CN214565543U - Brick neatly-unloading and placing device for building construction - Google Patents

Brick neatly-unloading and placing device for building construction Download PDF

Info

Publication number
CN214565543U
CN214565543U CN202120999079.9U CN202120999079U CN214565543U CN 214565543 U CN214565543 U CN 214565543U CN 202120999079 U CN202120999079 U CN 202120999079U CN 214565543 U CN214565543 U CN 214565543U
Authority
CN
China
Prior art keywords
car hopper
brick
baffle
hopper
unloading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120999079.9U
Other languages
Chinese (zh)
Inventor
冯九龙
朱建青
黄传真
朱升吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHONGNAN CONSTRUCTION INDUSTRY GROUP CO LTD
Original Assignee
JIANGSU ZHONGNAN CONSTRUCTION INDUSTRY GROUP CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHONGNAN CONSTRUCTION INDUSTRY GROUP CO LTD filed Critical JIANGSU ZHONGNAN CONSTRUCTION INDUSTRY GROUP CO LTD
Priority to CN202120999079.9U priority Critical patent/CN214565543U/en
Application granted granted Critical
Publication of CN214565543U publication Critical patent/CN214565543U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a neat device of putting of unloading of fragment of brick for construction relates to construction equipment technical field. It comprises a car hopper; two handrails are fixedly arranged on the outer wall of the car hopper; a plurality of U-shaped rails are fixedly arranged at the bottom in the car hopper; a plurality of supporting plates are uniformly distributed in the hopper; a plurality of pulleys are fixedly arranged at the bottom of the supporting plate; a baffle is arranged in the hopper in a sliding way; a power box is fixedly arranged on the outer wall of the car hopper between the two handrails; the output end of the electric push rod penetrates through the power box and the car hopper respectively and is fixedly connected with the baffle; a storage battery is arranged in the power box; the storage battery is electrically connected with the electric push rod. The utility model has the advantages that: make the constructor put the loading and unload the fragment of brick in the outside region of car hopper through the position of adjustment backup pad, the smooth and easy convenient use of operation is nimble, reduces intensity of labour, improves the work efficiency of putting the loading and unloading of fragment of brick.

Description

Brick neatly-unloading and placing device for building construction
Technical Field
The utility model relates to a building construction equipment technical field.
Background
When carrying out building construction, the fragment of brick is the building material commonly used, and transport vehicle transports the fragment of brick to the building site after, transport the fragment of brick through the shallow and use it, and when putting the fragment of brick in the shallow transportation, put the fragment of brick to the most inside position of shallow when needing constructor large-span to put the fragment of brick, consequently need consume a large amount of physical power, and when unloading the fragment of brick and using, along with the most outside fragment of brick uninstallation back of shallow, the same fragment of brick that needs the large-span to remove inside the shallow and uninstall, consequently make putting loading and unloading of fragment of brick have the limitation, reduce work efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that the technique that exists is not enough to the aforesaid, provide a device is put to neat unloading of fragment of brick for construction. Make the constructor put the loading and unload the fragment of brick in the outside region of car hopper through the position of adjustment backup pad, the smooth and easy convenient use of operation is nimble, reduces intensity of labour, improves the work efficiency of putting the loading and unloading of fragment of brick.
The utility model adopts the technical proposal that: the brick orderly unloading and placing device for building construction comprises a car hopper; wheels are arranged at the bottom of the hopper along the circumferential direction; two handrails are fixedly arranged on the outer wall of the car hopper; a plurality of U-shaped rails are fixedly arranged at the bottom in the car hopper; the rails penetrate through the car hopper and extend to the bottom of the car hopper; a plurality of supporting plates are uniformly distributed in the hopper; a plurality of pulleys are fixedly arranged at the bottom of the supporting plate; the pulleys are correspondingly matched with the positions of the rails respectively, and the pulleys are matched with the rails in a sliding connection mode respectively; the two adjacent supporting plates are fixedly connected and matched through a traction rope; a baffle is arranged in the hopper in a sliding way; the baffle is fixedly connected with the outermost side supporting plate; the sliding direction of the baffle is correspondingly matched with the sliding direction of the supporting plate; a power box is fixedly arranged on the outer wall of the car hopper between the two handrails; the power box is correspondingly matched with the baffle in position, and an electric push rod is arranged in the power box; the output end of the electric push rod penetrates through the power box and the car hopper respectively and is fixedly connected with the baffle; a storage battery is arranged in the power box; the storage battery is electrically connected with the electric push rod.
Further optimize this technical scheme, the baffle bottom fixed mounting that the fragment of brick was neatly unloaded for the construction puts the device has the brush.
Further optimizing the technical scheme, the corrugated pipe is sleeved on the outer wall of the traction rope of the brick orderly unloading and placing device for building construction; two ends of the corrugated pipe are respectively fixedly connected with the outer walls of the two adjacent supporting plates.
Further optimize this technical scheme, the building construction is with fragment of brick neatly unload put device the fixed cover of having connect with the handle cover of handrail outer wall.
The beneficial effects of the utility model reside in that:
1. when the bricks are loaded and operated, the supporting plates slide along the rails through the pulleys, so that the innermost supporting plate in the hopper is moved to the outermost part of the hopper, the bricks are conveniently placed and loaded, the supporting plates are continuously pulled to move into the hopper during loading, the bricks are completely placed in the hopper, the bricks are prevented from being placed and loaded by a user in a large span manner, the operation is convenient and fast, and the loading and placing efficiency is improved;
when the bricks are unloaded, the supporting plate is pushed to move again after the bricks on the supporting plate at the outermost part of the car hopper are unloaded, so that the supporting plates at other positions in the car hopper drive the bricks to move to the outermost part of the car hopper, the bricks are conveniently unloaded, the use is flexible and convenient, and the unloading efficiency is improved;
2. when the supporting plates move along the rail through the pulleys, the output ends of the electric push rods stretch and contract to drive the baffle plates to move along the hopper, so that the supporting plates are driven to move, the use is more flexible and labor-saving, the supporting plates are flexibly connected through the traction ropes, the transition parts of the U-shaped rails can be smoothly bent, and the use is smoother;
the corrugated pipes are sleeved on the outer walls of the traction ropes to shield and protect the traction ropes so as to prevent bricks from wearing the traction ropes, so that the device is safer and more reliable to use, the service life is prolonged, and the corrugated pipes can be deformed and bent, so that the supporting plates are not influenced by bending along the tracks, and the use is smooth and reliable;
3. after finishing the fragment loading, move the car hopper through holding up the hand and move and transport the fragment of brick, and the friction that grips is increased to the cover of handrail outer wall, and move the in-process to the car hopper and cushion the building and make and grip more comfortable, and when unloading the fragment of brick, when the baffle promotes the backup pad and removes, the baffle drives the brush and removes, thereby clean to the car hopper outside bottom and the interior fragment of brick dregs that remain of track in the car hopper, consequently avoid along with remaining the removal that influences the backup pad, it is more reliable to use.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a drawing schematic view of the structure of the hopper of the present invention;
fig. 3 is a schematic drawing of the track structure of the present invention.
In the figure, 1, a car hopper; 2. a wheel; 3. a handrail; 4. a track; 5. a support plate; 6. a pulley; 7. a hauling rope; 8. a baffle plate; 9. a power box; 10. an electric push rod; 11. a storage battery; 12. a brush; 13. a bellows; 14. a handle sleeve.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
As shown in fig. 1-3, the brick tidying, unloading and placing device for building construction comprises a car hopper 1; the bottom of the car hopper 1 is provided with wheels 2 along the circumferential direction; two handrails 3 are fixedly arranged on the outer wall of the car hopper 1; a plurality of U-shaped rails 4 are fixedly arranged at the bottom in the car hopper 1; the rails 4 penetrate through the car hopper 1 and extend to the bottom of the car hopper 1; a plurality of supporting plates 5 are uniformly distributed in the car hopper 1; a plurality of pulleys 6 are fixedly arranged at the bottom of the supporting plate 5; the pulleys 6 are respectively matched with the track 4 correspondingly, and the pulleys 6 are respectively matched with the track 4 in a sliding connection manner; the two adjacent supporting plates 5 are fixedly connected and matched through a traction rope 7; a baffle plate 8 is arranged in the car hopper 1 in a sliding way; the baffle 8 is fixedly connected with the outermost support plate 5; the sliding direction of the baffle 8 is correspondingly matched with the sliding direction of the support plate 5; a power box 9 is fixedly arranged on the outer wall of the car hopper 1 between the two handrails 3; the power box 9 is correspondingly matched with the baffle 8, and an electric push rod 10 is arranged in the power box 9; the output end of the electric push rod 10 penetrates through the power box 9 and the car hopper 1 respectively and is fixedly connected with the baffle 8; a storage battery 11 is arranged in the power box 9; the storage battery 11 is electrically connected with the electric push rod 10; the bottom of the baffle 8 is fixedly provided with a brush 12; the outer wall of the hauling cable 7 is sleeved with a corrugated pipe 13; two ends of the corrugated pipe 13 are respectively fixedly connected with the outer walls of the two adjacent supporting plates 5; the outer wall of the handrail 3 is fixedly sleeved with a handle sleeve 14.
When the brick is placed and transported in the hopper 1 by using the hopper 1, a user firstly starts the electric push rod 10 to stretch the output end of the electric push rod to push the baffle 8 to move along the position in the hopper 1 and drive the supporting plate 5 to move along the position of the track 4 through the pulley 6;
one part of the U-shaped structure of the rail 4 is fixedly installed with the inner bottom of the car hopper 1, the other part of the U-shaped structure is distributed at the outer bottom of the car hopper 1, when the baffle 8 drives the supporting plate 5 to slide, the supporting plate 5 moves to the bottom of the car hopper 1 along the rail 4 along with being pushed out of the car hopper 1, so that the innermost supporting plate 5 in the car hopper 1 is pushed out to the outermost part of the car hopper 1, bricks are conveniently placed on the supporting plate 5, after the bricks are placed on the supporting plate 5, the electric push rod 10 contracts to pull the unused supporting plate 5 at the bottom of the car hopper 1 to be located at the outermost part of the car hopper 1, and the supporting plate 5 for placing the bricks is pulled into the car hopper 1, so that a user is prevented from placing the bricks into the car hopper 1 in a large span, the bricks are placed more flexibly and conveniently, and the placing of the bricks is improved, and the placing efficiency is improved;
when bricks are placed on the supporting plate 5 and pulled into the hopper 1, the hopper 1 is pushed to transfer the bricks, and then the bricks are transferred to a use site, and when the bricks are unloaded, firstly, the outermost bricks of the hopper 1 are unloaded, then the electric push rod 10 is started again to stretch, the baffle 8 is pushed to drive the supporting plate 5 to move, and then the bricks in the hopper 1 are pushed to the outside of the hopper 1, so that the bricks are flexibly and conveniently unloaded;
when baffle 8 drives backup pad 5 and moves along track 4, carry out the flexible connection through haulage rope 7 between the backup pad 5, thereby the convenient department of buckling through track 4's "U" shape, thereby slide to car hopper 1 bottom, the operation is more smooth and easy, and haulage rope 7 outer wall cover has bellows 13 to protect haulage rope 7 and avoid impaired, and bellows 13 makes things convenient for the deformation and adapts to the buckling of haulage rope 7 so that backup pad 5 is bent along track 4, it is nimble convenient to use, and when electric putter 10 promoted baffle 8 and moved along car hopper 1, drive brush 12 and remove so as to clean remaining fragment of brick etc. in car hopper 1 bottom and the track 4 along car hopper 1, thereby avoid causing the jam in car hopper 1 and influence the removal of backup pad 5 and influence putting and uninstallation of fragment of brick, it is smooth and reliable to use.

Claims (4)

1. The utility model provides a device is put to neat unloading of fragment of brick for construction, its characterized in that: comprises a car hopper (1); wheels (2) are arranged at the bottom of the car hopper (1) along the circumferential direction; two handrails (3) are fixedly arranged on the outer wall of the car hopper (1); a plurality of U-shaped rails (4) are fixedly arranged at the bottom in the car hopper (1); the rails (4) penetrate through the car hopper (1) and extend to the bottom of the car hopper (1); a plurality of supporting plates (5) are uniformly distributed in the car hopper (1); a plurality of pulleys (6) are fixedly arranged at the bottom of the supporting plate (5); the pulleys (6) are correspondingly matched with the track (4) respectively, and the pulleys (6) are matched with the track (4) in a sliding connection mode respectively; the two adjacent supporting plates (5) are fixedly connected and matched through a traction rope (7); a baffle (8) is arranged in the car hopper (1) in a sliding way; the baffle (8) is fixedly connected with the outermost side support plate (5); the sliding direction of the baffle (8) is correspondingly matched with the sliding direction of the support plate (5); a power box (9) is fixedly arranged on the outer wall of the car hopper (1) between the two handrails (3); the power box (9) is correspondingly matched with the baffle (8), and an electric push rod (10) is arranged in the power box (9); the output end of the electric push rod (10) respectively penetrates through the power box (9) and the car hopper (1) and is fixedly connected with the baffle (8); a storage battery (11) is arranged in the power box (9); the storage battery (11) is electrically connected with the electric push rod (10).
2. The brick tidying, unloading and placing device for building construction according to claim 1, characterized in that: the bottom of the baffle (8) is fixedly provided with a brush (12).
3. The brick tidying, unloading and placing device for building construction according to claim 1, characterized in that: the outer wall of the traction rope (7) is sleeved with a corrugated pipe (13); two ends of the corrugated pipe (13) are respectively fixedly connected with the outer walls of the two adjacent supporting plates (5).
4. The brick tidying, unloading and placing device for building construction according to claim 1, characterized in that: the outer wall of the handrail (3) is fixedly sleeved with a handle sleeve (14).
CN202120999079.9U 2021-05-11 2021-05-11 Brick neatly-unloading and placing device for building construction Expired - Fee Related CN214565543U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120999079.9U CN214565543U (en) 2021-05-11 2021-05-11 Brick neatly-unloading and placing device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120999079.9U CN214565543U (en) 2021-05-11 2021-05-11 Brick neatly-unloading and placing device for building construction

Publications (1)

Publication Number Publication Date
CN214565543U true CN214565543U (en) 2021-11-02

Family

ID=78362333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120999079.9U Expired - Fee Related CN214565543U (en) 2021-05-11 2021-05-11 Brick neatly-unloading and placing device for building construction

Country Status (1)

Country Link
CN (1) CN214565543U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115092230A (en) * 2022-07-19 2022-09-23 河南豫创联胜建设工程有限公司 Material transfer device suitable for house building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115092230A (en) * 2022-07-19 2022-09-23 河南豫创联胜建设工程有限公司 Material transfer device suitable for house building construction

Similar Documents

Publication Publication Date Title
CN214565543U (en) Brick neatly-unloading and placing device for building construction
CN203833566U (en) Forklift boxed goods loading and unloading device
CN205396139U (en) Coiling formula tunnel construction is with upset handcart
CN110723049A (en) Scraper type discharging device for inhaul cable
CN212893565U (en) A lifting device for automobile mold processing
CN211710910U (en) Carrier with fixing mechanism
CN213356845U (en) Novel terrace vehicle
CN220332743U (en) Transformer travelling car
CN212449117U (en) Garbage bin carrier
CN214879803U (en) Lifting and carrying equipment for logistics transportation
CN220844115U (en) Ore conveyor capable of automatically cleaning slag
JP3087490B2 (en) Travel power supply
CN218707311U (en) Material loading turning device and conveying system thereof
CN210766421U (en) Girder carrying trolley for girder crane of girder crane for hoisting bridge
CN215363825U (en) Baked brick adobe stacking device
CN210885053U (en) Multifunctional movable cableway
CN217205428U (en) Use convenient construction handling device
CN218929298U (en) Barreled water dragging interlinking machine
CN220103763U (en) Graphitized finished product high-efficiency tapping trolley system
CN218538840U (en) Cable construction draw gear
CN218433810U (en) Promote blevile of push and conveying system thereof
CN109573409A (en) A kind of community's solar energy compression heap garbage bucket
CN217918043U (en) Material transportation convenient for unloading
CN209352478U (en) A kind of road and bridge construction tool fast lifting equipment
CN113277276B (en) Material dust collection storage and transportation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102