CN214530205U - Assembled pier stud installation adjusting device - Google Patents

Assembled pier stud installation adjusting device Download PDF

Info

Publication number
CN214530205U
CN214530205U CN202022682973.1U CN202022682973U CN214530205U CN 214530205 U CN214530205 U CN 214530205U CN 202022682973 U CN202022682973 U CN 202022682973U CN 214530205 U CN214530205 U CN 214530205U
Authority
CN
China
Prior art keywords
adjusting
rod
pier stud
pier
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022682973.1U
Other languages
Chinese (zh)
Inventor
任加甜
庞丹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tengda Construction Group Co Ltd
Original Assignee
Tengda Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tengda Construction Group Co Ltd filed Critical Tengda Construction Group Co Ltd
Priority to CN202022682973.1U priority Critical patent/CN214530205U/en
Application granted granted Critical
Publication of CN214530205U publication Critical patent/CN214530205U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an assembled pier stud installation adjusting device, it belongs to bridge technical field, include two sets of adjusting part that set up along the direction of height interval of pier stud, adjusting part is located adjacently between the pier stud, adjusting part includes sleeve, alignment jig, regulation pole and levelness detection device, the sleeve fixed set up in on the pier stud, correspond every the pier stud sets up one the alignment jig, the one end of alignment jig with the sleeve rotates and can dismantle the connection, adjust the pole with the other end of alignment jig is connected, it is located two to adjust the pole between the alignment jig, can adjust two distance between the alignment jig, levelness detection device is located on the alignment jig, can detect the levelness of alignment jig. The utility model provides an assembled pier stud installation adjusting device simple structure is convenient for adjust the straightness that hangs down of every pier stud and the interval between two pier studs.

Description

Assembled pier stud installation adjusting device
Technical Field
The utility model relates to a bridge technical field especially relates to an assembled pier stud installation adjusting device.
Background
At present, the application of the fabricated bridge is more and more extensive, the fabricated bridge is a bridge formed by assembling prefabricated steel accessories on site, and the pier stud, the capping beam and the upper structural beam all adopt a full-fabricated mode.
When assembling the pier stud, the verticality of the pier stud needs to be ensured. When only one pier stud exists, the perpendicularity of the pier stud is generally adjusted through the jacks on the four sides, when two pier studs exist, the perpendicularity of the pier studs needs to be adjusted, the distance between the two pier studs needs to be ensured, otherwise, the prefabricated capping beam cannot be installed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assembled pier stud installation adjusting device to solve the assembled bridge pier stud that exists among the prior art and assemble the technical problem of the straightness difficulty of adjusting that hangs down of interval and pier stud between the in-process two pier studs.
As the conception, the utility model adopts the technical proposal that:
the utility model provides an assembled pier stud installation adjusting device, includes two sets of adjusting part that the direction of height interval along the pier stud set up, adjusting part is located adjacently between the pier stud, adjusting part includes:
the sleeve is fixedly arranged on the pier stud;
the adjusting frame is arranged corresponding to each pier stud, and one end of the adjusting frame is rotatably and detachably connected with the sleeve;
the adjusting rod is connected with the other end of the adjusting frame, is positioned between the two adjusting frames and can adjust the distance between the two adjusting frames;
and the levelness detection device is positioned on the adjusting frame and can detect the levelness of the adjusting frame.
Furthermore, every correspond every on the pier stud adjust the frame and be provided with two the sleeve, two the sleeve symmetry set up in on two relative sides of pier stud.
Further, the adjusting bracket is the I-shaped structure, including bracing piece and two connecting rods, two connecting rod parallel arrangement, the bracing piece is connected in two between the connecting rod and with the connecting rod sets up perpendicularly, the both ends of connecting rod respectively with the sleeve with adjust the pole and connect.
Further, the connecting rod comprises a rod part and a sleeve part, the rod part is detachably connected with the sleeve, and the sleeve part is in threaded connection with the adjusting rod.
Furthermore, the adjusting frame also comprises a connecting part, the connecting part comprises a connecting piece, a bolt and a nut, one end of the connecting piece is in threaded connection with the sleeve, and the bolt penetrates through the rod part and the other end of the connecting piece and is matched and locked with the nut.
Further, the connecting part also comprises a spring, and the spring is sleeved on the bolt and is positioned between the rod part and the connecting piece.
Furthermore, an installation groove is formed in the supporting rod, and the levelness detection device is located in the installation groove.
Further, the support rod is welded with the connecting rod.
Furthermore, the adjusting rod is in threaded connection with the adjusting frame, and two sections of external threads with opposite thread turning directions are arranged on the adjusting rod.
Furthermore, a cross-shaped adjusting handle is fixedly connected to the adjusting rod.
The utility model has the advantages that:
the utility model provides an assembled pier stud installation adjusting device, through two sets of adjusting part that the direction of height interval along the pier stud set up, adjust the straightness that hangs down of pier stud and the interval between two pier studs, concrete accommodation process is: the sleeve is fixedly arranged on the pier stud, the adjusting frames are installed with the sleeve, the adjusting rod is connected with the two adjusting frames, the distance between the two adjusting frames is adjusted through the adjusting rod to adjust the distance between the two pier studs, in the adjusting process, after the adjusting rod of one group of adjusting parts is adjusted, the distance between the two adjusting frames is measured, and when the adjusting rod of the other group of adjusting parts is adjusted, the distance between the two adjusting frames is equal to that of the previous group, so that the distance between the two adjusting frames of one group of adjusting parts is equal to that of the two adjusting frames of the other group of adjusting parts, and the two pier studs are parallel; because the sleeve is the same highly on two pier stud, adjust the pole and be connected with two alignment brackets, form with two pier stud vertically face, so pier stud just perpendicular to ground when the alignment bracket is the level, detect the levelness of alignment bracket through levelness detection device, thereby obtain the straightness that hangs down of pier stud, when adjusting part wholly inclines, adjust adjusting part's levelness, when levelness detection device detects that the alignment bracket is the level, adjusting part is the level, thereby pier stud perpendicular to ground, stop adjusting. The utility model provides an assembled pier stud installation adjusting device simple structure is convenient for adjust the straightness that hangs down of every pier stud and the interval between two pier studs.
Drawings
Fig. 1 is a front view of the assembled pier stud installation and adjustment device provided by the present invention;
fig. 2 is a schematic structural diagram of an adjusting part of the assembly type pier stud installation adjusting device provided by the invention;
FIG. 3 is an enlarged view at A in FIG. 1;
FIG. 4 is a sectional view taken along line B-B of FIG. 3;
FIG. 5 is an enlarged view at C in FIG. 2;
fig. 6 is a sectional view taken along line D-D of fig. 1.
In the figure:
10. pier studs;
1. a sleeve;
2. an adjusting bracket; 21. a support bar; 22. a connecting rod; 221. a rod portion; 222. a sleeve portion; 23. a connecting portion; 231. a connecting member; 232. a bolt; 233. a nut; 234. a spring;
3. adjusting a rod;
4. a levelness detecting device;
5. the handle is adjusted.
Detailed Description
Reference will now be made in detail to the embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, unless expressly stated or limited otherwise, the terms "connected," "connected," and "fixed" are to be construed broadly, e.g., as meaning permanently connected, detachably connected, or integral to one another; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
Referring to fig. 1 to 6, the embodiment of the utility model provides an assembled pier stud installation adjusting device for the straightness that hangs down of interval and pier stud between the pier stud of assembled bridge is assembled the in-process and is adjusted to two pier studs.
Assembled pier stud installation adjusting device includes two sets of adjusting part that the direction of height interval along pier stud 10 set up, adjusting part is located between the adjacent pier stud 10, adjusting part includes sleeve 1, alignment jig 2, adjust pole 3 and levelness detection device 4, sleeve 1 is fixed to be set up on pier stud 10, be used for connecting pier stud 10 and alignment jig 2, alignment jig 2 cooperation is adjusted pole 3 and is used for connecting two pier studs 10, with the distance between adjusting two pier studs 10, adjust pole 3 and be located between two alignment jigs 2, be used for adjusting the distance between two alignment jigs 2, levelness detection device 4 is used for detecting the levelness of alignment jig 2 and is in order to obtain the straightness that hangs down of pier stud 10.
Referring to fig. 2 and 5, an adjusting bracket 2 is arranged corresponding to each pier stud 10, and one end of the adjusting bracket 2 is detachably connected with the sleeve 1, so that the adjusting bracket is convenient to mount and dismount and can be repeatedly used in different assembled bridges.
Correspond every alignment jig 2 and be provided with two sleeves 1 on every pier stud 10, two sleeve 1 symmetries set up on two relative sides of pier stud 10, and the symmetry sets up stable in structure to be convenient for process.
Specifically, when pier stud 10 is prefabricated, bury sleeve 1 in pier stud 10 both sides fixed position, sleeve 1 is perpendicular to the surface of pier stud 10, be convenient for process and draw materials.
Referring to fig. 2, alignment jig 2 is the I shape structure, including bracing piece 21 and two connecting rods 22, two connecting rods 22 parallel arrangement, bracing piece 21 connect between two connecting rods 22 and set up perpendicularly with connecting rod 22 for the stress is even at connecting rod 22 both ends, and stable in structure, the both ends of connecting rod 22 are connected with sleeve 1 and regulation pole 3 respectively, realize adjusting pole 3 and alignment jig 2 and pier column 10's being connected.
Specifically, the connecting rod 22 includes a rod portion 221 and a sleeve portion 222, and the rod portion 221 is aligned with the sleeve portion 222. The rod part 221 is detachably connected with the sleeve 1, so that the installation and the disassembly are convenient. Bushing portion 222 and 3 threaded connection of regulation pole, the helicitic texture processing is convenient, rotates and adjusts pole 3 and can realize two distance between bushing portion 222 and adjust, realizes the distance between two alignment jig 2 on two pier stud 10 promptly and adjusts to realize the distance between two pier stud 10 and adjust, simple structure, the operation of being convenient for.
Specifically, the adjusting rod 3 is in threaded connection with the adjusting frame 2, and two sections of external threads with opposite thread turning directions are arranged on the adjusting rod 3, so that two sleeve portions 222 connected with the adjusting rod 3 can be simultaneously contracted or extended when the adjusting rod 3 is rotated, and the effect of adjusting the distance between the two adjusting frames 2 is realized.
Optionally, the support rod 21 is welded with the connecting rod 22, so that the welding strength is high, the processing is convenient, the connection tightness is good, the structural rigidity is high, the cost is low, the welding can be processed in batch, and the adjusting frame 2 is convenient to manufacture.
The supporting rod 21 is provided with a mounting groove, the levelness detection device 4 is positioned in the mounting groove, and the mounting groove fixing levelness detection device 4 is simple in structure and convenient to process.
Referring to fig. 3 and 4, the adjusting bracket 2 further includes a connecting portion 23, the connecting portion 23 includes a connecting member 231, a bolt 232 and a nut 233, one end of the connecting member 231 is in threaded connection with the sleeve 1, the bolt 232 penetrates through the rod portion 221 and the other end of the connecting member 231 and is matched and locked with the nut 233, the rod portion 221 and the sleeve 1 are connected through the structure, one end of the connecting member 231 is in threaded connection with the sleeve 1 so as to be convenient to disassemble and assemble, processing and material taking are facilitated, the rod portion 221 and the connecting member 231 are locked through the bolt 232 and the nut 233, the adjusting bracket 2 and the sleeve 1 are connected through the structure, the structure is simple, material taking is facilitated, and cost is low.
Specifically, the connecting member 231 and the bolt 232 are high-strength members which have good mechanical properties and are not easily damaged in the assembling and using processes.
The connecting part 23 further comprises a spring 234, the spring 234 is sleeved on the bolt 232 and located between the rod part 221 and the connecting piece 231, the spring 234 reduces the pressure between the rod part 221 and the connecting piece 231, the contact part of the rod part 221 and the connecting piece 231 is prevented from being damaged, the spring 234 is added, locking is facilitated, and mounting and dismounting are facilitated.
Referring to fig. 6, a cross-shaped adjusting handle 5 is fixedly connected to the adjusting rod 3, and the adjusting rod 3 can be rotated by rotating the adjusting handle 5, so that the adjusting rod 3 can be rotated by applying a small force.
In conclusion, through two sets of adjusting part that the direction of height interval along pier stud 10 set up, adjust the straightness that hangs down of pier stud 10 and the interval between two pier studs 10, specific installation is: the sleeve 1 is fixedly arranged on the pier stud 10, the connecting piece 231 is connected with the sleeve 1, the bolt 232 sequentially penetrates through the rod part 221, the spring 234 and the connecting piece 231, the rod part 221 and the sleeve 1 are installed through locking in cooperation with the nut 233, and the adjusting part is installed through the adjusting rod 3 connected with the two sleeve parts 222.
The specific adjusting process is as follows: rotate the distance of adjusting handle 5 and adjusting between two alignment jig 2, with the distance between two pier stud 10 of regulation, in the adjustment process, because the one end of alignment jig 2 rotates with sleeve 1 and is connected, so can adjust a set of adjusting part's regulation pole 3 earlier, make the distance of adjusting pole 3 in the outside of two sleeve parts 222 be a definite value, adjust another set of adjusting part's regulation pole 3 again, pier stud 10 and alignment jig 2 take place to rotate this moment, two sets of adjusting part's regulation noninterfere, make the distance of adjusting pole 3 in the outside of two sleeve parts 222 equal with last one set, finally make the distance between two alignment jig 2 of a set of adjusting part equal with the distance between two alignment jig 2 of another set of adjusting part, in order to guarantee that two pier studs 10 are parallel.
Because sleeve 1 is the same in the height on two pier stud 10, adjust pole 3 and two alignment jig 2 are connected, form with two pier stud 10 vertically faces, so pier stud 10 is just perpendicular to ground when alignment jig 2 is the level, detect the levelness of bracing piece 21 through levelness detection device 4, detect the levelness of alignment jig 2 promptly, thereby obtain the straightness that hangs down of pier stud 10, when the whole slope of adjusting part, adjust adjusting part's levelness, when levelness detection device 4 detects bracing piece 21 and is the level, adjusting part is the level, thereby pier stud 10 perpendicular to ground, stop adjusting.
The above embodiments have been described only the basic principles and features of the present invention, and the present invention is not limited by the above embodiments, and is not departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (10)

1. The utility model provides an assembled pier stud installation adjusting device, its characterized in that includes two sets of adjusting part that the direction of height interval along pier stud (10) set up, adjusting part is located adjacently between pier stud (10), adjusting part includes:
the sleeve (1) is fixedly arranged on the pier stud (10);
the adjusting frames (2) are arranged corresponding to the pier columns (10), and one end of each adjusting frame (2) is rotatably and detachably connected with the corresponding sleeve (1);
the adjusting rod (3) is connected with the other end of the adjusting frame (2), the adjusting rod (3) is positioned between the two adjusting frames (2), and the distance between the two adjusting frames (2) can be adjusted;
and the levelness detection device (4) is positioned on the adjusting frame (2) and can detect the levelness of the adjusting frame (2).
2. The assembly type pier column installation and adjustment device according to claim 1, wherein two sleeves (1) are arranged on each pier column (10) corresponding to each adjustment frame (2), and the two sleeves (1) are symmetrically arranged on two opposite side surfaces of the pier column (10).
3. The assembly type pier stud installation and adjustment device according to claim 2, wherein the adjustment frame (2) is of an I-shaped structure and comprises a support rod (21) and two connecting rods (22), the two connecting rods (22) are arranged in parallel, the support rod (21) is connected between the two connecting rods (22) and is arranged perpendicular to the connecting rods (22), and two ends of the connecting rods (22) are respectively connected with the sleeve (1) and the adjustment rod (3).
4. The fabricated pier-column installation adjustment device according to claim 3, wherein the connecting rod (22) comprises a rod part (221) and a sleeve part (222), the rod part (221) is detachably connected with the sleeve (1), and the sleeve part (222) is in threaded connection with the adjusting rod (3).
5. The assembly type pier column installation and adjustment device according to claim 4, wherein the adjustment frame (2) further comprises a connecting part (23), the connecting part (23) comprises a connecting piece (231), a bolt (232) and a nut (233), one end of the connecting piece (231) is in threaded connection with the sleeve (1), and the bolt (232) penetrates through the rod part (221) and the other end of the connecting piece (231) and is matched and locked with the nut (233).
6. The fabricated pier mounting adjustment device of claim 5, wherein the connecting part (23) further comprises a spring (234), and the spring (234) is sleeved on the bolt (232) and is located between the rod part (221) and the connecting part (231).
7. The assembly type pier column installation and adjustment device according to claim 3, wherein the support rod (21) is provided with an installation groove, and the levelness detection device (4) is located in the installation groove.
8. The fabricated pier mounting adjustment device according to claim 3, wherein the support rod (21) is welded to the connection rod (22).
9. The assembly type pier stud installation and adjustment device according to claim 1, wherein the adjustment rod (3) is in threaded connection with the adjustment frame (2), and two sections of external threads with opposite thread turning directions are arranged on the adjustment rod (3).
10. The assembly type pier column installation adjusting device according to claim 1, wherein a cross-shaped adjusting handle (5) is fixedly connected to the adjusting rod (3).
CN202022682973.1U 2020-11-18 2020-11-18 Assembled pier stud installation adjusting device Active CN214530205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022682973.1U CN214530205U (en) 2020-11-18 2020-11-18 Assembled pier stud installation adjusting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022682973.1U CN214530205U (en) 2020-11-18 2020-11-18 Assembled pier stud installation adjusting device

Publications (1)

Publication Number Publication Date
CN214530205U true CN214530205U (en) 2021-10-29

Family

ID=78287534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022682973.1U Active CN214530205U (en) 2020-11-18 2020-11-18 Assembled pier stud installation adjusting device

Country Status (1)

Country Link
CN (1) CN214530205U (en)

Similar Documents

Publication Publication Date Title
CN209686860U (en) A kind of floor of steel structure construction top support type exempts from support for shuttering
CN214530205U (en) Assembled pier stud installation adjusting device
CN217053764U (en) Foundation frame component of prefabricated building
CN213654384U (en) Support based on photovoltaic bicycle shed
CN212642262U (en) Fixed leveling structure for swimming pool
CN110593127B (en) Temporary support frame for steel bridge construction
CN213389719U (en) Jacking suitable for assembled support
CN210947143U (en) Steel structure for building
CN113309366A (en) Steel structure mounting shoring system and construction process thereof
CN219012064U (en) Novel adjustable bracket
CN221761378U (en) Wall form reinforced structure
CN218114859U (en) Mounting structure of tower crane basis
CN115492411B (en) High-precision rapid butt joint device and butt joint method for unitized high-altitude overhanging steel structure
CN218881718U (en) Detachable assembly type building supporting upright post module
CN216740286U (en) Complex curved surface point type curtain wall assembled processing support
CN219060927U (en) Prefabricated post positioner of assembled frame construction
CN215926674U (en) Wall connecting piece structure for high-assembly-rate building beam plate position
CN213683203U (en) Adjustable square column supporting structure
CN204590563U (en) A kind of Novel dismountable scaffold
CN220226249U (en) Template support frame convenient to installation
CN210975888U (en) Novel aluminum alloy formwork support system
CN220058310U (en) Assembled steel structure frame
CN215331519U (en) Steel pipe inclined strut structure for large-face shear wall formwork
CN219137680U (en) Positioning tool for guide frame
CN219218726U (en) Cage is hung in safe operation of T type roof beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant