CN214575496U - Scaffold support for civil engineering - Google Patents

Scaffold support for civil engineering Download PDF

Info

Publication number
CN214575496U
CN214575496U CN202022569084.4U CN202022569084U CN214575496U CN 214575496 U CN214575496 U CN 214575496U CN 202022569084 U CN202022569084 U CN 202022569084U CN 214575496 U CN214575496 U CN 214575496U
Authority
CN
China
Prior art keywords
scaffold
civil engineering
operation platform
spring
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022569084.4U
Other languages
Chinese (zh)
Inventor
陈昌燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202022569084.4U priority Critical patent/CN214575496U/en
Application granted granted Critical
Publication of CN214575496U publication Critical patent/CN214575496U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold support for civil engineering, which comprises a base, wherein two sides of the top of the base are correspondingly provided with support frames, the top of each support frame is fixedly connected with the bottom of a fixed plate, the top of the fixed plate is connected with two sides of the bottom of an operation platform through a lifting mechanism with adjustable height, the top of the operation platform is provided with a construction box, a standing cavity for protecting the safety of constructors is arranged inside the construction box, two sides of the operation platform are movably hinged with a staircase through hinges, and a plurality of crossbearers are equidistantly arranged on the staircase, so that the scaffold support can be adjusted at any time according to the actual needs of the constructors, is simple to operate, convenient to use and strong in practicability, and can effectively buffer the pressure through the elastic potential energy generated by a second spring, and the further buffering through first spring can further improve the buffering effect to pressure, effectively improves user of service's work efficiency, has brought very big facility for constructor's use.

Description

Scaffold support for civil engineering
Technical Field
The utility model relates to a construction scaffolding technical field specifically is a scaffold support for civil engineering.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out, and is divided into an outer scaffold and an inner scaffold according to the erected position; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
The scaffold frame is used for the building field more, and current scaffold frame is most for fixed design, can't adjust the scaffold frame according to the height of construction to when the user of service constructs, do not have shock-absorbing structure and cushion the produced pressure of constructor, bring the threat for constructor personal safety, reduced constructor's work efficiency.
Therefore, we propose a scaffold for civil engineering to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a scaffold support for civil engineering to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a scaffold support for civil engineering, includes the base, but base top both sides correspondence is equipped with the support frame, but support frame top and fixed plate bottom fixed connection, but the fixed plate top is connected with operation platform bottom both sides through height-adjusting's elevating system, and the operation platform top is equipped with the construction case, and the inside chamber of standing that is equipped with protection constructor safety of construction case, hinge activity hinge staircase are passed through to the operation platform both sides, and the equidistance is equipped with a plurality of crossbearers on the staircase, base bottom four corners is connected with the universal wheel that promotes scaffold support and remove, base front end rear end is connected with the fixed establishment who improves scaffold support stability.
As a further aspect of the present invention: elevating system is including corresponding two telescopic cylinder that set up at the fixed plate top, telescopic cylinder top and telescopic column bottom swing joint, telescopic column top and operation platform bottom both sides fixed connection, and the operation platform bottom is connected with the shock attenuation capital portion that a plurality of equidistance set up, and inside a plurality of shock attenuation capital portion extended to the surge tank, the surge tank setting was between two telescopic cylinder outer walls.
As a further aspect of the present invention: the outer wall of the damping column is wound with a first spring, the top of the first spring is fixedly connected with the bottom of the operating platform, and the bottom of the first spring is fixedly connected with the top of the damping box.
As a further aspect of the present invention: shock attenuation column bottom extends to inside and a plurality of connecting block top fixed connection of surge tank, and a plurality of connecting block equidistance are established inside the surge tank, a plurality of connecting block bottoms and a plurality of second spring top fixed connection, a plurality of second spring bottoms with surge tank inner wall bottom fixed connection.
As a further aspect of the present invention: the fixing mechanism is arranged on the connecting plate at the rear end of the front end of the base in a corresponding mode, a threaded rod penetrates through the inside of the connecting plate, the top of the threaded rod is connected with the bottom of the rotary table, and the bottom of the threaded rod is connected with the top of the limiting plate.
As a further aspect of the present invention: the inner wall of the connecting plate is provided with an internal thread matched with the outer wall of the threaded rod.
As a further aspect of the present invention: the outer wall of the telescopic column is provided with height scale marks convenient for constructors to observe.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an operation platform's height is adjusted with flexible post to a flexible section of thick bamboo, solves current scaffold frame most of for fixed design, can't adjust the problem of scaffold frame according to the height of construction, can adjust at any time according to constructor's actual need, easy operation, convenient to use, the practicality is strong.
2. The utility model discloses can produce pressure to operation platform when constructor is located standing intracavity portion, the shock attenuation post that sets up in operation platform bottom can promote the connecting block and extrude the second spring downwards, and the elastic potential energy that the second spring produced can carry out effectual buffering to pressure to further buffering through first spring can further improve the buffering effect to pressure, effectively improve user of service's work efficiency, the use of giving constructor has brought very big facility.
Drawings
Fig. 1 is a three-dimensional view of a scaffold for civil engineering.
Fig. 2 is a three-dimensional view of a lifting structure in a scaffold for civil engineering.
Fig. 3 is a schematic structural view of a damper box in a scaffold for civil engineering.
In the figure: 1-a base; 2-a support frame; 3, fixing a plate; 4-a telescopic cylinder; 5-a shock absorption box; 501-connecting blocks; 502-a second spring; 6-telescopic column; 7-operating the platform; 8-a shock-absorbing column; 801-a first spring; 9-construction box; 901-standing chamber; 10-a hinge; 11-an escalator; 12-a transverse frame; 13-a universal wheel; 14-a connecting plate; 15-threaded rod; 16-a turntable; and 17-a limiting plate.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-3, in the embodiment of the present invention, a scaffold for civil engineering, including base 1, base 1 top both sides correspond and are equipped with support frame 2, support frame 2 top and fixed plate 3 bottom fixed connection, but height-adjusting's elevating system is passed through at fixed plate 3 top and is connected with operation platform 7 bottom both sides, operation platform 7 top is equipped with construction box 9, the inside chamber 901 of standing of protection constructor safety that is equipped with of construction box 9, operation platform 7 both sides are through hinge 10 activity articulated staircase 11, but equidistance is equipped with a plurality of crossbearers 12 on the staircase 11, base 1 bottom four corners is connected with universal wheel 13 that promotes scaffold and moves, when using, moves suitable position with scaffold through universal wheel 13, base 1 front end rear end is connected with the fixed establishment who improves scaffold stability.
Elevating system is including corresponding two telescopic cylinder 4 that set up at fixed plate 3 top, telescopic cylinder 4 top and the 6 bottom swing joint of flexible post, 6 tops of telescopic cylinder and 7 bottom both sides fixed connection of operation platform, operation platform 7 bottom is connected with the shock attenuation post 8 tops that a plurality of equidistance set up, a plurality of shock attenuation post 8 bottoms extend to the surge tank 5 inside, surge tank 5 sets up between two telescopic cylinder 4 outer walls, adjust operation platform 7's height through telescopic cylinder 4 and telescopic cylinder 6, it is fixed design to solve current scaffold frame most of, can't adjust the problem of scaffold frame according to the height of construction, can adjust at any time according to constructor's actual need, and is easy to operate, high use and high practicability.
The outer wall of the shock absorption column 8 is wound with a first spring 801, the top of the first spring 801 is fixedly connected with the bottom of the operation platform 7, the bottom of the first spring 801 is fixedly connected with the top of the shock absorption box 5, the buffering effect on pressure can be further improved through further buffering of the first spring 801, and the practical use of construction personnel is facilitated.
8 bottoms of shock attenuation post extend to 5 inside and a plurality of connecting block 501 top fixed connection of surge tank, and a plurality of connecting block 501 equidistance are established inside 5 surge tank, a plurality of connecting block 501 bottoms and a plurality of second spring 502 top fixed connection, a plurality of second spring 502 bottoms with 5 inner wall bottom fixed connection of surge tank can produce pressure to operation platform 7 when constructor is located standing chamber 901 inside, and the shock attenuation post 8 of setting in operation platform 7 bottom can promote connecting block 501 extrusion second spring 502 downwards, and the elastic potential energy that second spring 502 produced can carry out effectual buffering to pressure, effectively improves user of service's work efficiency, has brought very big facility for constructor's use.
The fixed establishment is including corresponding the setting and being in connecting plate 14 of 1 front end rear end of base, connecting plate 14 inside runs through and is equipped with threaded rod 15, and 15 tops of threaded rod are connected with carousel 16 bottoms, and 15 bottoms of threaded rod are connected with limiting plate 17 tops, rotate carousel 16 with threaded rod 15 along 14 inner walls of connecting plate downwardly rotating, until limiting plate 17 bottoms and ground contact, can effectively improve the stability of scaffold frame, promoted constructor operational environment's security.
The inner wall of the connecting plate 14 is provided with an internal thread matched with the outer wall of the threaded rod 15.
6 outer walls of flexible post are equipped with the high scale mark that the constructor of being convenient for observed, can be convenient for the constructor adjust according to the scale mark, the constructor's of being convenient for use.
The utility model discloses a theory of operation is: when the scaffold is used, the scaffold support is moved to a proper position through the universal wheel 13, the rotary table 16 is rotated to enable the threaded rod 15 to rotate downwards along the inner wall of the connecting plate 14 until the bottom of the limiting plate 17 is contacted with the ground, the stability of the scaffold support can be effectively improved, the safety of the working environment of a constructor is improved, the height of the operating platform 7 is adjusted through the telescopic cylinder 4 and the telescopic column 6, the problem that most of existing scaffolds are designed in a fixed mode and cannot be adjusted according to the height of construction is solved, the scaffold can be adjusted at any time according to the actual needs of the constructor, the scaffold is simple to operate, convenient to use and high in practicability, pressure can be generated on the operating platform 7 when the constructor is located inside the standing cavity 901, the shock absorption column 8 arranged at the bottom of the operating platform 7 can push the connecting block 501 to downwards extrude the second spring 502, and elastic potential energy generated by the second spring 502 can effectively buffer the pressure, and the further buffering through first spring 801 can further improve the buffering effect to pressure, effectively improves user of service's work efficiency, has brought very big facility for constructor's use.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides a scaffold support for civil engineering, includes base (1), its characterized in that, but base (1) top both sides correspondence is equipped with support frame (2), support frame (2) top and fixed plate (3) bottom fixed connection, but fixed plate (3) top is passed through height-adjusting's elevating system and is connected with operation platform (7) bottom both sides, operation platform (7) top is equipped with construction case (9), the inside chamber of standing (901) that are equipped with protection constructor safety of construction case (9), hinge (10) activity hinge staircase (11) are passed through to operation platform (7) both sides, equidistance is equipped with a plurality of crossbearers (12) on staircase (11), base (1) bottom four corners is connected with universal wheel (13) that promote scaffold support and remove, base (1) front end rear end is connected with the fixed establishment who improves scaffold support stability.
2. The scaffold for civil engineering as claimed in claim 1, wherein the lifting mechanism comprises two telescopic cylinders (4) correspondingly arranged on the top of the fixed plate (3), the top of the telescopic cylinder (4) is movably connected with the bottom of the telescopic column (6), the top of the telescopic column (6) is fixedly connected with both sides of the bottom of the operation platform (7), the bottom of the operation platform (7) is connected with the tops of a plurality of shock absorbing columns (8) arranged at equal intervals, the bottoms of a plurality of shock absorbing columns (8) extend into the interior of the shock absorbing box (5), and the shock absorbing box (5) is arranged between the outer walls of the two telescopic cylinders (4).
3. Scaffold for civil engineering according to claim 2, characterized in that the outer wall of the shock-absorbing column (8) is wound with a first spring (801), the top of the first spring (801) is fixedly connected with the bottom of the operating platform (7), and the bottom of the first spring (801) is fixedly connected with the top of the shock-absorbing box (5).
4. A scaffold for civil engineering as claimed in claim 2, wherein the bottom of shock absorber column (8) extends into shock absorber box (5) and is fixedly connected with the top of connecting blocks (501), connecting blocks (501) are equidistantly arranged inside shock absorber box (5), the bottom of connecting blocks (501) is fixedly connected with the top of second springs (502), and the bottom of second springs (502) is fixedly connected with the bottom of inner wall of shock absorber box (5).
5. The scaffold for civil engineering as defined in claim 1, wherein the fixing mechanism includes a connecting plate (14) correspondingly disposed at the front end and the rear end of the base (1), a threaded rod (15) is disposed through the inside of the connecting plate (14), the top of the threaded rod (15) is connected with the bottom of the turntable (16), and the bottom of the threaded rod (15) is connected with the top of the limiting plate (17).
6. Scaffold for civil engineering according to claim 5, characterized in that the inner wall of the plate (14) is provided with an internal thread adapted to the outer wall of the threaded rod (15).
7. Scaffold for civil engineering according to claim 2, characterized in that the outer wall of the telescopic column (6) is provided with height graduations for the constructor to observe.
CN202022569084.4U 2020-11-09 2020-11-09 Scaffold support for civil engineering Expired - Fee Related CN214575496U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022569084.4U CN214575496U (en) 2020-11-09 2020-11-09 Scaffold support for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022569084.4U CN214575496U (en) 2020-11-09 2020-11-09 Scaffold support for civil engineering

Publications (1)

Publication Number Publication Date
CN214575496U true CN214575496U (en) 2021-11-02

Family

ID=78324300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022569084.4U Expired - Fee Related CN214575496U (en) 2020-11-09 2020-11-09 Scaffold support for civil engineering

Country Status (1)

Country Link
CN (1) CN214575496U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115977360A (en) * 2023-01-09 2023-04-18 江苏悦达绿色建筑科技有限公司 Assembly type structure safety construction platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115977360A (en) * 2023-01-09 2023-04-18 江苏悦达绿色建筑科技有限公司 Assembly type structure safety construction platform
CN115977360B (en) * 2023-01-09 2023-10-20 江苏悦达绿色建筑科技有限公司 Assembled building safety construction platform

Similar Documents

Publication Publication Date Title
CN211524670U (en) Ladder convenient to adjust
CN214575496U (en) Scaffold support for civil engineering
CN211114717U (en) But height-adjusting's scaffold frame for house construction
CN213654149U (en) Aluminum climbing frame with adjustable height
CN213296374U (en) Subway construction foundation ditch excavation supporting construction
CN211847056U (en) Mast type aerial work platform
CN214194104U (en) Bridge steel structure with anti-seismic effect
CN210768106U (en) Construction that security performance is high is with enclosing fender
CN211447694U (en) Lifting platform for building construction
CN209670301U (en) A kind of scaffold with stress monitoring protection
CN208898458U (en) A kind of network communication construction aerial device
CN215443055U (en) Hanging basket for constructional engineering
CN219826893U (en) Tunnel supporting structure for layered surrounding rock tunnel construction
CN220078543U (en) Interior decoration construction lifting structure
CN218597672U (en) Scaffold elevating gear for housing construction
CN217173066U (en) Tower crane base for construction that shock attenuation is effectual
CN214615563U (en) Auxiliary frame for building engineering with safeguard function
CN213654164U (en) Scaffold for building engineering
CN218668480U (en) Building support frame
CN212026792U (en) Top protection structure for shock-proof safety bin
CN220705076U (en) Building construction support body reinforcing apparatus
CN213742172U (en) Scaffold frame that has length adjustment function and be convenient for remove for building engineering
CN218843680U (en) Scaffold frame of building engineering construction usefulness
CN216921298U (en) Basket is hung with safe construction in room construction
CN218714870U (en) Translation type construction vehicle for construction of museum

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102