CN214530217U - Service platform for bridge outside construction - Google Patents

Service platform for bridge outside construction Download PDF

Info

Publication number
CN214530217U
CN214530217U CN202120010545.6U CN202120010545U CN214530217U CN 214530217 U CN214530217 U CN 214530217U CN 202120010545 U CN202120010545 U CN 202120010545U CN 214530217 U CN214530217 U CN 214530217U
Authority
CN
China
Prior art keywords
bridge
hanging
rods
roller bearing
basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120010545.6U
Other languages
Chinese (zh)
Inventor
张召顺
李磊
马海涛
徐浚棋
杨虎子
郭小刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Installation Engineering Co Ltd filed Critical China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority to CN202120010545.6U priority Critical patent/CN214530217U/en
Application granted granted Critical
Publication of CN214530217U publication Critical patent/CN214530217U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a bridge outside construction is used as industry platform relates to bridge construction equipment technical field, including being used for hanging in the basket of the bridge outside, the top of hanging the basket is close to one side in the bridge outside and is connected with L type mounted frame, L type mounted frame is used for the card to locate the bridge the inboard apex angle department that encloses of fender, the position that the horizontal part of L type mounted frame is close to and encloses the fender top is connected with first roller bearing, the position that the vertical part of L type mounted frame is close to and encloses the fender inside wall is connected with second roller bearing and locking plate, the second roller bearing with the locking plate respectively through the telescoping cylinder with L type mounted frame connects, the position that the basket is close to the bridge outside is connected with the third roller bearing, first roller bearing the second roller bearing with the third roller bearing rolls along the length direction who encloses, and the unable removal of basket of solving among the prior art needs workman to hang the basket repeatedly, High working strength and low construction efficiency.

Description

Service platform for bridge outside construction
Technical Field
The utility model belongs to the technical field of the equipment is built to the bridge, specifically provide a bridge outside construction is as industry platform.
Background
After the bridge is cast with fenders on two sides, the outside of the bridge generally needs to be painted and maintained, or communication lines and the like are installed on the outside of the bridge, and a hanging basket located on the outside of the bridge is usually used in the process.
The utility model discloses a hang basket, including the bridge, the L type mounted frame is connected to the top of peg, and the L type mounted frame card is established in the fender internal vertex angle department of enclosing of bridge, and the peg supports and leans on in the bridge outside to this forms the hanging of hanging basket in the bridge outside.
But present string basket has the inconvenient problem of removal usually, and the workman of standing in string basket just needs to climb to the bridge from hanging the basket after carrying out the construction operation of minizone, will hang the basket and lift by crane and move the position, later get into the interior construction operation of hanging the basket, and climbing repeatedly not only brings the potential safety hazard for the workman like this, increases workman working strength, and the efficiency of construction is lower moreover.
Accordingly, there is a need in the art for a bridge outboard construction service platform that addresses the above-mentioned problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a bridge outside construction is as industry platform solves the unable removal of hanging the basket among the prior art and needs the workman to scramble repeatedly and hang the basket, working strength is big, the problem that efficiency of construction is low.
The technical scheme of the utility model is realized like this: the utility model provides a bridge outside construction is as industry platform is including being used for hanging in the basket of hanging in the bridge outside, one side that the top of hanging the basket is close to the bridge outside is connected with L type mounted frame, L type mounted frame is used for the card to locate the bridge enclose the inboard apex angle department that keeps off, the position that the horizontal part of L type mounted frame is close to and encloses the fender top is connected with first roller bearing, the position that the vertical part of L type mounted frame is close to and encloses the fender inside wall is connected with second roller bearing and check plate, the second roller bearing with the check plate respectively through the telescoping cylinder with L type mounted frame is connected, the position that the basket is close to the bridge outside is connected with the third roller bearing, first roller bearing the second roller bearing with the third roller bearing rolls along the length direction who encloses the fender.
The technical effect of the scheme is as follows: when the cradle needs to be moved, the extension of a telescopic cylinder connected with a second roller is controlled, the second roller is enabled to abut against the inner side wall of the enclosure of the bridge, the contraction of the telescopic cylinder connected with the stop plate is controlled, the stop plate is enabled not to contact with the enclosure, at the moment, the whole operation platform is in contact with the bridge through the first roller, the second roller and the third roller, the cradle can be moved only by pushing the operation platform, workers do not need to climb between the cradle and the bridge repeatedly, and the operation platform is safe, reliable and high in construction efficiency; and after moving to suitable position, the telescopic cylinder extension that control and stop plate are connected makes the stop plate support and lean on in enclosing the fender, and the telescopic cylinder that control and second roller bearing are connected shortens, makes the second roller bearing keep away from and encloses the fender inside wall, and the extrusion through the telescopic cylinder makes the stop plate and encloses the fender inside wall and produce great frictional force to stabilize the operation platform in current position, avoid the operation platform to slide, improve operation platform's stability.
In the preferable technical scheme of the service platform for the construction outside the bridge, two stop plates are arranged and symmetrically distributed on two sides of the second roller, and a friction structure is arranged on one side face, close to the enclosure, of the two stop plates.
The technical effect of the scheme is as follows: the holistic stability of work platform is guaranteed through the symmetry setting of structure on the one hand, and on the other hand increases frictional force through increase check plate and the contact area who encloses the fender inside wall and set up friction structure on the check plate, and the work platform can not slide along enclosing the fender when further guaranteeing the workman construction operation in hanging the basket.
In the preferable technical scheme of the work platform for the construction outside the bridge, two hanging rods extending in the vertical direction are arranged on the part, close to the outside of the bridge, of the hanging basket, the tops of the hanging rods are connected with the L-shaped suspension frame, climbing rods are arranged between the two hanging rods at intervals in the vertical direction, the climbing rods extend in the horizontal direction, and the two ends of each climbing rod are fixedly connected with the two hanging rods respectively.
The technical effect of the scheme is as follows: through setting up the climbing pole, make things convenient for the construction workman to climb between bridge and string basket through the climbing pole.
In the preferable technical scheme of the working platform for bridge outside construction, protective enclosing rods are arranged between the two hanging rods at intervals in the vertical direction, and a safety channel allowing people to pass is formed between each protective enclosing rod and each climbing rod.
The technical effect of the scheme is as follows: when the construction worker climbs along the climbing rod, usually towards the bridge outside, construction worker is behind one's back and both sides do not have the shelter from so, if construction worker's foot slippage can be very dangerous from the climbing rod, through setting up the protection surrounding rod, let construction worker pass through from the escape way who forms between protection surrounding rod and the climbing rod, the protection surrounding rod forms the protection in its both sides and behind one's back, has improved operation platform's security.
In the preferable technical scheme of the working platform for bridge outside construction, the two ends of the protective enclosing rods are respectively hinged to the hanging rods, the hanging rods are provided with stop blocks below the ends of the protective enclosing rods to stop the protective enclosing rods from rotating downwards, and the distance between the protective enclosing rods is greater than or equal to the distance between the protective enclosing rods which is parallel to the length of the hanging rods during rotation.
The technical effect of the scheme is as follows: when a constructor enters the hanging basket along a safety channel formed between the protective enclosing rod and the climbing rod, the protective enclosing rod can possibly prevent the constructor from standing for operation, and at the moment, the protective enclosing rod can be turned upwards to be positioned in a position parallel to the hanging rod; when construction worker scrambles, can overturn the protection surrounding rod downwards to leaning on the dog on the peg, avoid the protection surrounding rod transition to rotate downwards, and the escape way that forms between the climbing rod is too little, is not convenient for pass through.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
FIG. 1 is a diagram of the working platform for the outside construction of the bridge of the present invention;
FIG. 2 is a schematic view of an L-shaped suspension frame used as a working platform for bridge outside construction according to the present invention;
fig. 3 is a schematic view of the protective enclosing rod of the utility model used as an operation platform for bridge outside construction.
List of reference numerals: 1. hanging a basket; 11. a hanging rod; 111. a stopper; 12. climbing a pole; 13. a third roller; 2. an L-shaped suspension bracket; 21. a first roller; 22. a second roller; 23. a stopper plate; 231. a friction structure; 24. a telescopic cylinder; 3. a protective fence rod; 4. and (7) fencing.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
It should be noted that in the description of the present invention, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicating the directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
The utility model discloses a bridge outside construction is as concrete embodiment of industry platform:
as shown in figure 1, an operation platform for bridge outside construction comprises a hanging basket 1 hung on the outer side of a bridge, wherein two hanging rods 11 extending along the vertical direction are arranged on the portion, close to the outer side of the bridge, of the hanging basket 1, climbing rods 12 are arranged between the two hanging rods 11 at intervals along the vertical direction, the climbing rods 12 extend along the horizontal direction, two ends of each climbing rod 12 are fixedly connected with the two hanging rods 11 respectively, an L-shaped suspension frame 2 is connected to the tops of the two hanging rods 11, and the L-shaped suspension frame 2 is clamped at the inner top angle of a fence 4 of the bridge.
A first roller 21 is connected below the transverse part of the L-shaped suspension bracket 2, and the first roller 21 abuts against the top of the enclosure 4; the vertical part of the L-shaped suspension frame 2 is connected with a second roller 22 and a stop plate 23 at the position close to the inner side wall of the enclosure 4, the second roller 22 and the stop plate 23 are respectively connected with the L-shaped suspension frame 2 through a telescopic cylinder 24, when the cradle 1 needs to be moved, the second roller 22 abuts against the inner side wall of the enclosure 4 of the bridge, the stop plate 23 does not contact with the enclosure 4, when the position of the cradle 1 needs to be fixed, the stop plate 23 abuts against the enclosure 4, and the second roller 22 is far away from the inner side wall of the enclosure 4. The position of the cradle 1 close to the outer side of the bridge is connected with a third roller 13, and the third roller 13 is abutted against the outer side of the bridge. The first roller 21, the second roller 22, and the third roller 13 roll in the longitudinal direction of the apron 4.
As shown in fig. 2, two stop plates 23 are arranged in a rectangular structure, two stop plates 23 are symmetrically arranged on two sides of the second roller 22, and a friction structure 231 is arranged on one side surface of each of the two stop plates 23 close to the enclosure 4. As an example, the friction structure 231 is a rubber pad on which a saw-toothed texture is disposed. Through setting up two check plates 23, increased check plate 23 and enclosed the area of contact who keeps off 4 inside walls, in addition be provided with friction structure 231 on the check plate 23, support at check plate 23 and lean on when enclosing 4 inside walls, have great frictional force, guarantee that the workman can not slide along enclosing 4 when the construction operation in hanging basket 1 work platform.
As shown in fig. 1 and 3, the two hanging rods 11 are provided with the protective enclosing rod 3 at intervals along the vertical direction, the protective enclosing rod 3 is of an arc-shaped structure, and two ends of the protective enclosing rod 3 are hinged to the two hanging rods 11 respectively. The hanging rod 11 is provided with a stop 111 below the end of the protective enclosing rod 3 to stop the protective enclosing rod 3 from rotating downwards. The distance between two adjacent protection surrounding rods 3 is greater than the length of the protection surrounding rods 3 when rotating to be parallel to the hanging rod 11, and when the protection surrounding rods 3 are prevented from being turned upwards, the adjacent protection surrounding rods 3 block the protection surrounding rods. When the protective enclosing rod 3 rotates to abut against the stop block 111, a safe passage allowing a person to pass through is formed between the protective enclosing rod 3 and the climbing rod 12. The protective fence 3 forms a protection on both sides and behind it, when the constructor climbs along the climbing rod 12, usually facing the outside of the bridge.
The concrete use method of the bridge outer side construction service platform is as follows: erecting an operation platform on the outer side of a bridge to be used as an enclosure 4 of the bridge, enabling a first rolling shaft 21 of an L-shaped suspension frame 2 to abut against the top of the enclosure 4 and a third rolling shaft 13 of a hanging basket 1 to abut against the outer side of the bridge, controlling a telescopic cylinder 24 connected with a stop plate 23 to extend, enabling the stop plate 23 to abut against the inner side wall of the enclosure 4, and stably hanging the operation platform on the outer side of the bridge through the stop plate 23, the first rolling shaft 21 and the third rolling shaft 13; a construction worker climbs the bridge enclosure 4 and enters the cradle 1 through the climbing rod 12 on the cradle 1 to perform construction operation, and when the protection enclosure rod 3 blocks the construction worker to perform construction, the protection enclosure rod 3 is turned upwards to be parallel to the hanging rod 11; when the cradle 1 needs to be moved, the telescopic cylinder 24 connected with the second roller 22 is controlled to extend to enable the second roller 22 to abut against the inner side wall of the enclosure 4 of the bridge, then the telescopic cylinder 24 connected with the stop plate 23 is controlled to shorten to enable the stop plate 23 not to contact with the enclosure 4, at the moment, the whole operation platform contacts with the bridge through the first roller 21, the second roller 22 and the third roller 13, and the cradle 1 can be moved only by pushing the operation platform; after the telescopic cylinder 24 connected with the stop plate 23 is controlled to extend to enable the stop plate 23 to abut against the enclosure 4, the telescopic cylinder 24 connected with the second roller 22 is controlled to shorten to enable the second roller 22 to be far away from the inner side wall of the enclosure 4, and the stop plate 23 and the inner side wall of the enclosure 4 generate large friction force through extrusion of the telescopic cylinder 24, so that the operation platform is stable at the current position.
In the above embodiment, the portion of the hanging basket near the outer side of the bridge is provided with two hanging rods, the tops of the two hanging rods are connected with the L-shaped suspension frame, in other embodiments, different from the above embodiment, the portion of the hanging basket near the outer side of the bridge is provided with a rectangular hanging frame arranged in the vertical direction, and the rectangular hanging frame is connected with the L-shaped suspension frame.
In the above embodiment, the stopper plate is provided in two pieces, and in other embodiments, unlike the above embodiment, the stopper plate is provided in one piece or three pieces.
In the above embodiments, the friction structure is a rubber pad, and the rubber pad has saw-toothed lines, and in other embodiments, different from the above embodiments, the friction structure is a rubber pad, and the rubber pad has wavy lines.
In the above-mentioned embodiment, the protection surrounding rod is the arc structure, and the both ends of protection surrounding rod are articulated with two peg respectively, and in other embodiments, different with above-mentioned embodiment, the protection surrounding rod is the structure of ] shape, the both ends of protection surrounding rod respectively with two peg fixed connection.
In the above embodiment, the distance between two adjacent protective enclosing rods is greater than the length of the protective enclosing rod when the protective enclosing rods rotate to be parallel to the hanging rod, and in other embodiments, different from the above embodiment, the distance between two adjacent protective enclosing rods is equal to the length of the protective enclosing rod when the protective enclosing rods rotate to be parallel to the hanging rod.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a bridge outside construction is used as industry platform, its characterized in that, is including being used for hanging the basket of hanging in the bridge outside, the top of hanging the basket is close to one side in the bridge outside and is connected with L type mounted frame, L type mounted frame is used for the card to locate the bridge the inboard apex angle department that encloses the fender, the position that the horizontal part of L type mounted frame is close to enclosing fender top is connected with first roller bearing, the vertical part of L type mounted frame is close to the position that encloses the fender inside wall and is connected with second roller bearing and check plate, the second roller bearing with the check plate respectively through telescopic cylinder with L type mounted frame is connected, the position that the basket is close to the bridge outside is connected with the third roller bearing, first roller bearing the second roller bearing with the third roller bearing rolls along the length direction who encloses the fender.
2. The work platform for construction outside the bridge according to claim 1, wherein the number of the stop plates is two, the two stop plates are symmetrically distributed on two sides of the second roller, and a friction structure is arranged on one side of the two stop plates close to the enclosure.
3. The work platform for construction outside the bridge according to claim 1 or 2, wherein two hanging rods extending in the vertical direction are arranged at the part of the hanging basket close to the outside of the bridge, the tops of the hanging rods are connected with the L-shaped hanging frame, climbing rods are arranged between the two hanging rods at intervals in the vertical direction, the climbing rods extend in the horizontal direction, and two ends of each climbing rod are fixedly connected with the two hanging rods respectively.
4. The work platform for construction outside a bridge according to claim 3, wherein protective enclosing rods are arranged between the two hanging rods at intervals along the vertical direction, and a safety channel allowing people to pass is formed between each protective enclosing rod and the corresponding climbing rod.
5. The work platform for bridge outside construction according to claim 4, wherein two ends of the protective enclosing rod are respectively hinged to the two hanging rods, a stop block is arranged below the end portion of the protective enclosing rod of each hanging rod to prevent the protective enclosing rod from rotating downwards, and the distance between every two adjacent protective enclosing rods is greater than or equal to the length of the protective enclosing rods when the protective enclosing rods rotate to be parallel to the hanging rods.
CN202120010545.6U 2021-01-05 2021-01-05 Service platform for bridge outside construction Active CN214530217U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120010545.6U CN214530217U (en) 2021-01-05 2021-01-05 Service platform for bridge outside construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120010545.6U CN214530217U (en) 2021-01-05 2021-01-05 Service platform for bridge outside construction

Publications (1)

Publication Number Publication Date
CN214530217U true CN214530217U (en) 2021-10-29

Family

ID=78301037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120010545.6U Active CN214530217U (en) 2021-01-05 2021-01-05 Service platform for bridge outside construction

Country Status (1)

Country Link
CN (1) CN214530217U (en)

Similar Documents

Publication Publication Date Title
CN214530217U (en) Service platform for bridge outside construction
CN210067378U (en) Fall-proof housing construction support
CN103950872B (en) The vertical rod lifting multi-purpose tool of a kind of electric substation high-altitude equipment
CN106337652B (en) A kind of power equipment maintaining ladder
CN214995779U (en) Improvement type scaffold frame for interior decoration design
CN214653428U (en) Lifting platform with adjusting function for building construction
CN203555689U (en) Electric hanging basket for vertical shaft
CN203382337U (en) Electric hanging basket for drainage vertical well of large-scale ship lock
CN207436477U (en) For the sleigh of installation photovoltaic component
CN215978556U (en) Building outer wall whitewashes safety protection network for building engineering
CN219840355U (en) Hanging basket device suitable for arc-shaped structure
CN219711432U (en) Safety protection device for high-altitude operation
CN210944628U (en) Lifting device for constructional engineering
CN214328569U (en) Bridge operation platform
CN214364820U (en) Engineering construction scaffold
CN215174860U (en) High altitude lamps and lanterns installing support
CN212175491U (en) A hanger type platform for construction outside bridge construction guardrail
CN220642498U (en) Lifting operation platform based on inner and outer double-layer safety protection
CN217268704U (en) Operation platform that electric power construction used
CN213774522U (en) Formwork structure for construction of main structure of high-rise building
CN210828254U (en) Movable scaffold
CN211596451U (en) Hanging flower basket device for bridge construction
CN209855186U (en) Mobile working platform for decoration
CN215632717U (en) Man-climbing ladder on roof
CN214935805U (en) Load-carrying hanging basket for tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant