CN214585697U - Intelligent electric meter device in comprehensive energy system based on 5G transmission data - Google Patents

Intelligent electric meter device in comprehensive energy system based on 5G transmission data Download PDF

Info

Publication number
CN214585697U
CN214585697U CN202120317952.1U CN202120317952U CN214585697U CN 214585697 U CN214585697 U CN 214585697U CN 202120317952 U CN202120317952 U CN 202120317952U CN 214585697 U CN214585697 U CN 214585697U
Authority
CN
China
Prior art keywords
module
mcu chip
dust screen
transmission
energy system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120317952.1U
Other languages
Chinese (zh)
Inventor
李宏伟
王思敏
王锁艮
白宇
周吉元
田艳
张勇
于晓伟
王香玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hetian Power Supply Co Of State Grid Xinjiang Electric Power Co ltd
State Grid Xinjiang Power Co Ltd Kezhou Power Supply Co
State Grid Xinjiang Integrated Energy Service Co ltd
Original Assignee
Hetian Power Supply Co Of State Grid Xinjiang Electric Power Co ltd
State Grid Xinjiang Power Co Ltd Kezhou Power Supply Co
State Grid Xinjiang Integrated Energy Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hetian Power Supply Co Of State Grid Xinjiang Electric Power Co ltd, State Grid Xinjiang Power Co Ltd Kezhou Power Supply Co, State Grid Xinjiang Integrated Energy Service Co ltd filed Critical Hetian Power Supply Co Of State Grid Xinjiang Electric Power Co ltd
Priority to CN202120317952.1U priority Critical patent/CN214585697U/en
Application granted granted Critical
Publication of CN214585697U publication Critical patent/CN214585697U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

Smart electric meter device among the comprehensive energy system based on 5G transmission data relates to smart electric meter technical field, has solved the problem that current communication is poor and heat dissipation deashing difficulty easily advances the insect, includes: the device comprises a shell, a wiring terminal, a power supply panel, a voltage acquisition module, a current acquisition module, a first A/D converter, a second A/D converter, an MCU chip, a 5G transmission module, a storage module, a display module and a key input module; the left side face and the right side face of the shell are provided with heat dissipation hole structures, the outer surface of the shell is provided with an upper sliding groove and a lower sliding groove, the upper sliding groove is located above the heat dissipation hole structures, the lower sliding groove is located below the heat dissipation hole structures, a dust screen is arranged corresponding to the heat dissipation hole structures, and the dust screen is detachably connected with the upper sliding groove and the lower sliding groove. The utility model discloses the transmission speed of 5G transmission module is fast, and transmission distance is far away, and the interference killing feature is strong; the dust screen can prevent that the winged insect from getting into in the casing, can reduce the dust in heat radiation structure and the casing, can dismantle easy clearance.

Description

Intelligent electric meter device in comprehensive energy system based on 5G transmission data
Technical Field
The utility model relates to a smart electric meter technical field, concretely relates to smart electric meter device among the comprehensive energy system based on 5G transmission data.
Background
The intelligent electric meter is applied to the power industry of the comprehensive energy system, the development of the power industry plays a key role, the modern power grid is revolutionarily developed compared with the traditional power grid due to the application of the intelligent electric meter, and the application of the intelligent electric meter plays an important role in the construction of the power grid.
The conventional electric energy meter shell generally does not have a heat dissipation structure, and heat is dissipated through heat conduction of the outer wall of the shell. The casing that has heat radiation structure also is the direct punching a hole and forms on the electric energy meter, and along with the increase of electric energy meter live time, the heat dissipation hole of this kind of heat dissipation mechanism is given by the dust easily and is covered, and then influences the radiating effect, and the staff is comparatively difficult to the clearance of dust, and inside the insect got into the electric energy meter from the louvre easily, led to the fact the destruction to the electric wire, the security of electric energy meter can not obtain the assurance.
Most of the conventional electric meter devices do not have a communication function, and the electric meter devices having the communication function have a problem of slow transmission or a problem of short transmission distance and susceptibility to interference. The traditional intelligent electric energy meter with the communication function is usually in infrared communication, and the transmission speed is low and is only the K-level baud rate by an infrared communication method; the transmission distance is short and is only meter-level, the atmospheric influence and light interference are seriously received in long-distance transmission, and the long-distance transmission is not required to be blocked by a barrier; only straight line transmission and only one-to-one transmission.
Along with wireless technology's development, remote communication uses more and more, and to the smart electric meter field, the smart electric meter that wireless communication transmission speed is fast, the distance is far away and interference immunity is strong is required, solves the insect and gets into the casing from the louvre easily simultaneously and the problem of louvre dust clearance difficulty.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a smart electric meter device among the comprehensive energy system based on 5G transmission data.
The utility model discloses a solve the technical scheme that technical problem adopted as follows:
smart electric meter device among the comprehensive energy system based on 5G transmission data includes: the circuit board is provided with a wiring terminal, a power supply board connected with the wiring terminal, a voltage acquisition module connected with the wiring terminal, a current acquisition module connected with the wiring terminal, a first A/D converter connected with the voltage acquisition module, a second A/D converter connected with the current acquisition module, an MCU chip, a 5G transmission module connected with the MCU chip, a storage module connected with the MCU chip, a display module connected with the MCU chip and a key input module connected with the MCU chip, wherein the MCU chip is connected with the first A/D converter and the second A/D converter; the display surface of the display module and the keys in the key input module are positioned on the front side surface of the shell, and the wiring end of the wiring terminal is positioned on the lower side surface of the shell; the heat dissipation hole structure is arranged on the left side face and the right side face of the shell, an upper sliding groove and a lower sliding groove are arranged on the outer surface of the shell, the upper sliding groove is located above the heat dissipation hole structure, the lower sliding groove is located below the heat dissipation hole structure, a dust screen is arranged corresponding to the heat dissipation hole structure, and the dust screen is detachably connected with the upper sliding groove and the lower sliding groove.
Further, be equipped with stopper, preceding pin and lug on the casing, the stopper is spacing as the back of dust screen, and the lug is located the front side of spout down, and the one end of preceding pin is located spout front side and rotates and connect the casing, and the other end of preceding pin corresponds the lug and is equipped with the recess, and preceding pin passes through recess detachable and connects the lug, and preceding pin is spacing as the preceding of dust screen.
Furthermore, the keys of the key input module are keys with LED key lamps.
Further, the material of the shell is a mixture of PC and ABS, PC or ABS.
Furthermore, a heat dissipation fan is arranged in the shell.
Furthermore, the shell is provided with a temperature sensor, and the temperature sensor and the cooling fan are both connected with the MCU chip.
The utility model has the advantages that:
the utility model discloses smart electric meter device among the comprehensive energy system based on 5G transmission data can transmit away the processing calculated result of MCU chip through 5G transmission module, and transmission speed is fast, and transmission distance is far away, and the interference killing feature is strong. The utility model discloses a smart electric meter device provides required hardware condition for smart power grids construction, the integrated unified management of power consumption, has promoted to improve the electric power industry development.
The utility model discloses a set up heat radiation structure and guaranteed the heat dissipation of circuit substrate in the casing, through setting up the dust screen, can prevent that the winged insect from getting into in the casing, can reduce the dust that gets into the casing through heat radiation structure by a wide margin, the dust can not pile up on heat radiation structure simultaneously; the dust-collecting accessible on the dust screen is dismantled and is changed, can dismantle the back clearance, and the detachable design is convenient for the clearance of dust on the dust screen, has simple structure's advantage simultaneously.
Drawings
Fig. 1 is a front view structure diagram of the smart meter device in the integrated energy system based on 5G data transmission.
Fig. 2 is the utility model discloses a right side view structure chart of smart electric meter device among the comprehensive energy system based on 5G transmission data.
Fig. 3 is the utility model discloses a right side view structure graph when the dust screen of smart electric meter device among the comprehensive energy system based on 5G transmission data is waited to install.
Fig. 4 is the utility model discloses a schematic diagram is connected to each module on the circuit substrate of smart electric meter device among the comprehensive energy system based on 5G transmission data.
In the figure: 1. the display screen comprises a shell, 2, a display surface, 3, a key, 4, a heat dissipation hole structure, 5, a dustproof net, 6, an upper chute, 7, a lower chute, 8, a limiting block, 9, a front stop lever, 10 and a bump.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Intelligent ammeter device among comprehensive energy system based on 5G transmission data, including casing 1 with install the circuit substrate in casing 1, the circuit substrate is equipped with MCU chip, button input module, storage module, voltage acquisition module, current acquisition module, first AD converter, second AD converter, 5G transmission module, display module, binding post, power supply panel on. The display surface 2 of the display module, the keys 3 in the key input module and the wiring terminals of the wiring terminals are respectively arranged on the outer surface of the shell 1. As shown in fig. 1, the display surface 2 and the keys 3 in the key input module are located on the front side surface of the housing 1. The terminals of the terminals are located on the lower side of the housing 1. As shown in fig. 3, heat dissipation hole structures 4 are disposed on the left side surface and the right side surface of the housing 1, the heat dissipation hole structures 4 are disposed corresponding to the circuit substrate and used for dissipating heat of MCU chips, and the heat dissipation hole structures 4 are formed by a plurality of small holes in circular, prismatic or other shapes. As shown in fig. 2, the housing 1 is provided with a dust screen 5, and the dust screen 5 is disposed corresponding to the heat dissipation hole structure 4. The detachable 1 surface of connecting casing of dust screen 5 is equipped with spout 6 and lower spout 7 on the casing 1, and spout 6 and lower spout 7 set up on 1 surface of casing. Go up the spout 6 and be located directly over louvre structure 4, lower spout 7 is located louvre structure 4 directly below, and dust screen 5 is located last spout 6 and lower spout 7, is located between spout 6 and the lower spout 7, and upper spout 6 is spacing as the last limit of dust screen 5, and lower spout 7 is spacing as the lower limit of dust screen 5, and lower spout 7 supports dust screen 5. The dust screen 5 can be installed between the upper chute 6 and the lower chute 7, and can also be removed from the upper chute 6 and the lower chute 7.
The connection terminal is electrically connected with the power supply panel as shown in fig. 4. The input end of the voltage acquisition module is connected with the wiring terminal, the output end of the voltage acquisition module is connected with the input end of the first A/D converter, and the output end of the first A/D converter is connected with the input end of the MCU chip. The input end of the current acquisition module is connected with the wiring terminal, the output end of the current acquisition module is connected with the input end of the second A/D converter, and the output end of the second A/D converter is connected with the input end of the MCU chip. The key input module is connected with the input end of the MCU chip. The output end of the MCU chip is respectively connected with the input end of the display module and the 5G transmission module. The MCU chip is also connected with a storage module.
The voltage acquisition module is used for detecting the voltage value of the power-in user terminal, and the first A/D converter is used for converting the analog signal provided by the voltage acquisition module into a digital signal and sending the digital signal to the MCU chip for processing and calculation. The current acquisition module is used for detecting the current amount of the electricity entering the user end, and the second A/D converter is used for converting the analog signals provided by the current metering module into digital signals and sending the digital signals to the MCU chip for processing and calculation. The MCU chip is used as a microprocessor and is used for processing and calculating data signals collected by the first A/D converter and the second A/D converter. The storage module is used for storing the working data of the intelligent electric meter device, namely storing electric energy metering information: the method comprises the step of storing the processing calculation result of the MCU chip. The data stored in the storage module is read and modified by the MCU chip. And the display surface 2 of the display module is used for displaying the processing and calculation results of the MCU chip. And the 5G transmission module is used for transmitting the processing calculation result of the MCU chip. The power supply board is used for supplying power for each power utilization module and supplying power for the power utilization modules such as the MCU chip, the display module, the 5G transmission module, the key input module, the voltage acquisition module, the current acquisition module, the first A/D converter and the second A/D converter.
The utility model discloses smart electric meter device among the comprehensive energy system based on 5G transmission data can transmit away the processing calculated result of MCU chip through 5G transmission module, and transmission speed is fast, and transmission distance is far away, and the interference killing feature is strong. The information that 5G transmission module transmitted is received to the electric wire netting platform accessible to carry out the analysis in order to promote the intelligent development that realizes the electric wire netting according to this, the utility model discloses a smart electric meter device provides required hardware condition for smart power grids construction, the integrated unified management of power consumption, has promoted the development of improvement electric power industry. The utility model discloses a set up heat radiation structure and guaranteed the heat dissipation of circuit substrate in casing 1, through setting up dust screen 5, can prevent that the winged insect from getting into casing 1, can reduce the dust that gets into casing 1 through heat radiation structure by a wide margin, the dust can not pile up on heat radiation structure simultaneously; the dust collecting accessible on the dust screen 5 is dismantled and is changed, can dismantle the back clearance, and the detachable design is convenient for the clearance of dust on the dust screen 5, has simple structure's advantage simultaneously.
As shown in fig. 1 to 3, a limiting block 8 is disposed on the housing 1, the limiting block 8 serves as a rear limiting of the dust screen 5, the limiting block 8 can be disposed at the rear side of the upper chute 6, at the rear side of the lower chute 7 or at the rear side of the heat dissipation holes, and the limiting block 8 serves as a rear limiting of the dust screen 5. The front side of lower spout 7 is equipped with a lug 10, is equipped with a preceding pin 9 on casing 1, and the one end of preceding pin 9 is rotated and is connected casing 1, and this one end is located the front side of last spout 6, corresponds lug 10 on the other end of preceding pin 9 and is equipped with the recess, and preceding pin 9 can the lock on lug 10 through the recess, realizes dismantling the connection through recess and lug 10. The front stop lever 9 is used as the front limit of the dust screen 5, and the dust screen 5 can be installed and removed through the front ends of the upper chute 6 and the lower chute 7. The front stop lever 9 is rotated to ensure that the front stop lever 9 does not block the area between the upper chute 6 and the lower chute 7, at the moment, the dust screen 5 can be arranged in the upper chute 6 and the lower chute 7 from the front sides of the upper chute 6 and the lower chute 7, the dust screen 5 is pushed backwards along the upper chute 6 and the lower chute 7 until the dust screen is limited by the limiting block 8, and at the moment, the dust screen 5 is opposite to the corresponding heat dissipation hole structure 4; the front stop lever 9 is rotated to make the front stop lever 9 located at the front side of the dust screen 5, the front stop lever 9 is connected with the convex block 10 through the groove on the front stop lever, and at this time, the dust screen 5 can not be taken down from the shell 1. When the dust screen 5 needs to be detached, the connection between the groove and the bump 10 is cancelled, and the front stop lever 9 is rotated to slide the dust screen 5 out of the upper chute 6 and the lower chute 7. Because all be provided with louvre structure 4 on the left surface of casing 1 and the right flank, all be equipped with spout 6, lower spout 7, stopper 8, preceding pin 9 and lug 10 on casing 1 left surface and the right flank. The utility model discloses smart electric meter device among the comprehensive energy system based on 5G transmission data is through setting up spout 6, lower chute 7, stopper 8 and preceding gag lever post 9, and simple to operate is dismantled to dust screen 5, and the installation can firmly not drop.
The button 3 of the button input module is the button 3 with the LED button lamp, the button 3 can be seen clearly when the light is dark, and the button 3 operation of an operator is facilitated.
A heat radiation fan is arranged in the shell 1 and connected with a power supply board, the heat radiation fan is arranged corresponding to the heat radiation hole structures 4 on the left side and the right side, and the heat radiation fan can be arranged on the left side surface or the right side surface of the shell 1. Casing 1 still is equipped with temperature sensor, and temperature sensor and radiator fan all connect the MCU chip, and temperature sensor surveys the temperature in casing 1 and sends temperature information to the MCU chip, is equipped with on the MCU chip and predetermines the upper limit value and predetermine the lower limit value, and the MCU chip starts radiator fan when the temperature surpasss predetermineeing the upper limit value and dispels the heat, and the radiator fan is closed to the MCU chip when the temperature is less than predetermineeing the lower limit value.
The material of the housing 1 may be polycarbonate PC, or acrylonitrile-butadiene-styrene ABS, or a mixture of PC and ABS.

Claims (5)

1. Smart electric meter device among comprehensive energy system based on 5G transmission data, its characterized in that includes: the circuit board is provided with a wiring terminal, a power supply board connected with the wiring terminal, a voltage acquisition module connected with the wiring terminal, a current acquisition module connected with the wiring terminal, a first A/D converter connected with the voltage acquisition module, a second A/D converter connected with the current acquisition module, an MCU chip, a 5G transmission module connected with the MCU chip, a storage module connected with the MCU chip, a display module connected with the MCU chip and a key input module connected with the MCU chip, wherein the MCU chip is connected with the first A/D converter and the second A/D converter; the display surface (2) of the display module and the keys (3) in the key input module are positioned on the front side surface of the shell (1), and the wiring ends of the wiring terminals are positioned on the lower side surface of the shell (1); be provided with louvre structure (4) on the left surface and the right flank of casing (1), be equipped with spout (6) and lower spout (7) on casing (1) surface, go up spout (6) and be located louvre structure (4) top, lower spout (7) are located louvre structure (4) below, correspond louvre structure (4) and are equipped with dust screen (5), and dust screen (5) detachable connects spout (6) and lower spout (7).
2. The intelligent electric meter device in the comprehensive energy system based on 5G data transmission as claimed in claim 1, wherein the housing (1) is provided with a limiting block (8), a front stop lever (9) and a convex block (10), the limiting block (8) is used as a rear limit of the dust screen (5), the convex block (10) is located at the front side of the lower chute (7), one end of the front stop lever (9) is located at the front side of the upper chute (6) and is rotatably connected with the housing (1), the other end of the front stop lever (9) is provided with a groove corresponding to the convex block (10), the front stop lever (9) is detachably connected with the convex block (10) through the groove, and the front stop lever (9) is used as a front limit of the dust screen (5).
3. The smart meter device for a 5G-based transmission data integrated energy system according to claim 1, wherein the button (3) of the button input module is a button (3) with an LED button lamp.
4. The smart meter device for a 5G-based data transmission integrated energy system according to claim 1, wherein a heat radiation fan is provided in the case (1).
5. The smart meter device for a 5G-based integrated energy system for transmitting data according to claim 4, wherein the case (1) is provided with a temperature sensor, and the temperature sensor and the cooling fan are connected to the MCU chip.
CN202120317952.1U 2021-02-04 2021-02-04 Intelligent electric meter device in comprehensive energy system based on 5G transmission data Active CN214585697U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120317952.1U CN214585697U (en) 2021-02-04 2021-02-04 Intelligent electric meter device in comprehensive energy system based on 5G transmission data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120317952.1U CN214585697U (en) 2021-02-04 2021-02-04 Intelligent electric meter device in comprehensive energy system based on 5G transmission data

Publications (1)

Publication Number Publication Date
CN214585697U true CN214585697U (en) 2021-11-02

Family

ID=78349874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120317952.1U Active CN214585697U (en) 2021-02-04 2021-02-04 Intelligent electric meter device in comprehensive energy system based on 5G transmission data

Country Status (1)

Country Link
CN (1) CN214585697U (en)

Similar Documents

Publication Publication Date Title
CN108872766A (en) A kind of electric instrument with positioning function
CN214585697U (en) Intelligent electric meter device in comprehensive energy system based on 5G transmission data
CN208239937U (en) A kind of computer data acquiring device based on Internet of Things
CN205910838U (en) Handheld meter recorder
CN209824268U (en) Data acquisition device for electric power marketing
CN216247954U (en) Soil moisture content supervisory equipment based on internet
CN212808396U (en) Single-phase smart meter of intelligence convenient to observe
CN203573484U (en) Wired concentrator with multifunctional acquisition and control capacity
CN209297964U (en) A kind of 5G communication intelligent terminal device
CN208188199U (en) Smart grid non-intrusion type resident load monitoring device
CN210071965U (en) Electric power instrument
CN210166937U (en) Wireless earth magnetism vehicle detection is with intelligent host computer from taking display screen
CN213186379U (en) Intelligent 5G gateway with printing function
CN206805659U (en) Personnel amount information collecting device based on infrared sensor
CN218180950U (en) Remote control intelligent electric energy meter
CN206610428U (en) A kind of wireless data acquisition device
CN211122986U (en) Digital display guide rail type electric energy meter
CN205983804U (en) Handheld wireless data collector
CN218630547U (en) Control selector of thermal coupling distillation system
CN212085866U (en) Energy cabinet
CN220855003U (en) Multifunctional electric energy meter with HPLC communication function
CN219676538U (en) Mobile equipment of remote monitoring and storing integrated machine
CN214124940U (en) Terminal management device is synthesized to distribution wisdom
CN218247194U (en) Intelligent labeling visual chart for vision detection
CN213210284U (en) Based on intelligence multiloop electric parameter acquisition equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant