CN214574631U - Vertical elbow for assembled light steel building keel connecting member - Google Patents

Vertical elbow for assembled light steel building keel connecting member Download PDF

Info

Publication number
CN214574631U
CN214574631U CN202022928785.2U CN202022928785U CN214574631U CN 214574631 U CN214574631 U CN 214574631U CN 202022928785 U CN202022928785 U CN 202022928785U CN 214574631 U CN214574631 U CN 214574631U
Authority
CN
China
Prior art keywords
tubular column
light steel
steel building
column
fossil fragments
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022928785.2U
Other languages
Chinese (zh)
Inventor
廖晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Guangyu Cable Bridge Co ltd
Original Assignee
Guangdong Guangyu Cable Bridge Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Guangyu Cable Bridge Co ltd filed Critical Guangdong Guangyu Cable Bridge Co ltd
Priority to CN202022928785.2U priority Critical patent/CN214574631U/en
Application granted granted Critical
Publication of CN214574631U publication Critical patent/CN214574631U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a perpendicular curved expert of assembled light steel building fossil fragments connecting elements, including first tubular column and second tubular column, first tubular column and second tubular column are 90 perpendicular settings, first tubular column and second tubular column surface are rectangular array and distribute and have a plurality of locking hole, the utility model is suitable for an assembled light steel building fossil fragments are connected, and the device is connected light steel building fossil fragments through first tubular column and second tubular column, has changed original welded structure, and when the installation, only need peg graft light steel building fossil fragments respectively in first tubular column and second tubular column, and it can to consolidate the double-screw bolt at the downthehole screw in locking again to make light steel building fossil fragments's connection more convenient, promoted light steel building fossil fragments's connection speed.

Description

Vertical elbow for assembled light steel building keel connecting member
Technical Field
The utility model belongs to the technical field of light steel building keel connects, specifically an assembled light steel building keel connecting elements is curved logical perpendicularly.
Background
The light steel keel is a building material, has the effects of light weight, high strength, adaptability to water prevention, shock prevention, dust prevention, constant temperature and the like, can be divided into a ceiling keel and a partition keel according to the application, and can be divided into V-shaped, C-shaped, T-shaped, L-shaped and U-shaped keels according to the section form, wherein the ceiling keel has the advantages of short construction period, simple and convenient construction and the like, and the material is widely applied to places such as hotels, waiting buildings, stations, office buildings, indoor decoration settings and the like;
the assembled light steel building keel connecting component is a device used for connecting the light steel building keel, however, most of the existing light steel building keels are welded when being connected, welding operation needs to be carried out on site, labor and time are wasted, and the connecting speed of the light steel building keel is slow.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect, provide a perpendicular curved expert of assembled light steel building keel connecting elements.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a perpendicular curved expert of assembled light steel building fossil fragments connecting elements, includes first tubular column and second tubular column, first tubular column and second tubular column are 90 perpendicular settings, first tubular column and second tubular column surface are rectangular array and distribute and have a plurality of locking hole.
Preferably, the first pipe column and the second pipe column are detachably connected in an inserting mode, a combined sleeve is arranged at one end of the first pipe column, and one end of the second pipe column is inserted into the combined sleeve.
Preferably, the second pipe column is welded with a limiting sleeve, and the limiting sleeve surrounds the outer wall of the second pipe column in an annular shape.
Preferably, one side of the limiting sleeve is attached to the combined sleeve, a locking hole is also formed in the outer wall of the combined sleeve, and the locking holes in the part, inserted into the combined sleeve, of the second pipe column are correspondingly superposed with the locking holes in the outer wall of the combined sleeve in a one-to-one correspondence mode.
In the utility model, the light steel building keel is connected through the first tubular column and the second tubular column, the original welding structure is changed, when in installation, the light steel building keel only needs to be respectively inserted into the first tubular column and the second tubular column, and then the reinforcing stud is screwed into the locking hole, so that the light steel building keel is more convenient to connect, and the connection speed of the light steel building keel is improved;
the utility model discloses in, adopt between first tubular column and the second tubular column to dismantle to insert to close and connect, such structure setting makes the device can separately transport and carry out the composite erection according to the on-the-spot condition after the scene, and it is more convenient to use, and split type structure makes things convenient for the production, simultaneously because first tubular column and second tubular column are split type structure for first tubular column and second tubular column can independently change it when the damage appears, reduce the use cost of device.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of a second tubular column of the present invention;
fig. 3 is a side view of a first tubular string in the present invention.
Reference numerals: 1. a first tubular string; 2. a combination sleeve; 3. a locking hole; 4. a second tubular string; 5. spacing external member.
Detailed Description
The following further describes a specific embodiment of the vertical elbow of the assembled light steel building keel connecting member according to the present invention with reference to fig. 1-3. The utility model relates to a perpendicular curved expert of assembled light steel building fossil fragments connecting elements is not limited to the description of following embodiment.
Example 1:
this embodiment provides a concrete structure that assembled light steel building fossil fragments connecting element is bent perpendicularly and is led to, as shown in fig. 1, including first tubular column 1 and second tubular column 4, first tubular column 1 and second tubular column 4 are 90 and set up perpendicularly, and first tubular column 1 and second tubular column 4 surface are rectangular array and distribute and have a plurality of locking hole 3.
By adopting the technical scheme:
the device is connected light steel building keel through first tubular column 1 and second tubular column 4, has changed original welded structure, when the installation, only need with light steel building keel peg graft respectively in first tubular column 1 and second tubular column 4, again in the locking hole 3 go into soon consolidate the double-screw bolt can to make light steel building keel's connection more convenient, promoted light steel building keel's connection speed.
Example 2:
this embodiment provides a concrete structure that assembled light steel building fossil fragments connecting element is bent perpendicularly to be led to, as shown in fig. 1-3, including first tubular column 1 and second tubular column 4, first tubular column 1 and second tubular column 4 are 90 and set up perpendicularly, and first tubular column 1 and second tubular column 4 surface are rectangular array and distribute and have a plurality of locking hole 3.
The first pipe column 1 and the second pipe column 4 are detachably connected in an inserting mode, a combined sleeve 2 is arranged at one end of the first pipe column 1, and one end of the second pipe column 4 is inserted into the combined sleeve 2.
A limiting sleeve member 5 is further welded on the second pipe column 4, and the limiting sleeve member 5 annularly surrounds the outer wall of the second pipe column 4.
One side of the limiting sleeve 5 is attached to the combined sleeve 2, the outer wall of the combined sleeve 2 is also provided with locking holes 3, the second pipe column 4 is inserted into the locking holes 3 in the inner part of the combined sleeve 2 and coincides with the locking holes 3 in the outer wall of the combined sleeve 2 in a one-to-one correspondence mode, and when the first pipe column 1 and the second pipe column 4 are spliced, reinforcing studs are inserted into the second pipe column 4 and the locking holes 3 coinciding with the combined sleeve 2.
By adopting the technical scheme:
the detachable insertion connection is adopted between the first tubular column 1 and the second tubular column 4 in the device, the device can be separately transported to the site and then assembled and installed according to the site condition through the structure setting, the use is more convenient, the split structure is convenient to produce, and meanwhile, the first tubular column 1 and the second tubular column 4 are split structures, so that the first tubular column 1 and the second tubular column 4 can be independently replaced when being damaged, and the use cost of the device is reduced.
The foregoing is a more detailed description of the present invention, taken in conjunction with the specific preferred embodiments thereof, and it is not intended that the invention be limited to the specific embodiments shown and described. To the utility model belongs to the technical field of ordinary technical personnel, do not deviate from the utility model discloses under the prerequisite of design, can also make a plurality of simple deductions or replacement, all should regard as belonging to the utility model discloses a protection scope.

Claims (4)

1. The utility model provides a perpendicular curved expert of assembled light steel building fossil fragments connecting elements, its characterized in that includes first tubular column (1) and second tubular column (4), first tubular column (1) and second tubular column (4) are 90 perpendicular settings, first tubular column (1) and second tubular column (4) surface are rectangular array and distribute and have a plurality of locking hole (3).
2. The fabricated light steel building keel connecting member vertical elbow of claim 1, wherein: the first pipe column (1) and the second pipe column (4) are detachably connected in an inserting mode, a combined sleeve (2) is arranged at one end of the first pipe column (1), and one end of the second pipe column (4) is inserted into the combined sleeve (2).
3. The fabricated light steel building keel connecting member vertical elbow of claim 2, wherein: and the second pipe column (4) is also welded with a limiting sleeve member (5), and the limiting sleeve member (5) annularly surrounds the outer wall of the second pipe column (4).
4. The fabricated light steel building keel connecting member vertical elbow of claim 3, wherein: one side of the limiting sleeve (5) is attached to the combination sleeve (2), the outer wall of the combination sleeve (2) is also provided with a locking hole (3), and the second pipe column (4) is inserted into the locking hole (3) in the inner part of the combination sleeve (2) and the locking hole (3) in the outer wall of the combination sleeve (2) in a one-to-one correspondence mode.
CN202022928785.2U 2020-12-09 2020-12-09 Vertical elbow for assembled light steel building keel connecting member Active CN214574631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022928785.2U CN214574631U (en) 2020-12-09 2020-12-09 Vertical elbow for assembled light steel building keel connecting member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022928785.2U CN214574631U (en) 2020-12-09 2020-12-09 Vertical elbow for assembled light steel building keel connecting member

Publications (1)

Publication Number Publication Date
CN214574631U true CN214574631U (en) 2021-11-02

Family

ID=78330671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022928785.2U Active CN214574631U (en) 2020-12-09 2020-12-09 Vertical elbow for assembled light steel building keel connecting member

Country Status (1)

Country Link
CN (1) CN214574631U (en)

Similar Documents

Publication Publication Date Title
CN209924120U (en) Assembled light steel frame structure building system
CN210439520U (en) Hollow curtain wall structure
CN214034055U (en) Ready-package steel construction
CN211499913U (en) Low-energy-consumption prefabricated house
CN105821989A (en) Assembly type steel pipe bundle concrete shear wall structure system and construction method thereof
CN207453084U (en) A kind of skeleton structure for setting room dome
CN214574631U (en) Vertical elbow for assembled light steel building keel connecting member
CN106592456A (en) Railway line subsidiary facilities and mounting method thereof
CN111088866A (en) Prefabricated three-hinged-arch roof panel and mounting method
CN201125568Y (en) Assembled type sectional material guard rail
CN112196117B (en) Assembled building unit body and tectosome
CN103255837B (en) A kind of removable modular combination room
CN211690962U (en) Assembled keeps warm and decorates integrative outer wallboard and connected node
US20220220733A1 (en) A modular structural system and construction method thereof
CN108265861A (en) A kind of aluminium-plastic panel mounting connection structure
CN110258798B (en) Mounting method of assembled column base connection node
CN208472962U (en) A kind of container house column and panel wall system
CN209011315U (en) A kind of novel prefabricated beam-column connection
CN114568313A (en) Assembled pigsty and assembling method
CN206512623U (en) A kind of railway line affiliated facility
CN111255147A (en) Composite building wall module, modular building wall, preparation method and application
CN205276554U (en) Steel construction unit -installment building body and node is hung with steel column to outer wall thereof
CN215977854U (en) Anti-seismic splicing structure of light precast concrete wallboard
CN115419205B (en) BIM technology-based building decoration suspended ceiling and installation method thereof
CN210661655U (en) Prefabricated piping lane is pipeline support installation device for component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant