CN214535511U - Geotechnical engineering stabilizes real-time early warning device - Google Patents
Geotechnical engineering stabilizes real-time early warning device Download PDFInfo
- Publication number
- CN214535511U CN214535511U CN202120312293.2U CN202120312293U CN214535511U CN 214535511 U CN214535511 U CN 214535511U CN 202120312293 U CN202120312293 U CN 202120312293U CN 214535511 U CN214535511 U CN 214535511U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- geotechnical engineering
- early warning
- bottom plate
- real
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Signs Or Road Markings (AREA)
Abstract
The utility model discloses a real-time early warning device is stabilized to geotechnical engineering, comprising a base plate, the bottom fixedly connected with universal wheel of bottom plate, the top fixedly connected with stand of bottom plate, the top fixedly connected with mount of stand, the surface of bottom plate is provided with strutting arrangement, the utility model relates to a geotechnical engineering technical field. This real-time early warning device is stabilized to geotechnical engineering, reached whole convenient to remove, set up strutting arrangement, the staff of being convenient for supports wholly and consolidates, improve the overall installation stability, set up damping device, make the in-process of moving as a whole, the display has certain shock attenuation performance, improve equipment life, set up the sleeve in the both sides of mount, be convenient for be connected soil pressure gauge wire and main part, utilize fastening bolt to consolidate the wire, improve wire connection stability, prevent to drop, be convenient for stabilize real-time early warning to geotechnical engineering, satisfy user demand's purpose.
Description
Technical Field
The utility model relates to a geotechnical engineering field, more specifically say, relate to a real-time early warning device is stabilized to geotechnical engineering.
Background
Geotechnical engineering is a new technical system established in civil engineering practice in 60's of the 20 th century in the countries of the Europe and the America. Geotechnical engineering is to solve the problems of rock and soil engineering, including foundation and foundation, slope, underground engineering and the like, and is used as a research object of the geotechnical engineering. In the geotechnical engineering construction process, a soil pressure gauge needs to be installed on soil bodies inside structures such as earth and rockfill dams, earth dikes, side slopes and roadbed, the pressure stress of the soil bodies inside the structures such as the earth and rockfill dams, the earth dikes, the side slopes and the roadbed is measured for a long time, and early warning is carried out through an early warning device. At present, current geotechnical engineering stabilizes real-time early warning device, the staff of being not convenient for removes the use, and installation stability is poor, and the staff of being not convenient for carries out quick installation, is not convenient for carry out the shock attenuation to equipment, influences equipment life, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Aiming at the problems that the prior geotechnical engineering stable real-time early warning device in the prior art has a single structure, is inconvenient for workers to move and use, has poor installation stability, is inconvenient for workers to quickly install, is inconvenient for damping equipment, influences the service life of the equipment and cannot meet the use requirement, the utility model aims to provide a geotechnical engineering stable real-time early warning device which can realize that a bottom plate, a universal wheel, a stand column, a fixing frame, a supporting device, a main body, a binding post, a sleeve, a fastening bolt, a damping device, a display and an alarm form a whole body, is convenient to move integrally, is provided with a supporting device, is convenient for the workers to support and reinforce the whole body, improves the overall installation stability, is provided with the damping device, ensures that the display has certain damping performance in the integral moving process, and prolongs the service life of the equipment, set up the sleeve in the both sides of mount, be convenient for be connected soil pressure gauge wire and main part, utilize fastening bolt to consolidate the wire, improve wire connection stability, prevent to drop, be convenient for stabilize real-time early warning to geotechnical engineering, satisfy the user demand.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
The utility model provides a real-time early warning device is stabilized in geotechnical engineering, comprises a base plate, the bottom fixedly connected with universal wheel of bottom plate, the top fixedly connected with stand of bottom plate, the top fixedly connected with mount of stand, the surface of bottom plate is provided with strutting arrangement, the inner wall bottom fixedly connected with main part of mount, the both sides fixedly connected with terminal of main part, the outside fixedly connected with sleeve of mount, the sleeve is corresponding with the terminal, telescopic surface is provided with fastening bolt, the inner wall top fixedly connected with damping device of mount, the mount passes through damping device fixedly connected with display, the top fixedly connected with siren of mount.
Preferably, strutting arrangement includes the fixed block, fixed block and stand fixed connection, the fixed block rotates and is connected with the rotation lead screw, the bottom and the bottom plate that rotate the lead screw rotate and are connected, the top fixedly connected with rolling disc that rotates the lead screw, it has the lead screw slider to rotate lead screw threaded connection, lead screw slider and stand sliding connection, the bottom fixedly connected with kelly of lead screw slider, kelly and bottom plate sliding connection.
Preferably, damping device includes spacing frame, the inner wall top fixed connection of spacing frame and mount, spacing frame sliding connection has the slide bar, the top fixedly connected with baffle of slide bar, the bottom fixedly connected with supporting spring of baffle, supporting spring cup joints with the slide bar, the baffle is connected with spacing frame inner wall through supporting spring, the bottom fixedly connected with mounting panel of slide bar, display and mounting panel fixed connection.
Preferably, the bottom plate sliding connection has the balancing weight, the top fixedly connected with haulage rope of balancing weight, the top fixedly connected with connecting bolt of haulage rope, the bottom fixedly connected with installation piece of mount, connecting bolt and installation piece threaded connection.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of: the device comprises a bottom plate, universal wheels, a stand column, a fixing frame, a supporting device, a main body, a binding post, a sleeve, a fastening bolt, a damping device, a display and an alarm, wherein the display and the alarm are integrated into a whole body, the whole body is convenient to move, the supporting device is arranged, workers can conveniently support and reinforce the whole body, the whole installation stability is improved, the damping device is arranged, the display has certain damping performance in the whole moving process, the service life of equipment is prolonged, the sleeve is arranged on two sides of the fixing frame, a soil pressure gauge lead is convenient to be connected with the main body, the lead is reinforced by the fastening bolt, the lead connection stability is improved, the lead is prevented from falling off, geotechnical engineering can be conveniently stabilized and early warned in real time, the supporting device is arranged, when the whole body moves to a designated position, a rotating disc is rotated to drive a rotating lead screw to rotate, a lead screw sliding block is driven to move, and the lead screw sliding block slides with the stand column, the motion stability of the screw rod sliding block is improved, the screw rod sliding block drives the clamping rod to move downwards to clamp the ground, the whole installation stability is further improved, the shock absorption device is arranged, the supporting spring supports the baffle plate to drive the baffle plate to move upwards, the baffle plate drives the mounting plate to move upwards through the sliding rod to further drive the display to move upwards, the display has certain shock absorption performance in the whole moving process, the service life of equipment is prolonged, when the whole body is used, the limitation of the connecting bolt and the mounting block is removed, the balancing weight moves downwards under the self gravity to extrude the ground, the whole gravity center is reduced, the whole stability is further improved, the operation of a worker is facilitated, the bottom plate, the universal wheel, the upright post, the fixing frame, the supporting device, the main body, the binding post, the sleeve, the fastening bolt, the shock absorption device, the display and the alarm are integrated, wholly be convenient for remove, set up strutting arrangement, the staff of being convenient for supports wholly to consolidate, improve the overall installation stability, set up damping device, make the in-process of moving as a whole, the display has certain damping performance, improve equipment life, both sides at the mount set up the sleeve, be convenient for be connected soil pressure gauge wire and main part, utilize fastening bolt to consolidate the wire, improve wire connection stability, prevent to drop, be convenient for stabilize real-time early warning to geotechnical engineering, satisfy user demand's purpose.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the internal structure of the fixing frame of the present invention;
fig. 3 is a schematic view of a part of an enlarged structure of fig. 1 according to the present invention.
The reference numbers in the figures illustrate:
1. a base plate; 2. a universal wheel; 3. a column; 4. a fixed mount; 5. a support device; 51. a fixed block; 52. rotating the screw rod; 53. rotating the disc; 54. a lead screw slider; 55. a clamping rod; 6. a main body; 7. a binding post; 8. a sleeve; 9. fastening a bolt; 10. a damping device; 101. a limiting frame; 102. a slide bar; 103. a baffle plate; 104. a support spring; 105. mounting a plate; 11. a display; 12. an alarm; 13. a balancing weight; 14. a hauling rope; 15. a connecting bolt; 16. and (7) installing the block.
Detailed Description
The drawings in the embodiments of the present invention will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the present invention; rather than all embodiments. Based on the embodiment of the utility model; all other embodiments obtained by a person skilled in the art without making any inventive step; all belong to the protection scope of the utility model.
Example 1:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a real-time early warning device is stabilized in geotechnical engineering, comprising a base plate 1, the bottom fixedly connected with universal wheel 2 of bottom plate 1, the top fixedly connected with stand 3 of bottom plate 1, the top fixedly connected with mount 4 of stand 3, the surface of bottom plate 1 is provided with strutting arrangement 5, the inner wall bottom fixedly connected with main part 6 of mount 4, the both sides fixedly connected with terminal 7 of main part 6, the outside fixedly connected with sleeve 8 of mount 4, sleeve 8 is corresponding with terminal 7, sleeve 8's surface is provided with fastening bolt 9, the inner wall top fixedly connected with damping device 10 of mount 4, mount 4 passes through damping device 10 fixedly connected with display 11, the top fixedly connected with siren 12 of mount 4. Bottom plate 1, the universal wheel 2, the stand 3, mount 4, strutting arrangement 5, main part 6, terminal 7, sleeve 8, fastening bolt 9, damping device 10, display 11 constitutes a whole with siren 12, wholly be convenient for remove, set up strutting arrangement 5, the staff of being convenient for supports the reinforcement to whole, improve the integral erection stability, set up damping device 10, make the in-process of moving wholly, display 11 has certain damping performance, improve equipment life, set up sleeve 8 in mount 4's both sides, be convenient for be connected soil pressure gauge wire and main part 6, utilize fastening bolt 9 to consolidate the wire, improve wire connection stability, prevent to drop, be convenient for stabilize real-time early warning to geotechnical engineering.
Example 2:
referring to fig. 3, a geotechnical engineering stability real-time warning device is substantially the same as that in embodiment 1, and further, the supporting device 5 includes a fixed block 51, the fixed block 51 is fixedly connected with the column 3, the fixed block 51 is rotatably connected with a rotating screw 52, the bottom of the rotating screw 52 is rotatably connected with the bottom plate 1, the top of the rotating screw 52 is fixedly connected with a rotating disc 53, the rotating screw 52 is in threaded connection with a screw slider 54, the screw slider 54 is slidably connected with the column 3, the bottom of the screw slider 54 is fixedly connected with a clamping rod 55, and the clamping rod 55 is slidably connected with the bottom plate 1. Set up strutting arrangement 5, when the bulk movement arrives the assigned position, rotate rolling disc 53, drive and rotate lead screw 52 and rotate, drive lead screw slider 54 motion, lead screw slider 54 slides with stand 3, improves lead screw slider 54 motion stability, and lead screw slider 54 drives kelly 55 downstream, carries out the joint to ground, and then improves overall installation stability.
Example 3:
referring to fig. 2, a geotechnical engineering stabilization real-time early warning device is substantially the same as that in embodiment 1, and further, the damping device 10 includes a limiting frame 101, the limiting frame 101 is fixedly connected to the top of the inner wall of the fixing frame 4, the limiting frame 101 is slidably connected to a sliding rod 102, the top of the sliding rod 102 is fixedly connected to a baffle 103, the bottom of the baffle 103 is fixedly connected to a supporting spring 104, the supporting spring 104 is sleeved to the sliding rod 102, the baffle 103 is connected to the inner wall of the limiting frame 101 through the supporting spring 104, the bottom of the sliding rod 102 is fixedly connected to a mounting plate 105, and the display 11 is fixedly connected to the mounting plate 105. Set up damping device 10, supporting spring 104 supports baffle 103, drives baffle 103 upward movement, and baffle 103 passes through slide bar 102, drives mounting panel 105 upward movement, and then drives display 11 upward movement for the in-process of moving as a whole, display 11 have certain shock attenuation performance, improve equipment life.
Example 4:
referring to fig. 1, a geotechnical engineering stabilization real-time early warning device is substantially the same as that in embodiment 1, further, a bottom plate 1 is slidably connected with a balancing weight 13, a traction rope 14 is fixedly connected to the top of the balancing weight 13, a connecting bolt 15 is fixedly connected to the top of the traction rope 14, a mounting block 16 is fixedly connected to the bottom of a fixing frame 4, and the connecting bolt 15 is in threaded connection with the mounting block 16. When whole when using, remove connecting bolt 15 and installation piece 16's restriction, balancing weight 13 receives self gravity downstream, extrudees ground, reduces whole focus, improves overall stability then, makes things convenient for the staff to operate.
The above; is only a preferred embodiment of the present invention; however, the scope of protection of the present invention is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; according to the technical scheme of the utility model and the improvement conception, equivalent substitution or change is carried out; are all covered by the protection scope of the utility model.
Claims (4)
1. The utility model provides a real-time early warning device is stabilized in geotechnical engineering, includes bottom plate (1), its characterized in that: the bottom of the bottom plate (1) is fixedly connected with a universal wheel (2), the top of the bottom plate (1) is fixedly connected with an upright post (3), the top of the upright post (3) is fixedly connected with a fixed frame (4), the surface of the bottom plate (1) is provided with a supporting device (5), the bottom of the inner wall of the fixing frame (4) is fixedly connected with a main body (6), two sides of the main body (6) are fixedly connected with binding posts (7), the outside of the fixed mount (4) is fixedly connected with a sleeve (8), the sleeve (8) corresponds to the binding post (7), the surface of the sleeve (8) is provided with a fastening bolt (9), the top of the inner wall of the fixed frame (4) is fixedly connected with a damping device (10), the fixing frame (4) is fixedly connected with a display (11) through a damping device (10), and the top of the fixing frame (4) is fixedly connected with an alarm (12).
2. The geotechnical engineering stabilization real-time early warning device according to claim 1, characterized in that: support arrangement (5) include fixed block (51), fixed block (51) and stand (3) fixed connection, fixed block (51) are rotated and are connected with rotation lead screw (52), the bottom and bottom plate (1) of rotating lead screw (52) are rotated and are connected, the top fixedly connected with rolling disc (53) of rotating lead screw (52), it has lead screw slider (54) to rotate lead screw (52) threaded connection, lead screw slider (54) and stand (3) sliding connection, the bottom fixedly connected with kelly (55) of lead screw slider (54), kelly (55) and bottom plate (1) sliding connection.
3. The geotechnical engineering stabilization real-time early warning device according to claim 1, characterized in that: damping device (10) are including spacing frame (101), the inner wall top fixed connection of spacing frame (101) and mount (4), spacing frame (101) sliding connection has slide bar (102), top fixedly connected with baffle (103) of slide bar (102), the bottom fixedly connected with supporting spring (104) of baffle (103), supporting spring (104) cup joint with slide bar (102), baffle (103) are connected with spacing frame (101) inner wall through supporting spring (104), the bottom fixedly connected with mounting panel (105) of slide bar (102), display (11) and mounting panel (105) fixed connection.
4. The geotechnical engineering stabilization real-time early warning device according to claim 1, characterized in that: the base plate (1) sliding connection has balancing weight (13), the top fixedly connected with haulage rope (14) of balancing weight (13), the top fixedly connected with connecting bolt (15) of haulage rope (14), the bottom fixedly connected with installation piece (16) of mount (4), connecting bolt (15) and installation piece (16) threaded connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120312293.2U CN214535511U (en) | 2021-02-04 | 2021-02-04 | Geotechnical engineering stabilizes real-time early warning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120312293.2U CN214535511U (en) | 2021-02-04 | 2021-02-04 | Geotechnical engineering stabilizes real-time early warning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214535511U true CN214535511U (en) | 2021-10-29 |
Family
ID=78233627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120312293.2U Active CN214535511U (en) | 2021-02-04 | 2021-02-04 | Geotechnical engineering stabilizes real-time early warning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214535511U (en) |
-
2021
- 2021-02-04 CN CN202120312293.2U patent/CN214535511U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210561849U (en) | Height limiting alarm device for highway engineering | |
CN111140169A (en) | Method for assembling small-sized drilling equipment for climbing slope | |
CN210400615U (en) | Building site construction noise detection device | |
CN214535511U (en) | Geotechnical engineering stabilizes real-time early warning device | |
CN218439407U (en) | Coal mine tunneling and supporting device | |
CN213457380U (en) | Slope monitoring data acquisition device based on Beidou satellite positioning | |
CN214787425U (en) | Tunnel intelligent construction trolley capable of automatically lifting | |
CN213061751U (en) | Highway bridge and culvert supporting structure for bridge engineering | |
CN109083035B (en) | Automatically extensible road construction indicating plate applicable to sand blown areas | |
CN209243524U (en) | Reference line Auxiliary hanging rack applied to asphalt-spreader construction | |
CN215107941U (en) | Water conservancy construction safety device | |
CN208220256U (en) | A kind of civil engineering foundation pile | |
CN217501706U (en) | Roadway support device with solidified top | |
CN218543842U (en) | Video water level flow monitoring device convenient to dismouting | |
CN214124666U (en) | Support frame for civil engineering construction | |
CN220013698U (en) | Foundation pit supporting device with adjustable | |
CN213956448U (en) | Mapping device for geotechnical engineering design | |
CN109559494A (en) | A kind of monitoring of building intelligent and automatic alarm system | |
CN214096274U (en) | Water level gauge for hydraulic engineering management | |
CN219908417U (en) | Roadbed edge protection equipment during pavement construction | |
CN215522718U (en) | Reconnaissance device is used in public road bridge roof beam construction | |
CN211649685U (en) | Theodolite for pavement construction | |
CN215053025U (en) | Bridge engineering foundation pile construction equipment | |
CN212248186U (en) | Environment-friendly earth rammer for engineering machinery | |
CN221630836U (en) | Pressure-bearing water level monitoring equipment in foundation pit of subway station in water-rich sand layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |