CN214513025U - Window limit infiltration testing arrangement is managed with building - Google Patents

Window limit infiltration testing arrangement is managed with building Download PDF

Info

Publication number
CN214513025U
CN214513025U CN202120869674.0U CN202120869674U CN214513025U CN 214513025 U CN214513025 U CN 214513025U CN 202120869674 U CN202120869674 U CN 202120869674U CN 214513025 U CN214513025 U CN 214513025U
Authority
CN
China
Prior art keywords
filter screen
box
filter
cleaning
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120869674.0U
Other languages
Chinese (zh)
Inventor
麻群
高燕
谌祥银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hongji Construction Project Management Co ltd
Original Assignee
Anhui Hongji Construction Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hongji Construction Project Management Co ltd filed Critical Anhui Hongji Construction Project Management Co ltd
Priority to CN202120869674.0U priority Critical patent/CN214513025U/en
Application granted granted Critical
Publication of CN214513025U publication Critical patent/CN214513025U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model relates to a window limit infiltration testing arrangement is managed to building relates to the field of building management, and it includes the rose box of base and fixed connection at the base up end, the collection mouth has been seted up at the top of rose box, the inside slidable mounting of rose box has first filter screen, set up the hole of placing that supplies first filter screen to take on the lateral wall of rose box, install on the lateral wall of rose box and carry out the confined apron to placing the hole, the inside fixedly connected with second filter screen of rose box. The application improves the problem that the working efficiency of the testing device is lower.

Description

Window limit infiltration testing arrangement is managed with building
Technical Field
The application relates to the field of building supervision, especially, relate to a window limit infiltration testing arrangement for building supervision.
Background
At present, with the rapid development of the building industry in China, the requirements of people on construction safety and construction quality are higher and higher, the management system, the production mode and the organizational structure of the building industry are deepened continuously, and the phenomenon of water leakage is often seen in buildings such as houses and office buildings, which seriously affects the life and work of people, so that water seepage detection is required in the building construction process, and the water leakage point of the building is checked so as to repair in time.
The utility model discloses a chinese utility model patent that prior art can refer to bulletin number for CN206410826U, it discloses a building outer wall and window limit infiltration testing arrangement for building prison and manage, including base and casing, the wheel is removed to the bottom fixedly connected with of base, turn right fixedly connected with water tank and rose box in proper order from a left side in the top of base, one side upper portion intercommunication of water tank has the inlet tube, top one side fixedly connected with branch of water tank, the top fixedly connected with solar cell panel of branch, the top opposite side fixedly connected with battery of water tank, one side fixedly connected with dc-to-ac converter of battery, solar cell panel passes through dc-to-ac converter and battery electric connection, the internal connection of rose box has filter plate. When the filter screen plate needs to be cleaned, the filter screen plate is taken out of the filter box at first, and then the filter screen plate is cleaned.
With respect to the related art in the above, the inventors consider that: in-process to filtering the otter board and clearing up, filter the otter board and be located the outside of box, can not continuously filter the waste water in the box, lead to testing arrangement's work efficiency lower.
SUMMERY OF THE UTILITY MODEL
In order to improve the lower problem of testing arrangement work efficiency, this application provides a window limit infiltration testing arrangement for building supervision.
The application provides a pair of window limit infiltration testing arrangement for building supervision adopts following technical scheme:
the utility model provides a building is managed with window limit infiltration testing arrangement, includes the rose box of base and fixed connection at the base up end, the collection mouth has been seted up at the top of rose box, the inside slidable mounting of rose box has first filter screen, set up the hole of placing that supplies first filter screen to take on the lateral wall of rose box, install on the lateral wall of rose box and carry out the confined apron to placing the hole, the inside fixedly connected with second filter screen of rose box.
By adopting the technical scheme, when the first filter screen needs to be cleaned, the cover plate is firstly opened, then the first filter screen is moved towards one side close to the placing hole, when the first filter screen is taken out of the filter box, the first filter screen is cleaned, and at the moment, the second filter screen is still in the filter box, so that large-particle impurities in the wastewater can be filtered; through setting up the second filter screen, after first filter screen takes out, the second filter screen still can use in the filter box, has improved the lower problem of testing arrangement work efficiency.
Preferably, the first filter screen is positioned above the second filter screen, and the first filter screen and the second filter screen are parallel to each other; the lower end surface of the first filter screen is provided with a cleaning component for cleaning the second filter screen, and the cleaning component comprises a cleaning box arranged on the lower end surface of the first filter screen and a scraper arranged on the cleaning box; the cleaning box is parallel to the first filter screen, the cleaning box is provided with a feed inlet on the side wall of the placing hole towards the side wall, the scraper is parallel to the second filter screen, the scraper is fixedly connected to the side wall of the placing hole towards the feed inlet, and the lower end face of the scraper is in contact with the upper end face of the second filter screen.
By adopting the technical scheme, in the process of taking the first filter screen, the first filter screen drives the cleaning box to move towards one side close to the placing hole, and the cleaning box moves the scraper to move towards one side close to the placing hole, so that the scraper can clean impurities on the surface of the second filter screen, and meanwhile, the cleaning box can collect the scraped impurities; through setting up clearance box and scraper blade, at the in-process of the first filter screen of taking, can realize the clearance to the second filter screen.
Preferably, the side wall of the scraper towards one side of the placing hole is formed into an inclined plane, and the distance from the first filter screen to the second filter screen to the placing hole is gradually increased.
Through adopting above-mentioned technical scheme, at the in-process of scraper blade to the clearance of second filter screen, impurity can follow the inclined plane and enter into the clearance box, and the scraper blade of being convenient for clears up the second filter screen.
Preferably, a plurality of filtering holes are formed in the side wall of the cleaning box.
Through adopting above-mentioned technical scheme, the in-process of collecting impurity is carried out at the clearance box, filters the hole and can further filter impurity for moisture in the impurity flows out from filtering the hole, thereby has improved the utilization ratio of waste water.
Preferably, the inner bottom surface of the cleaning box is provided with a storage groove, and the inner bottom surface of the storage groove is lower than the upper end surface of the scraper.
Through adopting above-mentioned technical scheme, at the in-process that the clearance box was collected impurity, impurity enters into along the feed inlet and receives the groove, when the clearance box received the impact of waste water, has reduced the emergence that impurity spilled over the condition from the clearance box.
Preferably, the first filter screen and the second filter screen are both arranged obliquely.
Through adopting above-mentioned technical scheme, carrying out filterable in-process to waste water, the first filter screen and the second filter screen that the slope set up have slowed down waste water to the impact of first filter screen and second filter screen, have reduced the emergence that waste water splashed the condition.
Preferably, one end of the cover plate is hinged to the outer side wall of the filter box, and the other end of the cover plate is mounted on the outer side wall of the filter box through a locking piece.
Through adopting above-mentioned technical scheme, at the in-process of opening the apron, the articulated connection has restricted the movement track of apron, has improved the stability of apron motion.
Preferably, the locking piece comprises a bolt arranged on the cover plate in a penetrating mode, and one end of the bolt is inserted into the side wall of the filter box.
Through adopting above-mentioned technical scheme, when the apron is opened to needs, at first remove the bolt towards the one side of keeping away from the rose box, when bolt and rose box alternate segregation, then rotate the apron, can realize opening of apron.
In summary, the present application includes at least one of the following beneficial technical effects:
by arranging the second filter screen, the second filter screen can still be used in the filter box after the first filter screen is taken out, so that the problem of low working efficiency of the testing device is solved;
by arranging the cleaning box and the scraper, the second filter screen can be cleaned in the process of taking the first filter screen;
this application is through setting up the inclined plane, and at the in-process of scraper blade to the clearance of second filter screen, impurity can follow the inclined plane and enter into the clearance box, and the scraper blade of being convenient for clears up the second filter screen.
Drawings
Fig. 1 is a schematic overall structure diagram of a building supervision window edge water seepage testing device according to an embodiment of the present application.
Fig. 2 is a schematic sectional structure view of a filter box according to an embodiment of the present application.
Fig. 3 is a schematic structural diagram of a cleaning member according to an embodiment of the present application.
Description of reference numerals: 1. a base; 11. a universal wheel; 12. a push handle; 2. a filter box; 21. a collection port; 22. placing holes; 23. a cover plate; 24. a collection hopper; 25. a sliding groove; 3. a first filter screen; 4. a second filter screen; 5. cleaning the component; 51. cleaning the box; 511. a feed inlet; 512. a filtration pore; 513. a receiving groove; 52. a squeegee; 521. a bevel; 6. a locking member; 61. a bolt; 7. a water collection tank; 71. a pipeline; 72. and (5) discharging a water pipe.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses window limit infiltration testing arrangement is used in building supervision. Referring to fig. 1, the window edge water seepage testing device for building supervision comprises a horizontally placed base 1, wherein the upper end surface of the base 1 is fixedly connected with a filter box 2, the top of the filter box 2 is provided with a collection port 21, and the top of the filter box 2 is fixedly connected with a collection hopper 24 communicated with the collection port 21; the upper end surface of the base 1 is fixedly connected with a water collecting tank 7 positioned on one side of the filter tank 2, the water collecting tank 7 is communicated with the filter tank 2 through a pipeline 71, and the top of the water collecting tank 7 is fixedly connected with a water outlet pipe 72; four universal wheels 11 are fixedly connected to the lower portion of the base 1, the four universal wheels 11 are respectively located at opposite corners of the lower end face of the base 1, and a push handle 12 is fixedly connected to the side wall of the base 1.
Referring to fig. 1 and 2, a placing hole 22 is formed in the outer side wall of the filtering box 2 on the side away from the water collecting tank 7, sliding grooves 25 are formed in two side walls of the filtering box 2 adjacent to the placing hole 22, the two sliding grooves 25 are communicated with the placing hole 22, a first filtering net 3 is placed between the two sliding grooves 25 in a sliding mode, the side wall of the first filtering net 3 is in contact with the side wall of the sliding grooves 25, and the first filtering net 3 can be taken out of the placing hole 22; the interior of the filter box 2 is fixedly connected with a second filter screen 4 positioned below the first filter screen 3, the first filter screen 3 and the second filter screen 4 are parallel to each other and are obliquely arranged, and one end of the first filter screen 3 close to the placing hole 22 is higher than one end of the first filter screen far away from the placing hole 22; the lower end surface of the first filter 3 is provided with a cleaning component 5 for cleaning the second filter 4, and the cleaning component 5 can be taken out from the placing hole 22.
A cover plate 23 for sealing the placing hole 22 is arranged on the outer side wall of the filter box 2, one end of the cover plate 23 is hinged to the outer side wall of the filter box 2, and the other end of the cover plate 23 is arranged on the outer side wall of the filter box 2 through a locking piece 6; the locking member 6 includes a bolt 61; a bolt 61 is inserted through the outer side wall of the cover plate 23, and the bolt 61 is inserted into the side wall of the filter box 2 toward one end of the filter box 2.
When the first filter screen 3 needs to be cleaned, firstly, the bolt 61 is moved towards one side far away from the filter box 2, when the bolt 61 and the filter box 2 are separated from each other, then the cover plate 23 is rotated, and then the first filter screen 3 is moved towards one side close to the placing hole 22, the first filter screen 3 drives the cleaning component 5 to move towards one side close to the placing hole 22, so that the cleaning component 5 cleans the second filter screen 4, when the first filter screen 3 is taken out of the filter box 2, the first filter screen 3 and the cleaning component 5 are cleaned, and at the moment, the second filter screen 4 is still in the filter box 2, and large-particle impurities in the wastewater can be filtered; through setting up second filter screen 4, take out the back at first filter screen 3, second filter screen 4 still can use in rose box 2, has improved the lower problem of testing arrangement work efficiency.
Referring to fig. 2 and 3, the cleaning member 5 includes a cleaning box 51 and a squeegee 52; the cleaning box 51 is fixedly connected to the lower end face of one end, far away from the placing hole 22, of the first filter screen 3, the cleaning box 51 is parallel to the first filter screen 3, the extending direction of the cleaning box 51 is perpendicular to the moving direction of the first filter screen 3, the lower end face of the cleaning box 51 is in contact with the upper end face of the second filter screen 4, and the length of the cleaning box 51 in the extending direction is consistent with the width of the second filter screen 4; the side wall of the cleaning box 51 facing the placing hole 22 is provided with a feeding hole 511, the side wall of the cleaning box 51 is provided with a plurality of filtering holes 512, and the inner bottom surface of the cleaning box 51 is provided with an accommodating groove 513.
The scraper 52 is fixedly connected to the side wall of the feed port 511 facing the placing hole 22, the lower end face of the scraper 52 is in contact with the upper end face of the second filter screen 4, the scraper 52 is parallel to the second filter screen 4, the length of the scraper 52 in the extending direction is consistent with that of the cleaning box 51, and the inner bottom face of the accommodating groove 513 is lower than the upper end face of the scraper 52; the side wall of the squeegee 52 toward the side of the placement hole 22 is formed as a slope 521, and the distance from the first filter 3 to the second filter 4 to the placement hole 22 is gradually increased by the slope 521.
In the process of taking the first filter screen 3, the first filter screen 3 drives the cleaning box 51 to move towards one side close to the placing hole 22, the cleaning box 51 drives the scraper 52 to move towards one side close to the placing hole 22, so that the scraper 52 can clean impurities on the surface of the second filter screen 4, the impurities can enter the accommodating groove 513 along the inclined plane 521 to collect the scraped impurities, and the filtering holes 512 can further filter the impurities, so that moisture in the impurities flows out of the filtering holes 512; through setting up clearance box 51 and scraper blade 52, at the in-process of taking first filter screen 3, can realize the clearance to second filter screen 4.
The embodiment of the application provides a building is managed with window limit infiltration testing arrangement's implementation principle does: when the first filter screen 3 needs to be cleaned, the bolt 61 is firstly moved towards the side far away from the filter box 2, and when the bolt 61 and the filter box 2 are separated from each other, the cover plate 23 is then rotated; then, the first filter screen 3 is moved towards the side close to the placing hole 22, the first filter screen 3 drives the cleaning box 51 to move towards the side close to the placing hole 22, the cleaning box 51 drives the scraper 52 to move towards the side close to the placing hole 22, the scraper 52 cleans impurities on the surface of the second filter screen 4, the impurities = enter the accommodating groove 513 along the inclined plane 521, the scraped impurities are collected, and meanwhile, the filtering holes 512 further filter the impurities, so that moisture in the impurities flows out of the filtering holes 512; when the first filter screen 3 is taken out of the filter box 2, the first filter screen 3 and the cleaning component 5 are cleaned, and the second filter screen 4 is still positioned in the filter box 2 at the moment and can filter large-particle impurities in the wastewater; through setting up second filter screen 4, take out the back at first filter screen 3, second filter screen 4 still can use in rose box 2, has improved the lower problem of testing arrangement work efficiency.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a building is managed with window limit infiltration testing arrangement, includes filter box (2) of base (1) and fixed connection at base (1) up end, collection mouth (21), its characterized in that have been seted up at the top of filter box (2): the inside slidable mounting of rose box (2) has first filter screen (3), set up on the lateral wall of rose box (2) and supply first filter screen (3) to take place hole (22), install on the lateral wall of rose box (2) and carry out confined apron (23) to placing hole (22), the inside fixedly connected with second filter screen (4) of rose box (2).
2. The window edge water seepage testing device for building supervision according to claim 1, characterized in that: the first filter screen (3) is positioned above the second filter screen (4), and the first filter screen (3) and the second filter screen (4) are parallel to each other; a cleaning component (5) for cleaning the second filter screen (4) is arranged on the lower end face of the first filter screen (3), and the cleaning component (5) comprises a cleaning box (51) arranged on the lower end face of the first filter screen (3) and a scraper (52) arranged on the cleaning box (51); clearance box (51) and first filter screen (3) are parallel to each other, clearance box (51) have been seted up feed inlet (511) towards placing on the lateral wall of hole (22) one side, scraper blade (52) are parallel to each other with second filter screen (4), scraper blade (52) fixed connection is on feed inlet (511) towards placing the lateral wall of hole (22) one side, the lower terminal surface of scraper blade (52) contacts with the up end of second filter screen (4).
3. The window edge water seepage testing device for building supervision according to claim 2, characterized in that: the side wall of the scraper blade (52) facing one side of the placing hole (22) is formed into an inclined surface (521), and the distance between the inclined surface (521) and the placing hole (22) is gradually increased from the first filter screen (3) to the second filter screen (4).
4. The window edge water seepage testing device for building supervision according to claim 2, characterized in that: the side wall of the cleaning box (51) is provided with a plurality of filtering holes (512).
5. The window edge water seepage testing device for building supervision according to claim 2, characterized in that: a containing groove (513) is formed in the inner bottom surface of the cleaning box (51), and the inner bottom surface of the containing groove (513) is lower than the upper end surface of the scraper (52).
6. The window edge water seepage testing device for building supervision according to claim 1, characterized in that: the first filter screen (3) and the second filter screen (4) are both obliquely arranged.
7. The window edge water seepage testing device for building supervision according to claim 1, characterized in that: one end of the cover plate (23) is hinged to the outer side wall of the filter box (2), and the other end of the cover plate (23) is installed on the outer side wall of the filter box (2) through a locking piece (6).
8. The window edge water seepage testing device for building supervision according to claim 7, wherein: the locking piece (6) comprises a bolt (61) arranged on the cover plate (23) in a penetrating mode, and one end of the bolt (61) is inserted into the side wall of the filter box (2).
CN202120869674.0U 2021-04-25 2021-04-25 Window limit infiltration testing arrangement is managed with building Expired - Fee Related CN214513025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120869674.0U CN214513025U (en) 2021-04-25 2021-04-25 Window limit infiltration testing arrangement is managed with building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120869674.0U CN214513025U (en) 2021-04-25 2021-04-25 Window limit infiltration testing arrangement is managed with building

Publications (1)

Publication Number Publication Date
CN214513025U true CN214513025U (en) 2021-10-29

Family

ID=78276866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120869674.0U Expired - Fee Related CN214513025U (en) 2021-04-25 2021-04-25 Window limit infiltration testing arrangement is managed with building

Country Status (1)

Country Link
CN (1) CN214513025U (en)

Similar Documents

Publication Publication Date Title
CN214513025U (en) Window limit infiltration testing arrangement is managed with building
CN220237951U (en) Filter equipment with clean function
CN213825340U (en) Impurity purification device for electrolyte
CN214913775U (en) A processing apparatus for electroplating burnt copper waste water
CN209969067U (en) Belt cleaning device is used in STM paster production and processing
CN213760687U (en) Sewage treatment device convenient to wash filter
CN208260318U (en) A kind of water feed apparatus of underground sewage disposal system system
CN215539523U (en) Dust removal device for coal mining
CN215901056U (en) Advanced filtering device for wastewater treatment
CN212327631U (en) Rainwater collecting and treating device
CN216964926U (en) Dust collector that ore crusher used
CN218980632U (en) Sewage treatment filter equipment
CN213558957U (en) Heat treatment wastewater circulating device for forging process
CN212215000U (en) Building engineering construction dust collector
CN217340571U (en) Dust remover convenient to clearance
CN219922437U (en) Special high-efficient filtration equipment of clean equipment
CN214546215U (en) Environment-friendly water conservancy irrigation device
CN214551619U (en) Rural distributed domestic sewage treatment device
CN220888826U (en) Water supply and drainage device for building
CN219879274U (en) Inorganic salt processing is with waste water filter equipment
CN218451923U (en) Suspended solid microsphere separation device
CN215711790U (en) Integral type nitrogen generator
CN219834992U (en) Water-saving irrigation device
CN217092754U (en) Filtration equipment for air dust treatment
CN218405342U (en) Floating garbage fishing device for sewage treatment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211029

CF01 Termination of patent right due to non-payment of annual fee