CN214583336U - Intelligent tunnel construction safety detection equipment - Google Patents

Intelligent tunnel construction safety detection equipment Download PDF

Info

Publication number
CN214583336U
CN214583336U CN202121180764.5U CN202121180764U CN214583336U CN 214583336 U CN214583336 U CN 214583336U CN 202121180764 U CN202121180764 U CN 202121180764U CN 214583336 U CN214583336 U CN 214583336U
Authority
CN
China
Prior art keywords
wall
bearing
tunnel construction
detection
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121180764.5U
Other languages
Chinese (zh)
Inventor
张琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Vocational and Technical College
Original Assignee
Dalian Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Vocational and Technical College filed Critical Dalian Vocational and Technical College
Priority to CN202121180764.5U priority Critical patent/CN214583336U/en
Application granted granted Critical
Publication of CN214583336U publication Critical patent/CN214583336U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides an intelligence tunnel construction safety inspection equipment, including organism and float bar, the detection case is installed in the organism outside, and detection case outer wall is fixed with control panel, the control panel bottom is provided with the bottom plate, bottom surface intermediate position department installs the motor in the detection case, motor drive end is connected with first bearing, the threaded rod is installed at first bearing top, the thread bush is installed to the threaded rod outer wall, thread bush outside symmetric connection has the second bearing, second bearing outer wall connection has the bull stick, and the outer wall of bull stick is provided with the alarm piece, the outside reservation of alarm piece has the draw-in groove, and the bottom of draw-in groove is fixed with the contact piece, the float bar is connected in the outer wall of contact piece, the float bar top is provided with the connecting block, connecting block outer wall connection has the bull stick, the outer wall of bull stick is installed and is detected the floater. The utility model discloses beneficial effect: the system provides guarantee for subsequent safe construction, is convenient for intelligent safety detection, can prevent in advance and is convenient for reducing the loss caused by water burst.

Description

Intelligent tunnel construction safety detection equipment
Technical Field
The utility model relates to a safety inspection equipment technical field specifically is an intelligence tunnel construction safety inspection equipment.
Background
The tunnel is built underground or underwater or in a mountain, a railway is laid or a highway is built for the motor vehicle to pass through, the tunnel is special in environment, various accidents are easy to occur, the internal condition of the tunnel is detected regularly, the problem can be found early, and when the water inrush phenomenon occurs in the tunnel at present, people cannot know the occurrence of the water inrush phenomenon in the tunnel in the first time due to the fact that effective detection equipment is not available, so that the water inrush phenomenon processing in the tunnel is delayed, the tunnel cannot be subjected to immeasurable consequences, and therefore the intelligent detection equipment for safely detecting tunnel construction is needed.
Safety inspection equipment in the existing market is not convenient for play omnidirectional safety monitoring, be difficult for detecting in advance and the protection to tunnel safety environment, be not convenient for provide guarantee and prerequisite to follow-up safety construction, be not convenient for intelligent safety inspection, and be difficult for reducing the loss that gushes water and bring, to above-mentioned condition, carry out technical innovation on current safety inspection equipment basis, research and design one kind can reach omnidirectional safety monitoring, can detect in advance and the protection to tunnel safety environment, provide the guarantee for follow-up safety construction, and can prevent in advance, reduce the intelligent tunnel construction safety inspection equipment of the loss that gushes water and bring, very necessary.
Disclosure of Invention
An object of the utility model is to provide an intelligence tunnel construction safety inspection equipment to general safety inspection equipment that proposes in solving the background art is not convenient for play omnidirectional safety monitoring, is difficult for detecting in advance and protecting tunnel safety ring border, is not convenient for provide guarantee and the problem of proposition to follow-up safe construction.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
an intelligent tunnel construction safety detection device comprises a machine body and a floating rod, wherein a detection box is installed on the outer side of the machine body, a control panel is fixed on the outer wall of the detection box, a bottom plate is arranged at the bottom of the control panel, a placing vehicle is connected to the lower wall surface of the bottom plate through a spring, a moving wheel is arranged on the lower wall surface of the placing vehicle, a motor is installed at the middle position of the inner bottom surface of the detection box, a first bearing is connected to the driving end of the motor, a threaded rod is installed at the top of the first bearing, a threaded sleeve is installed on the outer wall of the threaded rod, a second bearing is symmetrically connected to the outer side of the threaded sleeve, a rotating rod is connected to the outer wall of the second bearing, an alarm block is arranged on the outer wall of the rotating rod, a clamping groove is reserved on the outer side of the alarm block, a contact block is fixed to the bottom of the clamping groove, the floating rod is connected to the outer wall of the contact block, and a connecting block is arranged above the floating rod, the outer wall of connecting block is connected with changes the piece, and changes the outer wall of piece and install and detect the floater.
Preferably, the threaded rod forms a rotating structure with the detection box through the first bearing, and the threaded rod is in threaded connection with the threaded sleeve.
Preferably, the rotating rod and the detection box form a rotating structure through a second bearing, and the second bearing is in sliding connection with the threaded rod.
Preferably, the floating rod forms a rotating structure with the connecting block through the rotating block, and the connecting block and the rotating rod are integrally arranged.
Preferably, the axis that detects the floater parallels with the axis that contacts the piece, and contacts the piece and passes through the draw-in groove and constitute the block structure with the alarm piece.
Preferably, the bottom plate forms an elastic structure with the placing vehicle through a spring, and the placing vehicle and the moving wheel are arranged in parallel.
Advantageous effects
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a control panel carries out the control of data procedure, start the first motor below and make it operate and drive first bearing and rotate, first bearing drives the threaded rod and rotates, the threaded connection of thread bush and threaded rod simultaneously, make the thread bush along with rotate the top and bottom slip lift, therefore it is convenient for drive this safety inspection equipment by oneself in the tunnel go up and down to carry out intelligent up and down scanning detection, be convenient for carry out comprehensive analysis to the construction environment in the tunnel and safety, and spread data into on control panel, so that constructor more audio-visual understanding tunnel construction safety situation, it is more intelligent and convenient directly perceived, also safer simultaneously;
2. the utility model discloses a screw thread cover also drives the motor case of its both sides when going up and down to go up and down to slide, therefore the motor on both sides drives the bull stick rotation in the second bearing outside to this has formed that the both sides limit is also the same rotating when safety inspection equipment goes up and down, and such mode makes the check out test set also rotate and detect the position around to when being convenient for carry out the upper and lower detection scanning to the environment in the tunnel, easily reaches omnidirectional safety monitoring, plays more intelligent tunnel safety environment's detection in advance and protection, in order to guarantee and the prerequisite that provides for follow-up safety construction;
3. the utility model discloses an it examines time measuring to carry out omnidirectional scanning at this safety inspection equipment, the float rod has been connected to its check out test set's connecting block intermediate position, because of the float rod quality is lighter, density is less, therefore its effect on detection mechanism is the condition of gushing water in the detection tunnel, when detection mechanism goes up and down in the omnidirectional rotation, the float rod is also in synchronous intellectual detection system thereupon, if have gush water in the tunnel, the float rod can be because the effect perk of buoyancy, on triggering alarm system transmission simultaneously advances control panel, inform constructor to pay attention to, the intelligent safety inspection of being convenient for like this, and prevent in advance, be convenient for reduce the loss that gushes water and bring.
Drawings
Fig. 1 is a perspective view of the present invention.
Fig. 2 is a front sectional view of the present invention.
Fig. 3 is an enlarged schematic view of a portion a of fig. 2 according to the present invention.
Description of reference numerals: 1. a body; 2. a detection box; 3. a control panel; 4. placing a vehicle; 5. a base plate; 6. a spring; 7. a moving wheel; 8. a first bearing; 9. a threaded rod; 10. a threaded sleeve; 11. a second bearing; 12. a rotating rod; 13. an alarm block; 14. a card slot; 15. a contact block; 16. a float rod; 17. connecting blocks; 18. rotating the block; 19. and detecting the floating ball.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
All the electrical components in the present application are connected with the power supply adapted to the electrical components through a wire, and an appropriate controller and an appropriate encoder should be selected according to actual conditions to meet control requirements, and specific connection and control sequences should be obtained.
Referring to fig. 1-3, the present invention provides a technical solution:
an intelligent tunnel construction safety detection device comprises a machine body 1 and a floating rod 16, wherein a detection box 2 is installed on the outer side of the machine body 1, a control panel 3 is fixed on the outer wall of the detection box 2, a bottom plate 5 is arranged at the bottom of the control panel 3, a placing vehicle 4 is connected with a lower wall surface spring 6 of the bottom plate 5, a moving wheel 7 is arranged on the lower wall surface of the placing vehicle 4, a motor is installed at the middle position of the inner bottom surface of the detection box 2, a driving end of the motor is connected with a first bearing 8, a threaded rod 9 is installed at the top of the first bearing 8, a threaded sleeve 10 is installed on the outer wall of the threaded rod 9, a second bearing 11 is symmetrically connected to the outer side of the threaded sleeve 10, a rotating rod 12 is connected to the outer wall of the second bearing 11, an alarm block 13 is arranged on the outer wall of the rotating rod 12, a clamping groove 14 is reserved on the outer side of the alarm block 13, a contact block 15 is fixed at the bottom of the clamping groove 14, the floating rod 16 is connected to the outer wall of the contact block 15, and a connecting block 17 is arranged above the floating rod 16, the outer wall of the connecting block 17 is connected with a rotating block 18, and the outer wall of the rotating block 18 is provided with a detection floating ball 19.
As preferred scheme, further, threaded rod 9 constitutes revolution mechanic through first bearing 8 and detection case 2, and be threaded connection between threaded rod 9 and the thread bush 10, be convenient for drive this check out test set and go up and down by oneself in the tunnel and carry out intelligent upper and lower scanning detection, be convenient for carry out comprehensive analysis and spread into control panel 3 with data with safety to the construction environment in the tunnel on, so that constructor more audio-visual understanding tunnel construction safety situation, it is more intelligent and convenient directly perceived, also safer simultaneously.
As preferred scheme, furthermore, bull stick 12 passes through second bearing 11 and detection case 2 constitution revolution mechanic, and be sliding connection between second bearing 11 and the threaded rod 9, it is also the same rotating in both sides limit when safety inspection equipment oscilaltion to have formed, make detection equipment also rotate when being convenient for carry out the upper and lower detection scanning to the environment in the tunnel, realize detecting the position to all around, easily reach omnidirectional safety monitoring, play the detection in advance and the protection of more intelligent tunnel safety environment, so that guarantee and the prerequisite that provides for follow-up safety construction.
As a preferred scheme, furthermore, the floating rod 16 forms a rotating structure through the rotating block 18 and the connecting block 17, and the connecting block 17 and the rotating rod 12 are integrally arranged, because the floating rod 16 has a light weight and a small density, the floating rod 16 on the detection mechanism is used for detecting the water inrush condition in the tunnel, when the detection mechanism rotates and goes up and down in an omnibearing manner, the floating rod 16 synchronously carries out intelligent detection along with the water inrush condition, if the water inrush condition exists in the tunnel, the floating rod 16 can tilt due to the action of the floating force, and simultaneously triggers the alarm system to transmit the water inrush condition to the control panel 3 to inform constructors of paying attention, so that the intelligent safety detection is facilitated, the advance prevention is realized, and the loss caused by the water inrush condition is reduced.
As preferred scheme, furthermore, the axis that detects floater 19 is parallel with the axis that contacts piece 15, and contact piece 15 constitutes block structure through draw-in groove 14 and alarm piece 13, it is integrative to detect floater 19 and float bar 16, all possess the effect that the buoyancy detected, after float bar 16 detected gushing water, and the perk under the buoyancy of water, it upwards to detect floater 19 drive it, contact piece 15 and alarm piece 13 on the float bar 16 other end are separated from each other, consequently can trigger alarm system, alarm piece 13 can be with on data pass to control panel 3 rapidly, in order to remind constructor to gush the safety processing of water, the loss that has reduced because of the tunnel gushes water and brings, this safety inspection equipment is more intelligent, be convenient for the construction in tunnel and use.
As preferred scheme, further, bottom plate 5 passes through spring 6 and places car 4 and constitute elastic construction, and place car 4 and remove and be mutual parallel arrangement between the wheel 7, such setting is convenient for remove the transportation, and convenient removal more carries out the safety inspection in the tunnel, and bottom plate 5 lower wall has set up spring 6 simultaneously, can effectively slow down its vibrations that remove the in-process and jolt, and it does not receive the damage to be convenient for its protection check out test set.
The working principle is as follows:
when the intelligent tunnel construction safety detection device is used, firstly, when the machine body 1 is used for tunnel construction detection, a control panel 3 of the tunnel safety detection device is controlled by a data program, a motor at the middle position of the inner bottom surface of a detection box 2 is started to operate and drive a first bearing 8 to rotate, the first bearing 8 drives a threaded rod 9 to rotate, and meanwhile, a threaded sleeve 10 is in threaded connection with the threaded rod 9, so that the threaded sleeve 10 slides up and down along with rotation, the safety device is conveniently driven to automatically lift in the tunnel, intelligent up-and-down scanning detection is carried out, comprehensive analysis on the construction environment and safety in the tunnel is facilitated, and data are transmitted to the control panel 3, so that a constructor can more visually know the safety condition of tunnel construction, and the intelligent, convenient and visual effects are achieved, and the machine body is safer;
then, when the threaded sleeve 10 is lifted, the motor boxes on two sides of the threaded sleeve are driven to lift and slide, and the motors on two sides drive the rotating rod 12 on the outer side of the second bearing 11 to rotate, so that the safety detection mechanism is lifted up and down, and simultaneously two sides of the safety detection mechanism are also rotated, the detection mechanism is convenient to detect the environment in the tunnel in front, back, left and right directions in a rotating mode, omnibearing safety monitoring is easy to achieve, more intelligent advanced detection and protection of the tunnel safety environment are achieved, and guarantee and premise are provided for subsequent safety construction;
when the safety detection equipment carries out omnibearing scanning detection, the middle position of a connecting block 17 of a detection mechanism of the safety detection equipment is connected with a floating rod 16, the floating rod 16 is light in weight and small in density, so that the floating rod acts on the detection mechanism to detect the water inrush condition in a tunnel, when the detection mechanism rotates and rises in an omnibearing manner, the floating rod 16 is synchronously and intelligently detected, if water inrush exists in the tunnel, the floating rod 16 tilts due to the action of buoyancy, and simultaneously, an alarm system is triggered to be transmitted to a control panel 3 to inform constructors of paying attention, so that intelligent safety detection is facilitated, advance prevention is realized, and loss caused by water inrush is reduced;
then, the detection floating ball 19 and the floating rod 16 are integrated and have the function of buoyancy detection, when the floating rod 16 detects water burst and tilts under the buoyancy of the water, the detection floating ball 19 is driven to move upwards, the contact block 15 on the other end of the floating rod 16 is separated from the alarm block 13, so that an alarm system can be triggered, the alarm block 13 can rapidly transmit data to the control panel 3 to remind constructors of safe treatment of the water burst, the loss caused by the water burst of the tunnel is reduced, the safety detection equipment is more intelligent, and the construction and the use of the tunnel are facilitated; this safety inspection equipment is placed on placing car 4, and it removes the transportation of being convenient for like this, and the safety inspection in convenient removal and the tunnel more, this 5 bottom surfaces of bottom plate of placing car 4 have set up spring 6 simultaneously, can effectively slow down its vibrations that remove the in-process and jolt, protect its protection check out test set not receive the damage.
The above, only be the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and all the technicians familiar with the technical field are in the technical scope of the present invention, according to the technical scheme of the present invention and the concept of the present invention equivalent replacement or change should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides an intelligence tunnel construction safety inspection equipment, includes organism (1) and float bar (16), its characterized in that: the detection box (2) is installed on the outer side of the machine body (1), a control panel (3) is fixed on the outer wall of the detection box (2), a bottom plate (5) is arranged at the bottom of the control panel (3), a lower wall spring (6) of the bottom plate (5) is connected with a placement vehicle (4), a movable wheel (7) is arranged on the lower wall of the placement vehicle (4), a motor is installed at the middle position of the inner bottom surface of the detection box (2), a first bearing (8) is connected to the driving end of the motor, a threaded rod (9) is installed at the top of the first bearing (8), a threaded sleeve (10) is installed on the outer wall of the threaded rod (9), a second bearing (11) is symmetrically connected to the outer side of the threaded sleeve (10), a rotating rod (12) is connected to the outer wall of the second bearing (11), an alarm block (13) is arranged on the outer wall of the rotating rod (12), and a clamping groove (14) is reserved on the outer side of the alarm block (13), and the bottom of draw-in groove (14) is fixed with contact piece (15), the float bar (16) is connected in the outer wall of contact piece (15), and the top of float bar (16) is provided with connecting block (17), the outer wall of connecting block (17) is connected with changes piece (18), and changes the outer wall of piece (18) and install and detect floater (19).
2. The intelligent tunnel construction safety detection device of claim 1, wherein: threaded rod (9) constitute rotating-structure through first bearing (8) and detection case (2), and be threaded connection between threaded rod (9) and thread bush (10).
3. The intelligent tunnel construction safety detection device of claim 1, wherein: the rotating rod (12) and the detection box (2) form a rotating structure through a second bearing (11), and the second bearing (11) is in sliding connection with the threaded rod (9).
4. The intelligent tunnel construction safety detection device of claim 1, wherein: the floating rod (16) and the connecting block (17) form a rotating structure through the rotating block (18), and the connecting block (17) and the rotating rod (12) are integrally arranged.
5. The intelligent tunnel construction safety detection device of claim 1, wherein: the central axis of the detection floating ball (19) is parallel to the central axis of the contact block (15), and the contact block (15) and the alarm block (13) form a clamping structure through the clamping groove (14).
6. The intelligent tunnel construction safety detection device of claim 1, wherein: the bottom plate (5) and the placing vehicle (4) form an elastic structure through a spring (6), and the placing vehicle (4) and the moving wheel (7) are arranged in parallel.
CN202121180764.5U 2021-05-25 2021-05-25 Intelligent tunnel construction safety detection equipment Active CN214583336U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121180764.5U CN214583336U (en) 2021-05-25 2021-05-25 Intelligent tunnel construction safety detection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121180764.5U CN214583336U (en) 2021-05-25 2021-05-25 Intelligent tunnel construction safety detection equipment

Publications (1)

Publication Number Publication Date
CN214583336U true CN214583336U (en) 2021-11-02

Family

ID=78363057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121180764.5U Active CN214583336U (en) 2021-05-25 2021-05-25 Intelligent tunnel construction safety detection equipment

Country Status (1)

Country Link
CN (1) CN214583336U (en)

Similar Documents

Publication Publication Date Title
CN102561773B (en) Vehicle chassis height detecting device
CN214583336U (en) Intelligent tunnel construction safety detection equipment
CN106703488B (en) Multilayer rotary type stereo garage
CN113043882A (en) Unmanned ship charging device
CN210242975U (en) Bridge frequency detection equipment
CN204990588U (en) Upper cover and base mounting structure of conflagration control detector
CN108760756B (en) Pantograph detection device
CN207042887U (en) Protective cover cleaning device
CN215659313U (en) Three-edge milling cutter grinding device with protection structure
CN210800533U (en) Highway bridge detection device
CN209962411U (en) Signal detector for traffic control
CN211305297U (en) End socket inner surface overlaying welding device
CN216553259U (en) Parking limiting machine
CN216863571U (en) Subway contact net DC supply integrated device
CN215218073U (en) Accident vehicle braking efficiency detection device
CN218174302U (en) Alarm device for elevator
CN207775856U (en) A kind of road and bridge safety guard
CN111276880A (en) Switch board electric leakage fault intelligent detection device
CN206245822U (en) Mechanical parking equipment stroke protects controller
CN212433123U (en) Concentration value detection device for hydrogen sulfide safety
CN214150928U (en) Electric leakage detection device for research and development of power distribution switch control equipment
CN217026811U (en) Road construction safety warning device with long-range real-time perception
CN217921259U (en) Automatic lifting device of electric rescue vehicle
CN217022328U (en) Automatic maintenance device for electric power system
CN212450524U (en) Auxiliary device for tunnel detection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant