CN214590349U - Power protection pipe construction support - Google Patents

Power protection pipe construction support Download PDF

Info

Publication number
CN214590349U
CN214590349U CN202120761709.9U CN202120761709U CN214590349U CN 214590349 U CN214590349 U CN 214590349U CN 202120761709 U CN202120761709 U CN 202120761709U CN 214590349 U CN214590349 U CN 214590349U
Authority
CN
China
Prior art keywords
fixed
chucking frame
power protection
chucking
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120761709.9U
Other languages
Chinese (zh)
Inventor
赵刘安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Changjiu Industrial Co ltd
Original Assignee
Henan Changjiu Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Changjiu Industrial Co ltd filed Critical Henan Changjiu Industrial Co ltd
Priority to CN202120761709.9U priority Critical patent/CN214590349U/en
Application granted granted Critical
Publication of CN214590349U publication Critical patent/CN214590349U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model provides a power protection pipe construction support for solve present power protection pipe construction support awkward problem. The utility model provides an electric power protection tube construction support, includes a supporting bench, and the subtend is equipped with first chucking frame and second chucking frame on the supporting bench, and first card is fixed on the supporting bench, and the second chucking puts up the slip and establishes on the supporting bench, and the upper end of second chucking frame is equipped with spacing post, and the upper end of first chucking frame is equipped with and is used for spacing post male hole, the one end that the supporting bench is close to second chucking frame is fixed with first stopper, is fixed with a plurality of pneumatic cylinders on the first stopper, and the end that stretches out of pneumatic cylinder is fixed mutually with second chucking frame. The utility model relates to a rationally, simple to operate, improved the automation of device, reduce artifical the input, improved work efficiency.

Description

Power protection pipe construction support
Technical Field
The utility model relates to an electric power facility technical field especially indicates a power protection tube construction support.
Background
The MPP power pipe is divided into a common type and a reinforced type, the reinforced type is divided into an excavated pipe and a non-excavated pipe, the MPP non-excavated pipe is also called as an MPP jacking pipe, an MPP supporting and pulling pipe and an MPP traction pipe, and can be widely applied to pipeline engineering of municipal administration, telecommunication, electric power, coal gas, tap water, heating power and the like.
Because the required length of construction is longer than tubular product length, generally through the hot melting machine two tubular products fuse together, for guaranteeing precision and fusion degree, need the support to fix a position, fix the pipe, the construction support that uses at present passes through artifical wrench movement screw rod and makes two pipe heads dock together through the fixation clamp, and not only work efficiency is low, needs a plurality of workman moreover just can accomplish, wastes time and also difficultly.
SUMMERY OF THE UTILITY MODEL
The utility model provides a power protection pipe construction support has solved the current inconvenient problem of power protection pipe construction support.
The technical scheme of the utility model is realized like this:
the utility model provides an electric power protection tube construction support, includes a supporting bench, and the subtend is equipped with first chucking frame and second chucking frame on the supporting bench, and first card is fixed on the supporting bench, and the second chucking puts up the slip and establishes on the supporting bench, and the upper end of second chucking frame is equipped with spacing post, and the upper end of first chucking frame is equipped with and is used for spacing post male hole, the one end that the supporting bench is close to second chucking frame is fixed with first stopper, is fixed with a plurality of pneumatic cylinders on the first stopper, and the end that stretches out of pneumatic cylinder is fixed mutually with second chucking frame.
Wherein, a plurality of bracing pieces are fixed on both sides of the supporting platform, and a positioning rod is fixed on the bracing piece.
Wherein, the one end of keeping away from first stopper on the brace table is fixed with the second stopper.
Wherein, the bottom surface of brace table still is equipped with the auto-lock wheel all around.
Advantageous effects
The utility model has reasonable design and convenient installation, and the control hydraulic cylinder pushes the second fixing frame to move towards the first fixing frame and tighten the second fixing frame by arranging the sliding second fixing frame and the fixed first fixing frame, thereby not only saving time and labor, but also completing the welding work by one person and improving the work efficiency; the limiting columns and the holes are arranged, so that the positioning is convenient, and the welding precision is improved; the positioning rod is arranged, so that the positioning rod can be used for positioning the welding machine, and the welding precision and efficiency are improved; the second limiting block is arranged, so that the two pipes are positioned at the same height, and welding is facilitated; the self-locking wheels are arranged, so that the device is convenient to move, and the flexibility of the device in field work is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a top view of FIG. 1;
FIG. 3 is a side view of the second clamping frame;
FIG. 4 is a side view of the first stop block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
Example 1
As shown in fig. 1-4, a power protection pipe construction support, including brace table 1, the subtend is equipped with first chucking frame 5 and second chucking frame 9 on the brace table 1, and first chucking frame 5 fixes on brace table 1, and second chucking frame 9 slides and establishes on brace table 1, and the upper end of second chucking frame 9 is equipped with spacing post 8, and the upper end of first chucking frame 5 is equipped with and is used for spacing post 8 male hole 6, the one end that brace table 1 is close to second chucking frame 9 is fixed with first stopper 11, is fixed with a plurality of pneumatic cylinders 10 on the first stopper 11, and the end that stretches out of pneumatic cylinder 1 is fixed mutually with second chucking frame 9.
The first clamping frame 5 is composed of a first base 12 and a first buckle 13, the first buckle 13 is fixed on the first base 12 through a bolt, and the hole 6 is located at the midpoint of the first buckle 13.
The second clamping frame 9 is composed of a second base 14 and a second buckle 15, the second buckle 15 is fixed on the second base 14 through a bolt, and the limiting column 8 is movably inserted in the middle point position of the second buckle 15.
The length of the slideway on the surface of the supporting table 1 is required to satisfy the sliding of the second clamping frame 9, and the sliding distance of the second clamping frame 9 is required to be larger than the distance between the two pipe heads.
The working process of the embodiment is as follows: a supporting table 1 is fixed, the tube heads of two tubes are respectively placed in a first clamping frame 5 and a second clamping frame 9, the fixing is good, then a hydraulic cylinder 10 on a first limiting block 11 is controlled to stretch, the hydraulic cylinder 10 pushes the second clamping frame 9 to move slowly, then the limiting columns 8 are moved until the limiting columns can be inserted into holes 6, then the limiting columns 8 are reset, the welding machine is manually taken up and placed between the two tube heads, then the hydraulic cylinder 10 is continuously controlled to push the second clamping frame 9 until the two tube heads are respectively contacted with the two surfaces of the welding machine, after the welding machine is completed, the welding machine is taken away, the hydraulic cylinder 10 is continuously controlled to push the second clamping frame 9 until the two tube heads are contacted, and the welding is completed.
Example 2
Preferably, a plurality of support rods 3 are fixed on two sides of the support table 1, and positioning rods 4 are fixed on the support rods 3. Set up locating lever 4, can be used for supporting the heat sealing machine hot plate, through protruding location heat sealing machine on the hot plate, improve welded precision and efficiency.
Other structures of this embodiment are the same as those of embodiment 1.
Example 3
Preferably, a second limiting block 2 is fixed at one end of the support table 1 far away from the first limiting block 11.
The second limiting block 2 is arranged, so that the two pipes 7 are at the same height, and welding is facilitated.
Other structures of this embodiment are the same as those of embodiment 1.
Example 4
Preferably, the periphery of the bottom surface of the support table 1 is further provided with an auto-lock wheel 16.
The self-locking wheels 16 are arranged, so that the device is convenient to move, and the flexibility of the device in field work is improved.
Other structures of this embodiment are the same as those of embodiment 1.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (4)

1. The utility model provides a power protection pipe construction support, includes brace table (1), its characterized in that: brace table (1) is gone up the subtend and is equipped with first chucking frame (5) and second chucking frame (9), and first chucking frame (5) are fixed on brace table (1), and second chucking frame (9) slide and establish on brace table (1), and the upper end of second chucking frame (9) is equipped with spacing post (8), and the upper end of first chucking frame (5) is equipped with and is used for spacing post (8) male hole (6), the one end that brace table (1) is close to second chucking frame (9) is fixed with first stopper (11), is fixed with a plurality of pneumatic cylinders (10) on first stopper (11), and the end that stretches out of pneumatic cylinder (10) is fixed mutually with second chucking frame (9).
2. The power protection tube construction bracket of claim 1, wherein: a plurality of support rods (3) are fixed on two sides of the support table (1), and positioning rods (4) are fixed on the support rods (3).
3. The power protection tube construction bracket of claim 1, wherein: a second limiting block (2) is fixed at one end of the supporting table (1) far away from the first limiting block (11).
4. The power protection tube construction bracket of claim 1, wherein: and self-locking wheels (16) are further arranged around the bottom surface of the support table (1).
CN202120761709.9U 2021-04-14 2021-04-14 Power protection pipe construction support Active CN214590349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120761709.9U CN214590349U (en) 2021-04-14 2021-04-14 Power protection pipe construction support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120761709.9U CN214590349U (en) 2021-04-14 2021-04-14 Power protection pipe construction support

Publications (1)

Publication Number Publication Date
CN214590349U true CN214590349U (en) 2021-11-02

Family

ID=78326025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120761709.9U Active CN214590349U (en) 2021-04-14 2021-04-14 Power protection pipe construction support

Country Status (1)

Country Link
CN (1) CN214590349U (en)

Similar Documents

Publication Publication Date Title
CN110280954B (en) Frock clamp is used in metal pipe fitting welding
CN111438551A (en) Automatic cutting device for metal pipe
CN214590349U (en) Power protection pipe construction support
CN210309106U (en) Connection structure is used in PE pipeline construction
CN219413733U (en) Heating power pipeline installing support
CN219004321U (en) Double-end pipe expander
CN215635728U (en) Factory high-position pipeline leak repairing device
CN212311267U (en) Welding tool
CN209738267U (en) Novel processing of plastics return bend elbow device
CN214027204U (en) Flaring device for PVC (polyvinyl chloride) pipe
CN211219448U (en) Combined welding equipment for pipe machining
US3644978A (en) Assembly fixture for constructing superheater and/or reheater modules
CN216966732U (en) Pipeline welding set for hydraulic engineering
CN214868426U (en) Stainless steel tubular product pipe fitting welding frock
CN217571504U (en) Welding clamping device is used in excavator accessory production
CN220445539U (en) Butt joint fixing device used during welding of industrial welded pipe
CN217618735U (en) Pneumatic tool for welding iron bed climbing frame
CN213002960U (en) Cutting clamping jig for metal pipes
CN212372015U (en) Angle-adjustable valve positioning mechanism
CN212665283U (en) Clamp for welding steel pipe
CN210731475U (en) Workpiece clamping structure for welding
CN216989598U (en) Hydraulic continuous pipe stretcher
CN217433542U (en) Combined welding fixture
CN102962624B (en) Bent-pipe welding tool for finned radiator
CN211841043U (en) Building pipe cutting clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant