CN214575840U - Material conveyor for building engineering construction - Google Patents

Material conveyor for building engineering construction Download PDF

Info

Publication number
CN214575840U
CN214575840U CN202120327023.9U CN202120327023U CN214575840U CN 214575840 U CN214575840 U CN 214575840U CN 202120327023 U CN202120327023 U CN 202120327023U CN 214575840 U CN214575840 U CN 214575840U
Authority
CN
China
Prior art keywords
close
box body
cavity
fixedly connected
inner cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120327023.9U
Other languages
Chinese (zh)
Inventor
杨永明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120327023.9U priority Critical patent/CN214575840U/en
Application granted granted Critical
Publication of CN214575840U publication Critical patent/CN214575840U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a material conveying device for construction engineering construction, which comprises a box body, wherein the left side of the box body is provided with a first T-shaped screw rod, the inner cavity of the box body is provided with a first slide block, a second clamp plate, a first clamp plate and a first spring, the utility model adjusts the distance between the two second clamp plates through the arrangement of the first T-shaped screw rod and the first slide block when in use, tiles with different sizes can be fixed through the first clamp plate and the first spring, the tiles are prevented from shaking to cause the cracking of the tiles, and the purpose of good protection effect is achieved, the inner cavity of the box body is divided into a plurality of first cavities, the bottoms of the first cavities are provided with a threaded rod, a second nut and a support plate, the utility model realizes the fast conveying of the tiles with different stacking heights through the first cavities formed by the box body when in use, and through the arrangement of the threaded rod and the second nut, the supporting plate can reduce physical waste caused by height difference during tile carrying.

Description

Material conveyor for building engineering construction
Technical Field
The utility model relates to a material transportation field especially relates to a material conveyor for building engineering construction.
Background
Along with the social development, different mansions are pulled up, and office buildings are often rented to different customers, so that the houses are often required to be decorated, and can only be carried manually under the condition that a large-scale hoisting device is not suitable, the ceramic tiles are used as the most common construction materials, have heavier weight and belong to fragile products, can only be carried by material conveying equipment during carrying, and are generally stacked together in a bag form.
Conventional material conveying equipment protective effect is poor because it does not have the better fixture of regulation nature, is difficult to fix the not unidimensional ceramic tile of putting things in good order on conveying equipment, if take place to shake violently probably to lead to the ceramic tile to break, and conventional material conveying equipment transport is hard, during the transport, and the ceramic tile packing box of putting things in good order is difficult to load conveyor on, if the ceramic tile is put things in good order too high, the ceramic tile that is in the bottom is crushed easily.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, one of the purposes of the utility model is to provide a material conveying device for construction engineering.
The utility model discloses an one of the purpose adopts following technical scheme to realize:
a material conveying device for building engineering construction comprises a box body, wherein a plurality of first cavities are formed in an inner cavity of the box body, a plurality of first T-shaped screw rods are arranged on the left side of the box body, the right end of each first T-shaped screw rod penetrates through the left side wall of the box body, first grooves matched with the first T-shaped screw rods are formed in the tops of the first cavities, the right end of each first T-shaped screw rod is rotatably connected to the inner cavity of each first groove, first nuts are sleeved on the outer side edges of the first T-shaped screw rods close to the left side and the right side, the two first nuts are in threaded connection with the first T-shaped screw rods, first sliding blocks are sleeved on the outer side edges of the first nuts and fixedly connected with the first nuts, the top ends of the first sliding blocks are slidably connected to the inner cavities of the first grooves, a clamping mechanism is arranged at the bottoms of the first sliding blocks, a plurality of first T-shaped rods are arranged on the rear side of the box body close to the left side, the front end of the first T-shaped rod penetrates through the rear side wall of the box body and is inserted into the front side of the inner cavity of the first cavity to be close to the left side, the outer edge of the first T-shaped rod is sleeved with worms close to the front side and the rear side, the two worms are fixedly connected with the first T-shaped rod, worm wheels are arranged at the bottoms of the two worms, a threaded rod is fixedly connected to the right side of the worm wheel, a second groove matched with the threaded rod is formed in the bottom of the first cavity, the threaded rod is rotatably connected to the inner cavity of the second groove, second nuts are sleeved on the outer edge of the threaded rod close to the left side and the right side, the two second nuts are in threaded connection with the threaded rod, a first connecting rod is arranged at one side of the two second nuts close to the center of the box body, the bottom end of the first connecting rod is hinged to the top of the second nuts, and supporting plates are arranged at the tops of the four first connecting rods together, the bottom of backup pad is close to the equal fixedly connected with first fixed block in the left and right sides, and every side is two first fixed block is symmetry setting around being with the center of backup pad, the top and the first fixed block of head rod are articulated.
Further, fixture includes two sleeves, two the sleeve pipe is symmetry setting around the central axis of first cavity is, the sleeve pipe is kept away from the inner chamber at first cavity of one end fixed connection at the box center, sheathed tube inner chamber is equipped with the square pole, the square pole is kept away from the one end sliding connection at the box center at sheathed tube inner chamber, two per side the square pole is close to the common fixedly connected with second splint of one end at box center, one side that the second splint are close to the box center is equipped with first splint, be equipped with two first springs between first splint and the second splint, the one end that first spring is close to first splint rather than fixed connection, the other end and the second splint fixed connection of first spring, two the first spring is symmetry setting around using the central axis of second splint to be the symmetry axis.
Further, the front side of first splint is the arc setting, first splint use the central axis of first cavity to be bilateral symmetry setting.
Furthermore, a plurality of balls are arranged at the top of the supporting plate.
Further, the left and right sides of box is close to the equal first fixed plate of fixedly connected with in bottom, the equal swing joint in both sides has the wheel around the bottom of first fixed plate is close to, the wheel is equipped with the lock function of dying.
Furthermore, the rear sides of the plurality of first cavities are provided with openings, and the bottom of each opening is higher than the top of the corresponding support plate.
Furthermore, the outer side edges of the first T-shaped screw rod and the threaded rod are provided with threads in different directions close to the left side and the right side.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. when the utility model is used, the distance between the two second clamping plates is adjusted through the arrangement of the first T-shaped screw rod and the first sliding block, and the ceramic tiles with different sizes can be fixed through the arrangement of the first clamping plate and the first spring, so that the ceramic tiles are prevented from being cracked due to shaking, and the purpose of good protection effect is achieved;
2. the utility model discloses through the first cavity of a plurality of that the box formed when using, realize the swift transport of the ceramic tile of different stacking heights, through the setting of threaded rod and second nut for the backup pad can better must accord with the ceramic tile transport height, and the physical power that the difference in height caused when reducing the ceramic tile transport is extravagant.
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical means of the present invention more clearly understood, the present invention may be implemented according to the content of the description, and in order to make the above and other objects, features, and advantages of the present invention more obvious and understandable, the following preferred embodiments are described in detail with reference to the accompanying drawings.
Drawings
FIG. 1 is a perspective view of the present embodiment;
FIG. 2 is a front sectional view of a square bar of the present embodiment;
FIG. 3 is an enlarged view taken at A in FIG. 2;
fig. 4 is a top cross-sectional view of a second nut of the present embodiment.
In the figure: 1. a first T-shaped screw; 2. a box body; 3. a first cavity; 4. a first fixing plate; 5. a first slider; 6. a first slot; 7. a first splint; 8. a first spring; 9. a worm; 10. a first nut; 11. a first T-bar; 12. a worm gear; 13. a threaded rod; 14. a second slot; 15. a first fixed block; 16. a first connecting rod; 17. a second nut; 18. a second splint; 19. a square bar; 20. a sleeve; 21. and a support plate.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and the detailed description, and it should be noted that the embodiments or technical features described below can be arbitrarily combined to form a new embodiment without conflict.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When a component is referred to as being "connected" to another component, it can be directly connected to the other component or intervening components may also be present. When a component is referred to as being "disposed on" another component, it can be directly on the other component or intervening components may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1 to 4, a material conveying device for building engineering construction comprises a box body 2, wherein the left side and the right side of the box body 2 are fixedly connected with a first fixing plate 4 close to the bottom, the bottom of the first fixing plate 4 is movably connected with wheels close to the front side and the rear side, the wheels are provided with locking functions, the inner cavity of the box body 2 is provided with a plurality of first cavities 3, the left side of the box body 2 is provided with a plurality of first T-shaped screws 1, the right end of each first T-shaped screw 1 penetrates through the left side wall of the box body 2, the top of each first cavity 3 is provided with a first notch 6 matched with the corresponding first T-shaped screw 1, the right end of each first T-shaped screw 1 is rotatably connected with the inner cavity of the corresponding first notch 6, the outer edges of the first T-shaped screws 1 close to the left side and the right side are respectively sleeved with a first nut 10, the two first nuts 10 are in threaded connection with the first T-shaped screws 1, the outer edges of the first nuts 10 are sleeved with a first sliding block 5, the first slider 5 is fixedly connected with a first nut 10, the top end of the first slider 5 is slidably connected with the inner cavity of the first slot 6, the bottom of the first slider 5 is provided with a clamping mechanism, the clamping mechanism comprises two sleeves 20, the two sleeves 20 are symmetrically arranged in front and back directions with the central axis of the first cavity 3, one ends of the sleeves 20 far away from the center of the box body 2 are fixedly connected with the inner cavity of the first cavity 3, the inner cavity of the sleeves 20 is provided with a square rod 19, one ends of the square rods 19 far away from the center of the box body 2 are slidably connected with the inner cavity of the sleeves 20, one ends of the two square rods 19 at each side close to the center of the box body 2 are fixedly connected with a second clamping plate 18 together, one side of the second clamping plate 18 close to the center of the box body 2 is provided with a first clamping plate 7, two first springs 8 are arranged between the first clamping plate 7 and the second clamping plate 18, one end of the first spring 8 close to the first clamping plate 7 is fixedly connected with the first clamping plate, the other end of the first spring 8 is fixedly connected with the second clamping plate 18, the two first springs 8 are symmetrically arranged in the front and back direction by taking the central axis of the second clamping plate 18 as a symmetry axis, the front side of the first clamping plate 7 is arranged in an arc shape, the first clamping plate 7 is symmetrically arranged in the left and right direction by taking the central axis of the first cavity 3 as a symmetry axis, the utility model adjusts the distance between the two second clamping plates 18 by arranging the first T-shaped screw rod 1 and the first slider 5 when in use, so that tiles with different sizes can be fixed by arranging the first clamping plate 7 and the first springs 8, the purpose of good protection effect is achieved by preventing the tiles from cracking caused by shaking, a plurality of first T-shaped rods 11 are arranged on the rear side of the box body 2 close to the left side, the front end of each first T-shaped rod 11 penetrates through the rear side wall of the box body 2 and is inserted on the front side of the inner cavity of the first cavity 3, worms 9 are sleeved on the outer edge of each first T-shaped rod 11 close to the front side and the rear side, and the two worms 9 are fixedly connected with the first T-shaped rods 11, the bottom of each worm 9 is provided with a worm wheel 12, the right side of each worm wheel 12 is fixedly connected with a threaded rod 13, the outer edges of the first T-shaped screw rod 1 and the threaded rod 13 close to the left side and the right side are respectively provided with threads in different directions, the bottom of the first cavity 3 is provided with a second groove 14 matched with the threaded rod 13, the threaded rod 13 is rotatably connected with the inner cavity of the second groove 14, the outer edges of the threaded rod 13 close to the left side and the right side are respectively sleeved with a second nut 17, the two second nuts 17 are respectively in threaded connection with the threaded rod 13, one side of each second nut 17 close to the center of the box body 2 is provided with a first connecting rod 16, the bottom end of each first connecting rod 16 is hinged with the top of each second nut 17, the top of the four first connecting rods 16 is jointly provided with a support plate 21, the top of each support plate 21 is provided with a plurality of balls, the rear sides of the plurality of the first cavities 3 are respectively provided with an opening, and the bottom of the opening is higher than the top of the support plates 21, the bottom of backup pad 21 is close to the first fixed block 15 of the equal fixedly connected with in the left and right sides, and symmetry sets up around two first fixed blocks 15 of every side are with the center of backup pad 21, and head rod 16's top is articulated with first fixed block 15, the utility model discloses through the first cavity 3 of a plurality of that box 2 formed when using, realize the swift transport of the ceramic tile of different stacking heights, through threaded rod 13 and second nut 17's setting for backup pad 21 can better must accord with the ceramic tile transport height, and the physical power that the difference in height caused when reducing the ceramic tile transport is extravagant.
The working principle is as follows: the box body 2 is moved to a place tightly attached to tiles through the first fixing plate 4, wheels are locked to prevent the box body 2 from moving, then the heights of a plurality of supporting plates 21 are respectively adjusted according to the stacking heights of the tiles, the first T-shaped rod 11 is rotated, the first T-shaped rod 11 drives the worm wheel 12 to rotate through the worm 9, the rotation of the worm wheel 12 is converted into the mutual distance or approach of two first connecting rods 16 through the threaded connection of a threaded rod 13 and a second nut 17, the front side and the rear side of each supporting plate 21 are respectively provided with two first fixing blocks 15, when the first connecting rods 16 approach each other, the supporting plates 21 are driven to move up and down through the hinging of the first fixing blocks 15, after the heights of the plurality of supporting plates 21 are adjusted, the distance between the two first clamping plates 7 is adjusted according to the widths of the tiles, the first T-shaped screw rod 1 is rotated, and the first T-shaped screw rod 1 is connected with the first nut 10 through the threads, drive two first sliders 5 and keep away from each other or be close to, when two first sliders 5 are close to each other, can extrude two adjacent second splint 18 respectively, make two second splint 18 be close to each other, square bar 19 and sleeve pipe 20 play spacing effect this moment, second splint 18 drives two first splint 7 through first spring 8 and are close to each other, after adjusting suitable width, to put things in good order in the first cavity 3 of pushing the eminence between the ceramic tile of eminence, setting through first splint 7 and first spring 8, make the ceramic tile get into and can obtain the centre gripping after the first cavity 3, prevent it and rock, in proper order from high to low all pack into corresponding first cavity 3 with the ceramic tile of putting things in good order, alright accomplish the ceramic tile and load, only need from low to high when unloading, push away from the opening of first cavity 3 rear sides from the ceramic tile can put things in good order once more of ceramic tile.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention cannot be limited thereby, and any insubstantial changes and substitutions made by those skilled in the art based on the present invention are all within the protection scope of the present invention.

Claims (7)

1. The utility model provides a material conveyor for building engineering construction, includes box (2), its characterized in that: the inner cavity of the box body (2) is provided with a plurality of first cavities (3), the left side of the box body (2) is provided with a plurality of first T-shaped screws (1), the right ends of the first T-shaped screws (1) penetrate through the left side wall of the box body (2), the top of each first cavity (3) is provided with a first notch (6) matched with the corresponding first T-shaped screw (1), the right ends of the first T-shaped screws (1) are rotatably connected with the inner cavity of the corresponding first notch (6), the outer edges of the first T-shaped screws (1) close to the left side and the right side are respectively sleeved with a first nut (10), the two first nuts (10) are respectively in threaded connection with the first T-shaped screws (1), the outer edges of the first nuts (10) are respectively sleeved with a first sliding block (5), the first sliding blocks (5) are fixedly connected with the first nuts (10), and the top ends of the first sliding blocks (5) are slidably connected with the inner cavities of the first notches (6), the bottom of the first sliding block (5) is provided with a clamping mechanism, a plurality of first T-shaped rods (11) are arranged on the rear side of the box body (2) close to the left side, the front ends of the first T-shaped rods (11) penetrate through the rear side wall of the box body (2) and are inserted into the front side of the inner cavity of the first cavity (3) close to the left side, the outer side edges of the first T-shaped rods (11) close to the front side and the rear side are respectively sleeved with a worm (9), the two worms (9) are fixedly connected with the first T-shaped rods (11), the bottoms of the two worms (9) are respectively provided with a worm wheel (12), the right side of each worm wheel (12) is fixedly connected with a threaded rod (13), the bottom of the first cavity (3) is provided with a second slot (14) matched with the threaded rod (13), the threaded rod (13) is rotatably connected to the inner cavity of the second slot (14), the outer side edges of the threaded rod (13) close to the left side and the right side are respectively sleeved with a second nut (17), two second nut (17) all with threaded rod (13) threaded connection, two one side that second nut (17) are close to box (2) center all is equipped with head rod (16), the bottom of head rod (16) is articulated with the top of second nut (17), four the top of head rod (16) is equipped with backup pad (21) jointly, the bottom of backup pad (21) is close to the equal fixedly connected with first fixed block (15) of the left and right sides, and every side is two symmetry sets up around first fixed block (15) is with the center of backup pad (21), the top and first fixed block (15) of head rod (16) are articulated.
2. A construction material conveyance apparatus as claimed in claim 1, wherein: the clamping mechanism comprises two sleeves (20), the two sleeves (20) are symmetrically arranged around the central axis of the first cavity (3), one end of each sleeve (20) far away from the center of the box body (2) is fixedly connected with the inner cavity of the first cavity (3), the inner cavity of each sleeve (20) is provided with a square rod (19), one end of each square rod (19) far away from the center of the box body (2) is slidably connected with the inner cavity of each sleeve (20), two square rods (19) on each side are fixedly connected with a second clamping plate (18) together at the end close to the center of the box body (2), one side of each second clamping plate (18) close to the center of the box body (2) is provided with a first clamping plate (7), two first springs (8) are arranged between the first clamping plate (7) and the second clamping plate (18), one end of each first spring (8) close to the first clamping plate (7) is fixedly connected with the first clamping plate (7), the other end and the second splint (18) fixed connection of first spring (8), two first spring (8) use the central axis of second splint (18) to be symmetrical setting from beginning to end as the symmetry axis.
3. A construction material conveyance apparatus as claimed in claim 2, wherein: the front side of first splint (7) is the arc setting, first splint (7) are bilateral symmetry setting with the central axis of first cavity (3).
4. A construction material conveyance apparatus as claimed in claim 1, wherein: the top of the supporting plate (21) is provided with a plurality of balls.
5. A construction material conveyance apparatus as claimed in claim 1, wherein: the left and right sides of box (2) are close to the equal fixedly connected with first fixed plate (4) in bottom, the equal swing joint in both sides has the wheel around the bottom of first fixed plate (4) is close to, the wheel is equipped with the lock function of dying.
6. A construction material conveyance apparatus as claimed in claim 1, wherein: the rear sides of the first cavities (3) are provided with openings, and the bottom of each opening is higher than the top of the support plate (21).
7. A construction material conveyance apparatus as claimed in claim 1, wherein: the outer edges of the first T-shaped screw rod (1) and the threaded rod (13) are provided with threads in different directions close to the left side and the right side.
CN202120327023.9U 2021-02-04 2021-02-04 Material conveyor for building engineering construction Expired - Fee Related CN214575840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120327023.9U CN214575840U (en) 2021-02-04 2021-02-04 Material conveyor for building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120327023.9U CN214575840U (en) 2021-02-04 2021-02-04 Material conveyor for building engineering construction

Publications (1)

Publication Number Publication Date
CN214575840U true CN214575840U (en) 2021-11-02

Family

ID=78350180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120327023.9U Expired - Fee Related CN214575840U (en) 2021-02-04 2021-02-04 Material conveyor for building engineering construction

Country Status (1)

Country Link
CN (1) CN214575840U (en)

Similar Documents

Publication Publication Date Title
CN210946830U (en) Building foundation pit supporting device
CN214575840U (en) Material conveyor for building engineering construction
CN214523915U (en) Transferring device for long steel structure
CN210563490U (en) Plate clamping device
CN210594903U (en) Precast beam transportation frame
CN204161740U (en) A kind of pallet
CN217535436U (en) Anti-extrusion glass bottle carbonated beverage filling equipment
CN213948045U (en) Stair conveyer
CN212861541U (en) Auxiliary device for informationized operation and maintenance field-parking project
CN115180500A (en) Vertical charcoal piece fixture of stack overhead traveling crane
CN111056423B (en) Multi-angle movable glass lifting device
CN213736370U (en) Cabinet body for commodity circulation with locate function
CN211765791U (en) Cement handling device for building engineering
CN203416967U (en) Insulation ladder frame
CN206613735U (en) One kind takes off type wooden unit straw separator
CN216659959U (en) Air entrainment piece handling device for building engineering construction
CN214057649U (en) Article transfer device for house construction project
CN217349873U (en) Hollow brick removes clamping device
CN107012627A (en) A kind of cloth prestressing force stretching device
CN214929998U (en) Rotatory screens device of handcart front guardrail
CN217374610U (en) A conveyer for TV set production and processing
CN205952869U (en) Brick finished product conveying equipment
CN218750932U (en) Section bar handling device that security is good
CN221396909U (en) Sculpture hoisting and handling device
CN214775995U (en) Hauling device for building material processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102