CN214590107U - Construction engineering detects uses switch board - Google Patents

Construction engineering detects uses switch board Download PDF

Info

Publication number
CN214590107U
CN214590107U CN202120719158.XU CN202120719158U CN214590107U CN 214590107 U CN214590107 U CN 214590107U CN 202120719158 U CN202120719158 U CN 202120719158U CN 214590107 U CN214590107 U CN 214590107U
Authority
CN
China
Prior art keywords
storehouse
heat dissipation
construction engineering
switch board
cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120719158.XU
Other languages
Chinese (zh)
Inventor
何涛
彭一兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Gushan Construction Engineering Co ltd
Original Assignee
Anhui Gushan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Gushan Construction Engineering Co ltd filed Critical Anhui Gushan Construction Engineering Co ltd
Priority to CN202120719158.XU priority Critical patent/CN214590107U/en
Application granted granted Critical
Publication of CN214590107U publication Critical patent/CN214590107U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model provides a construction engineering detects uses switch board, including the cabinet body, cabinet door and display screen, wherein the front side swing joint of the cabinet body has the cabinet door, is provided with the display screen on the cabinet door, the bottom both sides of the cabinet body are provided with the support sill bar, two the spout has been seted up to the inboard of supporting the sill bar, and sliding connection has sliding bottom in two spouts. The utility model discloses in, sliding connection has sliding bottom plate through between two supporting baseplate, wherein set up hydraulic controller at supporting baseplate's top, the bottom plate is provided with the gyro wheel, hydraulic controller connects the gyro wheel, and can drive the gyro wheel and move down, can drive the switch board when the gyro wheel moves down to supporting the bottom bar below and remove, adopt the above-mentioned setting to need not all to set up the gyro wheel at the bottom plate of every switch board, the cost is wasted, the setting of this device only needs to set up the spout and installs the mobile device go, pull down it after removing, not only practice thrift the cost and install and dismantle the convenience.

Description

Construction engineering detects uses switch board
Technical Field
The utility model relates to a construction engineering field especially relates to a construction engineering detects and uses switch board.
Background
The distribution cabinet (case) is a final-stage device of a distribution system and is divided into a power distribution cabinet (case), a lighting distribution cabinet (case) and a metering cabinet (case). The power distribution cabinet is a general name of a motor control center. The power distribution cabinet is used in the occasions with dispersed loads and less loops; the motor control center is used for occasions with concentrated loads and more loops. They distribute the power of a certain circuit of the upper-level distribution equipment to the nearby loads. This level of equipment should provide protection, monitoring and control of the load. But because current switch board still has some weak points when using, there is not the effect of removal in current switch board generally, has partial switch board to have the gyro wheel to realize the effect of removing, but is equipped with the gyro wheel on the switch board and can cause the unstable defect of switch board, and the switch board is fixed most of the time simultaneously, is furnished with the gyro wheel and can cause extravagant cost and rate of utilization not high, for this reason this use novel the proposition switch board for construction engineering detects can solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction engineering detects uses switch board to solve above-mentioned technical problem.
The utility model discloses a solve above-mentioned technical problem, adopt following technical scheme to realize: a power distribution cabinet for construction engineering detection comprises a cabinet body, cabinet doors and a display screen, wherein the cabinet doors are movably connected to the front side of the cabinet body, the display screen is arranged on the cabinet doors, supporting bottom rods are arranged on two sides of the bottom of the cabinet body, sliding grooves are formed in the inner sides of the two supporting bottom rods, sliding bottom plates are connected in the two sliding grooves in a sliding mode, a hydraulic controller is arranged at the top of each sliding bottom plate, a bottom plate of the hydraulic controller penetrates through the sliding bottom plates through telescopic rods to be connected with idler wheels, and stop blocks are movably arranged on the two supporting bottom rods and just right abut against the sliding bottom plates; the inside of the cabinet body is from last down having seted up storage electricity storehouse, electrical apparatus in proper order and having placed storehouse and heat dissipation storehouse, wherein store up the electricity storehouse and the electrical apparatus is placed and separates through the baffle between the storehouse, and the electrical apparatus is placed and is separated through the heat-conducting plate between storehouse and the heat dissipation storehouse.
Furthermore, through the moving mechanism that sets up mountable and dismantlement at the bottom plate of switch board, when the switch board need remove, only need with the bottom plate of moving mechanism installation switch board, then through moving mechanism drive switch board remove can, when not using, with it dismantle get off can, adopt such setting, can save the cost that every switch board below all was equipped with the gyro wheel, it is convenient to install simultaneously and dismantle, practicality and flexibility are higher.
Preferably, two fans are arranged on the rear side of the inside of the heat dissipation bin, the two fans are driven by a motor, the motor is fixed on the rear wall of the inner side of the heat dissipation mud outlet pipe, and a heat dissipation plate is arranged on the front side of the inside of the heat dissipation bin and located on the fan.
Further, drive the fan through the motor and rotate, fan and heating panel cooperation are used, can pass through the ventilation hole with the heat outside the discharge switch board, realize ventilation cooling's effect, and the electrical apparatus is placed simultaneously and is separated through the heat-conducting plate between storehouse and the heat dissipation storehouse, and the heat-conducting plate can place the electrical apparatus in the heat conduction to the heat dissipation storehouse in the storehouse, then dispels the heat.
Preferably, the outer side wall of the heat dissipation bin is provided with a vent hole.
Preferably, the electrical appliance placing bin is provided with vertical rods on two side walls inside the electrical appliance placing bin, and a plurality of cross rods are detachably fixed between the vertical rods.
Preferably, a plurality of locating holes are formed in the vertical rod and the cross rods, the vertical rod and the cross rods are fixed through bolts or pin shafts, and the vertical rod, the cross rods and the electrical equipment are also fixed through bolts or pin shafts.
Furthermore, the bolt and the pin shaft are adopted for fixing, so that the installation and the disassembly are more convenient.
Compared with the prior art, the utility model provides a construction engineering detects uses switch board has following beneficial effect:
the utility model provides a power distribution cabinet for construction engineering detection, through setting up the support sill bar in the bottom plate both sides of power distribution cabinet, and sliding connection has the sliding bottom plate between two support sill plates, wherein set up hydraulic controller at the top of support sill plate, the bottom plate is provided with the gyro wheel, hydraulic controller connects the gyro wheel, and can drive the gyro wheel and move down, can drive the power distribution cabinet and move when the gyro wheel moves down to support the sill bar below, adopt the above-mentioned setting and need not all set up the gyro wheel at the bottom plate of every power distribution cabinet, the cost is wasted, the setting of this device only needs to set up the spout and installs the mobile device up, pull down it after moving, not only save the cost and install and dismantle conveniently, secondly, cooperate through setting up fan and heating panel, the heat that the electrical apparatus produced in placing the storehouse enters into the heat dissipation storehouse through the heat-conducting plate, dispel the heat through the heat dissipation mechanism, and discharge the heat through the ventilation hole, adopt above-mentioned heat dissipation mechanism that sets up can not influence the normal use of electrical apparatus, and the radiating effect is good.
Drawings
Fig. 1 is a schematic structural view of a power distribution cabinet for construction engineering detection according to the present invention;
fig. 2 is a schematic view of a part of the structure of the power distribution cabinet for construction engineering detection according to the present invention;
fig. 3 is a plan view of the utility model of a power distribution cabinet for construction engineering detection;
reference numerals: 1. a cabinet body; 2. a cabinet door; 3. a display screen; 4. a heat dissipation bin; 5. a vent hole; 6. a support bottom bar; 7. a sliding bottom plate; 8. a stopper; 9. a hydraulic controller; 10. a roller; 11. an electricity storage bin; 12. an electrical appliance placing bin; 13. a vertical rod; 14. a cross bar; 15. a heat conducting plate; 16. a fan; 17. a heat sink.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand, the present invention will be further explained below with reference to the following embodiments and the accompanying drawings, but the following embodiments are only the preferred embodiments of the present invention, and not all embodiments are included. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative efforts belong to the protection scope of the present invention.
Specific embodiments of the present invention will be described below with reference to the accompanying drawings.
In a specific implementation process, as shown in fig. 1, 2 and 3, the power distribution cabinet for construction engineering detection comprises a cabinet body 1, a cabinet door 2 and a display screen 3, wherein the cabinet door 2 is movably connected to the front side of the cabinet body 1, the display screen 3 is arranged on the cabinet door 2, supporting bottom rods 6 are arranged on two sides of the bottom of the cabinet body 1, sliding grooves are formed in the inner sides of the two supporting bottom rods 6, sliding bottom plates 7 are slidably connected in the two sliding grooves, a hydraulic controller 9 is arranged at the top of each sliding bottom plate 7, a bottom plate of the hydraulic controller 9 penetrates through the sliding bottom plates 7 through a telescopic rod to be connected with idler wheels 10, stop blocks 8 are movably arranged on the two supporting bottom rods 6, and the stop blocks 8 just abut against the sliding bottom plates 7; the inside of the cabinet body 1 is from last down seted up store up electrical bin 11, electrical apparatus in proper order and placed storehouse 12 and heat dissipation storehouse 4, wherein store up electrical bin 11 and electrical apparatus and place and separate through the baffle between the storehouse 12, electrical apparatus is placed and is separated through heat-conducting plate 15 between storehouse 12 and the heat dissipation storehouse 4.
In the time of sliding power distribution cabinet, at first slide sliding bottom plate 7 to between two support sill bars 6, rotate dog 8 simultaneously, and carry on spacingly can to sliding bottom plate 7 through dog 8, then drive gyro wheel 10 through hydraulic controller 9 and move down, be located the below that supports sill bar 6 until the bottommost of gyro wheel 10, can drive the switch board through gyro wheel 10 this moment and remove, after the switch board removes required position, when need fixing the switch board, hydraulic controller 9 drives gyro wheel 10 and moves up this moment, until two support sill bar 6 contact ground, then take out sliding bottom plate 7 can.
In the specific implementation process, as shown in fig. 3, two fans 16 are disposed at the rear side of the interior of the heat dissipation bin 4, wherein the two fans 16 are both driven by a motor, the motor is fixed on the rear wall of the interior of the heat dissipation mud pipe 4, and a heat dissipation plate 17 is disposed at the front side of the fan 16 and inside the heat dissipation bin 4.
In the specific implementation process, as shown in fig. 1 and 3, two fans 16 are arranged on the rear side inside the heat dissipation bin 4, wherein the two fans 16 are both driven by a motor, the motor is fixed on the rear wall inside the heat dissipation mud outlet pipe 4, and a heat dissipation plate 17 is arranged inside the heat dissipation bin 4 and in front of the fans 16; the outer side wall of the heat dissipation bin 4 is provided with a ventilation hole 5.
When using, when needs dispel the heat to the switch board, only need to drive fan 16 through the motor and rotate, and then carry out the heat dissipation on conveying heating panel 17 with the heat, at last with the heat through ventilation taste 5 discharge can.
In the specific implementation process, as shown in fig. 3, two side walls inside the electrical appliance placing bin 12 are both provided with vertical bars 13, and a plurality of cross bars 14 are detachably fixed between the two vertical bars 13.
In a specific implementation process, as shown in fig. 3, two side walls inside the electrical appliance placing bin 12 are respectively provided with a vertical rod 13, and a plurality of cross rods 14 are detachably fixed between the two vertical rods 13; a plurality of positioning holes are formed in the two vertical rods 13 and the plurality of cross rods 14, the vertical rods 13 and the cross rods 14 are fixed through bolts or pin shafts, and the vertical rods 13, the cross rods 14 and the electrical equipment are also fixed through bolts or pin shafts.
When the electric appliance is used, when the electric appliance is installed, the electric appliance can be fixed on the vertical rods 13 or the transverse rods 14 by bolts or pin shafts.
The utility model relates to a construction engineering detects does with implementation principle of switch board: during the use, at first with electrical equipment through round pin axle or bolt fastening to corresponding montant 13 or horizontal pole 14 on, then close cabinet door 2 can, then remove the switch board to assigned position department, when removing, only need slide to two with sliding bottom plate 7 and support between the sill bar 6, and support sliding bottom plate 7 through dog 8, play spacing effect, then through the gyro wheel 10 drive switch board of sliding bottom plate 7 bottom plate remove can, after the removal finishes, then take out sliding bottom plate 7 can.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a construction engineering detects uses switch board, includes the cabinet body (1), cabinet door (2) and display screen (3), wherein the front side swing joint of the cabinet body (1) has cabinet door (2), is provided with display screen (3) on cabinet door (2), its characterized in that: supporting bottom rods (6) are arranged on two sides of the bottom of the cabinet body (1), sliding grooves are formed in the inner sides of the two supporting bottom rods (6), sliding bottom plates (7) are connected in the two sliding grooves in a sliding mode, a hydraulic controller (9) is arranged on the top of each sliding bottom plate (7), a bottom plate of each hydraulic controller (9) penetrates through the corresponding sliding bottom plate (7) through a telescopic rod and is connected with idler wheels (10), stop blocks (8) are movably arranged on the two supporting bottom rods (6), and the stop blocks (8) just abut against the sliding bottom plates (7);
the inside of the cabinet body (1) is from last down seted up store up electricity storehouse (11), electrical apparatus and placed storehouse (12) and heat dissipation storehouse (4) in proper order, wherein store up electricity storehouse (11) and electrical apparatus and place and separate through the baffle between storehouse (12), and electrical apparatus is placed and is separated through heat-conducting plate (15) between storehouse (12) and the heat dissipation storehouse (4).
2. The power distribution cabinet for construction engineering detection according to claim 1, characterized in that: the inside rear side in heat dissipation storehouse (4) is provided with two fans (16), and wherein two fans (16) all pass through motor drive, and the motor is fixed on the inboard back wall in heat dissipation storehouse (4), the inside in heat dissipation storehouse (4) and the front side that is located fan (16) are provided with heating panel (17).
3. The power distribution cabinet for construction engineering detection according to claim 2, characterized in that: the outer side wall of the heat dissipation bin (4) is provided with a ventilation hole (5).
4. The power distribution cabinet for construction engineering detection according to claim 1, characterized in that: the electric appliance placing bin is characterized in that two side walls inside the electric appliance placing bin (12) are respectively provided with a vertical rod (13), and a plurality of transverse rods (14) are detachably fixed between the vertical rods (13).
5. The construction engineering detection power distribution cabinet according to claim 4, characterized in that: two a plurality of locating holes have all been seted up on montant (13) and a plurality of horizontal pole (14), montant (13) with fix through bolt or round pin axle between horizontal pole (14), also fix through bolt or round pin axle between montant (13), horizontal pole (14) and the electrical equipment.
CN202120719158.XU 2021-04-09 2021-04-09 Construction engineering detects uses switch board Expired - Fee Related CN214590107U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120719158.XU CN214590107U (en) 2021-04-09 2021-04-09 Construction engineering detects uses switch board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120719158.XU CN214590107U (en) 2021-04-09 2021-04-09 Construction engineering detects uses switch board

Publications (1)

Publication Number Publication Date
CN214590107U true CN214590107U (en) 2021-11-02

Family

ID=78323962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120719158.XU Expired - Fee Related CN214590107U (en) 2021-04-09 2021-04-09 Construction engineering detects uses switch board

Country Status (1)

Country Link
CN (1) CN214590107U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118431920A (en) * 2024-04-22 2024-08-02 南通宇顺通信工程有限公司 Buried power distribution cabinet

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118431920A (en) * 2024-04-22 2024-08-02 南通宇顺通信工程有限公司 Buried power distribution cabinet

Similar Documents

Publication Publication Date Title
CN214590107U (en) Construction engineering detects uses switch board
CN210628750U (en) Switch board convenient to installation is maintained
CN111688267A (en) Direct-drive motor device of tablet press
CN110932114B (en) Power distribution cabinet capable of expanding inner cavity volume
CN201956582U (en) Electrical control cabinet capable of being mounted conveniently
CN217790148U (en) Server rack with cooling mechanism
CN205375332U (en) Hanging machine case
CN214070465U (en) Intelligent building integrated management equipment console
CN211015331U (en) Quick radiating computer machine case
CN204362478U (en) A kind of intelligent PDU system rack
CN209993917U (en) Suspension device for power distribution cabinet
CN210350569U (en) Low-voltage cabinet capable of dissipating heat quickly
CN207409814U (en) A kind of outdoor electric cabinet with snow removing
CN112040702A (en) Network rack convenient to heat dissipation
CN221380117U (en) Suspension type distribution box
CN221353449U (en) Dehumidifying device for distribution box
CN219998852U (en) Switch board with inside temperature regulation and control function
CN215528380U (en) Switch board with cooling structure
CN219268226U (en) Wall-mounted emergency access box
CN220822193U (en) Electric power energy-saving device
CN221353574U (en) Switch board convenient to dismantle
CN221548839U (en) Air conditioner supporting partition plate structure
CN205178273U (en) Communication power supply cabinet
CN203707598U (en) Power distribution cabinet convenient for installation and maintenance
CN221177067U (en) Power distribution cabinet body with heat radiation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102