting of rethread support diaphragm can increase the atress degree of a support frame to make whole equipment can carry out steady operation, avoid building waste's weight overweight, lead to the damage of a support frame, influence building waste's transport problem.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the conveyor belt of the present invention;
FIG. 3 is a schematic view of the elastic connecting block of the present invention;
fig. 4 is a schematic view of the shock pad structure of the present invention.
In the figure: 1. a first support frame; 11. a movable platform; 12. a baffle plate; 13. a second support frame; 14. supporting the transverse plate; 2. a vibration mechanism; 21. a conveyor belt; 211. a first N pole magnetic block; 212. a second N pole magnetic block; 213. a movable rod; 214. an elastic connecting block; 2141. a movable bin; 2142. an air bag; 215. a vibrating machine; 216. a transmission block; 217. a shock pad; 2171. a shock absorbing hole; 3. a power box; 4. a control cabinet.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in fig. 1-4, the utility model provides a conveyor belt clout recovery unit for construction waste recovery, including a support frame 1, headstock 3 and switch board 4, the top of a support frame 1 is provided with headstock 3, and the top of a support frame 1 is provided with switch board 4, the upper end fixedly connected with vibrations mechanism 2 of a support frame 1, the output shaft of headstock 3 and the positive swing joint of vibrations mechanism 2, the front of switch board 4 and the back fixed connection of vibrations mechanism 2.
In this embodiment, through the setting of a support frame 1, can support whole conveyer, guarantee that work can normally go on, through the setting of vibrations mechanism 2, can carry construction waste to screening the uneven construction waste of size, utilize the setting of headstock 3, for vibrations mechanism 2 provides the power basis, the setting of rethread switch board 4 can carry out effectual control to whole equipment, guarantees that whole equipment can even running.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, No. 1 support frame is including supporting diaphragm 14, supports diaphragm 14 and sets up in the top of support frame 1, No. 13 support frame of No. 1 middle part fixedly connected with of support frame 1, the upper end fixedly connected with movable platform 11 of a support frame 1, and movable platform 11's upper end fixedly connected with baffle 12 supports diaphragm 14's both ends and No. 13 support frame's inner wall both sides fixed connection.
In this embodiment, through the setting of a support frame 1, can be for playing the effect of support at whole transfer apparatus, rethread supports the setting of diaphragm 14, can increase the stress degree of a support frame 1, thereby make whole equipment can carry out steady operation, avoid building rubbish's weight overweight, lead to the damage of a support frame 1, influence building rubbish's transport problem, rethread baffle 12's setting can guarantee to sieve the in-process of transportation building rubbish, can not drop the place.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, the vibration mechanism 2 comprises a vibration machine 215, the vibration machine 215 is arranged inside the vibration mechanism 2, a conveyor belt 21 is arranged inside the vibration mechanism 2, two sides of the conveyor belt 21 are movably connected with the inner wall of the vibration mechanism 2, the inner wall of the conveyor belt 21 is fixedly connected with a first N pole magnetic block 211, the upper end of the supporting transverse plate 14 is fixedly connected with a second N pole magnetic block 212, the upper end of the supporting transverse plate 14 is movably connected with a movable rod 213, one end of the movable rod 213 is movably connected with an elastic connecting block 214, the lower end of the elastic connecting block 214 is fixedly connected with a spring, the lower end of the spring is fixedly connected with the upper end of the supporting transverse plate 14, the upper end of the vibration machine 215 is fixedly connected with a transmission block 216, the lower end of the vibration machine 215 is bonded with a shock absorption pad 217, the vibration machine 215 is arranged on one side of the movable rod 213, the upper end of the elastic connecting block 214 is fixedly connected with a movable bin 2141, the inner wall of the movable bin 2141 is provided with an air bag 2142, the front surface of the damper pad 217 is provided with a damper hole 2171.
In this embodiment, through the setting of vibrations machine 215 and transmission block 216, can make conveyer belt 21 vibrate, thereby can carry out effectual screening to the construction waste on the conveyer belt 21, set up through the combination of No. two N utmost point magnetic blocks 212 and elasticity connecting block 214, when an N utmost point magnetic block 211 passes through the top of elasticity connecting block 214, utilize the spring of elasticity connecting block 214 below, make whole conveyer belt 21 vibration frequency increase, thereby vibration amplitude has been increased, thereby can be better screen the construction waste, recycle the setting of an N utmost point magnetic block 211 and No. two N utmost point magnetic blocks 212, and the N utmost point of two magnetic blocks sets up relatively, because the reason that like poles repel each other, thereby can further increase the frequency of vibrations, make better carry out the screening to the construction waste.
The working principle of the conveyer belt excess material recycling device for recycling construction waste is described in detail below.
As shown in fig. 1-4, when the utility model is used, firstly, in order to ensure the stress intensity of the whole bracket, the supporting transverse plate 14 is added at the upper end of the first supporting frame 1, so that the whole weight of the construction waste is effectively shared, the whole stress burden of the first supporting frame 1 is reduced, when the garbage crusher is used, the vibrator 215 is turned on to work, the crushed construction garbage is placed on the conveyor belt 21, when the construction waste passes above the vibrator 215, the construction waste is gradually separated by the vibration of the vibrator 215, and the construction waste is separated by the combination of the second N pole magnetic block 212 and the elastic connecting block 214, when the N-pole magnet block 211 passes above the elastic connection block 214, by means of the spring below the elastic connection block 214, the vibration frequency of the whole conveyor belt 21 is increased, so that the vibration amplitude is increased, and the construction waste can be better screened.
The present invention has been described in detail with reference to the above general description, but it will be apparent to one of ordinary skill in the art that modifications and improvements can be made to the invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.

Claims (7)

1. The utility model provides a building waste retrieves and uses conveyer belt clout recovery unit, includes support frame (1), headstock (3) and switch board (4), the top of support frame (1) is provided with headstock (3), the top of support frame (1) is provided with switch board (4), its characterized in that: the upper end of the first support frame (1) is fixedly connected with a vibration mechanism (2), an output shaft of the power box (3) is movably connected with the front side of the vibration mechanism (2), and the front side of the control cabinet (4) is fixedly connected with the back side of the vibration mechanism (2);
the first support frame (1) comprises a support transverse plate (14), and the support transverse plate (14) is arranged above the first support frame (1);
the vibration mechanism (2) comprises a vibration machine (215), and the vibration machine (215) is arranged in the vibration mechanism (2).
2. The conveying belt residue recycling device for recycling construction waste as claimed in claim 1, wherein: support frame (13) No. two of middle part fixedly connected with of a support frame (1), upper end fixedly connected with movable platform (11) of a support frame (1), upper end fixedly connected with baffle (12) of movable platform (11), the inner wall both sides fixed connection of both ends and No. two support frames (13) of support diaphragm (14).
3. The conveying belt residue recycling device for recycling construction waste as claimed in claim 1, wherein: the vibration mechanism (2) is internally provided with a conveyor belt (21), and two sides of the conveyor belt (21) are movably connected with the inner wall of the vibration mechanism (2).
4. The conveying belt residue recycling device for recycling construction waste as claimed in claim 3, wherein: the inner wall of the conveyor belt (21) is fixedly connected with a first N-pole magnetic block (211), and the upper end of the supporting transverse plate (14) is fixedly connected with a second N-pole magnetic block (212).
5. The conveying belt residue recycling device for recycling construction waste as claimed in claim 1, wherein: the upper end swing joint that supports diaphragm (14) has movable rod (213), the one end swing joint of movable rod (213) has elasticity connecting block (214), the lower extreme and the fixedly connected with spring of elasticity connecting block (214), the lower extreme and the upper end fixed connection who supports diaphragm (14) of spring.
6. The conveying belt residue recycling device for recycling construction waste as claimed in claim 5, wherein: the upper end of the vibrator (215) is fixedly connected with a transmission block (216), the lower end of the vibrator (215) is bonded with a shock absorption pad (217), and the vibrator (215) is arranged on one side of the movable rod (213).
7. The conveying belt residue recycling device for recycling construction waste as claimed in claim 6, wherein: the upper end of the elastic connecting block (214) is fixedly connected with a movable bin (2141), the inner wall of the movable bin (2141) is provided with an air bag (2142), and the front face of the shock absorption pad (217) is provided with a shock absorption hole (2171).
CN202120802831.6U 2021-04-19 2021-04-19 Conveying belt excess material recovery device for recovering construction waste Expired - Fee Related CN214651184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120802831.6U CN214651184U (en) 2021-04-19 2021-04-19 Conveying belt excess material recovery device for recovering construction waste

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120802831.6U CN214651184U (en) 2021-04-19 2021-04-19 Conveying belt excess material recovery device for recovering construction waste

Publications (1)

Publication Number Publication Date
CN214651184U true CN214651184U (en) 2021-11-09

Family

ID=78464612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120802831.6U Expired - Fee Related CN214651184U (en) 2021-04-19 2021-04-19 Conveying belt excess material recovery device for recovering construction waste

Country Status (1)

Country Link
CN (1) CN214651184U (en)

Similar Documents

Publication Publication Date Title
CN205128128U (en) Building stones breaker with vibration screening device
CN203972302U (en) Powder vibratory sieve
CN206911744U (en) Novel civil engineering shale shaker
CN212702915U (en) Shale shaker is used in production of building rubbish regeneration grit material
CN104889043A (en) An aggregate silica powder coarse smashing screening device
CN108325854A (en) A kind of special dreg sieving device of building waste
CN214651184U (en) Conveying belt excess material recovery device for recovering construction waste
CN210187729U (en) Multistage combination screening equipment
CN201900096U (en) Vibrating screen
CN216779432U (en) Sand screening device for ready-mixed mortar
CN214183517U (en) Portable crushing station with twice screening function
CN208177840U (en) A kind of vibrating screen
CN207238207U (en) A kind of highway bridge concrete waste material processing device
CN216174170U (en) Vibration amplitude stabilizing device of vibrating screen
CN213194480U (en) Building waste treatment device for housing construction
CN205165134U (en) Adjustable vibrating rod screening equipment
CN211515155U (en) Built-in material vibrating screen of vibration exciter
CN109499852B (en) Vibration screening device for intelligent coal dry separation machine
CN210814213U (en) Device for garbage dehydration
CN211964509U (en) Recycled mortar aggregate production facility
CN207941684U (en) A kind of grading machine
CN211412658U (en) Construction waste solid waste recycled aggregate sorting machine with belt conveying device
CN204817158U (en) Dirt -proof environment -friendly shale shaker can give sound insulation
CN220092070U (en) Hierarchical sieving mechanism of building rubbish regeneration aggregate
CN111167705A (en) Vibration screening machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211109