CN214508466U - A trees fixing device for landscape - Google Patents

A trees fixing device for landscape Download PDF

Info

Publication number
CN214508466U
CN214508466U CN202120604740.1U CN202120604740U CN214508466U CN 214508466 U CN214508466 U CN 214508466U CN 202120604740 U CN202120604740 U CN 202120604740U CN 214508466 U CN214508466 U CN 214508466U
Authority
CN
China
Prior art keywords
rod
fixing device
baffle
thorn
elastic wedge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120604740.1U
Other languages
Chinese (zh)
Inventor
杨锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Ousi Landscape Design Engineering Co ltd
Original Assignee
Shanghai Ousi Landscape Design Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Ousi Landscape Design Engineering Co ltd filed Critical Shanghai Ousi Landscape Design Engineering Co ltd
Priority to CN202120604740.1U priority Critical patent/CN214508466U/en
Application granted granted Critical
Publication of CN214508466U publication Critical patent/CN214508466U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Plants (AREA)

Abstract

The application relates to a tree fixing device for garden landscape, which comprises at least two hoops, a hinge rod hinged to the side wall of each hoop and a thorn rod arranged at one end, far away from the hoops, of the hinge rod; at least two of the hoops are detachably connected; the side wall of the thorn rod is provided with a baffle. This application has the effect that improves trees survival rate.

Description

A trees fixing device for landscape
Technical Field
The application relates to the field of tree planting devices, in particular to a tree fixing device for garden landscapes.
Background
Landscaping planting refers to the wide planting of flowers, plants and trees in landscape construction, so that the environment is beautiful and sanitary, and water and soil loss is prevented. Greening improves environmental hygiene and plays a variety of roles in maintaining ecological balance.
In the green ring planting process of gardens, the trees after transplanting are easy to topple over because the root system is not pricked in soil yet, so maintainer can bracing wooden pole or iron pole in the week side of trees, reduces the risk that trees after transplanting topple over. However, in rainy season, the soil is prone to sinking, and wood poles or iron poles in the inclined strut state are prone to shifting along with the sunk soil, so that the survival rate of trees is reduced.
SUMMERY OF THE UTILITY MODEL
In order to improve the survival rate of trees, this application provides a trees fixing device for landscape.
The application provides a tree fixing device for landscape adopts following technical scheme:
a tree fixing device for garden landscapes comprises at least two hoops, a hinge rod hinged to the side wall of each hoop and a thorn rod arranged at one end of each hinge rod, which is far away from the corresponding hoop; at least two of the hoops are detachably connected; the side wall of the thorn rod is provided with a baffle.
Through adopting above-mentioned technical scheme, when needs are fixed trees after transplanting, the thorn pole is pricked to the soil of trees week side to the relative clamp upset earlier, and the baffle supports in the surface of soil, then installs two piece at least clamps in the week side of trees trunk, just accomplishes the fixed of trees. Through the setting of baffle, improve this trees fixing device and soil surface's area of contact, the risk that the sunken thorn pole of soil removed when reducing rainy season improves the support stability that the thorn pole supported trees to improve the survival rate of trees.
Optionally, the surface of the baffle is perforated with through holes; the inner wall of the through hole is hinged with a sliding cylinder for the puncture rod to pass through; the side wall of the thorn rod is provided with a sliding groove extending along the axial direction of the thorn rod; a plurality of first elastic wedge blocks are arranged at the bottom of the sliding groove; the plurality of first elastic wedge blocks are arranged along the length direction of the sliding chute; the large end of the first elastic wedge-shaped block faces to one end, far away from the hinge rod, of the barbed rod; the inner wall of the sliding barrel is provided with a second elastic wedge-shaped block, the inclined surface of which is opposite to the inclined surface of the first elastic wedge-shaped block; the inclined plane of the first elastic wedge-shaped block can be used for the inclined plane of the second elastic wedge-shaped block to abut against.
Through adopting above-mentioned technical scheme, along with the difference that the thorn pole pierces the soil degree of depth, maintainer can be along with the change that the thorn pole pierces the soil degree of depth, and the position of removal baffle in thorn pole week side, first elasticity wedge and second elasticity wedge inclined plane removal in-process, and elastic deformation dodges, and when the baffle had the trend of moving toward the one end that thorn pole and hinge bar are connected, the main aspects of first elasticity wedge and second elasticity wedge offset, the aversion of restriction baffle. The hinge between slide cartridge and the baffle can make the relative thorn pole upset of baffle to reply different soil surface, make the baffle more laminate soil surface, improve the support stability that thorn pole supported trees, thereby improve the survival rate of trees.
Optionally, one end of the sliding groove penetrates through one end of the barbed rod far away from the hinge rod.
Through adopting above-mentioned technical scheme, be convenient for follow-up take off the baffle from the week side of thorn pole and change or clean.
Optionally, a mounting plate is connected to the bottom of the sliding groove through a bolt; the first elastic wedge block is fixed on one side of the mounting plate, which is deviated from the groove bottom.
Through adopting above-mentioned technical scheme, be convenient for change first elasticity wedge, reduce the risk that first elasticity wedge wearing and tearing lose restriction second elasticity wedge removal function, improve this trees fixing device's life.
Optionally, the bayonet rod is threadedly connected to the hinge rod.
Through adopting above-mentioned technical scheme, be convenient for accomodate and carry this trees fixing device, improve this trees fixing device's portability.
Optionally, a cavity is formed in the baffle.
Through adopting above-mentioned technical scheme, reduce the weight of baffle, improve this trees fixing device's portability.
Optionally, a rubber pad for contacting with the tree is fixed on one side of the clamp away from the hinge rod.
By adopting the technical scheme, the risk that the clamp scrapes the surface of the tree is reduced, and the survival rate of the tree is improved.
Optionally, a water retaining edge is fixed to the edge of the baffle.
Through adopting above-mentioned technical scheme, the risk that the baffle was submerged to soil when reducing rainy season improves this trees fixing device's support stability, improves the survival rate of trees.
In summary, the present application includes at least one of the following beneficial technical effects:
1. through the arrangement of the baffle, the contact area between the tree fixing device and the soil surface is increased, the risk of the soil sinking and the movement of the thorn rod in rainy season is reduced, the supporting stability of the thorn rod for supporting the tree is improved, and the survival rate of the tree is improved;
2. the large ends of the first elastic wedge-shaped block and the second elastic wedge-shaped block abut against each other to limit the displacement of the baffle plate, and the sliding cylinder is hinged with the baffle plate to enable the baffle plate to turn over relative to the pricking rod so as to deal with different soil surfaces, so that the baffle plate is more attached to the soil surface, the supporting stability of the pricking rod for supporting trees is improved, and the survival rate of the trees is improved;
3. through the setting on manger plate edge, the risk that baffle was submerged to soil when reducing rainy season improves this trees fixing device's support stability, improves the survival rate of trees.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
FIG. 2 is a cross-sectional view of the bayonet and the baffle of an embodiment of the present application.
Description of reference numerals: 1. clamping a hoop; 2. a hinged lever; 3. pricking a rod; 31. a tip; 32. a chute; 4. a rubber pad; 5. a baffle plate; 51. perforating; 52. a cavity; 53. a water retaining edge; 6. a slide cylinder; 7. mounting a plate; 8. a first elastic wedge block; 9. a second resilient wedge block.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses a trees fixing device for landscape. Referring to fig. 1, a trees fixing device for landscape includes two clamps 1, hinge joint in the articulated arm 2 and the thorn pole 3 of threaded connection in the articulated arm 2 of clamp 1 lateral wall keeping away from 1 one end of clamp, can dismantle the connection between two clamps 1, and the mode of dismantling the connection can be the laminating of magnetism absorption, can be bolted connection, also can be the joint. Articulated rod 2 is located the evagination side of clamp 1, and the indent side of clamp 1 is fixed with be used for with the rubber pad 4 of trees contact to reduce the risk of clamp 1 scratch tree trunk.
Referring to fig. 1, the number of the hinge rods 2 is three, wherein in the three hinge rods 2, two hinge rods 2 are located on the outer convex side of one clamp 1, the remaining hinge rod 2 is located on the outer convex side of the other clamp 1, and a tip 31 is integrally formed at one end of the bayonet rod 3, which is far away from the hinge rod 2. Therefore, the three barbed rods 3 which are in threaded connection with the hinge rod 2 can better support the tree, and the risk of the tree inclining is reduced.
Referring to fig. 2, the sidewall of the pricking pin 3 is provided with a baffle 5 for contacting with the soil surface, and the baffle 5 may be rectangular, circular or regular polygonal. The surface of the baffle 5 is provided with a perforation 51 in a penetrating way, and the inner wall of the perforation 51 is hinged with a sliding cylinder 6 for the puncture rod 3 to pass through. The interior of the baffle 5 is provided with a cavity 52 to reduce the weight of the baffle 5. The edge of the peripheral side of the baffle 5 is fixed with a water retaining edge 53 with the end surface higher than the surface of the baffle 5 so as to reduce the risk that the baffle 5 is submerged by soil in rainy season. The lateral wall of the thorn pole 3 is provided with two chutes 32 extending along the axial direction of the thorn pole 3, the two chutes 32 are symmetrically arranged by taking the axis of the thorn pole 3 as a symmetrical line, and one end of the chute 32 penetrates through the lateral wall of the sharp head 31 of the thorn pole 3.
Referring to fig. 2, the mounting plate 7 is bolted to the bottom of the chute 32, and a plurality of first elastic wedge blocks 8 are fixed to one side of the mounting plate 7 away from the bottom of the chute 32, and the plurality of first elastic wedge blocks 8 are arranged along the length direction of the chute 32. The big end of the first elastic wedge-shaped block 8 faces the pointed end 31 of the bayonet rod 3, and the big end and the small end of two adjacent first elastic wedge-shaped blocks 8 are mutually attached. A second elastic wedge-shaped block 9 with an inclined surface opposite to the first elastic wedge-shaped block 8 is fixed on the inner wall of the sliding barrel 6, and the second elastic wedge-shaped block 9 is partially positioned in the sliding groove 32. The inclined plane of the first elastic wedge-shaped block 8 can be used for the inclined plane of the second elastic wedge-shaped block 9 to abut against. Move the position of baffle 5 in thorn pole 3 week side to sharp head 31 direction, first elasticity wedge 8 and the 9 inclined planes of second elasticity wedge and move the in-process, elastic deformation dodges, and when baffle 5 had the trend of moving toward the one end that thorn pole 3 and articulated rod 2 are connected, the main aspects of first elasticity wedge 8 and second elasticity wedge 9 offset, restriction baffle 5's aversion.
The implementation principle of the tree fixing device for the garden landscape is as follows: when needs are fixed the trees after transplanting, earlier relative clamp 1 upset thorn pole 3, pierce the tip 31 of thorn pole 3 in the soil of trees week side, move baffle 5 in the position of 3 week sides of thorn pole to tip 31 direction, make baffle 5 support in the surface of soil, then install two clamps 1 in the week side of trees trunk, press from both sides tightly the trunk, just accomplish the fixed of trees. Through baffle 5, improve this trees fixing device and soil surface's area of contact, the risk that the sunken messenger of soil thorn pole 3 removed when reducing rainy season improves the support stability that thorn pole 3 supported trees to improve the survival rate of trees.
When subsequently dismantling this trees fixing device, separate two clamps 1 earlier, then pull out thorn pole 3 from soil to continue to remove baffle 5 along tip 31 direction, make second elasticity wedge 9 break away from spout 32, alright break away from the lateral wall of thorn pole 3 with baffle 5, finally the rotating thorn pole 3 makes thorn pole 3 and articulated rod 2 separate, alright accomodate and transport this trees fixing device.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a trees fixing device for landscape, its characterized in that: comprises at least two clamps (1), a hinged rod (2) hinged to the side wall of the clamps (1) and a thorn rod (3) arranged at one end of the hinged rod (2) far away from the clamps (1); at least two clamps (1) are detachably connected; the side wall of the thorn pole (3) is provided with a baffle (5).
2. The tree fixing device for landscape architecture of claim 1, wherein: the surface of the baffle (5) is provided with a through hole (51) in a penetrating way; the inner wall of the perforation (51) is hinged with a sliding cylinder (6) for the puncture rod (3) to pass through; the side wall of the thorn rod (3) is provided with a sliding groove (32) which extends along the axial direction of the thorn rod (3); a plurality of first elastic wedge blocks (8) are arranged at the bottom of the sliding groove (32); the first elastic wedge blocks (8) are arranged along the length direction of the sliding groove (32); the large end of the first elastic wedge-shaped block (8) faces to one end, far away from the hinge rod (2), of the barbed rod (3); a second elastic wedge-shaped block (9) with an inclined surface opposite to the inclined surface of the first elastic wedge-shaped block (8) is arranged on the inner wall of the sliding barrel (6); the inclined plane of the first elastic wedge-shaped block (8) can be used for the inclined plane of the second elastic wedge-shaped block (9) to abut against.
3. The tree fixing device for landscape architecture of claim 2, wherein: one end of the sliding groove (32) penetrates through one end, far away from the hinge rod (2), of the barbed rod (3).
4. The tree fixing device for landscape architecture of claim 2, wherein: the bottom of the chute (32) is connected with a mounting plate (7) by a bolt; the first elastic wedge-shaped block (8) is fixed on one side of the mounting plate (7) departing from the groove bottom.
5. The tree fixing device for landscape architecture of claim 2, wherein: the thorn pole (3) threaded connection is in articulated rod (2).
6. The tree fixing device for landscape architecture according to any one of claims 1 to 5, wherein: a cavity (52) is formed in the baffle (5).
7. The tree fixing device for landscape architecture according to any one of claims 1 to 5, wherein: one side of the hoop (1) departing from the hinge rod (2) is fixed with a rubber pad (4) used for contacting with trees.
8. The tree fixing device for landscape architecture according to any one of claims 1 to 5, wherein: and a water retaining edge (53) is fixed at the edge of the baffle (5).
CN202120604740.1U 2021-03-24 2021-03-24 A trees fixing device for landscape Expired - Fee Related CN214508466U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120604740.1U CN214508466U (en) 2021-03-24 2021-03-24 A trees fixing device for landscape

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120604740.1U CN214508466U (en) 2021-03-24 2021-03-24 A trees fixing device for landscape

Publications (1)

Publication Number Publication Date
CN214508466U true CN214508466U (en) 2021-10-29

Family

ID=78265398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120604740.1U Expired - Fee Related CN214508466U (en) 2021-03-24 2021-03-24 A trees fixing device for landscape

Country Status (1)

Country Link
CN (1) CN214508466U (en)

Similar Documents

Publication Publication Date Title
CN111903424A (en) Lodging-resistant device for transplanted trees and using method thereof
CN212520228U (en) Municipal garden trees support
CN206776325U (en) A kind of gardens transplanting tree lifting device
CN214508466U (en) A trees fixing device for landscape
CN211353357U (en) Garden engineering is with holding up wooden strutting arrangement
CN215454351U (en) Landscape afforestation trees strutting arrangement
CN214257317U (en) Municipal afforestation wall
CN210959711U (en) Municipal garden trees protective cradle
CN210432528U (en) Portable trees are transplanted and receive and release support frame
CN113615460A (en) Agricultural mulching film machine device for agricultural mechanization
CN213343708U (en) Portable plantlet transplanting device for garden construction
CN211607640U (en) Mount is used in ornamental trees and shrubs planting
CN111436320B (en) Ornamental trees and shrubs protective apparatus in winter
CN211047906U (en) Municipal garden trimming means
CN210137677U (en) Trees protective cradle for afforestation
CN203775775U (en) Auxiliary tool for potted plant transplanting
CN210130198U (en) Supporting device for garden trees
CN209897840U (en) Recyclable sapling support for landscaping
CN207519296U (en) A kind of telescopic flue-cured tobacco mulch membrane-repturing device
CN214046894U (en) Support wood strutting arrangement that garden engineering used
CN215269412U (en) Peach is planted with device of digging pit fast
CN216362763U (en) High yield north storehouse art planting device that grows seedlings
CN216960995U (en) Nursery stock transplanting and transporting device
CN217591705U (en) Greenery patches fixing device
CN216164000U (en) Tree protection device is transplanted in forestry

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211029

CF01 Termination of patent right due to non-payment of annual fee