CN214565541U - Novel full prefabricated assembled piping lane - Google Patents

Novel full prefabricated assembled piping lane Download PDF

Info

Publication number
CN214565541U
CN214565541U CN202120968791.2U CN202120968791U CN214565541U CN 214565541 U CN214565541 U CN 214565541U CN 202120968791 U CN202120968791 U CN 202120968791U CN 214565541 U CN214565541 U CN 214565541U
Authority
CN
China
Prior art keywords
fixedly connected
plate
bottom plate
piping lane
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120968791.2U
Other languages
Chinese (zh)
Inventor
邓博团
李鑫
李攀
申超凡
付一帆
郑谢缙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN202120968791.2U priority Critical patent/CN214565541U/en
Application granted granted Critical
Publication of CN214565541U publication Critical patent/CN214565541U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a novel full prefabricated assembled piping lane, bottom plate, auto-lock universal wheel, piping lane body, bracing piece and fixing base, the bottom fixedly connected with auto-lock universal wheel of bottom plate, two fixture of top fixedly connected with of bottom plate, fixture include the fixed plate with bottom plate fixed connection, the quantity of fixed plate is two, the left side swing joint of fixed plate has one end to run through and extend to the connecting rod on fixed plate right side, the top swing joint of bottom plate has the piping lane body, the equal fixedly connected with bracing piece of the left and right sides wall of piping lane body inner chamber. This novel prefabricated assembled piping lane entirely removes through setting up the auto-lock universal wheel, fixes the piping lane body through fixture at the removal in-process for when the piping lane carries, can not drop easily, overall structure is simple, has realized the fixed effectual purpose of piping lane, has improved work efficiency greatly.

Description

Novel full prefabricated assembled piping lane
Technical Field
The utility model relates to a piping lane technical field.
Background
The pipe gallery, namely the corridor of the pipeline, many pipelines in the chemical industry and its related factory are gathered together, arrange along the apparatus or factory building outside, generally in the air, prop up with the support, form the similar appearance with the corridor, there are also few pipe galleries to locate underground, the major site that the large-scale apparatus pipeline is laid concentratedly, it is formed by steel construction or steel bar concrete structural pillar stand, crossbeam and truss, can divide into the single-storeyed or multilayer according to the type, can pass or can not pass etc..
Fixed shortcoming of being not convenient for when all having to remove in the piping lane on the present market, when generally removing, when meetting comparatively hollow road surface and removing, probably lead to the piping lane to drop, damage the piping lane, fix again, need start the crane and carry out the handling, need consume a large amount of manpower and materials, greatly reduced work efficiency so proposes a novel prefabricated assembled piping lane in order to solve above-mentioned problem completely.
SUMMERY OF THE UTILITY MODEL
The utility model discloses to the technical problem who exists among the prior art, provide a novel prefabricated assembled piping lane entirely, solved and generally removed the time, when meetting comparatively hollow road surface and removing, probably lead to the piping lane to drop, carry out the problem of damage to the piping lane.
The utility model provides an above-mentioned technical problem's technical scheme as follows: a novel fully-prefabricated assembled pipe gallery comprises a bottom plate, self-locking universal wheels, a pipe gallery body, supporting rods and fixing seats, wherein the self-locking universal wheels are fixedly connected to the bottom of the bottom plate, two clamping mechanisms are fixedly connected to the top of the bottom plate, the pipe gallery body is movably connected to the top of the bottom plate, the supporting rods are fixedly connected to the left side wall and the right side wall of an inner cavity of the pipe gallery body, and the two fixing seats are fixedly connected to the opposite sides of the two supporting rods;
fixture include with bottom plate fixed connection's fixed plate, the quantity of fixed plate is two, the left side swing joint of fixed plate has one end to run through and extend to the connecting rod on fixed plate right side, the outer fixed surface of connecting rod is connected with the limiting plate, two the equal fixedly connected with sleeve in one side that the fixed plate was carried on the back mutually, the outer swing joint of connecting rod has first spring, first spring and sleeve fixed connection, limiting plate and sleeve swing joint, two the equal fixedly connected with connecting plate in one side that the connecting rod was carried on the back mutually, two the equal fixedly connected with electric putter in one side that the connecting plate is relative, electric putter and bottom plate fixed connection.
On the basis of the technical scheme, the utility model discloses can also do following improvement.
Furthermore, the quantity of auto-lock universal wheel is four, four the auto-lock universal wheel is the symmetry equidistance with the axis of bottom plate and distributes.
Further, fixture still includes the backing plate with connecting rod fixed connection, two the equal fixedly connected with a plurality of second springs in the relative one side of backing plate, the left and right sides the equal fixedly connected with push pedal in the relative one side of second spring.
Furthermore, the upper side wall and the lower side wall of the inner cavity of the sleeve are both provided with sliding grooves, and the sliding grooves are matched with the limiting plates.
Furthermore, a communicating hole is formed in the fixing plate and is matched with the connecting rod.
Furthermore, the number of the supporting rods is two, and one side, opposite to the two supporting rods, of each supporting rod is fixedly connected with a stabilizing rod, and the stabilizing rods are fixedly connected with the fixing seats.
Furthermore, a through hole is formed in the right side of the sleeve, and the aperture of the through hole is smaller than that of the first spring.
Compared with the prior art, the technical scheme of the application has the following beneficial technical effects:
this novel prefabricated assembled piping lane entirely removes through setting up the auto-lock universal wheel, fixes the piping lane body through fixture at the removal in-process for when the piping lane carries, can not drop easily, overall structure is simple, has realized the fixed effectual purpose of piping lane, has improved work efficiency greatly.
Drawings
FIG. 1 is a front cross-sectional view of the present invention;
FIG. 2 is an external view of the present invention;
fig. 3 is a schematic structural view of the clamping mechanism of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. bottom plate, 2, auto-lock universal wheel, 3, fixture, 301, fixed plate, 302, connecting rod, 303, sleeve, 304, limiting plate, 305, first spring, 306, connecting plate, 307, electric putter, 308, backing plate, 309, second spring, 310, push pedal, 4, piping lane body, 5, bracing piece, 6, fixing base.
Detailed Description
The principles and features of the present invention are described below in conjunction with the following drawings, the examples given are only intended to illustrate the present invention and are not intended to limit the scope of the present invention.
Referring to fig. 1-2, in the embodiment, a novel fully prefabricated pipe gallery comprises a bottom plate 1, a self-locking universal wheel 2, a pipe gallery body 4, support rods 5 and fixing seats 6, wherein the self-locking universal wheel 2 is fixedly connected to the bottom of the bottom plate 1, the self-locking universal wheel 2 can rotate by three hundred sixty degrees to move, can be unlocked when moving and can be locked when stopping, two clamping mechanisms 3 are fixedly connected to the top of the bottom plate 1, the clamping mechanisms 3 mainly fix the pipe gallery body 4 so as to prevent the pipe gallery from falling off when moving, the pipe gallery body 4 is movably connected to the top of the bottom plate 1, the support rods 5 are fixedly connected to the left side wall and the right side wall of the inner cavity of the pipe gallery body 4, the support rods 5 support the fixing seats 6, the two fixing seats 6 are fixedly connected to the opposite sides of the two support rods 5, and the fixing seats 6 are U-shaped, the pipeline can be placed inside, and is not easy to fall.
The quantity of auto-lock universal wheel 2 is four, and four auto-lock universal wheels 2 are the symmetry equidistance with the axis of bottom plate 1 and distribute, and auto-lock universal wheel 2 supports bottom plate 1 and piping lane body 4.
The quantity of bracing piece 5 is two, and the equal fixedly connected with of one side that two bracing pieces 5 are relative stabilizes the pole, and the top fixing base 6 is supported through the pole that stabilizes with fixing base 6 fixed connection.
Referring to fig. 3, the clamping mechanism 3 includes two fixing plates 301 fixedly connected to the base plate 1, the left side of the fixing plates 301 is movably connected with two connecting rods 302, one end of each connecting rod 302 penetrates through and extends to the right side of the fixing plate 301, the connecting rods 302 move along through holes formed in the fixing plates 301, the outer surfaces of the connecting rods 302 are fixedly connected with limiting plates 304, the limiting plates 304 limit the first springs 305, so that the reaction force of the first springs 305 is reduced, sleeves 303 are fixedly connected to opposite sides of the two fixing plates 301, the sleeves 303 limit the springs 305, the springs 305 cannot be separated from the sleeves 303, the outer surfaces of the connecting rods 302 are movably connected with the first springs 305, the connecting rods 302 limit the first springs 305, so that the first springs 305 can only move left and right and cannot be bent, and the first springs 305 are fixedly connected with the sleeves 303, limiting plate 304 and sleeve 303 swing joint, the equal fixedly connected with connecting plate 306 in one side that two connecting rods 302 carried on the back mutually, connecting plate 306 is injectd electric putter 307, and electric putter 307 starts, promotes 306 and makes push pedal 310 not contact with pipe gallery body 4, the equal fixedly connected with electric putter 307 in the one side that two connecting plates 306 are relative, electric putter 307 and bottom plate 1 fixed connection.
Fixture 3 still includes the backing plate 308 with connecting rod 302 fixed connection, a plurality of second springs 309 of the equal fixedly connected with in one side that two backing plates 308 are relative, the equal fixedly connected with push pedal 310 in one side that left and right sides second spring 309 is relative, backing plate 308 supports second spring 309 for second spring 309 promotes 310, makes push pedal 310 and the contact of piping lane body 4, fixes piping lane body 4.
The upper and lower both sides wall of sleeve 303 inner chamber has all seted up the spout, spout and limiting plate 304 looks adaptation, and the spout is injectd limiting plate 304, and limiting plate 304 can only remove about.
The fixed plate 301 is provided with a communication hole therein, and the communication hole is matched with the connecting rod 302.
A through hole is formed in the right side of the sleeve 303, the aperture of the through hole is smaller than that of the first spring 305, and the first spring 305 cannot be separated from the sleeve 303.
It will be appreciated that by actuating the electric push rod 307, the connection plate 306 is moved left and right, while allowing the push plate 310 to contact the tube lane body 4, while reacting the push plate 310 via the second spring 309, allowing the push plate 310 to contact the tube lane body 4.
The working principle of the above embodiment is as follows:
through starting electric putter 307, move connecting plate 306 and connecting rod 302 in step, make left and right sides push pedal 310 move to the one side of carrying on the back mutually, subsequently through carrying piping lane body 4 at bottom plate 1 top, start electric putter 307 subsequently, make connecting plate 306 and connecting rod 302 move to relative one side, centre gripping piping lane body 4, through setting up second spring 309 and push pedal 310, carry out reaction force to piping lane body 4 and centre gripping, push pedal 310 makes the lifting surface enlarge, make piping lane body 4 be difficult to drop, work efficiency is greatly improved.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (7)

1. A novel fully-prefabricated assembled pipe gallery comprises a bottom plate (1), self-locking universal wheels (2), a pipe gallery body (4), supporting rods (5) and fixing seats (6), and is characterized in that the self-locking universal wheels (2) are fixedly connected to the bottom of the bottom plate (1), two clamping mechanisms (3) are fixedly connected to the top of the bottom plate (1), the pipe gallery body (4) is movably connected to the top of the bottom plate (1), the supporting rods (5) are fixedly connected to the left side wall and the right side wall of an inner cavity of the pipe gallery body (4), and the two fixing seats (6) are fixedly connected to the opposite sides of the two supporting rods (5);
the clamping mechanism (3) comprises a fixing plate (301) fixedly connected with the bottom plate (1), the number of the fixing plates (301) is two, the left side of each fixing plate (301) is movably connected with a connecting rod (302) one end of which penetrates through and extends to the right side of the fixing plate (301), the outer surface of the connecting rod (302) is fixedly connected with a limiting plate (304), one side of each fixing plate (301) which is opposite to the other side is fixedly connected with a sleeve (303), the outer surface of the connecting rod (302) is movably connected with a first spring (305), first spring (305) and sleeve (303) fixed connection, limiting plate (304) and sleeve (303) swing joint, two equal fixedly connected with connecting plate (306) in one side that connecting rod (302) carried on the back mutually, two equal fixedly connected with electric putter (307) in one side that connecting plate (306) are relative, electric putter (307) and bottom plate (1) fixed connection.
2. The novel full prefabricated assembled pipe gallery according to claim 1, characterized in that the number of the self-locking universal wheels (2) is four, and the four self-locking universal wheels (2) are symmetrically and equidistantly distributed around the central axis of the bottom plate (1).
3. The novel full prefabricated assembled pipe gallery according to claim 1, wherein the clamping mechanism (3) further comprises a backing plate (308) fixedly connected with the connecting rod (302), a plurality of second springs (309) are fixedly connected to one side of each of the two backing plates (308), and a push plate (310) is fixedly connected to one side of each of the left side and the right side opposite to the second springs (309).
4. The novel fully prefabricated assembled pipe gallery according to claim 1, wherein sliding grooves are formed in the upper side wall and the lower side wall of the inner cavity of the sleeve (303), and the sliding grooves are matched with the limiting plates (304).
5. The novel fully prefabricated assembled pipe gallery according to claim 1, wherein a communication hole is formed in the fixing plate (301), and the communication hole is matched with the connecting rod (302).
6. The novel full prefabricated assembled pipe gallery of claim 1, characterized in that the number of the support rods (5) is two, and a stabilizing rod is fixedly connected to one side opposite to the two support rods (5), and is fixedly connected to the fixing seat (6).
7. The novel fully prefabricated assembled pipe gallery according to claim 1, wherein a through hole is formed in the right side of the sleeve (303), and the diameter of the through hole is smaller than that of the first spring (305).
CN202120968791.2U 2021-05-08 2021-05-08 Novel full prefabricated assembled piping lane Expired - Fee Related CN214565541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120968791.2U CN214565541U (en) 2021-05-08 2021-05-08 Novel full prefabricated assembled piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120968791.2U CN214565541U (en) 2021-05-08 2021-05-08 Novel full prefabricated assembled piping lane

Publications (1)

Publication Number Publication Date
CN214565541U true CN214565541U (en) 2021-11-02

Family

ID=78329117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120968791.2U Expired - Fee Related CN214565541U (en) 2021-05-08 2021-05-08 Novel full prefabricated assembled piping lane

Country Status (1)

Country Link
CN (1) CN214565541U (en)

Similar Documents

Publication Publication Date Title
CN104452516A (en) Assembly-type prefabricated concrete road board and hoisting tool thereof
CN214565541U (en) Novel full prefabricated assembled piping lane
CN107893530A (en) A kind of anti-fall climbing frame of high safety performance
JP5970124B1 (en) Temporary support pole and utility pole rebuilding method
CN210738053U (en) Turnover operation platform suitable for elevator counterweight installation
CN106337529A (en) Spliced herringbone beam
CN216728047U (en) Bridge bottom curing means is used in municipal administration bridge maintenance
CN115807532A (en) Device for attaching suspension bracket and construction method
CN211285299U (en) Protective bracket for bridge construction
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN210976521U (en) Building platform for outdoor building and indoor decoration
CN210768865U (en) Roadway roof anchor cable anchoring agent installation device
CN211815775U (en) Portable block pole setting support
CN209876443U (en) Fan hanger
CN214570010U (en) Concrete pipe lifting device
CN215976843U (en) Light bridge outlet construction work platform
CN219011871U (en) Device for attaching hanging frame
CN211846886U (en) Safe firm building construction hoist and mount frame
CN204401619U (en) precast pile fixing device
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN218613808U (en) Auxiliary device is assembled to steel bifurcated pipe and steel pipe stiffening ring
CN215368593U (en) Carrying frame is built in room
CN211080984U (en) Scaffold frame stabilising arrangement of pre-buried formula
CN218176555U (en) High-rise scaffold supports fixing device
CN221001924U (en) Scaffold wall connecting piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102

CF01 Termination of patent right due to non-payment of annual fee