CN214538238U - A raise dust noise monitoring facilities for transformer substation wisdom building site - Google Patents

A raise dust noise monitoring facilities for transformer substation wisdom building site Download PDF

Info

Publication number
CN214538238U
CN214538238U CN202022942997.6U CN202022942997U CN214538238U CN 214538238 U CN214538238 U CN 214538238U CN 202022942997 U CN202022942997 U CN 202022942997U CN 214538238 U CN214538238 U CN 214538238U
Authority
CN
China
Prior art keywords
transformer substation
detector
raise dust
display screen
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022942997.6U
Other languages
Chinese (zh)
Inventor
杨振伟
袁朝阳
李晓斌
饶望
李可彪
张升
段小涛
熊向芝
魏磊
连志鹏
刘冲
谢翔
佟志刚
熊薏
尹慧阳
夏亮
张蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiujiang Power Supply Branch Of State Grid Jiangxi Electric Power Co ltd
State Grid Corp of China SGCC
Original Assignee
Jiujiang Power Supply Branch Of State Grid Jiangxi Electric Power Co ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiujiang Power Supply Branch Of State Grid Jiangxi Electric Power Co ltd, State Grid Corp of China SGCC filed Critical Jiujiang Power Supply Branch Of State Grid Jiangxi Electric Power Co ltd
Priority to CN202022942997.6U priority Critical patent/CN214538238U/en
Application granted granted Critical
Publication of CN214538238U publication Critical patent/CN214538238U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model discloses a raise dust noise monitoring equipment for transformer substation intelligent building site, which comprises a base, wherein a support column is fixedly arranged at the center of the top of the base, and a plurality of positioning holes are arranged at the middle part of the front side of the support column, the raise dust noise monitoring equipment for transformer substation intelligent building site has the advantages that the raise dust noise is integrally detected, the occupied area is small, the voltage and the current of the transformer substation are constantly changed, the installation of a battery can ensure the transformer not to influence the equipment to detect at the same time, the installation of the protection plate can prevent dust and moisture and protect the display screen, the service life of the display screen is prolonged, the bottom parts at the two sides of a monitoring box are fixedly provided with balance plates, the installation of a protection angle can separate the generated radiation interference to ensure that the detection result is more accurate, the arrangement of a reinforcing plate can ensure that the installation between the base and the support column is more stable and firm, and the arrangement of a ring is taken out, the user of being convenient for takes the support column and installs fixedly.

Description

A raise dust noise monitoring facilities for transformer substation wisdom building site
Technical Field
The utility model relates to a transformer substation's wisdom building site field specifically is a raise dust noise monitoring equipment for transformer substation's wisdom building site.
Background
The intelligent construction site is a brand-new engineering full life cycle management idea, and is characterized in that an informatization means is applied, engineering projects are accurately designed and simulated through a three-dimensional design platform, construction process management is surrounded, a construction project informatization ecological circle with interconnection cooperation, intelligent production and scientific management is established, data mining and analysis are carried out on the data and engineering information acquired by the Internet of things in a virtual reality environment, process trend prediction and expert preplan are provided, visual intelligent management of engineering construction is achieved, engineering management informatization level is improved, green construction and ecological construction are gradually achieved, and various monitoring devices can be used for monitoring dust noise and the like in the intelligent construction site.
Present noise monitoring equipment and raise dust monitoring facilities separately monitor, increase the area of monitoring facilities totality, because raise dust monitoring time measuring can produce the noise, the interference noise monitors for the numerical value of monitoring is inaccurate, and the voltage current in the wisdom building site of transformer substation changes constantly and produces the radiation interference easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a raise dust noise monitoring equipment for transformer substation's wisdom building site to solve current noise monitoring equipment and raise dust monitoring equipment separately and monitor among the above-mentioned background art, increase the area of monitoring facilities totality, because raise dust monitoring time measuring can produce the noise, the interference noise monitors, makes the numerical value of monitoring inaccurate, and the voltage current in the transformer substation wisdom building site changes the problem that produces the radiation interference easily constantly.
In order to achieve the above object, the utility model provides a following technical scheme: a dust emission noise monitoring device for a transformer substation intelligent construction site comprises a base, wherein a support column is fixedly installed at the center of the top of the base, a plurality of positioning holes are formed in the middle of the front of the support column, fixing strips are fixedly installed in the middle of the top of the support column in a clamping mode, four fixing strips are fixedly connected with the two ends of the back of a display screen and the two ends of the back of a monitoring box respectively through two fixing bolts, the monitoring box is arranged at the top of the display screen, a dust emission monitor and a noise detector are fixedly installed on one side of the inner wall of the monitoring box from top to bottom in sequence, an anti-interference device and a noise information converter are fixedly installed on the other side of the inner wall of the monitoring box from top to bottom in sequence, a processor is fixedly installed at the center of the bottom of the inner wall of the monitoring box, and the dust emission monitor, the noise detector, the display screen, the anti-interference device and the noise information converter are all electrically connected with the processor, the switch is fixedly arranged in the middle of the back of the base.
As an optimal technical scheme of the utility model, the equal fixed mounting in top of monitoring case both sides has the workstation, one of them the top fixed mounting of workstation has wind direction detector, another the top fixed mounting of workstation has wind speed detector, the both ends difference fixed mounting at monitoring case top has thermodetector and moisture detector, wind direction detector, wind speed detector, thermodetector and moisture detector all with treater electric connection, the battery jar has been seted up to the positive bottom of support column, the inside fixed mounting of battery jar has the battery, one side fixed mounting of battery jar has the baffle, the treater passes through switch and external power supply and battery electric connection.
As a preferred technical scheme of the utility model, the front of display screen is fixed and is provided with the horizontal branch parting line of a plurality of and the vertical branch parting line of a plurality of, the positive avris of display screen all has the protection shield through clamping bolt fixed mounting.
As a preferred technical scheme of the utility model, the equal fixed mounting in four sides of base and support column junction has the gusset plate, the bottom cover in the support column outside is equipped with takes the ring, a plurality of louvre has all been seted up at the both ends of display screen back bottom and the both ends of monitoring case back bottom.
As a preferred technical scheme of the utility model, the equal fixed mounting in corner of monitoring incasement wall has the angle of protection, four the equal fixed mounting in inside of angle of protection has the copper mesh, the equal fixed mounting in bottom of monitoring case both sides has the balance plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the raised dust noise is integrally detected, the occupied area is small, the voltage and the current of the transformer substation are changed all the time, the detection of the equipment is not influenced while the transformer substation is carried out due to the installation of the battery, the display screen is protected from dust and moisture by the installation of the protection board, and the service life of the display screen is prolonged;
2. the equal fixed mounting in bottom of monitoring case both sides has the balance plate, and the installation of angle of protection is carried out the separation to the radiation interference who produces and is ensured that the testing result is comparatively accurate, and the setting of gusset plate makes the installation between base and the support column comparatively stable firm, takes the setting of ring, and convenient to use person takes the support column to install fixedly.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a rear view of the present invention;
fig. 3 is a schematic structural diagram of the monitoring box of the present invention.
In the figure: 1. a base; 2. a reinforcing plate; 3. a support pillar; 4. a baffle plate; 5. a battery case; 6. positioning holes; 7. clamping the bolt; 8. a protection plate; 9. a display screen; 10. a longitudinal separation line; 11. a transverse parting line; 12. a monitoring box; 13. a balance plate; 14. a work table; 15. a wind direction detector; 16. a wind speed detector; 17. a temperature detector; 18. a moisture detector; 19. a fixing strip; 20. fixing the bolt; 21. taking the ring; 22. a protection angle; 23. a dust monitor; 24. a noise detector; 25. an anti-jamming device; 26. a noise information converter; 27. a processor; 28. a switch; 29. a battery.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-3, the utility model provides a raise dust noise monitoring facilities for transformer substation wisdom building site, including base 1, the central fixed mounting at base 1 top has support column 3, a plurality of locating hole 6 has been seted up at the positive middle part of support column 3, the equal block in middle part and the top of support column 3 installs fixed strip 19, four fixed strips 19 are respectively through two fixing bolt 20 and the both ends at the display screen 9 back and the both ends fixed connection at the monitoring case 12 back, monitoring case 12 sets up and the top of display screen 9, one side from the top down of monitoring case 12 inner wall is fixed mounting in proper order has raise dust monitor 23 and noise detector 24, the opposite side from the top down of monitoring case 12 inner wall is fixed mounting in proper order has interference killer 25 and noise information converter 26, the central fixed mounting of monitoring case 12 inner wall bottom has treater 27, raise dust monitor 23, Noise detector 24, display screen 9, interference killing feature 25 and noise information converter 26 all with treater 27 electric connection, the middle part fixed mounting at the base 1 back has switch 28, noise information converter 26 demonstrates the noise information that detects on display screen 9 through the conversion, interference killing feature 25 shields the noise that each detector produced, noise detector 24 detects the noise, raise dust monitor 23 detects the raise dust, the model of noise information converter 26 is AD7520, the model of interference killing feature 25 is YCJK240, the model of display screen 9 is P2.0, the model of raise dust monitor 23 is HZ-YC6000S, the model of noise detector 24 is BSWA 308.
Preferably, the top of both sides of the monitoring box 12 is fixedly provided with a workbench 14, the top of one workbench 14 is fixedly provided with a wind direction detector 15, the top of the other workbench 14 is fixedly provided with a wind speed detector 16, both ends of the top of the monitoring box 12 are respectively fixedly provided with a temperature detector 17 and a humidity detector 18, the wind direction detector 15, the wind speed detector 16, the temperature detector 17 and the humidity detector 18 are electrically connected with a processor 27, the bottom of the front surface of the supporting column 3 is provided with a battery jar 5, the inside of the battery jar 5 is fixedly provided with a battery 29, one side of the battery jar 5 is fixedly provided with a baffle 4, the processor 27 is electrically connected with an external power supply and the battery 29 through a switch 28, the temperature detector 17 detects temperature, the humidity detector 18 detects humidity of the transformer substation, the wind direction detector 15 detects wind direction, and the wind speed detector 16 detects wind speed, the model of the wind speed detector 16 is BN-FSFX23, the model of the wind direction detector 15 is AS15-WS10, the model of the humidity detector 18 is YRF-0063, the model of the temperature detector 17 is PT100, and AS the voltage and the current of the transformer substation are changed at any moment, the installation of the battery 29 enables the transformer substation to be carried out without influencing the detection of the equipment.
Preferably, a plurality of transverse separation lines 11 and a plurality of longitudinal separation lines 10 are fixedly arranged on the front side of the display screen 9, a protection plate 8 is fixedly arranged on the side of the front side of the display screen 9 through a clamping bolt 7, the protection plate 8 is arranged to protect the display screen 9 from dust and moisture, and the service life of the display screen 9 is prolonged.
Preferably, the equal fixed mounting in four sides of base 1 and 3 junctions of support column has gusset plate 2, and the bottom cover in the 3 outsides of support column is equipped with takes ring 21, and a plurality of louvre has all been seted up at the both ends of 9 back bottoms of display screen and the both ends of monitoring case 12 back bottoms, and the setting of gusset plate 2 makes the installation comparatively stable firm between base 1 and the support column 3, takes ring 21's setting, and convenient to use person takes support column 3 to install fixedly.
Preferably, the equal fixed mounting in corner of monitoring case 12 inner wall has protective angle 22, and the equal fixed mounting in inside of four protective angles 22 has the copper mesh, and the equal fixed mounting in bottom of monitoring case 12 both sides has balance plate 13, and the installation of protective angle 22 is carried out the separation to the radiation interference who produces and is ensured that the testing result is comparatively accurate.
When in use, the utility model relates to a raise dust noise monitoring equipment for transformer substation wisdom building site, noise information converter 26 shows the noise information that detects on display screen 9 through the conversion, interference killing feature 25 shields the noise that each detector produced, noise detector 24 detects the noise, raise dust monitor 23 detects the raise dust, thermodetector 17 detects the temperature, thermodetector 18 detects the humidity of transformer substation, wind direction detector 15 detects the wind direction, wind speed detector 16 detects the wind speed, because the voltage electric current of transformer substation constantly changes, the installation of battery 29 makes the transformer do not influence equipment itself to detect, the installation of protection shield 8 carries out dustproof and dampproof protection to display screen 9, the life of display screen 9 is prolonged, the bottom of monitoring box 12 both sides is all fixed mounting has balance plate 13, the installation of angle of protection 22 carries out the separation to the radiation interference who produces and ensures that the testing result is comparatively accurate, and the setting up of gusset plate 2 makes the installation comparatively stable firm between base 1 and the support column 3, takes the setting of ring 21, and convenient to use person takes support column 3 to install fixedly.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a raise dust noise monitoring facilities for transformer substation's wisdom building site, includes base (1), its characterized in that: a supporting column (3) is fixedly installed at the center of the top of the base (1), a plurality of positioning holes (6) are formed in the middle of the front face of the supporting column (3), fixing strips (19) are fixedly installed in the middle of the top of the supporting column (3) in a clamped mode, the four fixing strips (19) are fixedly connected with the two ends of the back face of the display screen (9) and the two ends of the back face of the monitoring box (12) respectively through two fixing bolts (20), the monitoring box (12) is arranged at the top of the display screen (9), a dust raising monitor (23) and a noise detector (24) are fixedly installed on one side of the inner wall of the monitoring box (12) from top to bottom in sequence, an anti-jamming device (25) and a noise information converter (26) are fixedly installed on the other side of the inner wall of the monitoring box (12) from top to bottom in sequence, a processor (27) is fixedly installed at the center of the bottom of the inner wall of the monitoring box (12), raise dust monitor (23), noise detector (24), display screen (9), anti-jamming ware (25) and noise information converter (26) all with treater (27) electric connection, the middle part fixed mounting at the base (1) back has switch (28).
2. A raise dust noise monitoring facilities for transformer substation wisdom building site according to claim 1 characterized in that: the tops of two sides of the monitoring box (12) are fixedly provided with work tables (14), the top of one work table (14) is fixedly provided with a wind direction detector (15), the top of the other work table (14) is fixedly provided with a wind speed detector (16), a temperature detector (17) and a humidity detector (18) are respectively and fixedly arranged at two ends of the top of the monitoring box (12), the wind direction detector (15), the wind speed detector (16), the temperature detector (17) and the humidity detector (18) are all electrically connected with the processor (27), a battery jar (5) is arranged at the bottom of the front surface of the supporting column (3), a battery (29) is fixedly arranged inside the battery jar (5), one side of the battery jar (5) is fixedly provided with a baffle (4), and the processor (27) is electrically connected with an external power supply and a battery (29) through a switch (28).
3. A raise dust noise monitoring facilities for transformer substation wisdom building site according to claim 1 characterized in that: the front of the display screen (9) is fixedly provided with a plurality of transverse separation lines (11) and a plurality of longitudinal separation lines (10), and the side of the front of the display screen (9) is fixedly provided with a protection plate (8) through a clamping bolt (7).
4. A raise dust noise monitoring facilities for transformer substation wisdom building site according to claim 1 characterized in that: all fixed mounting have gusset plate (2) on four sides of base (1) and support column (3) junction, the bottom cover in support column (3) outside is equipped with takes ring (21), a plurality of louvre has all been seted up at the both ends of display screen (9) back bottom and the both ends of monitoring box (12) back bottom.
5. A raise dust noise monitoring facilities for transformer substation wisdom building site according to claim 1 characterized in that: all fixed mounting have angle of protection (22) four the equal fixed mounting in inside of angle of protection (22) monitors the corner of case (12) inner wall has copper mesh, the equal fixed mounting in bottom of monitoring case (12) both sides has balance plate (13).
CN202022942997.6U 2020-12-11 2020-12-11 A raise dust noise monitoring facilities for transformer substation wisdom building site Expired - Fee Related CN214538238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022942997.6U CN214538238U (en) 2020-12-11 2020-12-11 A raise dust noise monitoring facilities for transformer substation wisdom building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022942997.6U CN214538238U (en) 2020-12-11 2020-12-11 A raise dust noise monitoring facilities for transformer substation wisdom building site

Publications (1)

Publication Number Publication Date
CN214538238U true CN214538238U (en) 2021-10-29

Family

ID=78291222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022942997.6U Expired - Fee Related CN214538238U (en) 2020-12-11 2020-12-11 A raise dust noise monitoring facilities for transformer substation wisdom building site

Country Status (1)

Country Link
CN (1) CN214538238U (en)

Similar Documents

Publication Publication Date Title
CN214538238U (en) A raise dust noise monitoring facilities for transformer substation wisdom building site
CN205941801U (en) APD automatic test equipment
CN210720626U (en) Power line fault detection device
CN105654823B (en) Pull cabinet style power marketing actual training device
CN205808987U (en) Air detection instrument
CN212364371U (en) Optical fiber current sensor measuring instrument case
CN210864003U (en) Electric leakage inspection device for network equipment room
CN216134183U (en) Electric appliance cabinet with dampproofing function
CN209372974U (en) A kind of screened room of draw and insert-type more switching test system
CN213181678U (en) Three-phase track instrument with higher safety protection performance
CN210983736U (en) Information acquisition system of centrally installed switchgear
CN210982571U (en) Novel meter box
CN213067730U (en) Comprehensive management equipment for atmospheric environment monitoring and treatment
CN110720763A (en) Food and beverage class data information display device for multidata analysis
CN211206412U (en) Fixing device for analyzer
CN218301014U (en) City underground cable connects on-line monitoring device
CN213545604U (en) Intelligent monitoring practical training system of flexible production line
CN213880741U (en) Accurate refrigerating plant of communication equipment
CN212721560U (en) Power battery pack detection platform
CN218441364U (en) Construction engineering construction detection device
CN204241680U (en) A kind of multifunctional electric energy quality testing platform
CN212254004U (en) Automatic height measuring mechanism for extending arm
CN211979499U (en) Test system of dust catcher fan controller
CN218734355U (en) Avionics machine-mounted computer signal detection equipment
CN218070761U (en) Fixing device is used in switch board production and processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211029

CF01 Termination of patent right due to non-payment of annual fee