CN214497196U - Steel pipe lattice column splicing platform - Google Patents
Steel pipe lattice column splicing platform Download PDFInfo
- Publication number
- CN214497196U CN214497196U CN202022653965.4U CN202022653965U CN214497196U CN 214497196 U CN214497196 U CN 214497196U CN 202022653965 U CN202022653965 U CN 202022653965U CN 214497196 U CN214497196 U CN 214497196U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- steel
- platform
- lattice column
- moving frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a steel pipe lattice column assembly platform, which comprises a ground, a concrete cushion layer, a steel pipe positioning and moving frame, a steel pipe column, a limiting steel casing, a moving trolley, a jack and a steel pipe assembly base; the concrete cushion is arranged on the ground, a steel plate is laid on the concrete cushion, a moving trolley is mounted on the steel plate, walking wheels are arranged at two ends of the moving trolley, a main cross beam is arranged in the middle of the moving trolley, a platform steel plate is arranged at the upper part of the moving trolley, a steel pipe assembling base is arranged at the upper part of the platform steel plate, and a jack is arranged at the lower part of the steel pipe assembling base; the upper part of the steel pipe assembling base is provided with a steel pipe positioning moving frame, a limiting steel protective cylinder is arranged in the steel pipe positioning moving frame, and a steel pipe column is arranged in the limiting steel protective cylinder. The utility model has the advantages that: the utility model discloses a steel pipe lattice column assembly platform carries out steel pipe lattice column and assembles, makes things convenient for steel pipe lattice column to assemble through upper and lower cat ladder, outer platform, steel platform, effectively improves and assembles speed.
Description
Technical Field
The utility model relates to a steel pipe lattice column assembly platform belongs to the civil engineering field, is applicable to the construction that steel pipe lattice column was assembled.
Background
The steel pipe concrete structure is characterized in that two materials of steel and concrete are fused together, the core concrete is in a three-dimensional compression state by means of the hoop restraining effect of the steel pipes on the core concrete, the longitudinal compression strength of the compressed concrete is improved, and the elastic modulus and the compression deformation capacity of the compressed concrete are also improved. The filled concrete provides a supporting function for the wall of the steel pipe, enhances the geometric stability of the steel pipe, changes the instability mode of the hollow steel pipe, enables the reduced stress to reach the yield strength of the steel, and fully exerts the strength bearing capacity of the steel. The steel tube concrete lattice type pier is an ideal pier type scheme due to the fact that the steel tube concrete lattice type pier is small in self weight and has excellent anti-seismic performance.
However, the problems of difficult assembly, low assembly construction efficiency, poor positioning accuracy and the like of the steel tube lattice column easily occur in the construction process of the existing steel tube concrete lattice type pier.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a steel pipe lattice column assembly platform to the problem of construction is assembled to steel pipe lattice column, satisfies the demand of structure construction.
The steel pipe lattice column assembling platform comprises a ground, a concrete cushion layer, a steel pipe positioning moving frame, a steel pipe column, a limiting steel casing, a moving trolley, a jack and a steel pipe assembling base; the concrete cushion is arranged on the ground, a steel plate is laid on the concrete cushion, a moving trolley is mounted on the steel plate, walking wheels are arranged at two ends of the moving trolley, a main cross beam is arranged in the middle of the moving trolley, a platform steel plate is arranged at the upper part of the moving trolley, a steel pipe assembling base is arranged at the upper part of the platform steel plate, and a jack is arranged at the lower part of the steel pipe assembling base; the upper part of the steel pipe assembling base is provided with a steel pipe positioning moving frame, a limiting steel protecting cylinder is arranged in the steel pipe positioning moving frame, and a steel pipe column is arranged in the limiting steel protecting cylinder; the steel pipe column is connected with the steel pipe framework cross brace and the steel pipe framework diagonal brace through the fixed ear plates.
Preferably, the method comprises the following steps: the steel pipe positioning and moving frame is formed by assembling and splicing upright columns, and is provided with an upper and lower crawling ladder, an outer support platform and a steel platform; the outer side of the steel pipe positioning moving frame is provided with a platform fixing frame, and the platform fixing frame are fixedly connected through a horizontal pull rod.
Preferably, the method comprises the following steps: the inboard channel-section steel track that sets up of platform mount, the walking wheel is located the channel-section steel track, and channel-section steel track tip sets up the stopper.
Preferably, the method comprises the following steps: and a steel inclined strut is arranged between the outer strut platform and the steel pipe positioning moving frame.
Preferably, the method comprises the following steps: the fixed ear plate is connected with the steel pipe framework cross brace through a bolt.
Preferably, the method comprises the following steps: the steel pipe framework cross brace and the steel pipe framework diagonal brace form a steel pipe framework.
The utility model has the advantages that:
(1) the utility model discloses a steel pipe lattice column assembly platform carries out steel pipe lattice column and assembles, makes things convenient for steel pipe lattice column to assemble through upper and lower cat ladder, outer platform, steel platform, effectively improves and assembles speed.
(2) The utility model discloses a travelling car removes the steel-pipe column position, and it is laborsaving to save labour, practices thrift mechanical use expense simultaneously.
(3) The utility model discloses a jack carries out the accurate adjustment to the position of steel-pipe column, improves the quality of assembling of steel pipe lattice column.
Drawings
FIG. 1 is a sectional view of a steel tube lattice column splicing platform;
FIG. 2 is a plan view of a steel tube lattice column splicing platform;
description of reference numerals: 1-ground; 2-concrete cushion; 3, a limiting block; 4-a platform steel plate; 5-fixing the ear plate; 6, positioning and moving the steel pipe; 7-bolt; 8-steel pipe framework cross bracing; 9-steel pipe framework diagonal bracing; 10-an external support platform; 11-steel pipe column; 12-limiting steel protective cylinders; 13-steel diagonal bracing; 14-upright post; 15-a steel platform; 16-climbing and descending stairs; 17-moving the trolley; 18-a main beam; 19-steel plate; 20-a travelling wheel; 21-a jack; 22-assembling a base by using steel pipes; 23-channel steel rails; 24-a platform fixing frame; 25-a steel pipe framework; 26-pier stud; 27-horizontal pull rod.
Detailed Description
The present invention will be further described with reference to the following examples. The following description of the embodiments is merely provided to aid in understanding the invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.
As an embodiment, as shown in fig. 1-2, the steel tube lattice column assembling platform mainly includes a ground 1, a concrete cushion 2, a steel tube positioning moving frame 6, a steel tube column 11, a limiting steel casing 12, a moving trolley 17, a jack 21, a steel tube assembling base 22, a channel steel rail 23, a platform fixing frame 24, and a pier column 26; the ground 1 is provided with a concrete cushion 2, a steel plate 19 is laid on the concrete cushion 2, a moving trolley 17 is mounted on the steel plate 19, walking wheels 20 are arranged at two ends of the moving trolley 17, a main cross beam 18 is arranged in the middle of the moving trolley 17, a platform steel plate 4 is arranged at the upper part of the moving trolley 17, a steel pipe assembling base 22 is arranged at the upper part of the platform steel plate 4, and jacks 21 are arranged at the lower part of the steel pipe assembling base 22 to control the heights of four corners of the steel pipe assembling base; the upper part of the steel pipe assembling base 22 is provided with a steel pipe positioning moving frame 6, a limiting steel casing 12 is arranged in the steel pipe positioning moving frame 6 to position the steel pipe column, and a steel pipe column 11 is arranged in the limiting steel casing 12; the steel pipe column 11 is connected with the steel pipe framework cross brace 8 and the steel pipe framework inclined brace 9 through the fixed ear plates 5. The steel pipe positioning moving frame 6 is formed by assembling and splicing the upright columns 14, and the steel pipe positioning moving frame 6 is provided with an upper and lower crawling ladder 16, an outer supporting platform 10 and a steel platform 15, so that the steel pipe lattice columns can be conveniently assembled. The platform fixing frame 24 is arranged on the outer side of the steel pipe positioning moving frame 6, and the platform fixing frame 24 are fixed through a horizontal pull rod 27. The abutment 26 is located between the two platform mounts 24.
A channel steel rail 23 is arranged on the inner side of the platform fixing frame 24, the walking wheels 20 are located in the channel steel rail 23, and a limiting block 3 is arranged at the end part of the channel steel rail 23. And a steel inclined strut 13 is arranged between the outer strut platform 10 and the steel pipe positioning moving frame 6. The fixed ear plate 5 is connected with the steel pipe framework cross brace 8 through a bolt 7. The steel pipe framework 25 is composed of the steel pipe framework cross brace 8 and the steel pipe framework inclined brace 9.
Claims (6)
1. Platform is assembled to steel pipe lattice column, its characterized in that: the steel pipe positioning and moving device comprises a ground (1), a concrete cushion layer (2), a steel pipe positioning and moving frame (6), a steel pipe column (11), a limiting steel casing (12), a moving trolley (17), a jack (21) and a steel pipe assembling base (22); the concrete cushion (2) is arranged on the ground (1), a steel plate (19) is laid on the concrete cushion (2), a moving trolley (17) is mounted on the steel plate (19), traveling wheels (20) are arranged at two ends of the moving trolley (17), a main cross beam (18) is arranged in the middle of the moving trolley (17), a platform steel plate (4) is arranged at the upper part of the moving trolley (17), a steel pipe assembling base (22) is arranged at the upper part of the platform steel plate (4), and a jack (21) is arranged at the lower part of the steel pipe assembling base (22); the upper part of the steel pipe assembling base (22) is provided with a steel pipe positioning moving frame (6), a limiting steel casing (12) is arranged in the steel pipe positioning moving frame (6), and a steel pipe column (11) is arranged in the limiting steel casing (12); the steel pipe column (11) is connected with the steel pipe framework cross brace (8) and the steel pipe framework inclined brace (9) through the fixed ear plates (5).
2. The steel pipe lattice column splicing platform of claim 1, wherein: the steel pipe positioning moving frame (6) is formed by assembling and splicing upright columns (14), and the steel pipe positioning moving frame (6) is provided with an upper and lower crawling ladder (16), an outer support platform (10) and a steel platform (15); the platform fixing frame (24) is arranged on the outer side of the steel pipe positioning moving frame (6), and the platform fixing frame (24) is fixedly connected with the platform fixing frame (24) through a horizontal pull rod (27).
3. The steel pipe lattice column splicing platform of claim 2, wherein: a channel steel rail (23) is arranged on the inner side of the platform fixing frame (24), the walking wheels (20) are located in the channel steel rail (23), and a limiting block (3) is arranged at the end part of the channel steel rail (23).
4. The steel pipe lattice column splicing platform of claim 2, wherein: and a steel inclined support (13) is arranged between the outer support platform (10) and the steel pipe positioning moving frame (6).
5. The steel pipe lattice column splicing platform of claim 1, wherein: the fixed ear plate (5) is connected with the steel pipe framework cross brace (8) through a bolt (7).
6. The steel pipe lattice column splicing platform of claim 1, wherein: the steel pipe framework (25) is composed of steel pipe framework cross braces (8) and steel pipe framework inclined braces (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022653965.4U CN214497196U (en) | 2020-11-17 | 2020-11-17 | Steel pipe lattice column splicing platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022653965.4U CN214497196U (en) | 2020-11-17 | 2020-11-17 | Steel pipe lattice column splicing platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214497196U true CN214497196U (en) | 2021-10-26 |
Family
ID=78205908
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022653965.4U Active CN214497196U (en) | 2020-11-17 | 2020-11-17 | Steel pipe lattice column splicing platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214497196U (en) |
-
2020
- 2020-11-17 CN CN202022653965.4U patent/CN214497196U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114809699A (en) | Construction method of assembly type outer facade enclosure system for reconstruction of upper part of super high-rise building | |
CN214497196U (en) | Steel pipe lattice column splicing platform | |
CN210597630U (en) | Net rack integral lifting structure | |
CN209924434U (en) | High-altitude overhanging formwork support frame body | |
CN114837090B (en) | Combined bracket system for high tower beam construction and construction method | |
CN112901214B (en) | Construction method for bottom-penetrating tunnel frame section top plate | |
CN212224669U (en) | Super large box steel column installation system | |
CN110184915B (en) | Cast-in-situ tower column of cable-stayed bridge and construction method thereof | |
CN204780601U (en) | Bed -jig is assembled to reinforcing bar festival section | |
CN210317334U (en) | A template platform truck for tunnel thin wall mid-board concrete placement | |
CN112664235A (en) | Walking type pipe gallery formwork supporting device | |
CN113958355A (en) | Steel frame structure for tunnel support | |
CN112709162A (en) | Large-span thin-wall concrete sound barrier pouring trolley | |
CN221032621U (en) | A from removing brill explodes platform truck for tunnel excavation | |
CN217204255U (en) | Movable unit type unit frame body for early-dismantling formwork support construction process of thick plate | |
CN221321882U (en) | Civil engineering building structure reinforcing apparatus | |
CN219793478U (en) | Vibration-damping floating slab reinforcement pre-binding frame | |
CN213509517U (en) | High stable cantilever frame reinforcing apparatus | |
CN218813204U (en) | Few-bracket self-bearing system for corrugated steel web | |
CN214168805U (en) | Novel movable lifting formwork support system | |
CN214531094U (en) | Main frame structure of large robot sand blasting room | |
CN210288091U (en) | Lower pylon formwork system of cable-stayed bridge | |
CN212052374U (en) | Rhombus truss assembly | |
CN114635548B (en) | Rapid and accurate assembling device and method for hyperbolic space inverted triangle steel truss | |
CN218059930U (en) | Steel pipe concrete arch bridge arch rib vertical splicing hydraulic jig frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |