CN214532324U - Municipal works construction bounding wall - Google Patents

Municipal works construction bounding wall Download PDF

Info

Publication number
CN214532324U
CN214532324U CN202120323718.XU CN202120323718U CN214532324U CN 214532324 U CN214532324 U CN 214532324U CN 202120323718 U CN202120323718 U CN 202120323718U CN 214532324 U CN214532324 U CN 214532324U
Authority
CN
China
Prior art keywords
plate body
water supply
water
spray pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120323718.XU
Other languages
Chinese (zh)
Inventor
叶东鹏
郑创雄
黄锴
张晓烽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jian'an Municipal Engineering Co ltd
Original Assignee
Guangdong Jian'an Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jian'an Municipal Engineering Co ltd filed Critical Guangdong Jian'an Municipal Engineering Co ltd
Priority to CN202120323718.XU priority Critical patent/CN214532324U/en
Application granted granted Critical
Publication of CN214532324U publication Critical patent/CN214532324U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model relates to a technical field of construction bounding wall, concretely relates to municipal works building construction bounding wall, its package rubbing board body, the inside water supply channel of having seted up of plate body, the inside fixedly connected with spray pipe of water supply channel, the delivery port of spray pipe are located the plate body top, and delivery port department is connected with the atomizer, and the water supply pipe connection has the water source. According to the water supply device, the water supply channel is arranged in the plate body, the hard water spray pipe is connected in the water supply channel, and the outer side wall of the water spray pipe is fixedly abutted with the inner side wall of the water supply channel, so that the dropping of the water spray pipe is reduced; and the spray pipe is buried underground inside the plate body, so that the messy situation of winding the spray pipe on the plate body is reduced, and the plate body is integrally tidy.

Description

Municipal works construction bounding wall
Technical Field
The application relates to the technical field of construction bounding wall, especially, relate to a municipal works building construction bounding wall.
Background
In order to ensure the personal safety of the masses in urban construction, enclosing plates need to be arranged around a construction position, the construction enclosing plates are an isolating device for isolating a construction area from a safe area, and mainly play a role in informing and prompting, the normal operation of the construction area is ensured by the isolation of the enclosing plates, and the personnel safety of the safe area is also ensured.
Although the surrounding plate isolates the construction area, a large amount of raised dust is generated and can be dissipated to the external environment from the upper part of the surrounding plate in the construction process, so that the environment near the construction site is polluted and pedestrians passing through the environment are influenced. At present, raise dust to city construction department production is mainly handled through the watering, sets up many spray pipes on the bounding wall and sprays. During the connection, often fix the play water end of spray pipe in the top of bounding wall through the pipe clamp, this makes and takes place to drop easily when spraying the operation, causes the job site in a jumble.
SUMMERY OF THE UTILITY MODEL
In order to reduce the spray pipe and drop from the bounding wall, influence the environment of job site, this application provides a municipal works building construction bounding wall.
The application provides a municipal works building construction bounding wall adopts following technical scheme:
the utility model provides a municipal works building construction bounding wall, the package rubbing board body, the inside water supply channel that has seted up of plate body, the inside fixedly connected with stereoplasm spray pipe of water supply channel, the delivery port of spray pipe are located the plate body top, and delivery port department is connected with the atomizer, and the spray pipe is connected with the water source.
By adopting the technical scheme, the water supply channel is arranged in the plate body, the water spray pipe is connected in the water supply channel, and water is sprayed out from the atomizing nozzle at the top of the water spray pipe so as to carry out dust falling treatment on raised dust; the spray pipe is a plastic hard pipe, and the outer side wall of the spray pipe is fixedly abutted with the inner side wall of the water supply channel, so that the falling of the spray pipe is reduced; and the spray pipe is buried underground inside the plate body, so that the messy situation of winding the spray pipe on the plate body is reduced, and the plate body is integrally tidy.
Preferably, the water supply channels are arranged in the plate body, and the water supply channels are uniformly arranged in the plate body at intervals.
Through adopting above-mentioned technical scheme, the plate body is inside to be provided with many water supply channel, can all be used for connecting the spray pipe, also can regard as the lightening hole of plate body, and there are a plurality of atomizer at plate body top promptly when water supply channel connects the spray pipe, increases the area that sprays, increases the dust fall effect of plate body.
Preferably, the bottom of the water spray pipe is communicated with a water supply pipe, the water supply pipe is connected with the water spray pipe through a three-way pipe, and the water supply pipe is connected with a water source.
By adopting the technical scheme, the plurality of water spraying pipes are provided with one water supply pipe for centralized water supply, the condition that each water spraying pipe needs to be communicated with a water source is reduced, and the smoothness of a construction site is kept.
Preferably, the outer side of the plate body is hinged with a water baffle.
By adopting the technical scheme, the water sprayed by the atomizing nozzles at the top of the plate body is blocked by the water baffle, so that the water sprayed from the water spray pipes is prevented from wetting pedestrians passing through the outer side of the coaming; and the water baffle is hinged with the plate body, so that the water baffle can be restored to a vertical state from a water retaining state when the plate body is carried, the space is reduced, and the carrying is convenient.
Preferably, the water baffle is further connected with a fixing piece for fixing the water baffle.
Through adopting above-mentioned technical scheme, the mounting reduces that relative rotation takes place and loses the manger plate effect with the plate body for the breakwater.
Preferably, the mounting includes and is articulated the bracing piece with the breakwater, and the bounding wall is seted up and is supplied the butt groove of bracing piece butt.
Through adopting above-mentioned technical scheme, bracing piece one end is articulated with the breakwater, and one end is fixed the breakwater with the bounding wall butt, convenient operation, and it is simple to implement.
Preferably, the outer side of the coaming is fixedly connected with a warning strip.
Through adopting above-mentioned technical scheme, warning strip plays the effect of warning to the pedestrian and the driving that pass through near from the construction area.
Preferably, still include the spliced pole that splices the plate body, plate body fixed connection piece, the spliced pole is seted up and is supplied the plate body to carry out the inserting groove of pegging graft.
Through adopting above-mentioned technical scheme, the spliced pole is pegged graft with the plate body and then splices the plate body in order to accomplish the isolation to the construction area, convenient construction.
Preferably, the connecting column is provided with a mounting hole for the water supply pipe to pass through.
Through adopting above-mentioned technical scheme, the mounting hole process that the delivery pipe was seted up from the spliced pole reduces because the delivery pipe scatters to ground and causes the damage to the delivery pipe.
Preferably, the bottom of the connecting column is welded with a mounting plate for mounting a movable caster.
Through adopting above-mentioned technical scheme, the mountable activity truckle of mounting panel removes in order to make things convenient for to the bounding wall.
In summary, the present application at least includes the following beneficial technical effects:
1. the water supply channel is arranged in the plate body, the hard spray pipe is connected in the water supply channel, and the outer side wall of the spray pipe is fixedly abutted against the inner side wall of the water supply channel, so that the dropping of the spray pipe is reduced; the spray pipe is embedded in the plate body, so that the messy situation that the plate body is wound by the spray pipe is reduced, and the plate body is integrally smooth and tidy;
2. the water baffle is hinged to the plate body and used for blocking water sprayed out of the water spraying pipe, and the water sprayed out of the water spraying pipe is prevented from wetting pedestrians passing through the outer side of the coaming;
3. through setting up and bounding wall grafting complex support column, realize splicing the bounding wall in order to keep apart the job site, the concatenation is convenient.
Drawings
FIG. 1 is a schematic view of the overall construction of a civil engineering construction enclosure according to the present application;
FIG. 2 is a schematic cross-sectional view of the coaming of the present embodiment along the length direction of the plate body;
fig. 3 is an overall structure schematic diagram of another view of the coaming of the embodiment.
Description of reference numerals: 1. a plate body; 10. a water supply channel; 11. a water spray pipe; 111. an atomizing spray head; 12. a water supply pipe; 13. a water baffle; 131. a support bar; 132. a butt joint groove; 14. a warning strip; 15. connecting blocks; 2. connecting columns; 21. inserting grooves; 22. mounting a plate; 221. a movable caster; 23. and (7) installing holes.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses municipal works building construction bounding wall. Referring to fig. 1, municipal works construction bounding wall includes plate body 1, and vertical water supply channel 10 has been seted up to plate body 1 inside, the inside fixedly connected with stereoplasm spray pipe 11 of water supply channel 10, and water pipe is connected to 11 bottoms of spray pipe, and the delivery port is located plate body 1's top, and water outlet department still is connected with atomizer 111, and water gets into the atomizer 111 blowout of rear delivery port in order to carry out the dust fall and handles from 11 bottoms of spray pipe.
Referring to fig. 1, a plate body 1 is a rectangular plate vertically placed. The rectangular plate is provided with a water supply passage 10 therein. Referring to fig. 2, the water supply passage 10 is a circular through hole formed vertically and downwardly along the top surface of the plate body 1. The water supply passage 10 may serve as a lightening hole of the plate body 1 for connecting the spray pipe 11 while reducing the overall mass of the plate body 1. The water supply channel 10 is provided with 3 water supply pipes 12, and the 3 water supply pipes are evenly distributed along the width direction of the plate body 1 at intervals. The spray pipe 11 is a rigid plastic pipe which is vertically placed. The outer side wall of the spout 11 abuts against the inner side wall of the water supply passage 10. The top of the spray pipe 11 is higher than the top of the plate body 1 and is a water outlet, and the water outlet is connected with an atomizing nozzle 111, and the atomizing nozzle 111 increases the spraying area of water when the water is discharged from the top of the spray pipe 11. The bottom end of the spray pipe 11 is connected with a water supply pipe 12. The water supply pipe 12 is a horizontally placed round pipe, the water supply pipe 12 is communicated with the water spray pipe 11 through a tee pipe, and the water supply pipe 12 is communicated with a water source.
Referring to fig. 3, one side of the plate body 1 away from the construction area is the outer side of the plate body 1. The outer side of the plate body 1 is fixedly connected with a warning strip 14, the warning strip 14 is in a long strip shape, and the length direction is parallel to the width direction of the plate body 1. The warning strip 14 is fixedly adhered to the plate body 1. The outer side of the plate body 1 is also connected with a water baffle 13. The water baffle 13 is a rectangular plate, and the length direction is parallel to the length direction of the plate body 1. One side of the water baffle 13 in the length direction is hinged with the top of the plate body 1. In a natural state, the water baffle 13 is vertically placed. The side surface of the water baffle 13 close to one side of the plate body 1 is connected with a support rod 131. The support rod 131 is elongated. One end of the support rod 131 is hinged with the water baffle 13, and the other end is abutted with the plate body 1. The side surface of the plate body 1 near the water guard 13 is provided with an abutting groove 132 for abutting the supporting rod 131. The support rods 131 are provided with two supports which are distributed on both sides of the water guard 13 in the length direction. The water baffle 13 is rotated, and one end of the support rod 131 is abutted against the plate body 1, so that the water baffle 13 is positioned on one side above the plate body 1 in an inclined state and is inclined upwards from the joint, water sprayed by the atomizing nozzles 111 is blocked, and pedestrians passing through the outer side of the coaming are prevented from being wetted.
Referring to fig. 2 and 3, the civil engineering construction enclosing plate further comprises a connecting column 2 for splicing the plate bodies 1. Specifically, the connecting blocks 15 are fixedly connected to the side faces of two sides of the plate body 1 in the width direction, and the connecting blocks 15 are vertically arranged rectangular blocks. Two connecting blocks 15 are arranged on the side surface of the plate body 1 at intervals. The connecting column 2 is a vertically placed rectangular column. The rectangular column is provided with a splicing groove 21 for splicing the connecting block 15, and the connecting block 15 is inserted into the splicing groove to be spliced with the connecting column 2. The bottom of the connecting column 2 is provided with a mounting hole 23. The mounting hole 23 is a circular through hole penetrating the connection column 2, and the axial direction is parallel to the axial direction of the water supply pipe 12. The water supply pipe 12 penetrates through the mounting hole 23, and damage to the water supply pipe 12 caused by sand and sand friction between the ground and the water supply pipe 12 is reduced. The bottom surface of the connecting column 2 is connected with a mounting plate 22, and the mounting plate 22 is provided with a threaded hole. The threaded hole can be matched with an expansion bolt to fix the connecting column 2 on the ground; the threaded hole can also be used for installing the movable caster 221, and when the plate body 1 needs to be moved, the movable caster 221 passing through the connecting column 2 can be used for moving the plate body 1 and the connecting column 2.
The embodiment of the application provides a municipal works building construction bounding wall's implementation principle does: the water supply channel 10 is arranged in the plate body 1, the hard spray pipe 11 is connected in the water supply channel 10, and the outer side wall of the spray pipe 11 is fixedly abutted with the inner side wall of the water supply channel 10, so that the dropping of the spray pipe 11 is reduced; and spray pipe 11 buries underground in plate body 1 inside, has reduced plate body 1 winding spray pipe 11 mixed and disorderly condition, and plate body 1 is whole neatly and neatly good. And still articulated have breakwater 13 in the plate body 1 outside, breakwater 13 blocks the water that atomizer 111 spun, reduces the influence to passing pedestrian from the bounding wall outside.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a municipal works construction bounding wall, includes plate body (1), its characterized in that: the water supply device is characterized in that a water supply channel (10) is formed in the plate body (1), a hard spray pipe (11) is fixedly connected to the inside of the water supply channel (10), a water outlet of the spray pipe (11) is located at the top of the plate body (1), an atomizing nozzle (111) is connected to the water outlet, and a water source is connected to the spray pipe (11).
2. The municipal engineering construction coaming of claim 1, wherein: the water supply channels (10) are arranged in the plate body (1), and the water supply channels (10) are uniformly arranged in the plate body (1) at intervals.
3. The municipal engineering construction coaming of claim 2, wherein: the bottom of the spray pipe (11) is communicated with a water supply pipe (12), the water supply pipe (12) is connected with the spray pipe (11) through a three-way pipe fitting, and the water supply pipe (12) is connected with a water source.
4. The municipal engineering construction coaming of claim 1, wherein: the outer side of the plate body (1) is hinged with a water baffle (13).
5. The municipal engineering construction coaming of claim 4, wherein: the water baffle (13) is also connected with a fixing piece for fixing the water baffle (13).
6. The municipal engineering construction coaming of claim 5, wherein: the fixing piece comprises a supporting rod (131) hinged with the water baffle (13), and a butt joint groove (132) for the supporting rod (131) to abut against is formed in the plate body (1).
7. The municipal engineering construction coaming of claim 1, wherein: the outer side of the plate body (1) is fixedly connected with a warning strip (14).
8. The municipal engineering construction coaming of claim 1, wherein: still include spliced pole (2) with plate body (1), plate body (1) fixed connection piece (15), spliced groove (21) that supply plate body (1) to carry out the grafting are seted up in spliced pole (2).
9. The municipal engineering construction coaming of claim 8, wherein: the connecting column (2) is provided with a mounting hole (23) for the water supply pipe (12) to pass through.
10. The municipal engineering construction coaming of claim 8, wherein: the bottom of the connecting column (2) is welded with a mounting plate (22) for mounting a movable caster (221).
CN202120323718.XU 2021-02-04 2021-02-04 Municipal works construction bounding wall Active CN214532324U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120323718.XU CN214532324U (en) 2021-02-04 2021-02-04 Municipal works construction bounding wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120323718.XU CN214532324U (en) 2021-02-04 2021-02-04 Municipal works construction bounding wall

Publications (1)

Publication Number Publication Date
CN214532324U true CN214532324U (en) 2021-10-29

Family

ID=78233785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120323718.XU Active CN214532324U (en) 2021-02-04 2021-02-04 Municipal works construction bounding wall

Country Status (1)

Country Link
CN (1) CN214532324U (en)

Similar Documents

Publication Publication Date Title
KR20010076802A (en) Sprinkler for Curing of Tunnel Lining Concrete and Curing Method of Tunnel Lining Concrete for Using the Sprinkler
KR101605239B1 (en) Roads equipped with a filter crusher
CN214532324U (en) Municipal works construction bounding wall
CN113338704B (en) Urban highway environment-friendly construction device and construction method
CN211396893U (en) Guardrail support frame and foundation ditch guardrail with spray function
CN110547180B (en) Mobile spraying and sprinkling device for greening engineering and use method thereof
JP2004316397A (en) Ground improvement method and ground improvement device
CN210114933U (en) Factory building dust collecting equipment
CN210264174U (en) Building safety is with enclosing fender device
CN220267399U (en) Reusable building fence
CN219587357U (en) Dust collection and dust removal surrounding baffle for mortar feeding site
CN219548585U (en) Garden protection guardrail for garden engineering construction
CN209752015U (en) Fire sprinkler for high-rise building construction external scaffold
CN216123617U (en) Multi-angle sprinkler is irrigated in gardens maintenance
CN212021136U (en) Building concrete curing means
CN217746358U (en) Building construction working face sprays heat sink
CN217069295U (en) Garden road construction equipment
CN213038265U (en) Perforated plate guardrail with spray dust removal function
CN218459010U (en) But spray dust fall enclosure
CN210232993U (en) Platform for maintaining four-cable double-jaw grab bucket of gantry crane
CN214660320U (en) Tunnel construction appurtenance's dust removal sprinkler
CN219882800U (en) Concrete prefab water supply installation convenient to change nozzle
CN216497194U (en) Fire control reel of rust resistance ageing resistance
CN212425887U (en) Concrete curing means for construction
CN214886047U (en) Landscape rail guard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant