CN214619082U - Fire-fighting pipeline leads to check out test set who hinders state - Google Patents

Fire-fighting pipeline leads to check out test set who hinders state Download PDF

Info

Publication number
CN214619082U
CN214619082U CN202121046495.3U CN202121046495U CN214619082U CN 214619082 U CN214619082 U CN 214619082U CN 202121046495 U CN202121046495 U CN 202121046495U CN 214619082 U CN214619082 U CN 214619082U
Authority
CN
China
Prior art keywords
pipeline
bull stick
bolt
hole
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121046495.3U
Other languages
Chinese (zh)
Inventor
梁梦飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Wenhua Construction Development Co ltd
Original Assignee
Guangdong Wenhua Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Wenhua Construction Development Co ltd filed Critical Guangdong Wenhua Construction Development Co ltd
Priority to CN202121046495.3U priority Critical patent/CN214619082U/en
Application granted granted Critical
Publication of CN214619082U publication Critical patent/CN214619082U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model relates to a fire control pipeline leads to check out test set who hinders state, its including the bull stick that runs through the pipeline and fix the face board that expands on the bull stick, expand the thickness direction of face board with the radial unanimity of bull stick, the pipeline runs through to have and is used for supporting the connecting block of bull stick, one side that the pipeline was kept away from to the connecting block can be dismantled and have and be used to the drive bull stick pivoted driving piece, the driving piece includes the motor, the drive shaft one end of motor can with bull stick one end concatenation or separation, the bull stick is kept away from the one end of motor is fixed with the pointer, the pointer stretches out outside the pipeline. This application has the effect that reduces fire control pipeline and blocks up.

Description

Fire-fighting pipeline leads to check out test set who hinders state
Technical Field
The application relates to the field of fire fighting pipelines, in particular to a fire fighting pipeline resistance state detection device.
Background
For safe housing of a house, a fire fighting system is one of the important conditions, and a fire fighting pipeline communicated with a water outlet pipe of each floor is usually fixed on the wall of the house so as to extinguish fire of each floor of the building by people when a fire occurs.
The fire pipeline is fixed at the floor outer wall and downwardly extending, is the state of buckling in the intercommunication department with the inside outlet pipe of floor, and the aquatic of circulation carries silt to pile up when buckling the department in the fire pipeline, and the fire pipeline takes place to block up, and it is not smooth to go out water when leading to easily putting out a fire, finally leads to the condition that is difficult to save oneself when the condition of a fire takes place.
SUMMERY OF THE UTILITY MODEL
In order to reduce the condition that fire pipeline blockked up, this application provides a fire pipeline leads to check out test set who hinders state.
The application provides a fire pipeline leads to check out test set who hinders state adopts following technical scheme:
the utility model provides a fire control pipeline leads to check out test set who hinders state, includes the bull stick that runs through the pipeline and fixes the face board that expands on the bull stick, expand the thickness direction of face board with the radial unanimity of bull stick, the pipeline runs through to have and is used for supporting the connecting block of bull stick, one side that the pipeline was kept away from to the connecting block can be dismantled and have and be used to the drive the bull stick pivoted driving piece, the driving piece includes the motor, the drive shaft one end of motor can with bull stick one end concatenation or separation, the bull stick is kept away from the one end of motor is fixed with the pointer, the pointer stretches out outside the pipeline.
By adopting the technical scheme, when water flow in the pipeline is smooth, the water flow impacts the expanding panel to drive the rotating rod to rotate, and further drive the indicating needle to rotate; when the pipeline blockked up, rivers were difficult to strike and expand the panel, lead to the pointer to rotate unusually, install the driving piece outside the pipeline for drive shaft and bull stick concatenation, thereby drive the bull stick rotation with starter motor, thereby make the panel that expands on the bull stick rotate and break up and block up silt, thereby dredge the pipeline, reduce the pipe blockage, and then rivers are difficult to the spun condition when leading to need putting out a fire.
Preferably, a protection ring is fixed on the outer peripheral wall of the pipeline, a transparent plate is arranged on the side wall, away from the pipeline, of the protection ring, and the indicating needle is located in the protection ring.
By adopting the technical scheme, the protection of the indicating needle is facilitated, and the condition that the indicating needle is exposed outside and is easy to damage is prevented.
Preferably, one side of the connecting block, which is located outside the pipeline, is fixedly connected with a connecting ring, the connecting ring is connected with a sliding ring in a sliding mode, the sliding ring is detachably inserted into an installation box, and the motor is arranged in the installation box.
Through adopting above-mentioned technical scheme, when needs installation driving piece, peg graft the installation box in the one end of sliding ring and fixed, can accomplish the installation of motor for the drive shaft of motor is driven with the bull stick concatenation more easily after the installation motor.
Preferably, a main jack penetrates through the side wall of the connecting ring, an auxiliary jack penetrates through the side wall of the sliding ring, when the driving shaft is spliced with the rotating rod, the main jack is opposite to the auxiliary jack, a bolt penetrates through the main jack, and the bolt is in threaded connection with the auxiliary jack.
Through adopting above-mentioned technical scheme, when drive shaft and bull stick concatenation, drive shaft and bull stick butt, the bolt runs through main jack and vice jack restriction drive shaft and the separation of bull stick for the drive shaft can stably drive the bull stick.
Preferably, a spring is fixed on the bottom wall of the connecting ring, the other end of the spring is fixedly connected with the sliding ring, and when the bolt penetrates through the auxiliary insertion hole, the spring is in a compressed state.
Through adopting above-mentioned technical scheme, take out the bolt, the sliding ring outwards slides to drive shaft and bull stick separation under the effect of spring for during the rivers circulation, the rotation of bull stick is difficult for hindering to the drive shaft.
Preferably, the wall of the installation box is provided with a through hole, a movable cavity is formed inside the sliding ring, when the installation box is fixed on the sliding ring, the movable cavity is communicated with the through hole and partially faces the through hole, a main bolt is inserted into the through hole and connected with an auxiliary bolt perpendicular to the main bolt, and the auxiliary bolt can be inserted into the movable cavity through the through hole.
Through adopting above-mentioned technical scheme, insert vice bolt to the activity intracavity, rotate main bolt and make vice bolt and perforation dislocation, can restrict sliding ring and install bin separation.
Preferably, a limiting block is inserted into the through hole, and the limiting block abuts against the main bolt.
Through adopting above-mentioned technical scheme, insert main bolt to the perforation in, rotate main bolt until vice bolt and perforation dislocation, then insert the perforation with the restriction piece again to support tight main bolt, and restrict main bolt and rotate, make main bolt and vice bolt fix the installation case steadily.
Preferably, the side wall of the installation box is hinged with an auxiliary door, the auxiliary door is fixedly connected with the limiting block, and the limiting block is a flexible block.
Through adopting above-mentioned technical scheme for the restriction piece links to each other with the install bin, thereby makes the restriction piece be difficult for losing, thereby makes the restriction piece just insert to the perforation in with the perforation more easily simultaneously.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when water flow in the pipeline is smooth, the water flow impacts the expanding panel to drive the rotating rod to rotate, and further drive the indicating needle to rotate; when a pipeline is blocked, water flow is difficult to impact the expanding panel, so that the indicating needle rotates abnormally, the driving piece is arranged outside the pipeline, the driving shaft is spliced with the rotating rod, then the motor is started to drive the rotating rod to rotate, and the expanding panel on the rotating rod rotates to break up silt blocked, so that the pipeline is dredged, the pipeline blockage is reduced, and the condition that the water flow is difficult to spray when fire is needed is caused;
2. the main bolt is inserted into the through hole through the arrangement of the limiting block, the main bolt is rotated until the auxiliary bolt is dislocated with the through hole, and then the limiting block is inserted into the through hole, so that the main bolt is abutted against the main bolt, and the main bolt is limited to rotate, so that the main bolt and the auxiliary bolt can stably fix the installation box;
3. through the setting of supplementary door for the restriction piece links to each other with the install bin, thereby makes the restriction piece be difficult for losing, thereby makes the restriction piece just insert to the perforation in with the perforation more easily simultaneously.
Drawings
FIG. 1 is a schematic diagram illustrating an overall structure of a fire fighting pipeline resistance state detection device according to the present application;
FIG. 2 is a schematic diagram illustrating the construction of the expanding panel;
fig. 3 is a structural sectional view of the driving end of the enlarged panel.
Description of reference numerals: 1. a rotating rod; 2. expanding a panel; 3. an indicator needle; 4. connecting blocks; 5. a support block; 6. a pipeline; 7. a guard ring; 8. a connecting ring; 9. a spring; 10. a slip ring; 11. installing a box; 12. perforating; 13. a main bolt; 14. an auxiliary bolt; 15. an insertion cavity; 16. a movable cavity; 17. an auxiliary door; 18. a limiting block; 19. a motor; 20. a drive block; 21. a driven block; 22. a driven groove; 23. a main jack; 24. a sub-jack; 25. and (4) bolts.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses check out test set of fire control pipeline logical resistance state.
Referring to fig. 1 and 2, the fire fighting pipeline resistance state detection device comprises a rotating rod 1 penetrating through a water pipe, a panel expansion plate 2 fixed on the rotating rod 1, and a red indicator needle 3 fixed at one end of the rotating rod 1. The level of bull stick 1 sets up, and the one end that the pointer 3 was kept away from to bull stick 1 is equipped with and is used for the drive to expand panel 2 pivoted driving piece, when pipeline 6 blockked up, expands panel 2 through the driving piece drive and rotates and can break up accumulational silt, silt and dredge pipeline 6.
Referring to fig. 2 and 3, the enlarged panel 2 has a rectangular plate shape, both end edges of the enlarged panel 2 in the longitudinal direction are rounded, the rotating rod 1 penetrates the center of the enlarged panel 2, and the longitudinal direction of the rotating rod 1 is identical to the width direction of the enlarged panel 2.
Referring to fig. 2 and 3, the fire fighting pipeline 6 is fixedly provided with a connecting block 4 and a supporting block 5 in a penetrating manner, the connecting block 4 and the supporting block 5 are both partially positioned in the pipeline 6, and the supporting block 5 and the connecting block 4 are arranged on two opposite sides of the pipeline 6 in a facing manner.
Referring to fig. 1 and 2, the supporting block 5 is a square, the rotating rod 1 penetrates through the supporting block 5 and is rotatably connected with the supporting block 5, so as to support the rotating rod 1, the outer side wall of the pipeline 6 close to the supporting block 5 is also fixedly connected with a protecting ring 7, the protecting ring 7 is hollow, one side of the protecting ring 7 far away from the outer side wall of the pipeline 6 is a transparent plate, the indicating needle 3 is positioned in the protecting ring 7, the indicating needle 3 is protected, and the situation that the indicating needle 3 is exposed outside and is easily damaged is reduced.
Referring to fig. 2 and 3, a connection ring 8 is fixedly connected to one end of the connection block 4 located outside the pipeline 6, the connection ring 8 is a square ring, and the annular wall of the connection ring 8 is hollow. Be equipped with spring 9 in the go-between 8, spring 9's length direction is unanimous with go-between 8's direction of height, and spring 9 one end and 4 fixed connection of connecting block, other end fixedly connected with sliding ring 10, and the sliding ring 10 cross-section is the T style of calligraphy, and the great one end of sliding ring 10 cross sectional area and spring 9 fixed connection for sliding ring 10 can slide under spring 9's promotion.
Referring to fig. 2 and 3, the top end of the slip ring 10 is plugged with a mounting box 11, the mounting box 11 is hollow and has an open bottom end, and the wall of the mounting box 11 is hollow to form a plugging cavity 15 for the insertion and sliding of the annular wall of the slip ring 10. Four periphery walls of install bin 11 all run through and have perforated hole 12, it has main bolt 13 to peg graft in the perforated hole 12, main bolt 13 one end an organic whole is connected with vice bolt 14, thereby form the round pin form of L shape, the length of perforation 12 equals the length of vice bolt 14, sliding ring 10 is inside to be opened there is movable chamber 16, perforation 12 and movable chamber 16 intercommunication, movable chamber 16 is the semicircle form that the radius equals vice bolt 14 length, make vice bolt 14 can rotate to misplace with perforation 12 in movable chamber 16, thereby restrict vice bolt 14 and sliding ring 10 and separate, and main bolt 13 part is inserted in perforation 12, thereby restriction install bin 11 and sliding ring 10 separation.
Referring to fig. 2 and 3, the main bolt 13 and the auxiliary bolt 14 are both round rods, and rectangular rubber layers are sleeved outside the main bolt 13 and the auxiliary bolt 14. The side wall of the installation box 11 is also hinged with an auxiliary door 17, the auxiliary door 17 is in a rectangular plate shape, and the length direction of a rotating shaft of the auxiliary door 17 is consistent with the length direction of the rotating rod 1. The auxiliary door 17 is close to one side of the installation box 11 and is fixedly connected with a limiting block 18, the limiting block 18 is in a cuboid shape, the cross section of the limiting block 18 is the same as the shape and the size of the through hole 12, when the auxiliary door 17 is attached to the side wall of the installation box 11, the limiting block 18 is inserted into the through hole 12 to block the through hole 12, meanwhile, the lower surface of the limiting block 18 is abutted against the main bolt 13 to limit the rotation of the main bolt 13, and the bolt is not easy to pull out to limit the separation of the installation box 11 and the sliding ring 10.
Referring to fig. 2 and 3, the driving piece includes motor 19 fixed on one side of installation box 11 far from pipeline 6, drive shaft one end fixedly connected with drive block 20 of motor 19, drive block 20 is the quadrangular pyramid form, the one end fixedly connected with driven block 21 that bull stick 1 is close to motor 19, driven block 21 keeps away from the sunken driven groove 22 that has the confession drive block 20 to insert the concatenation of one end of bull stick 1, thereby push motor 19 makes drive block 20 insert to driven groove 22 in, make drive block 20 and driven groove 22 joint each other, the drive shaft rotates and drives driven block 21 and rotate and just can drive bull stick 1 and rotate, when making pipeline 6 block up, the enlarged panel 2 on the accessible motor 19 drive bull stick 1 rotates and then dredge pipeline 6.
Referring to fig. 2 and 3, an auxiliary insertion hole 24 penetrates through one end of the slip ring 10 with a larger cross-sectional area in the width direction, a main insertion hole 23 is formed in the outer side wall of the connecting ring 8, when the driving block 20 is inserted into the driven groove 22, the main insertion hole 23 is opposite to the auxiliary insertion hole 24, the auxiliary insertion hole 24 is a threaded hole, and a bolt 25 is connected to the auxiliary insertion hole 24 in a threaded manner, so that the slip ring 10 is fixed.
The implementation principle of the detection equipment for the resistance state of the fire fighting pipeline in the embodiment of the application is as follows: when the water flow in the pipeline 6 normally flows, the normally rotating pointer 3 can be observed through the transparent panel of the protection ring 7, and when the pipeline 6 is blocked, the pointer 3 is blocked to dredge the pipeline 6.
Firstly, the motor 19 is installed on the slip ring 10, the slip ring 10 is inserted into the inserting cavity 15, the through hole 12 is opposite to the movable cavity 16, then the auxiliary bolt 14 is inserted into the through hole 12 and the movable cavity 16, then the main bolt 13 is rotated, the auxiliary bolt 14 is rotated to be dislocated with the through hole 12, and the installation box 11 can be limited to be separated from the slip ring 10. Then the auxiliary door 17 is rotated to make one side of the auxiliary door 17 fit with the installation box 11, and the limiting block 18 is inserted into the through hole 12, so that the main bolt 13 is limited to rotate continuously, and finally the installation of the motor 19 and the installation box 11 is completed, so that the driving block 20 after installation is more easily inserted into the driven groove 22.
Push motor 19 is pegged graft in driven groove 22 until drive block 20, runs through main jack 23 and vice jack 24 with bolt 25 simultaneously to fixed sliding ring 10 and drive block 20, can the starter motor 19 drive bull stick 1 and rotate, thereby drive expand panel 2 and rotate, make expand panel 2 and promote the stopper emergence motion in the pipeline 6, thereby break up the stopper, make pipeline 6 dredge. When the motor 19 is not needed to be used, the motor 19 can be detached, and the situation that the motor 19 is damaged due to long-time placement outdoors is prevented.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a fire control pipeline leads to check out test set who hinders state which characterized in that: including bull stick (1) that runs through pipeline (6) and fix expand panel (2) on bull stick (1), expand the thickness direction of panel (2) with the radial unanimity of bull stick (1), pipeline (6) run through to have and are used for supporting connecting block (4) of bull stick (1), one side that pipeline (6) were kept away from in connecting block (4) can be dismantled and have and be used for the drive bull stick (1) pivoted driving piece, the driving piece includes motor (19), the drive shaft one end of motor (19) can with bull stick (1) one end concatenation or separation, bull stick (1) is kept away from the one end of motor (19) is fixed with pointer (3), pointer (3) stretch out outside pipeline (6).
2. The fire fighting pipeline blockage state detection device according to claim 1, wherein: the pipeline (6) periphery wall is fixed with protection ring (7), protection ring (7) are kept away from the lateral wall of pipeline (6) is the transparent plate, pointer (3) are located in protection ring (7).
3. The fire fighting pipeline blockage state detection device according to claim 1, wherein: the connecting block (4) is located one side fixedly connected with go-between (8) outside pipeline (6), go-between (8) sliding connection has sliding ring (10), the grafting can be dismantled in sliding ring (10) has install bin (11), install bin (11) are located in motor (19).
4. A fire fighting pipeline blockage state detection device as recited in claim 3, wherein: the side wall of the connecting ring (8) penetrates through a main insertion hole (23), the side wall of the sliding ring (10) penetrates through an auxiliary insertion hole (24), when the driving shaft is spliced with the rotating rod (1), the main insertion hole (23) is opposite to the auxiliary insertion hole (24), a bolt (25) penetrates through the main insertion hole (23), and the bolt (25) is in threaded connection with the auxiliary insertion hole (24).
5. The fire fighting pipeline blockage state detection device according to claim 4, wherein: and a spring (9) is fixed on the bottom wall of the connecting ring (8), the other end of the spring (9) is fixedly connected with the sliding ring (10), and when the bolt (25) penetrates through the auxiliary insertion hole (24), the spring (9) is in a compressed state.
6. A fire fighting pipeline blockage state detection device as recited in claim 3, wherein: the wall of the installation box (11) is provided with a through hole (12), a movable cavity (16) is formed in the sliding ring (10), when the installation box (11) is fixed on the sliding ring (10), the movable cavity (16) is communicated with the through hole (12) and partially faces the through hole, a main bolt (13) is inserted in the through hole (12), the main bolt (13) is connected with an auxiliary bolt (14) perpendicular to the main bolt (13), and the auxiliary bolt (14) can be inserted into the movable cavity (16) through the through hole (12).
7. The fire fighting pipeline blockage state detection device according to claim 6, wherein: and a limiting block (18) is inserted into the through hole (12), and the limiting block (18) is tightly propped against the main bolt (13).
8. The fire fighting pipeline blockage state detection device according to claim 7, wherein: the side wall of the installation box (11) is hinged with an auxiliary door (17), the auxiliary door (17) is fixedly connected with the limiting block (18), and the limiting block (18) is a flexible block.
CN202121046495.3U 2021-05-14 2021-05-14 Fire-fighting pipeline leads to check out test set who hinders state Expired - Fee Related CN214619082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121046495.3U CN214619082U (en) 2021-05-14 2021-05-14 Fire-fighting pipeline leads to check out test set who hinders state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121046495.3U CN214619082U (en) 2021-05-14 2021-05-14 Fire-fighting pipeline leads to check out test set who hinders state

Publications (1)

Publication Number Publication Date
CN214619082U true CN214619082U (en) 2021-11-05

Family

ID=78407844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121046495.3U Expired - Fee Related CN214619082U (en) 2021-05-14 2021-05-14 Fire-fighting pipeline leads to check out test set who hinders state

Country Status (1)

Country Link
CN (1) CN214619082U (en)

Similar Documents

Publication Publication Date Title
CN214619082U (en) Fire-fighting pipeline leads to check out test set who hinders state
CN202420884U (en) Fluid-solid coupling model test system for sea bed tunnel
CN114922562B (en) Slope anchoring device for constructional engineering
KR101858111B1 (en) Temporary air noise barrier
KR101665358B1 (en) Earth and sand removing apparatus of auger screw
CN115487457B (en) Fire hydrant water drain anti-blocking device and method
CN210052260U (en) Fire acousto-optic alarm
CN218562297U (en) Foundation pit drainage system
CN216748149U (en) Sand stratum ground monitoring devices that sinks
CN215522584U (en) Supporting device for software engineering test
CN109113094A (en) Household air-raid shelter and its construction method
CN220117231U (en) Safety support device for deep foundation pit
CN220150362U (en) Foundation structure in house building construction
CN209523206U (en) Foundation pit bolt-type suspension device
CN213933735U (en) Mask flame retardant property tester
CN220566746U (en) Pipeline positioning equipment
CN217299930U (en) Municipal works foundation ditch safety device
CN216194924U (en) Inspection well protection device
CN218972132U (en) Water pumping device with air
CN215483244U (en) Excavator bucket tooth protection device
CN220563383U (en) Square quick-opening manhole device
CN219732474U (en) Fire control furred ceiling device based on BIM building engineering
CN219450739U (en) Deep foundation pit supporting structure
CN219992814U (en) But interior partition wall of quick installation
CN220365083U (en) Water hydrant controller for high-rise building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211105

CF01 Termination of patent right due to non-payment of annual fee