CN214595082U - Auxiliary device for construction cost budget of building engineering - Google Patents

Auxiliary device for construction cost budget of building engineering Download PDF

Info

Publication number
CN214595082U
CN214595082U CN202120407151.4U CN202120407151U CN214595082U CN 214595082 U CN214595082 U CN 214595082U CN 202120407151 U CN202120407151 U CN 202120407151U CN 214595082 U CN214595082 U CN 214595082U
Authority
CN
China
Prior art keywords
fixedly connected
lateral wall
auxiliary device
base
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120407151.4U
Other languages
Chinese (zh)
Inventor
李倩倩
王业涛
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120407151.4U priority Critical patent/CN214595082U/en
Application granted granted Critical
Publication of CN214595082U publication Critical patent/CN214595082U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses an auxiliary device for building engineering cost budget, the on-line screen storage device comprises a base, two dead levers of the last lateral wall fixedly connected with of base, every the upper end of dead lever is all slided and is inserted and be equipped with the bracing piece, two the common fixedly connected with workstation in upper end of bracing piece, the last lateral wall fixedly connected with panel of workstation, the lower lateral wall fixedly connected with motor of base, the lower lateral wall that the output shaft of motor runs through the base sets up and fixedly connected with threaded rod, the nut that the outer wall threaded connection of threaded rod had, the equal threaded connection of both sides lateral wall of nut has the connecting rod. The utility model discloses a rotation of motor drive threaded rod realizes the altitude mixture control of workstation and panel, has made things convenient for the staff of different heights to use, through the centre gripping of splint to the drawing simultaneously, has made things convenient for the position of drawing to place.

Description

Auxiliary device for construction cost budget of building engineering
Technical Field
The utility model relates to a building engineering technical field especially relates to an auxiliary device for building engineering cost budget.
Background
The project cost refers to the total cost spent on a certain project construction, and the core content of the project cost is investment estimation, design approximate calculation, correction approximate calculation, construction drawing budget, project settlement, completion settlement and the like; the main tasks of the engineering cost are as follows: calculating direct fees, enterprise management fees, measure fees, planning fees, profits, taxes and the like contained in the project according to drawings, quota and list specifications; in the construction cost budget of the building project, relevant auxiliary devices are required to be used for measuring and analyzing the whole project.
The height of the existing engineering cost auxiliary device is mostly fixed, the height of the device cannot be adjusted, and the device is inconvenient for workers with different heights to use.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem in the background art, and the auxiliary device for construction cost budget that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an auxiliary device for construction cost budget of building engineering comprises a base, wherein the upper side wall of the base is fixedly connected with two fixed rods, the upper end of each fixed rod is slidably inserted with a support rod, the upper ends of the two support rods are fixedly connected with a workbench together, the upper side wall of the workbench is fixedly connected with a display board, the lower side wall of the base is fixedly connected with a motor, an output shaft of the motor penetrates through the lower side wall of the base and is fixedly connected with a threaded rod, a nut is connected with the outer wall of the threaded rod in a threaded manner, the equal threaded connection of both sides lateral wall of nut has the connecting rod, every the outer wall setting that the homonymy dead lever was all run through to the one end that the nut was kept away from to the connecting rod, every the one end that the connecting rod is located the dead lever all with the outer wall fixed connection of homonymy bracing piece, every the outer wall of dead lever all seted up with bracing piece assorted spacing groove.
Preferably, the upper side wall of the display board is rotatably connected with a clamping plate through a torque spring.
Preferably, a plurality of pulleys are mounted on the lower side wall of the base.
Preferably, the upper side wall of the workbench is fixedly connected with a plurality of storage cabinets positioned at two sides of the display board.
Preferably, the upper end of the threaded rod is fixedly connected with a limiting block.
Preferably, the side wall of the splint close to the display board is provided with a non-slip mat.
Compared with the prior art, the auxiliary device for the construction cost budget of the building engineering has the advantages that:
1. the threaded rod is arranged, the threaded rod is driven to rotate through the motor, the nut in threaded connection with the threaded rod is driven to move, the nut can only vertically move under the limiting of the two connecting rods and the limiting groove, so that the nut axially moves under the rotation of the threaded rod, the lifting of the nut is realized, the two supporting rods are driven to lift through the connecting rods, the height adjustment of the workbench and the display board is realized, and the use of workers with different heights is facilitated;
2. the torque spring and the clamping plate are arranged, the clamping plate is lifted upwards, the torque spring is compressed, then the drawing paper is placed on the outer wall of the display board, the clamping plate is loosened, the clamping plate rotates downwards under the elastic force of the torque spring, the drawing is clamped, and the drawing can be placed conveniently;
to sum up, the utility model discloses a rotation of motor drive threaded rod realizes the altitude mixture control of workstation and panel, has made things convenient for the staff of different heights to use, through the centre gripping of splint to the drawing simultaneously, has made things convenient for the position of drawing to place.
Drawings
Fig. 1 is a schematic structural diagram of an auxiliary device for construction cost budget of the present invention;
fig. 2 is a side view of a joint of a stop lever of a fixing lever in an auxiliary device for budget of construction cost according to the present invention.
In the figure: the device comprises a base 1, a fixing rod 2, a supporting rod 3, a workbench 4, a display board 5, a motor 6, a threaded rod 7, a nut 8, a connecting rod 9, a limiting groove 10, a pulley 11, a torque spring 12, a clamping plate 13, a storage cabinet 14 and a limiting block 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, an auxiliary device for construction cost budget of building engineering, including base 1, a plurality of pulleys 11 are installed to the lower lateral wall of base 1, and the setting of pulley 11 has facilitated the removal of device, has improved the practicality of device.
Two dead levers 2 of the last lateral wall fixedly connected with of base 1, the upper end of every dead lever 2 all slides and inserts and be equipped with bracing piece 3, the common fixedly connected with workstation 4 in upper end of two bracing pieces 3, the last lateral wall fixedly connected with of workstation 4 is located a plurality of lockers 14 of panel 5 both sides, the setting up of locker 14 has made things convenient for accomodating of drawing.
The last lateral wall fixedly connected with panel 5 of workstation 4, the last lateral wall of panel 5 rotates through torque spring 12 and is connected with splint 13, splint 13 is close to one side lateral wall of panel 5 and is equipped with the slipmat, through upwards lifting splint 13, and compression torque spring 12, then place the picture on the outer wall of panel 5, splint 13 is loosened to this moment, under torque spring 12's elasticity, splint 13 down rotates, accomplish the centre gripping to the drawing, the setting up of slipmat has increased the frictional force between drawing and splint 13, the stability of 13 centre gripping drawings of splint has been improved, the position that has made things convenient for the drawing is placed.
The lower side wall fixedly connected with motor 6 of base 1, motor 6's model is Y80M1-2, and motor 6's output shaft runs through the lower side wall setting and fixedly connected with threaded rod 7 of base 1, and threaded nut 8 that the outer wall threaded connection of threaded rod 7 has, and threaded rod 7's upper end fixedly connected with stopper 15, stopper 15 set up and avoided nut 8 to drop from threaded rod 7.
Equal threaded connection of both sides lateral wall of nut 8 has connecting rod 9, the one end that nut 8 was kept away from to every connecting rod 9 all runs through the outer wall setting of homonymy dead lever 2, the one end that every connecting rod 9 is located dead lever 2 all with the outer wall fixed connection of homonymy bracing piece 3, every outer wall of dead lever 2 all seted up with bracing piece 3 assorted spacing groove 10, rotate through motor 6 drive threaded rod 7, drive the nut 8 motion with 7 threaded connection of threaded rod, nut 8 is under two connecting rod 9 and spacing groove 10 spacing, can only vertical motion, thereby nut 8 is axial motion under the rotation of threaded rod 7, realize nut 8's lift, and then drive two bracing piece 3 lifts through connecting rod 9, realize workstation 4 and panel 5's altitude mixture control, the staff that has made things convenient for different heights uses.
Further, unless otherwise specifically stated or limited, the above-described fixed connection is to be understood in a broad sense, and may be, for example, welded, glued, or integrally formed as is conventional in the art.
Now, the operation principle of the present invention is explained as follows:
the motor 6 drives the threaded rod 7 to rotate, drives the nut 8 in threaded connection with the threaded rod 7 to move, the nut 8 can only vertically move under the limit of the two connecting rods 9 and the limit groove 10, so that the nut 8 axially moves under the rotation of the threaded rod 7 to realize the lifting of the nut 8, and then the two support rods 3 are driven to lift through the connecting rod 9, so that the height adjustment of the workbench 4 and the display board 5 is realized, the use by workers with different heights is facilitated, and then the clamping plate 13 is lifted upwards, and compresses the torsion spring 12, and then places the chart on the outer wall of the display board 5, at which time the clamping plate 13 is loosened, under torque spring 12's elasticity, splint 13 downturns, accomplishes the centre gripping to the drawing, and setting up of slipmat has increased the frictional force between drawing and splint 13, has improved the stability of splint 13 centre gripping drawing, has made things convenient for the position of drawing to place.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides an auxiliary device for building engineering cost budget, includes base (1), its characterized in that, the last lateral wall fixedly connected with of base (1) two dead levers (2), every the upper end of dead lever (2) all slides and inserts and be equipped with bracing piece (3), two the upper end of bracing piece (3) is fixedly connected with workstation (4) jointly, the last lateral wall fixedly connected with panel (5) of workstation (4), the lower lateral wall fixedly connected with motor (6) of base (1), the output shaft of motor (6) runs through the lower lateral wall setting of base (1) and fixedly connected with threaded rod (7), the outer wall threaded connection of threaded rod (7) has nut (8), the equal threaded connection in both sides lateral wall of nut (8) has connecting rod (9), every one end that nut (8) was kept away from in connecting rod (9) all runs through the outer wall setting of homonymy dead lever (2), every connecting rod (9) are located the one end of dead lever (2) and all are connected with the outer wall fixed connection of homonymy bracing piece (3), every the outer wall of dead lever (2) all seted up with bracing piece (3) assorted spacing groove (10).
2. An auxiliary device for construction cost budgeting according to claim 1, wherein the upper side wall of the display board (5) is pivotally connected to a clamping plate (13) by a torsion spring (12).
3. An auxiliary device for construction cost budgeting according to claim 1, wherein a plurality of pulleys (11) are mounted to the lower side wall of the base (1).
4. An auxiliary device for construction cost budgeting according to claim 1, wherein a plurality of storage cabinets (14) located at both sides of the display board (5) are fixedly connected to the upper side wall of the working platform (4).
5. An auxiliary device for construction cost budgeting according to claim 1, wherein a limiting block (15) is fixedly connected to the upper end of the threaded rod (7).
6. An auxiliary device for construction cost budgeting according to claim 2, wherein the side wall of the clamping plate (13) adjacent to the display board (5) is provided with a non-slip mat.
CN202120407151.4U 2021-02-24 2021-02-24 Auxiliary device for construction cost budget of building engineering Expired - Fee Related CN214595082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120407151.4U CN214595082U (en) 2021-02-24 2021-02-24 Auxiliary device for construction cost budget of building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120407151.4U CN214595082U (en) 2021-02-24 2021-02-24 Auxiliary device for construction cost budget of building engineering

Publications (1)

Publication Number Publication Date
CN214595082U true CN214595082U (en) 2021-11-05

Family

ID=78443160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120407151.4U Expired - Fee Related CN214595082U (en) 2021-02-24 2021-02-24 Auxiliary device for construction cost budget of building engineering

Country Status (1)

Country Link
CN (1) CN214595082U (en)

Similar Documents

Publication Publication Date Title
CN210378374U (en) Statistics display device that building engineering cost was used
CN214595082U (en) Auxiliary device for construction cost budget of building engineering
CN209883382U (en) Construction project cost budget auxiliary device for technical service
CN210574479U (en) A presentation device for building engineering cost teaching
CN209737857U (en) Pressing device of chair mortise and tenon structure
CN212698394U (en) Exhibition room is with frame aligning gear
CN208235973U (en) A kind of construction discharging platform
CN220080701U (en) Height-adjustable scaffold
CN212361384U (en) Be used for video monitoring test card to stabilize lift work platform
CN215899051U (en) Building engineering cost budgets auxiliary device
CN218889397U (en) Auxiliary device for construction engineering cost budget
CN220133452U (en) Scaffold convenient to use
CN217812559U (en) BIM-based supporting device for building structure
CN214340903U (en) Auxiliary device for construction cost budget of building engineering
CN215331492U (en) Building engineering template strutting arrangement
CN213640055U (en) Workbench for engineering cost
CN215407393U (en) Auxiliary support for building templates
CN218990285U (en) Foundation pile bearing capacity test device for municipal works
CN214963886U (en) Be used for building engineering cost budget rehearsal device
CN212740597U (en) Lifting device for height adjustment of heating furnace for performance test of separated hydrogen storage material
CN212514087U (en) Screw rockwell hardness testing device
CN211946166U (en) Mast type aerial work platform with staircase
CN214384040U (en) Liftable scaffold for building engineering
CN219194366U (en) Auxiliary device for building construction
CN218303985U (en) Novel engineering cost budgets toolbox

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211105

CF01 Termination of patent right due to non-payment of annual fee