CN214590263U - A structure between operation for cable joint construction - Google Patents

A structure between operation for cable joint construction Download PDF

Info

Publication number
CN214590263U
CN214590263U CN202120870541.5U CN202120870541U CN214590263U CN 214590263 U CN214590263 U CN 214590263U CN 202120870541 U CN202120870541 U CN 202120870541U CN 214590263 U CN214590263 U CN 214590263U
Authority
CN
China
Prior art keywords
plate
frames
bottom plate
top plate
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120870541.5U
Other languages
Chinese (zh)
Inventor
徐钰栋
叶鹏
鲍信超
李正浩
滕佳敏
张魏
姚苏娜
郑钦调
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yueqing Electric Power Industrial Co ltd
Original Assignee
Yueqing Electric Power Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yueqing Electric Power Industrial Co ltd filed Critical Yueqing Electric Power Industrial Co ltd
Priority to CN202120870541.5U priority Critical patent/CN214590263U/en
Application granted granted Critical
Publication of CN214590263U publication Critical patent/CN214590263U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses an operation room structure for cable joint construction, which comprises two frames which are arranged in parallel, wherein the front and the back of the two frames are respectively provided with a front plate and a back plate, the upper and the lower sides between the two frames are respectively spliced with a top plate and a bottom plate which are horizontally arranged, the left and the right sides between the top plate and the bottom plate are respectively spliced with a side plate which is vertically arranged, the two sides of the two frames are provided with clamping devices to realize that the top plate, the bottom plate and the side plate are clamped after the two frames are driven to slide, the utility model utilizes the clamping devices to tighten the two frames, so that the frames clamp the top plate, the bottom plate and the side plate, then the cross rod is screwed down to the U-shaped frame through the screw rod, so that the device can be rapidly installed on the electric well, the construction efficiency is improved, and through demolish clamping device and unscrew the screw rod after, can dismantle the device fast, solved the shortcoming of dismouting difficulty then.

Description

A structure between operation for cable joint construction
Technical Field
The utility model relates to an electric power construction technical field specifically is a structure between operation for cable joint construction.
Background
In the existing electric well cable intermediate head manufacturing process, the technical requirements for workers are high, and in order to prevent a wiring air gap from having certain requirements for the environment, a temporary field needs to be built on a construction site when the cable intermediate head is constructed, an operator enters a platform to manufacture a cable head, but the existing operation platform has the defect of difficulty in dismounting, the size of the existing platform is generally fixed and unchanged, and the size of the field cannot be adjusted, so that an operation room structure for cable joint construction is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a structure between operation for cable joint construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a structure between operation for cable joint construction, includes two frames of front and back parallel arrangement, and the inside of two frames is equipped with front bezel and back plate respectively around, be equipped with on the front bezel and seal the door, be equipped with the window on the back plate, the roof and the bottom plate that the level set up are spliced respectively to the upper and lower both sides between two frames, the left and right sides between roof and the bottom plate is spliced respectively has the curb plate of vertical setting, and the both sides of two frames are equipped with clamping device and realize pressing from both sides roof, bottom plate and curb plate after two frames of drive slip tightly, it has the handle hole to open on the lateral wall of bottom plate.
Preferably, the frame includes U type frame, the upside opening part of U type frame is equipped with the horizontal pole, the both ends of horizontal pole all are equipped with the screw rod, the screw thread end meshing of screw rod is connected inside the upper end of U type frame, just cup joint the spring that is used for upwards bouncing the horizontal pole on the screw rod.
Preferably, every clamping device all includes two cassettes, two pull rods, a plurality of bolt, nut, a plurality of regulation hole and baffle, and two cassettes are fixed connection respectively on the lateral wall of two frames, the regulation hole is opened on the lateral wall of pull rod, and two pull rods open the one end coincidence connection that has the regulation hole and pass through the bolt fastening, and the one end that the regulation hole was kept away from to two pull rods is respectively through baffle, nut card in the inside of cassette.
Preferably, a plurality of splice plates are respectively spliced on one side of the top plate, one side of the bottom plate and one side of the two side plates, supporting rods are arranged on the upper side and the lower side of one frame, and the inner ends of the supporting rods are connected to the inner parts of the top plate and the bottom plate and are used for supporting the splice plates on the upper side and the lower side.
Preferably, the frame, the top plate, the bottom plate, the two side plates and the splicing plates are connected in a clamping mode through the grooves and the bumps.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses utilize clamping device to strain two frames, cause the frame to press from both sides roof, bottom plate and curb plate tightly, then screw up the horizontal pole through the screw rod downwards to U type frame, realize that horizontal pole and U type frame fix front bezel and back plate fast, horizontal pole drive roof moves down simultaneously, realize roof and bottom plate fix the curb plate fast, then can realize fast installing the device on the electric well, improve the efficiency of construction, and through demolish clamping device and unscrew the screw rod after, can dismantle the device fast, then solved the shortcoming of dismouting difficulty;
2. the utility model discloses an increase or reduce the quantity of splice plate and adjust the device's volume and inside space, can carry out suitable regulation to the device's size then according to the size in place, further improved the device's expanded performance, can be used to multiple place.
Drawings
Fig. 1 is a schematic view I of the overall structure of the present invention;
FIG. 2 is an exploded view of the U-shaped frame, the cross bar, the top plate, the side plates and the splicing plates of the present invention;
FIG. 3 is an exploded view of the cross bar, top plate, support bar and splice plate of the present invention;
FIG. 4 is a schematic structural view of the clamp seat, the pull rod, the bolt, the nut and the baffle of the present invention;
FIG. 5 is an exploded view of the clamp seat, the pull rod, the bolt, the nut and the baffle of the present invention;
FIG. 6 is an exploded view of the bottom plate, side plates, top plate, U-shaped frame and back plate of the present invention;
FIG. 7 is an exploded view of the U-shaped frame, cross bar and front plate of the present invention;
fig. 8 is a schematic view II of the overall structure of the present invention.
In the figure: 1. the device comprises a frame, 101, a U-shaped frame, 102, a cross rod, 103, a screw rod, 104, a spring, 2, a front plate, 201, a closed door, 3, a rear plate, 301, a window, 4, a top plate, 5, a bottom plate, 6, a side plate, 7, a clamping device, 701, a clamping seat, 702, a pull rod, 703, a bolt, 704, a nut, 705, an adjusting hole, 706, a baffle, 8, an operating hole, 801, a cover plate, 9, a splicing plate, 10, a support rod, 11, a power supply port, 12, a clamping groove, 13 and a clamping block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-8, the present invention provides a technical solution: an operation room structure for cable joint construction comprises two frames 1 which are arranged in parallel in the front and the back, a front plate 2 and a back plate 3 are respectively arranged in the front and the back of the two frames 1, a sealing door 201 is arranged on the front plate 2, the device is in a sealing state after the sealing door 201 is closed, the phenomenon that dust, impurities and the like entering the inside of the device enter the cable joint to form air gaps to influence construction is avoided, partial discharge is effectively prevented under the action of a strong electric field, so that the safety of a construction site is ensured, the sealing door 201 is convenient for operators to enter and exit after being opened, a lockset is further arranged on the sealing door 201 and plays a role in closing and locking the sealing door 201, a window 301 is arranged on the back plate 3, the added window 301 can enable external light to be emitted into the inside of the device, the brightness inside of the device is increased, a power supply port 11 is further arranged on the back plate 3, and the power supply port 11 can introduce external power into the inside of the device, therefore, power is supplied to an electric device in the device (for example, a fresh air conditioning system is additionally arranged on the inner wall of the rear plate 3 to regulate and control the temperature and is electrically connected with an external power supply through a power supply port 11, so that the fresh air conditioning system is electrified and started and is used for ventilation and air exchange, which is not shown in the figure), a top plate 4 and a bottom plate 5 which are horizontally arranged are respectively spliced on the upper side and the lower side between the two frames 1, side plates 6 which are vertically arranged are respectively spliced on the left side and the right side between the top plate 4 and the bottom plate 5, as shown in the figures 1 and 6, the top plate 4, the bottom plate 5 and the two side plates 6 are fixed between the frames 1, so that the upper side, the lower side and the left side and the right side of the device are sealed, the environment in the frames 1 is effectively isolated from the external environment, the environmental cleanliness is improved, and clamping devices 7 are arranged on the two sides of the two frames 1 to drive the two frames 1 to slide and then drive the top plate 4 to slide, Bottom plate 5 presss from both sides tightly with curb plate 6, it has operation hole 8 to open on the lateral wall of bottom plate 5, and during the installation the device, operation hole 8 aligns with the oral area of electric well, and the operating personnel of being convenient for carries out construction treatment to the inside cable intermediate head of electric well from operation hole 8 department, has increased apron 801 in addition on the operation hole 8, when operating personnel rest that stops work, utilizes apron 801 to seal operation hole 8, avoids operating personnel to fall into the inside of electric well, has further improved the security of construction.
In order to facilitate quick installation of the front plate 2 and the rear plate 3 inside the frame 1 and installation of the side plates 6 between the top plate 4 and the bottom plate 5, specifically, the frame 1 includes a U-shaped frame 101, a cross rod 102 is arranged at an opening at the upper side of the U-shaped frame 101, screw rods 103 are arranged at two ends of the cross rod 102, threaded ends of the screw rods 103 are meshed and connected inside the upper end of the U-shaped frame 101, a spring 104 for upwards bouncing the cross rod 102 is sleeved on the screw rods 103, and after the screw rods 103 are unscrewed, the cross rod 102 automatically slides upwards under the elastic force action of the spring 104, so that the space for installing the front plate 2 or the rear plate 3 in the frame 1 can be enlarged for convenient operation, and meanwhile, the space between the top plate 4 and the bottom plate 5 can be enlarged for convenient operation, thereby facilitating installation of the front plate 2, the rear plate 3 and the side plates 6.
As shown in fig. 4 and 5, in order to clamp and fix the top plate 4, the bottom plate 5 and the two side plates 6 by the two frames 1, specifically, each clamping device 7 comprises two clamping seats 701, two pull rods 702, a plurality of bolts 703, nuts 704, a plurality of adjusting holes 705 and a baffle 706, the two clamping seats 701 are respectively fixedly connected to the side walls of the two frames 1, the adjusting holes 705 are opened on the side walls of the pull rods 702 in a linear array, and one ends of the two pull rods 702 provided with the adjusting holes 705 are overlapped and connected and fixed through bolts 703, the cooperation of the bolt 703 with the adjustment hole 705 as shown in fig. 4, achieves the fixation of the two tie rods 702, the fixed length can be adjusted, one ends of the two pull rods 702, which are far away from the adjusting hole 705, are clamped inside the clamping seat 701 through a baffle 706 and a nut 704 respectively, the baffle 706 is fixedly connected to the end of one pull rod 702, and the nut 704 is engaged with the end of the other pull rod 702 through threads;
when in use, the nut 704 and the baffle 706 are respectively clamped on the two clamping seats 701, then the overlapped end of the pull rod 702 is fixed through the bolt 703, then the nut 704 is rotated to enable the nut 704 to slide on the pull rod 702, so that the two clamping seats 701 slide relatively, at the moment, the two frames 1 slide relatively under the driving of the two clamping seats 701, at the moment, the two frames 1 can clamp and fix the top plate 4, the bottom plate 5 and the two side plates 6,
in order to enable the volume of the device to be properly adjusted according to the size of a field, specifically, a plurality of splicing plates 9 are respectively spliced on one side of the top plate 4, the bottom plate 5 and the two side plates 6, supporting rods 10 are respectively arranged on the upper side and the lower side of one frame 1, the inner ends of the supporting rods 10 are connected to the insides of the top plate 4 and the bottom plate 5 to support the splicing plates 9 on the upper side and the lower side, as shown in fig. 2, when the volume of the device needs to be expanded, the splicing plates 9 are spliced on one side of the top plate 4, the bottom plate 5 and the two side plates 6, at the moment, the splicing plates 9 can increase the length of the top plate 4, the bottom plate 5 and the two side plates 6, so that the volume of the device can be expanded, and after the splicing plates 9 on the upper layer and the lower layer are supported by the supporting rods 10 (the supporting rods 10 are provided with threads inserted into the insides of the top plate 4 or the bottom plate 5, and the supporting rods 10 are provided with threads and the top plate 4, Screw meshing on the bottom plate 5 is connected, thereby it is more firm), splice plate 9 is pressed from both sides tightly with two curb plates 6 to two rethread frame 1, roof 4, bottom plate 5, then realize enlarging the device's volume, otherwise through reducing the quantity of splice plate 9, it is special, as shown in fig. 8, when need not increase splice plate 9 (the device's volume is when minimum state), roof 4, the direct clamping of bottom plate 5 is between two frame 1, then needn't use bracing piece 10 this moment, can suitably reduce the device's volume like this, thereby make the device's volume can suitably adjust according to the size in place.
In order to enable the connection among the frame 1, the top plate 4, the bottom plate 5, the two side plates 6 and the splice plate 9 to be more stable, the frame 1, the top plate 4, the bottom plate 5, the two side plates 6 and the splice plate 9 are connected in a clamping mode of a groove and a lug, taking the top plate 4 and the splice plate 9 as an example, as shown in fig. 3, a groove is formed in one side, close to the splice plate 9, of the top plate 4, the lug of the splice plate 9 is matched with the groove of the top plate 4 in size, so that after the lug of the splice plate 9 is inserted into the groove of the top plate 4, the splice plate 9 and the top plate 4 are quickly and stably connected, and the connection mode among the frame 1, the top plate 4, the bottom plate 5, the two side plates 6 and the splice plate 9 is the same as the connection mode between the top plate 4 and the splice plate 9;
as shown in fig. 7, two sides of the front plate 2 are fixedly connected with a plurality of clamping blocks 13, the inner side wall of the frame 1 is provided with a plurality of clamping grooves 12, the clamping grooves 12 are in an inverted L-shape (the clamping grooves 12 include a transverse groove and a vertical groove), when the front plate 2 needs to be installed inside the frame 1, the releasing screw 103 is rotated to cause the cross bar 102 to slide upwards under the elastic force of the spring 104, so as to expand the installation space of the front plate 2, at this time, the front plate 2 is lifted up to align the clamping blocks 13 with the mouth parts of the clamping grooves 12, the front plate 2 is pushed into the frame 1, at this time, the clamping blocks 13 slide into the vertical grooves along the transverse groove of the clamping grooves 12, finally, the clamping blocks 13 are fixed at the bottom of the vertical grooves, at this time, the lower end projection of the front plate 2 is also clamped into the groove of the frame 1, the screw 103 is rotated in this state, at this time, after the cross bar 102 is screwed and slides downwards, the upper end projection of the front plate 2 is clamped into the groove of the cross bar 102, at this time, the front plate 2 is fixedly installed inside the frame 1, the rear plate 3 is mounted in the same manner as the front plate 2.
The working principle is as follows: during installation:
the first state: when the splicing plates 9 are not needed to increase the volume, the bottom plate 5 is placed on the ground to enable the operation hole 8 to be aligned with the electric wellhead part, then the two frames 1 are vertically placed on the front side and the back side of the bottom plate 5, the top plate 4 is placed on the upper side between the two frames 1 (between the two cross rods 102) and drives the two frames 1 to clamp the bottom plate 5 and the top plate 4 through the clamping device 7, then the front plate 2 and the back plate 3 are respectively installed in the two frames 1, the two side plates 6 are pre-installed on the left side and the right side between the top plate 4 and the bottom plate 5, the screw 103 is rotated to enable the cross rods 102 to slide downwards, after the cross rods 102 slide downwards, the lower side surfaces of the cross rods 102 abut against the upper ends of the front plate 2 (the back plate 3) to enable the front plate 2 (the back plate 3) to be quickly fixed in the frames 1, after the top plate 4 is driven to slide downwards through the two cross rods 102, the top plate 4 and the bottom plate 5 clamp the side plates 6, at the moment, the device can be quickly installed on a construction site;
and a second state: when the volume needs to be increased by using the splicing plates 9, a certain number of splicing plates 9 are selected according to the construction environment, a plurality of persons cooperate to vertically place two frames 1 on the front side and the rear side of a bottom plate 5, then place a top plate 4 on the upper side between the two frames 1 (between two cross rods 102), install a plurality of splicing plates 9, then insert and connect a support rod 10 on the frames 1 with the top plate 4 and the bottom plate 5 (as shown in fig. 6), then pre-install two side plates 6 on the left side and the right side between the top plate 4 and the bottom plate 5, splice a plurality of splicing plates 9 are also spliced on one side of each side plate 6, at the moment, after the two frames 1 are driven by a clamping device 7 to clamp the bottom plate 5, the top plate 4, the side plates 6 and the splicing plates 9, at the moment, a screw 103 is rotated to enable the cross rods 102 to slide downwards, at the lower side surface of the cross rod 102 is propped against the upper end of a front plate 2 (a rear plate 3), the front plate 2 (the rear plate 3) is rapidly fixed in the frame 1, the top plate 4 and the upper splicing plate 9 are driven to slide downwards through the two cross rods 102, and the top plate 4, the upper splicing plate 9, the bottom plate 5 and the lower splicing plate 9 clamp the side plate 6 and the splicing plates 9 on the two sides, namely, the device is rapidly installed on a construction site.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a structure between operation for cable joint construction, includes two frames (1) of front and back parallel arrangement, its characterized in that: the inside of two frames (1) is equipped with front bezel (2) and back plate (3) respectively around, be equipped with on front bezel (2) and seal door (201), be equipped with window (301) on back plate (3), roof (4) and bottom plate (5) that the level set up are spliced respectively to the upper and lower both sides between two frames (1), the left and right sides between roof (4) and bottom plate (5) is spliced respectively has curb plate (6) of vertical setting, and the both sides of two frames (1) are equipped with clamping device (7) and realize driving two frames (1) and slide the back and press from both sides roof (4), bottom plate (5) and curb plate (6) tightly, it has handle hole (8) to open on the lateral wall of bottom plate (5).
2. The structure of a workshop for cable joint construction according to claim 1, wherein: the frame (1) comprises a U-shaped frame (101), a cross rod (102) is arranged at an opening on the upper side of the U-shaped frame (101), screw rods (103) are arranged at two ends of the cross rod (102), the threaded ends of the screw rods (103) are meshed and connected with the inner portion of the upper end of the U-shaped frame (101), and springs (104) used for bouncing the cross rod (102) upwards are sleeved on the screw rods (103).
3. The structure of a workshop for cable joint construction according to claim 1, wherein: every clamping device (7) all includes two cassette (701), two pull rod (702), a plurality of bolt (703), nut (704), a plurality of regulation hole (705) and baffle (706), and two cassette (701) are fixed connection respectively on the lateral wall of two frames (1), adjust hole (705) and open on the lateral wall of pull rod (702), and two pull rod (702) open the one end coincidence connection that has regulation hole (705) and fixed through bolt (703), and the one end that regulation hole (705) were kept away from in two pull rod (702) is respectively through baffle (706), nut (704) card in the inside of cassette (701).
4. The structure of a workshop for cable joint construction according to claim 1, wherein: a plurality of splice plates (9) are spliced on one side of the top plate (4), the bottom plate (5) and the two side plates (6), supporting rods (10) are arranged on the upper side and the lower side of one frame (1), and the inner ends of the supporting rods (10) are connected to the inner portions of the top plate (4) and the bottom plate (5) and used for supporting the splice plates (9) on the upper side and the lower side.
5. The structure of a workshop for cable joint construction according to claim 4, wherein: the frame (1), the top plate (4), the bottom plate (5), the two side plates (6) and the splicing plates (9) are connected through a clamping mode of the grooves and the lugs.
CN202120870541.5U 2021-04-26 2021-04-26 A structure between operation for cable joint construction Expired - Fee Related CN214590263U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120870541.5U CN214590263U (en) 2021-04-26 2021-04-26 A structure between operation for cable joint construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120870541.5U CN214590263U (en) 2021-04-26 2021-04-26 A structure between operation for cable joint construction

Publications (1)

Publication Number Publication Date
CN214590263U true CN214590263U (en) 2021-11-02

Family

ID=78328184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120870541.5U Expired - Fee Related CN214590263U (en) 2021-04-26 2021-04-26 A structure between operation for cable joint construction

Country Status (1)

Country Link
CN (1) CN214590263U (en)

Similar Documents

Publication Publication Date Title
CN109449797B (en) Outer hanging regulator cubicle
EP3738488B1 (en) Assembled shower room
CN214590263U (en) A structure between operation for cable joint construction
CN211264836U (en) Safe display screen equipment
CN116938083A (en) Photovoltaic module mounting structure
CN115914552B (en) Intelligent building monitoring terminal and system
CN217892530U (en) Shielding structure of automobile charging port
CN215442578U (en) Aluminium system curtain wall construction convenient to installation
CN212670948U (en) Intelligent building curtain wall
CN209028117U (en) A kind of Standard type electric metering box
CN219062872U (en) Mounting structure and building site supervisory equipment
CN213305538U (en) Projection fusion cage convenient to installation
CN220798201U (en) Monitoring device based on solar photovoltaic power supply
CN219386786U (en) Curtain wall mounting frame with installation anti-loosening function
CN213331850U (en) Coupling mechanism for electromechanical installation
CN217708421U (en) Mounting structure of elevator car display screen
CN218437609U (en) Special anti-explosion wall body for reconstruction
CN211981208U (en) Dustproof switch board of hydraulic engineering construction usefulness
CN221231928U (en) Sealing washer erection equipment
CN218727546U (en) Electric energy metering box convenient to dismantle
CN216277299U (en) Retaining is enclosed in quick construction of municipal works assembled
CN212849544U (en) Electric energy meter data acquisition analysis terminal
CN216892998U (en) Three-dimensional adjusting wall connecting code of curtain wall framework
CN218828531U (en) Electrical monitoring protection cabinet
CN215112507U (en) Solar panel monitoring system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102