CN214618352U CN202120702433.7U CN202120702433U CN214618352U CN 214618352 U CN214618352 U CN 214618352U CN 202120702433 U CN202120702433 U CN 202120702433U CN 214618352 U CN214618352 U CN 214618352U
Authority
CN
China
Prior art keywords
heating
pipe
sleeve pipe
pipeline
connecting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120702433.7U
Other languages
Chinese (zh)
Inventor
王雨佳
张骁
郭亚飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Three Gorges Electric Power Jinzhou Energy (Hubei) Co.,Ltd.
Original Assignee
Jingzhou Distributed Energy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingzhou Distributed Energy Co ltd filed Critical Jingzhou Distributed Energy Co ltd
Priority to CN202120702433.7U priority Critical patent/CN214618352U/en
Application granted granted Critical
Publication of CN214618352U publication Critical patent/CN214618352U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Thermal Insulation (AREA)
  • Pipe Accessories (AREA)

Abstract

The utility model discloses a heating pipeline for central heating of heating logical in pipeline field, including body and sealing washer, the body both ends all are equipped with the fender ring, and the body both ends all are equipped with the connecting pipe, and the end wall is equipped with the antirust coat in the connecting pipe, and the body is inside to be equipped with the heat preservation, and the body mid-mounting has the sleeve pipe, and the sleeve pipe inner is equipped with flange, the sleeve pipe rear portion is equipped with the through-hole, and body top end wall is installed temperature monitor, and the temperature monitor lower extreme is installed the installation pole, through the temperature of the inside heating installation of temperature sensor response body, reminds heating mechanism whether need heat treatment to the heating installation on the way of heating installation supply, effectively improves the body functionality; and keep off the ring and be the rubber material, after two body concatenations were accomplished, merge two sleeve pipes, through flange with two fixed concatenations of sleeve pipe, through two sleeve pipe cooperations with body junction cover, and two flange joint are equipped with the sealing washer, are favorable to protecting and sealing its junction.

Description

Heating pipeline for central heating of heating and ventilation
Technical Field
The utility model relates to the field of pipelines, specifically a heating pipeline is used in central heating of warm logical.
Background
The pipeline installation is a novel technology introduced by all electromechanical equipment, and comprises common data, pipes, pipe fittings, flanges, a basic operation technology of the pipeline installation, pipeline connection, installation of a support and a compensator, a valve, installation of a building water supply and drainage pipeline, installation of a heating system, pressure test and cleaning of the pipeline, installation of common industrial pipelines, installation of non-ferrous metal pipelines and stainless steel pipelines, installation of common non-metallic pipelines and anti-corrosion lining pipelines, installation of instrument pipelines and corrosion prevention and heat insulation of the pipelines.
In the prior art, the heat supply pipeline function singleness commonly used does not have its junction seal protection after the heat supply pipeline concatenation, and the heat supply pipeline is wet easily for a long time in underground junction and is corroded, leads to pipeline intensity to reduce, and the practicality reduces.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a heating pipeline is used in central heating of warm logical to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a warm logical central heating with heat supply pipeline, includes body and sealing washer, the body both ends all are equipped with and keep off the ring, the body both ends all are equipped with the connecting pipe, the connecting pipe inner end wall is equipped with the antirust coat, the inside heat preservation that is equipped with of body, the body mid-mounting has the sleeve pipe, sleeve pipe inner is equipped with flange, the sleeve pipe rear portion is equipped with the through-hole, body top end wall installs temperature monitor, the installation pole is installed to the temperature monitor lower extreme.
As a further aspect of the present invention: the body is equipped with two, and during the use, two bodys can splice and use as a whole, and the left side body has the temperature measurement function.
As a further aspect of the present invention: the connecting pipe is stainless steel material, and two the body passes through the connecting pipe welding and is a whole, and after two body welding accomplished, its junction was twined it through multilayer heat preservation area, realizes the thermal insulation performance.
As a further aspect of the present invention: keep off the ring and be the rubber material, just the diameter that keeps off the ring is greater than sleeve pipe rear portion through-hole size, accomplishes the back when two bodys concatenations, merges two sleeve pipes, through the fixed concatenation of l flange with two sleeve pipes, covers the body junction through two sleeve pipe cooperations, and two flange junctions are equipped with the sealing washer, are favorable to protecting and sealing its junction.
As a further aspect of the present invention: the inner end wall of the anti-rust layer and the inner end wall of the connecting pipe are fixedly connected, and after the pipe body is used for a long time, the interior of the pipe body can be prevented from rusting through the anti-rust layer, so that the pipe body is corroded from the interior, the use is influenced, and the service cycle of the pipe body is prolonged.
As a further aspect of the present invention: temperature monitor installs in left side body upper end through installation pole and fixing base, just temperature monitor lower extreme is equipped with the temperature-sensing ware in the body, through the temperature of the inside heating installation of temperature-sensing ware response body, reminds whether heating mechanism need carry out heat treatment to the heating installation on the way that the heating installation was supplied with.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses in, keep off the ring and be the rubber material, and keep off the diameter of ring and be greater than sleeve pipe rear portion through-hole size, after two body concatenations are accomplished, merge two sleeve pipes, through flange with two fixed concatenations of sleeve pipe, through two sleeve pipe cooperations with the body junction cover, and two flange junctions are equipped with the sealing washer, are favorable to protecting and sealing its junction, avoid the body junction later stage to receive the corruption, influence the body and use, improve the body functionality.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection structure of the present invention;
fig. 3 is an enlarged view of the point B in fig. 2 according to the present invention.
In the figure: 1. a pipe body; 11. a baffle ring; 12. a connecting pipe; 13. a heat-insulating layer; 14. a rust-proof layer; 2. a sleeve; 21. a connecting flange; 22. a seal ring; 3. a temperature display; 31. and (5) installing a rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, in the embodiment of the present invention, a heating pipeline for central heating includes a pipe body 1 and a sealing ring 22, the two ends of the pipe body 1 are all provided with a retaining ring 11, the two ends of the pipe body 1 are all provided with a connecting pipe 12, the inner end wall of the connecting pipe 12 is provided with an antirust layer 14, the inside of the pipe body 1 is provided with a heat preservation layer 13, the middle of the pipe body 1 is provided with a sleeve 2, the inner end of the sleeve 2 is provided with a connecting flange 21, the rear portion of the sleeve 2 is provided with a through hole, the top end wall of the pipe body 1 is provided with a temperature display 3, and the lower end of the temperature display 3 is provided with an installation rod 31.
Wherein, body 1 is equipped with two, and during the use, two bodies 1 can splice and use as a whole, and left side body 1 has the temperature measurement function.
The connecting pipe 12 is stainless steel, and two bodys 1 are a whole through the welding of connecting pipe 12, and after two bodys 1 welding were accomplished, its junction was twined it through multilayer heat preservation area, realized thermal insulation performance.
Keep off ring 11 and be the rubber material, and keep off ring 11's diameter and be greater than sleeve pipe 2 rear portion through-hole size, accomplish the back when two 1 concatenations of body, merge two sleeve pipes 2, through the fixed concatenation of l flange 21 with two sleeve pipes 2, through two 2 cooperations of sleeve pipe with the body 1 junction cover, and two flange joint are equipped with sealing washer 22, are favorable to protecting and sealing its junction.
The inner end wall fixed connection of the antirust layer 14 and the connecting pipe 12 can prevent the interior of the pipe body 1 from rusting through the antirust layer 14 after the pipe body 1 is used for a long time, so that the pipe body 1 is corroded from the interior, the use is influenced, and the service cycle of the pipe body 1 is prolonged.
Temperature monitor 3 installs in 1 upper end of left side body through installation pole 31 and fixing base, and is equipped with the temperature-sensing ware in 3 lower extreme bodys of temperature monitor 1, through the temperature of the inside heating installation of temperature-sensing ware induction body 1, reminds whether heating mechanism need carry out heat treatment to the heating installation on the way that the heating installation was supplied with.
The utility model discloses a theory of operation is: the connecting pipe 12 is made of stainless steel, the two pipe bodies 1 are welded into a whole through the connecting pipe 12, after the two pipe bodies 1 are welded, the joints of the two pipe bodies 1 are wound by using a plurality of layers of heat preservation belts, so that the heat preservation performance is realized, after the two pipe bodies 1 are spliced, the two sleeve pipes 2 are combined, the two sleeve pipes 2 are fixedly spliced through the connecting flange 21, the joints of the pipe bodies 1 are sealed through the matching of the two sleeve pipes 2, the joints of the two flange joints are provided with sealing rings 22, so that the joints are protected and sealed, after the pipe bodies 1 are used for a long time, the rust inside of the pipe bodies 1 can be prevented through the antirust layer 14, the pipe bodies 1 are corroded from the inside and influence the use, the service cycle of the pipe bodies 1 is prolonged, the temperature display 3 is arranged at the upper end of the left pipe body 1 through the mounting rod 31 and the fixing seat, and the temperature sensor LM35DZ is arranged in the pipe body 1 at the lower end of the temperature display 3 in model PR5714, the temperature sensor LM35DZ senses the temperature of the warm air inside the pipe body 1, and prompts the heating mechanism whether the warm air needs to be heated during the warm air supply, which is beneficial to improving the functionality of the pipe body 1.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a heating pipeline for central heating of warm logical, includes body (1) and sealing washer (22), its characterized in that: body (1) both ends all are equipped with and keep off ring (11), body (1) both ends all are equipped with connecting pipe (12), the inner end wall of connecting pipe (12) is equipped with antirust coat (14), body (1) inside is equipped with heat preservation (13), body (1) mid-mounting has sleeve pipe (2), sleeve pipe (2) the inner is equipped with flange (21), sleeve pipe (2) rear portion is equipped with the through-hole, temperature monitor (3) are installed to body (1) top wall, installation pole (31) are installed to temperature monitor (3) lower extreme.
2. The heating pipeline for central heating according to claim 1, wherein: the number of the pipe bodies (1) is two.
3. The heating pipeline for central heating of claim 2, wherein: the connecting pipe (12) is made of stainless steel, and the two pipe bodies (1) are welded into a whole through the connecting pipe (12).
4. The heating pipeline for central heating according to claim 1, wherein: the blocking ring (11) is made of rubber, and the diameter of the blocking ring (11) is larger than the size of the through hole at the rear part of the sleeve (2).
5. The heating pipeline for central heating according to claim 1, wherein: the anti-rust layer (14) is fixedly connected with the inner end wall of the connecting pipe (12).
6. The heating pipeline for central heating according to claim 1, wherein: temperature monitor (3) are installed in left side body (1) upper end through installation pole (31) and fixing base, just be equipped with temperature-sensing ware in temperature monitor (3) lower extreme body (1).
CN202120702433.7U 2021-04-07 2021-04-07 Heating pipeline for central heating of heating and ventilation Active CN214618352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120702433.7U CN214618352U (en) 2021-04-07 2021-04-07 Heating pipeline for central heating of heating and ventilation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120702433.7U CN214618352U (en) 2021-04-07 2021-04-07 Heating pipeline for central heating of heating and ventilation

Publications (1)

Publication Number Publication Date
CN214618352U true CN214618352U (en) 2021-11-05

Family

ID=78400094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120702433.7U Active CN214618352U (en) 2021-04-07 2021-04-07 Heating pipeline for central heating of heating and ventilation

Country Status (1)

Country Link
CN (1) CN214618352U (en)

Similar Documents

Publication Publication Date Title
CN103437556B (en) Building water supply and drainage and heating engineering waterproofing and insulation construction method
RU2635943C2 (en) Pipeline, method for forming pipeline, method of cathodic pipeline protection, method for forming and laying underwater pipeline
CN101619779B (en) Sealing device for buried pipe connected with protective well
CN201496724U (en) Multifunctional haft joint of extra large pipe network
CN214618352U (en) Heating pipeline for central heating of heating and ventilation
CN213089173U (en) Insulating fixed bolster of prefabricated direct-burried high temperature steam insulating tube
CN210600695U (en) Anti-corrosion direct-buried heat-insulation pipe
CN110594534B (en) Insulating internal fixing support of prefabricated direct-buried steam heat-insulating pipe
CN215674192U (en) Quick-connecting polyethylene jacket pipe
CN217583466U (en) Be used for nuclear power plant water system HDPE hydrophobic exhaust pipe gallows
CN213512602U (en) Bent PPR tubular product of bridge
CN202228843U (en) Sealing type thermal insulation direct burial sleeve compensator
CN210344718U (en) Protection device for building water supply pipeline
CN105840922A (en) Novel thermal insulation water supply pipeline with multiplex corrosion resistance function
CN2465027Y (en) Improved corrugated pipe compensator
CN212840049U (en) Pipe gallery cold and hot combined supply pipeline sealing device
CN218494386U (en) Prefabricated overhead pipeline composite heat insulation structure for conveying high-temperature heating medium
CN221004150U (en) Clamping connector for bathroom water pipe
CN211315371U (en) Steel pipe structure with good bearing performance
CN211010367U (en) Pipeline displacement compensation connection structure
CN203656967U (en) Boiler water-cooled wall
CN216408096U (en) PP-R pipe fitting with good heat resistance
CN220286741U (en) Large-caliber high-temperature-resistant prefabricated directly-buried heat-insulation bent pipe
CN209041753U (en) A kind of Pipe installing support device
CN217519410U (en) Pipeline installation connecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 434021 Jingzhou Central Hospital (Jingbei Campus) Natural Gas Distributed Energy Station, No. 26 Chuyuan Avenue, Jingzhou District, Jingzhou City, Hubei Province (self declared)

Patentee after: Three Gorges Electric Power Jinzhou Energy (Hubei) Co.,Ltd.

Country or region after: China

Address before: 434021 No.14 Office of Greenland enterprise service platform, 25th floor, Greenland mingchuang office building, no.6, Zhuangwang Avenue, Jingzhou District, Jingzhou City, Hubei Province

Patentee before: Jingzhou Distributed Energy Co.,Ltd.