CN214562018U - Greening structure house building construction device - Google Patents

Greening structure house building construction device Download PDF

Info

Publication number
CN214562018U
CN214562018U CN202022579558.3U CN202022579558U CN214562018U CN 214562018 U CN214562018 U CN 214562018U CN 202022579558 U CN202022579558 U CN 202022579558U CN 214562018 U CN214562018 U CN 214562018U
Authority
CN
China
Prior art keywords
wall
hole
motor
mounting panel
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022579558.3U
Other languages
Chinese (zh)
Inventor
周又云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yuanqing Architectural Decoration Engineering Co ltd
Original Assignee
Shandong Yuanqing Architectural Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Yuanqing Architectural Decoration Engineering Co ltd filed Critical Shandong Yuanqing Architectural Decoration Engineering Co ltd
Priority to CN202022579558.3U priority Critical patent/CN214562018U/en
Application granted granted Critical
Publication of CN214562018U publication Critical patent/CN214562018U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model discloses a greening structure housing construction device, including shell body and motor casing, the handle is all installed at one side outer wall and the top of shell body, mounting panel A is installed to one side inner wall of shell body, mounting panel A's last surface mounting has motor A, install the double flute belt pulley on motor A's the output shaft, the bearing is all installed to the both sides inner wall top and the below of shell body, install the pivot in the bearing, driven pulley is installed to the outer wall of pivot, mounting panel B is all installed to the top and the bottom of motor casing, set up threaded hole on mounting panel B's the outer wall, the internally mounted of motor casing has motor B, through-hole C has been seted up to the one end of motor casing. The utility model has the advantages of simple and reasonable structure, can effectively prevent splashing of dust, reduce the utility model discloses the vibrations that the during operation produced, the practicality is strong.

Description

Greening structure house building construction device
Technical Field
The utility model relates to a housing construction equipment technical field specifically is a greening structure housing construction device.
Background
Over the last 10 years, the building industry in China has been developed at a high speed, the total value of the building industry is increased from 15362 hundred million in 2001 to 135303 hundred million yuan in 2012, the increase is nearly 9 times, the development of related industries is driven by the high-speed development of the building industry, the comprehensive national strength and the living standard of people in China are greatly improved, and a wide space is provided for building a well-being society in China. The global building market value is about 7.5 trillion dollars, accounts for 13.4% of global GDP, and punching is an essential step in building construction.
However, dust splashes when the existing building construction punching machine works, workers can easily suck the dust into the lung when punching, the body health of the workers is damaged, the drill bit can vibrate during working, the use of the workers is influenced, the arms of the workers are easily sore after long-time use, and the working efficiency is reduced; therefore, the existing use requirements are not satisfied.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a greening structure housing construction device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a greening structure house building construction device comprises an outer shell and a motor shell, wherein handles are respectively installed on the outer wall and the top of one side of the outer shell, a mounting plate A is installed on the inner wall of one side of the outer shell, a motor A is installed on the upper surface of the mounting plate A, a double-groove belt pulley is installed on an output shaft of the motor A, bearings are respectively installed above and below the inner walls of two sides of the outer shell, a rotating shaft is installed in each bearing, a driven belt pulley is installed on the outer wall of the rotating shaft, a mounting plate B is installed on the top and the bottom of the motor shell, a threaded hole is formed in the outer wall of the mounting plate B, a motor B is installed in the motor shell, a through hole C is formed in one end of the motor shell, the output shaft of the motor B penetrates through the through hole C in the motor shell to be connected with a drill chuck, a through hole E is formed in the outer wall of the other side of the drill chuck, a drill bit is arranged in the through hole E, the other end of the drill bit penetrates through the through hole A on the outer shell and the through hole B on the dust collection cover, the outer wall of the other side of the outer shell is connected with the outer wall of one side of the dust collection cover through a damping mechanism, the damping mechanism comprises a mounting plate C, a connecting column, a spring, a through hole D, a connecting plate, a fixing plate and a mounting plate D, the mounting plate D is arranged on one side of the outer shell, the fixing plate is arranged above and below the outer wall of the other side of the mounting plate D, the spring is arranged between every two adjacent fixing plates, one end of the spring is arranged on the upper surface of the mounting plate D, the other end of the spring is arranged on the outer wall of one side of the connecting plate, the mounting plate C is arranged on the outer wall of the other side of the connecting plate, the through hole D is arranged at the other end of the fixing plate, the connecting column is arranged on the outer wall of one side of the mounting plate C, the outer wall of the other side of the mounting plate C is mounted at one end of the dust collection cover.
Preferably, an external thread is arranged on one side of the outer wall of the rotating shaft, and the external thread on one side of the outer wall of the rotating shaft is meshed with the internal thread on the hole wall of the threaded hole in the mounting plate B.
Preferably, the drill chuck is connected with the drill bit through a fastening bolt.
Preferably, the hole wall of the through hole E is in clearance connection with the drill bit.
Preferably, the spring, the connecting plate and the mounting plate D are fixed through welding.
Preferably, the driven pulley is connected with the double-grooved pulley through a transmission belt.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of simple and reasonable structure, have following advantage:
1. through the cooperation setting of shell body and dust cage, the dust cage hugs closely the wall or ground all around of punching point at the during operation, has blockked splashing of dust, has avoided the staff to inhale the dust and has leaded to the uncomfortable condition of health to take place, has also avoided environmental pollution simultaneously.
2. Through the cooperation setting of shell body, dust cage and damper, the dust cage passes through damper with the shell body and is connected, and the spring among the damper has played absorbing effect, has avoided long-time during operation to lead to the condition such as staff's arm ache to take place because of vibrations, and the staff's of being convenient for use has improved work efficiency, has strengthened the stability of equipment.
Drawings
Fig. 1 is a schematic view of a front view cross-sectional structure of the present invention;
FIG. 2 is a cross-sectional view of the damping mechanism of the present invention;
fig. 3 is a schematic view of a part of an enlarged structure at a in fig. 1 according to the present invention.
In the figure: 1. an outer housing; 101. a handle; 102. mounting a plate A; 103. a bearing; 104. a through hole A; 2. a rotating shaft; 3. a driven pulley; 4. mounting a plate B; 401. a threaded hole; 5. a dust collection cover; 501. a through hole B; 6. a motor A; 7. a drive belt; 8. a double grooved pulley; 9. a motor B; 10. a motor housing; 1001. a through hole C; 11. a drill bit; 12. a damping mechanism; 1201. mounting a plate C; 1202. connecting columns; 1203. a spring; 1204. a through hole D; 1205. a connecting plate; 1206. a fixing plate; 1207. mounting a plate D; 13. drilling; 1301. a through hole E; 14. and fastening the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: a greening structure house building construction device comprises an outer shell 1 and a motor shell 10, wherein a handle 101 is installed on the outer wall and the top of one side of the outer shell 1, a mounting plate A102 is installed on the inner wall of one side of the outer shell 1, a motor A6 is installed on the upper surface of the mounting plate A102, a double-groove belt pulley 8 is installed on an output shaft of a motor A6, bearings 103 are installed above and below the inner walls of two sides of the outer shell 1, a rotating shaft 2 is installed in each bearing 103, a driven belt pulley 3 is installed on the outer wall of the rotating shaft 2, a mounting plate B4 is installed on the top and the bottom of the motor shell 10, a threaded hole 401 is formed in the outer wall of the mounting plate B4, a motor B9 is installed inside the motor shell 10, a through hole C1001 is formed in one end of the motor shell 10, an output shaft of a motor B9 penetrates through hole C1001 in the motor shell 10 to be connected with a drill chuck 13, a through hole E1301 is formed in the outer wall of the other side of the drill chuck 13, a drill bit 11 is installed in the through hole E1301, the other end of the drill 11 penetrates through a through hole A104 on the outer shell 1 and a through hole B501 on the dust hood 5, the outer wall of the other side of the outer shell 1 is connected with the outer wall of one side of the dust hood 5 through a damping mechanism 12, the damping mechanism 12 comprises a mounting plate C1201, a connecting column 1202, a spring 1203, a through hole D1204, a connecting plate 1205, a fixing plate 1206 and a mounting plate D1207, the mounting plate D1207 is mounted at one side of the outer shell 1, the fixing plate 1206 is mounted above and below the outer wall of the other side of the mounting plate D1207, a spring 1203 is arranged between every two adjacent fixing plates 1206, one end of the spring 1203 is arranged on the upper surface of the mounting plate D1207, the other end of the spring 1203 is mounted on the outer wall of one side of the connecting plate 1205, the mounting plate C1201 is mounted on the outer wall of the other side of the connecting plate 1205, the through hole D1204 is formed at the other end of the fixing plate 1206, a connecting column 1202 is arranged inside the through hole D1204, and the outer wall of one side of the mounting plate C1201, the opposite side outer wall of mounting panel C1201 is installed in the one end of dust cage 5, outer wall one side of pivot 2 is provided with the external screw thread, the external screw thread on outer wall one side of pivot 2 is connected with the internal thread screw thread meshing of the screw hole 401 pore wall on the mounting panel B4, be connected through fastening bolt 14 between drill chuck 13 and the drill bit 11, the pore wall and the drill bit 11 clearance joint of through-hole E1301, all through welded fastening between spring 1203 and connecting plate 1205 and the mounting panel D1207, driven pulley 3 passes through driving belt 7 and is connected with double flute belt pulley 8.
The working principle is as follows: when the dust hood is in work, firstly, the dust hood 5 is tightly attached to the wall or the ground around a punching point by holding the handle 101 by hand, dust generated during punching can be blocked by the dust hood, the dust is prevented from splashing everywhere, the working environment is improved, the condition that the body of a worker is damaged due to the fact that the dust is sucked into the lung when the worker punches is avoided, the dust hood 5 is connected with the outer shell 1 through the damping mechanism 12, the damping mechanism 12 reduces vibration through the action of the spring 1203 when a drill bit works, the condition that the worker works for a long time and arm ache and the like is avoided, the motor B9 is started, the output shaft of the motor B9 is connected with the drill bit 11 through the drill chuck 13, the output shaft of the motor B9 rotates to drive the drill bit 11 to rotate, the motor A6 is started, the output shaft of the motor A6 is connected with the double-groove belt pulley 8, the double-groove belt pulley 8 is connected with the driven belt pulley 3 through the transmission belt 7, motor a 6's output shaft rotates and drives double flute belt pulley 8 and rotate, thereby it rotates to drive driven pulley 3 through driving belt 7, driven pulley 3 drives pivot 2 and rotates, be provided with the external screw thread on the 2 outer wall interlude of pivot, be provided with the internal thread on the pore wall of screw hole 401 on the mounting panel B4, external screw thread on the 2 outer walls of pivot and the internal thread meshing on the 401 pore wall of screw hole are connected, thereby pivot 2 carries out corotation or reversal can make mounting panel B4 do forward or backward rectilinear movement on the outer wall of pivot 2, the both sides at motor casing 10 are installed to mounting panel B4, mounting panel B4 drives motor B9 in the motor casing 10 and removes, thereby drive drill bit 11 back-and-forth movement, drill bit 11 can punch at wall or subaerial.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a greening structure house building construction equipment, includes shell body (1) and motor casing (10), its characterized in that: handle (101) are all installed at one side outer wall and the top of shell body (1), mounting panel A (102) are installed to one side inner wall of shell body (1), the last surface mounting of mounting panel A (102) has motor A (6), install double flute belt pulley (8) on the output shaft of motor A (6), bearing (103) are all installed to the both sides inner wall top and the below of shell body (1), install pivot (2) in bearing (103), driven pulley (3) are installed to the outer wall of pivot (2), mounting panel B (4) are all installed to the top and the bottom of motor casing (10), threaded hole (401) have been seted up on the outer wall of mounting panel B (4), the internally mounted of motor casing (10) has motor B (9), through-hole C (1001) have been seted up to the one end of motor casing (10), the output shaft of motor B (9) passes through-hole C (1001) and drill clamp (13) on motor casing (10) ) The drill chuck is characterized in that a through hole E (1301) is formed in the outer wall of the other side of the drill chuck (13), a drill bit (11) is installed in the through hole E (1301), the other end of the drill bit (11) penetrates through a through hole A (104) in the outer shell (1) and a through hole B (501) in the dust collection cover (5), the outer wall of the other side of the outer shell (1) is connected with the outer wall of one side of the dust collection cover (5) through a damping mechanism (12), the damping mechanism (12) comprises a mounting plate C (1201), a connecting column (1202), a spring (1203), a through hole D (1204), a connecting plate (1205), a fixing plate (1206) and a mounting plate D (1207), the mounting plate D (1207) is installed on one side of the outer shell (1), the fixing plate (1206) is installed above and below the outer wall of the other side of the mounting plate D (1207), and the spring (1203) is arranged between every two adjacent fixing plates (1206), the one end setting of spring (1203) is at the upper surface of mounting panel D (1207), the other end of spring (1203) is installed on one side outer wall of connecting plate (1205), install mounting panel C (1201) on the other side outer wall of connecting plate (1205), through-hole D (1204) have been seted up to the other end of fixed plate (1206), the inside of through-hole D (1204) is provided with spliced pole (1202), the other end of spliced pole (1202) is installed on one side outer wall of mounting panel C (1201), the one end in dust cage (5) is installed to the other side outer wall of mounting panel C (1201).
2. A green structure house building construction device as claimed in claim 1, wherein: the outer wall one side of pivot (2) is provided with the external screw thread, the external screw thread on the outer wall one side of pivot (2) is connected with the internal thread screw thread meshing of screw hole (401) pore wall on mounting panel B (4).
3. A green structure house building construction device as claimed in claim 1, wherein: the drill chuck (13) is connected with the drill bit (11) through a fastening bolt (14).
4. A green structure house building construction device as claimed in claim 1, wherein: the hole wall of the through hole E (1301) is in clearance connection with the drill bit (11).
5. A green structure house building construction device as claimed in claim 1, wherein: and the spring (1203) is fixed with the connecting plate (1205) and the mounting plate D (1207) through welding.
6. A green structure house building construction device as claimed in claim 1, wherein: the driven belt pulley (3) is connected with a double-groove belt pulley (8) through a transmission belt (7).
CN202022579558.3U 2020-11-10 2020-11-10 Greening structure house building construction device Expired - Fee Related CN214562018U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022579558.3U CN214562018U (en) 2020-11-10 2020-11-10 Greening structure house building construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022579558.3U CN214562018U (en) 2020-11-10 2020-11-10 Greening structure house building construction device

Publications (1)

Publication Number Publication Date
CN214562018U true CN214562018U (en) 2021-11-02

Family

ID=78358439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022579558.3U Expired - Fee Related CN214562018U (en) 2020-11-10 2020-11-10 Greening structure house building construction device

Country Status (1)

Country Link
CN (1) CN214562018U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114131766A (en) * 2021-11-03 2022-03-04 菏泽城建工程发展集团有限公司 Building site is with novel wall drilling equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114131766A (en) * 2021-11-03 2022-03-04 菏泽城建工程发展集团有限公司 Building site is with novel wall drilling equipment

Similar Documents

Publication Publication Date Title
CN214562018U (en) Greening structure house building construction device
CN211413726U (en) Drilling device for refrigeration liquid storage device
CN210705379U (en) House building construction wall drilling machine
CN213402766U (en) Drilling equipment is used in motor housing processing with locate function
CN214773095U (en) Environment-friendly and clean wall drilling device
CN214023615U (en) Perforating machine for door and window production
CN214274334U (en) Machining equipment with shock absorption function
CN212085955U (en) High-speed motor bearing sealing device
CN213412237U (en) Drilling equipment is used in PCB circuit board production and processing
CN214102078U (en) Smart classroom capacitive touch screen protection device
CN112039254A (en) Variable speed motor with waterproof construction is convenient for install
CN111300346A (en) Electric drill dustproof equipment
CN213382296U (en) Environment-friendly punching dust collection equipment for building field
CN219028004U (en) Wall perforating device with dust collection function
CN217712433U (en) Dust protected trompil mechanism is used in mine rock drilling
CN218487273U (en) Perforating device is used in former moving equipment spare part processing of new forms of energy
CN213496580U (en) Metal hole digger with dust emission prevention structure
CN219026011U (en) Environment-friendly punching equipment with dust collection function for machining broken bridge aluminum doors and windows
CN217316012U (en) Environment-friendly multifunctional hole cleaning and dust collecting device
CN214845381U (en) High-frequency discharge detection equipment for electric dust collector
CN211052609U (en) A combination formula perforating device for water conservancy construction
CN215305476U (en) Dust collector rolling brush with quick installation function
CN217514260U (en) Wall perforating device that building engineering used
CN214920749U (en) Positioning tool of bench drill for metal processing
CN212726668U (en) Variable speed motor with waterproof construction is convenient for install

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102

CF01 Termination of patent right due to non-payment of annual fee