CN214613553U - Underwater water stopping structure suitable for prefabricated pier - Google Patents

Underwater water stopping structure suitable for prefabricated pier Download PDF

Info

Publication number
CN214613553U
CN214613553U CN202023327120.2U CN202023327120U CN214613553U CN 214613553 U CN214613553 U CN 214613553U CN 202023327120 U CN202023327120 U CN 202023327120U CN 214613553 U CN214613553 U CN 214613553U
Authority
CN
China
Prior art keywords
water stopping
stopping structure
rubber
water
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023327120.2U
Other languages
Chinese (zh)
Inventor
郑和晖
张晓光
王敏
代浩
俞俊业
杨建平
邓玉鑫
余小龙
彭成明
李刚
田飞
华晓涛
骆钊
刘修成
万猛
肖林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN202023327120.2U priority Critical patent/CN214613553U/en
Application granted granted Critical
Publication of CN214613553U publication Critical patent/CN214613553U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses an underwater water stop structure suitable for prefabricated pier, it sets up between steel-pipe pile and prefabricated pier, prefabricated pier sets up in the steel-pipe pile outside, its characterized in that, underwater water stop structure includes, first water stop structure, it is the tube-shape, and the laminating cover is established in the outside of steel-pipe pile; the second water stopping structure is in a ring plate shape, is sleeved on the outer side of the first water stopping structure and is positioned at the bottom of the prefabricated abutment, and the ring plate-shaped upper wall of the second water stopping structure is attached to the bottom of the prefabricated abutment; and a plurality of third water stopping structures filled between the first water stopping structure and the steel pipe pile and between the second water stopping structure and the bottom of the prefabricated abutment. The technical scheme of the utility model have quick, effective stagnant water, and stagnant water system is simple, construction method convenient and fast's technological effect. But wide application in the stagnant water structural technology field of prefabricated pier.

Description

Underwater water stopping structure suitable for prefabricated pier
Technical Field
The utility model relates to a stagnant water technical field of prefabricated pier nose. More specifically speaking, the utility model relates to a stagnant water structure under water suitable for prefabricated pier.
Background
The large bridges across rivers and the seas in China are more and more, and the construction window period is very limited under the severe working condition. In order to reduce the influence of environmental factors and improve the construction efficiency, a basic design provides a guideline of 'large-scale, factory, standard and assembly', the project construction adopts a full prefabricated hoisting construction process of a bearing platform pier body, and post-cast concrete is adopted for wet joint between the prefabricated pier and the steel pipe composite pile. Under the condition, how to ensure whether the gap between the bearing platform and the pipe wall of the steel pipe can be successfully sealed becomes a key control factor for success or failure of the foundation construction.
In traditional construction, an integral pouring jacket and large-volume concrete bottom sealing water stopping scheme is often adopted, novel water stopping methods such as a water stopping tray and an inflatable capsule are also provided in recent years, but the project amount is large in the practical operation process of the scheme, and under the condition of a low water head, the water stopping device is high in manufacturing cost and low in construction efficiency, so that the related water stopping technology is very necessary to be optimized.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a stagnant water structure under water suitable for prefabricated pier nose.
To achieve these objects and other advantages in accordance with the purpose of the present invention, there is provided an underwater water stopping structure adapted to a prefabricated abutment, which is provided between a steel pipe pile and the prefabricated abutment, the prefabricated abutment being provided outside the steel pipe pile, the underwater water stopping structure including,
the first water stopping structure is cylindrical and is fitted and sleeved on the outer side of the steel pipe pile;
the second water stopping structure is in a ring plate shape, is sleeved on the outer side of the first water stopping structure and is positioned at the bottom of the prefabricated abutment, and the ring plate-shaped upper wall of the second water stopping structure is attached to the bottom of the prefabricated abutment;
and a plurality of third water stopping structures filled between the first water stopping structure and the steel pipe pile and between the second water stopping structure and the bottom of the prefabricated abutment.
Preferably, the third water stopping structure is a rubber water stopping structure.
Preferably, the rubber waterstop structure comprises a compressed rubber waterstop which is filled between the second waterstop structure and the bottom of the prefabricated abutment.
Preferably, the rubber water stop structure further comprises a composite rubber water stop band, the composite rubber water stop band is composed of ethylene propylene diene monomer and compressed rubber, and the composite rubber water stop band is filled between the first water stop structure and the steel pipe pile.
Preferably, the one side of compressed rubber waterstop is for being planar first portion of pasting, and the another side is provided with outstanding first compression portion, the compressed rubber waterstop pastes first stagnant water structure with between the steel-pipe pile, first compression portion is the rubber structure that has crest and trough that a plurality of equidistance intervals set up, just the rubber waterstop passes through first bolted connection and is in the second stagnant water is structural.
Preferably, the composite rubber waterstop comprises a rubber layer and a rubber layer, wherein the rubber layer is formed by clamping ethylene propylene diene monomer and compressed rubber, one surface of the compressed rubber is a second pasting part, the other surface of the compressed rubber is a second compression part, the second pasting part is pasted on the first waterstop structure, a plurality of penetrating circular holes are formed in the second compression part, and the end surface, far away from the second pasting part, of the second compression part is provided with a plurality of clamping grooves which are arranged at equal intervals;
the compressed rubber is characterized in that one surface of the compressed rubber is provided with a plurality of clamping blocks arranged at intervals, the other surface of the compressed rubber is attached to the side wall of the steel pipe pile, the clamping blocks are clamped in the clamping grooves in a one-to-one correspondence mode, and the composite rubber water stop belt is connected to the first water stop structure through a second bolt.
Preferably, a hoisting device is arranged on the steel pipe pile and located right above the second water stopping structure, and the hoisting device is vertically hoisted on the second water stopping structure and used for tensioning the distance between the second water stopping structure and the prefabricated abutment.
A construction method of an underwater water stop structure suitable for prefabricated abutments comprises the following steps:
step S1, installing the third water stopping structures at predetermined positions of the first water stopping structure and the second water stopping structure, respectively;
step S2, sinking the steel pipe pile into a preset underwater position, lowering a water stopping structure, and adjusting the position once to enable the first water stopping structure to be naturally close to the outer wall of the steel pipe pile;
step S3, placing a plurality of prefabricated abutments to the outer side of the steel pipe pile, and adjusting the secondary position of the water stopping structure to enable the second water stopping structure to naturally approach the bottom of the prefabricated abutments;
and step S4, performing third position adjustment on the water stopping structure, so that the second water stopping structure in the step S3 is changed from naturally approaching the prefabricated abutment to a state of being tightly pressed and attached to the bottom of the prefabricated abutment, and the first water stopping structure in the step S2 is changed from naturally approaching the outer wall of the steel pipe pile to a state of being tightly pressed and attached to the outer wall of the steel pipe pile.
Preferably, the prefabricated abutment is a second L-shaped structure consisting of a horizontal part and a vertical part, a pouring gap is left between the vertical part and the steel pipe pile, and after the step S4 is completed, an underwater pouring process is performed to pour the pouring gap layer by layer;
and a groove is formed in the middle of the vertical part, the notch is opposite to the steel pipe pile, and water in the groove is pumped out after the underwater pouring process is completed.
The utility model discloses at least, include following beneficial effect:
1. the utility model discloses can not only solve because of the low stagnant water difficult problem that leads to prefabricated pier and pipe wall clearance too big or inequality of steel tubular pile sinking precision, can also be quick, effective stagnant water, replace the construction scheme of traditional bulky concrete back cover stagnant water.
2. The water stopping system has simple structure, convenient and quick construction method, reduces the environmental pollution to a certain extent, and has obvious cost advantage and great popularization and use value.
3. The sealing effect is good, and the underwater sealing water stop of the prefabricated abutment is realized by mutually matching the first water stop structure, the second water stop structure and the third water stop structure.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
Fig. 1 is a schematic structural view of the underwater water stopping structure suitable for the prefabricated abutment of the present invention;
FIG. 2 is an enlarged view of A in FIG. 1 according to the present invention;
FIG. 3 is a structural diagram of the compressed rubber waterstop of the present invention;
fig. 4 is a structure diagram of the composite rubber waterstop of the utility model.
The specification reference numbers indicate: 1. the steel pipe pile comprises a steel pipe pile body, 2, a prefabricated pier, 3, a first water stopping structure, 4, a second water stopping structure, 5, a compressed rubber water stopping strip, 6, a hoisting device, 7, a composite rubber water stopping strip, 8, a stiffening rib, 501, a first pasting part, 502, a first compressing part, 503, a first bolt, 701, compressed rubber, 702, ethylene propylene diene monomer rubber, 703, a second pasting part, 704, a round hole, 705 and a second bolt.
Detailed Description
The present invention is further described in detail below with reference to the drawings so that those skilled in the art can implement the invention with reference to the description.
In the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
As shown in fig. 1 to 4, an underwater water stopping structure suitable for a prefabricated abutment is provided between a steel pipe pile 1 and a prefabricated abutment 2, the prefabricated abutment 2 is provided at an outer side of the steel pipe pile 1, the underwater water stopping structure includes,
the first water stopping structure 3 is cylindrical and is fitted and sleeved on the outer side of the steel pipe pile 1;
the second water stopping structure 4 is in a ring plate shape, is sleeved on the outer side of the first water stopping structure 3 and is positioned at the bottom of the prefabricated abutment, and the upper wall of the ring plate shape of the second water stopping structure 4 is attached to the bottom of the prefabricated abutment;
and a plurality of third water stopping structures filled between the first water stopping structure 3 and the steel pipe pile 1 and between the second water stopping structure 4 and the bottom of the prefabricated abutment.
In the technical scheme, the water stopping function of the side walls of the prefabricated pier 2 and the steel pipe pile 1 is realized by mutually matching the first water stopping structure 3, the second water stopping structure 4 and the third water stopping structure, and during setting, mounting materials are prepared first, and a water stopping steel frame is welded in a prefabricated field; cutting rubber waterstops and composite rubber waterstops 7 of corresponding specifications, and sticking or fixing the rubber waterstops and the composite rubber waterstops on a steel frame by bolts according to design requirements; then, after all the steel pipe piles 1 are sunk in place and meet the construction precision, lowering the water-stopping steel frame to a preset position, and properly adjusting the gap between the water-stopping steel frame and the steel pipe; then transporting the prefabricated abutments to a construction site, hoisting and positioning by adopting hoisting equipment, temporarily fixing the prefabricated abutments after positioning is finished, arranging the fixed prefabricated abutments on two sides of the steel pipe pile 1, and forming gaps between the prefabricated abutments and the water-stopping steel frame; finally, 6 steel bars and a turnbuckle lifting device are arranged on the outer wall of the steel pipe column in the annular direction, and the rubber waterstop fixed on the top surface of the steel plate is in contact with the bottom surface of the prefabricated abutment and generates certain compression deformation by applying upward lifting force to the annular waterstop steel plate; properly adjusting the gap between the radial annular plate and the steel pipe wall to enable the side face of the composite water stop belt to be tightly attached to the outer wall of the steel pipe pile 1 as much as possible, then standing the composite water stop belt, and waiting for the expansion of the volume of the expanded rubber, so that the side face of the steel pipe pile 1 is further compressed to complete the water stop process; after the water-stopping pile reaches the designed strength, water pumping operation is carried out in a cavity formed by the steel pipe pile 1 and the prefabricated abutment after water stopping, and then the water stopping process is completed.
In another technical scheme, the third water stopping structure is a rubber water stopping structure.
Among the above-mentioned technical scheme, rubber stagnant water structure has good can and ductility, and the extrusion formula that is more fit for between pier and the steel-pipe pile 1 under water seals stagnant water.
In another technical scheme, the rubber waterstop structure comprises a compressed rubber waterstop 5, and the compressed rubber waterstop 5 is filled between the second waterstop structure 4 and the bottom of the prefabricated abutment.
In the above technical scheme, the second water stopping structure 4 is an L-shaped lifting structure, the compressed rubber 701 water stopping belt 5 is firstly arranged between the second water stopping structure 4 and the prefabricated abutment, and then the second water stopping structure 4 is lifted and pulled to be compacted, so that a sealing water stopping effect is achieved.
Furthermore, a stiffening rib 8 is arranged on the side wall of the bottom between the steel pipe pile 1 and the prefabricated abutment 2.
In another technical scheme, the rubber water stop structure further comprises a composite rubber water stop 7, the composite rubber water stop 7 is composed of ethylene propylene diene monomer 702 and compression rubber 701, and the composite rubber water stop 7 is filled between the first water stop structure 3 and the steel pipe pile 1.
In another technical scheme, one side of the compressed rubber 701 waterstop 5 is a first pasting part 501 which is a plane, the other side of the compressed rubber 701 waterstop 5 is provided with a first protruding compressing part 502, the compressed rubber 701 waterstop 5 is pasted between the first waterstop structure 3 and the steel pipe pile 1, the first compressing part 502 is a plurality of rubber structures which are arranged at equal intervals and have wave crests and wave troughs, and the rubber waterstop is connected to the second waterstop structure 4 through a first bolt 503.
In the above technical scheme, first portion 501 of pasting for paste and fix on first stagnant water structure 3, first compression portion 502 is crest trough shape, and when receiving the extrusion, the crest extrudees towards the trough direction, stops as the extrusion force, and first compression portion 502 kick-backs, and then fills first stagnant water structure 3 and steel-pipe pile 1, forms closely knit sealed environment.
In another technical scheme, the rubber composite waterstop 7 comprises a structure formed by clamping and arranging the ethylene propylene diene monomer 702 and the compression rubber 701, one surface of the compression rubber 701 is a second pasting part 703, the other surface of the compression rubber 701 is a second compression part, the second pasting part 703 is pasted and arranged on the first waterstop structure 3, a plurality of penetrating circular holes 704 are arranged on the second compression part, and the end surface of the second compression part far away from the second pasting part 703 is provided with a plurality of clamping grooves arranged at equal intervals;
the compressed rubber 701 is provided with a plurality of clamping blocks at intervals on one surface, the other surface is attached to the side wall of the steel pipe pile 1, the plurality of clamping blocks are clamped in the plurality of clamping grooves in a one-to-one correspondence mode, and the composite rubber waterstop 7 is connected to the first waterstop structure 3 through a second bolt 705.
In the above technical scheme, the composite rubber water stop structure is composed of the compression rubber 701 and the ethylene propylene diene monomer rubber 702, the round hole 704 of the compression rubber 701 has a space contraction function, and when the compression rubber is squeezed, the round hole is temporarily contracted and provides resilience force when the squeezing force is relieved, so that the compression rubber 701 and the ethylene propylene diene monomer rubber 702 generate squeezing force from inside to outside, and the sealing technical effect is achieved.
In another technical scheme, a hoisting device 6 is arranged on the steel pipe pile 1 and located right above the second water stopping structure 4, and the hoisting device is vertically hoisted on the second water stopping structure 4 and used for tensioning the distance between the second water stopping structure 4 and the prefabricated abutment 2.
A construction method suitable for an underwater water stop structure of a prefabricated pier 2 comprises the following steps:
step S1, installing the third water stopping structures at predetermined positions of the first water stopping structure 3 and the second water stopping structure 4, respectively;
step S2, sinking the steel pipe pile 1 to a preset underwater position, lowering a water stopping structure, and adjusting the position once to enable the first water stopping structure 3 to be naturally close to the outer wall of the steel pipe pile 1;
step S3, lowering a plurality of prefabricated abutments 2 to the outer side of the steel pipe pile 1, and adjusting the secondary position of the water stopping structure to enable the second water stopping structure 4 to naturally approach the bottom of the prefabricated abutments 2;
and step S4, performing third position adjustment on the water stopping structure, so that the second water stopping structure 4 in the step S3 is changed from being naturally close to the prefabricated abutment 2 to a state of being tightly pressed against the bottom of the prefabricated abutment 2, and the first water stopping structure 3 in the step S2 is changed from being naturally close to the outer wall of the steel pipe pile 1 to a state of being tightly pressed against the outer wall of the steel pipe pile 1.
In another technical scheme, the prefabricated abutment 2 is a second L-shaped structure consisting of a horizontal part and a vertical part, a pouring gap is reserved between the vertical part and the steel pipe pile 1, and after the step S4 is completed, an underwater pouring process is performed to pour the pouring gap layer by layer;
and a groove is formed in the middle of the vertical part, the notch is opposite to the steel pipe pile 1, and water in the groove is pumped out after the underwater pouring process is completed.
While the embodiments of the invention have been described above, it is not intended to be limited to the details shown, or described, but rather to cover all modifications, which would come within the scope of the appended claims, and all changes which come within the meaning and range of equivalency of the art are therefore intended to be embraced therein.

Claims (7)

1. An underwater water-stopping structure suitable for a prefabricated pier is arranged between a steel pipe pile and a prefabricated pier, the prefabricated pier is arranged on the outer side of the steel pipe pile, and the underwater water-stopping structure is characterized by comprising,
the first water stopping structure is cylindrical and is fitted and sleeved on the outer side of the steel pipe pile;
the second water stopping structure is in a ring plate shape, is sleeved on the outer side of the first water stopping structure and is positioned at the bottom of the prefabricated abutment, and the ring plate-shaped upper wall of the second water stopping structure is attached to the bottom of the prefabricated abutment;
and a plurality of third water stopping structures filled between the first water stopping structure and the steel pipe pile and between the second water stopping structure and the bottom of the prefabricated abutment.
2. The underwater water stopping structure suitable for the prefabricated abutments of claim 1, wherein the third water stopping structure is a rubber water stopping structure.
3. The underwater water stopping structure suitable for the prefabricated abutment according to claim 2, wherein the rubber water stopping structure comprises a compressed rubber water stopping strip filled between the second water stopping structure and the bottom of the prefabricated abutment.
4. The underwater water stopping structure suitable for the prefabricated abutment according to claim 3, wherein the rubber water stopping structure further comprises a composite rubber water stopping strip which is composed of ethylene propylene diene monomer and compression rubber, and the composite rubber water stopping strip is filled between the first water stopping structure and the steel pipe pile.
5. The underwater water stopping structure suitable for the prefabricated abutment according to claim 3, wherein one surface of the compressed rubber water stopping strip is a first pasting part which is a plane, a first protruding compression part is arranged on the other surface of the compressed rubber water stopping strip, the compressed rubber water stopping strip is pasted between the first water stopping structure and the steel pipe pile, the first compression part is a plurality of rubber structures which are arranged at equal intervals and are provided with wave crests and wave troughs, and the rubber water stopping strip is connected to the second water stopping structure through a first bolt.
6. The underwater water stopping structure suitable for the prefabricated abutment according to claim 4, wherein the composite rubber water stopping belt is formed by clamping ethylene propylene diene monomer and compression rubber, one surface of the compression rubber is a second pasting part, the other surface of the compression rubber is a second compression part, the second pasting part is pasted on the first water stopping structure, a plurality of penetrating circular holes are formed in the second compression part, and the end surface, far away from the second pasting part, of the second compression part is provided with a plurality of clamping grooves which are arranged at equal intervals;
the compressed rubber is characterized in that one surface of the compressed rubber is provided with a plurality of clamping blocks arranged at intervals, the other surface of the compressed rubber is attached to the side wall of the steel pipe pile, the clamping blocks are clamped in the clamping grooves in a one-to-one correspondence mode, and the composite rubber water stop belt is connected to the first water stop structure through a second bolt.
7. The underwater water stopping structure suitable for the prefabricated abutment according to claim 1, wherein a hoisting device is arranged on the steel pipe pile right above the second water stopping structure, is vertically hoisted on the second water stopping structure, and is used for tensioning the distance between the second water stopping structure and the prefabricated abutment.
CN202023327120.2U 2020-12-31 2020-12-31 Underwater water stopping structure suitable for prefabricated pier Active CN214613553U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023327120.2U CN214613553U (en) 2020-12-31 2020-12-31 Underwater water stopping structure suitable for prefabricated pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023327120.2U CN214613553U (en) 2020-12-31 2020-12-31 Underwater water stopping structure suitable for prefabricated pier

Publications (1)

Publication Number Publication Date
CN214613553U true CN214613553U (en) 2021-11-05

Family

ID=78434703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023327120.2U Active CN214613553U (en) 2020-12-31 2020-12-31 Underwater water stopping structure suitable for prefabricated pier

Country Status (1)

Country Link
CN (1) CN214613553U (en)

Similar Documents

Publication Publication Date Title
CN108643207B (en) Device for connecting side plate and bottom plate of bottom sealing-free concrete steel hanging box and construction method thereof
CN209854880U (en) Prefabricated assembled escape canal
CN108265835B (en) Prefabricated shear wall component assembly grouting sealing mechanism and sealing grouting method
CN214613553U (en) Underwater water stopping structure suitable for prefabricated pier
CN210563363U (en) Pouring template without tie bar hole
CN212021120U (en) Be used for prefabricated column bottom of prefabricated building to reserve grout seam shutoff mould
CN210315588U (en) Foundation ditch supports stagnant water sleeve and foundation ditch stagnant water structure of steel lattice column
CN112695613A (en) Underwater water stopping structure for prefabricated pier and construction method thereof
CN106948337A (en) The diaphram wall and its construction method of the wall of prestressing force assembled two unification
CN103485792B (en) The construction method of underground continuous wall of movable seal up a door mechanism and reserved opening within the walls
CN209798797U (en) Prefabricated pump station pit shaft of integration
CN215593742U (en) Reinforcing structure for bridge cracks
CN115492141B (en) Steel suspended box cofferdam structure, bottom plate thereof and construction method
CN217231805U (en) Anchor rod static pressure steel pipe pile hole outer anchoring pile sealing device
CN219621752U (en) Carrier pile based on groundwater environment
CN218843161U (en) Basement antidetonation impervious structure
CN217104942U (en) Assembled geomembrane and concrete connection structure
CN219930838U (en) A flood control cut-off wall for wisdom water conservancy
CN212104594U (en) Assembled structure coincide floor end opening seam plugging device
CN218148398U (en) Assembled deep basal pit supporting construction
CN217204194U (en) Assembled rectangle open caisson
CN215889343U (en) Limestone bin wear-resistant steel rail for synchronous sliding formwork construction of bin wall
CN217629832U (en) Anti-seepage underground continuous wall joint
CN214883877U (en) Prefabricated assembled cable joint well
CN216616352U (en) Truss connection assembled light outer wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant