CN214476029U - Engineering progress display device for building engineering management - Google Patents

Engineering progress display device for building engineering management Download PDF

Info

Publication number
CN214476029U
CN214476029U CN202120564955.5U CN202120564955U CN214476029U CN 214476029 U CN214476029 U CN 214476029U CN 202120564955 U CN202120564955 U CN 202120564955U CN 214476029 U CN214476029 U CN 214476029U
Authority
CN
China
Prior art keywords
progress
display device
board
spring
progress display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120564955.5U
Other languages
Chinese (zh)
Inventor
杨计超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120564955.5U priority Critical patent/CN214476029U/en
Application granted granted Critical
Publication of CN214476029U publication Critical patent/CN214476029U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an engineering progress display device for building engineering management, including base, cylinder, pressure handle, frame, show board, progress display device and stop device, the cylinder is located on the base, the pressure handle is located on the cylinder, through the flexible of pressure handle adjustable cylinder, the frame is located on the cylinder, the show board can be slided and located inside the frame, progress display device is located on the show board for the construction progress condition is directly perceived to be shown, stop device is located on the frame; progress display device includes progress strip subassembly, progress adjusting part and barb board, progress strip subassembly is located on the show board, the barb board is located on the show board, progress adjusting part slidable locates on the barb board. The utility model belongs to the technical field of building engineering, specifically indicate a visual display each item engineering progress strip, be convenient for open engineering progress display device for building engineering management of show board change progress value.

Description

Engineering progress display device for building engineering management
Technical Field
The utility model belongs to the technical field of building engineering, specifically indicate an engineering progress display device for building engineering management.
Background
The project progress display board is a common project progress display device in the scientific management of the building engineering, which is used for visually displaying the construction target value and the progress condition, the prior project progress display board is generally directly exposed and fixed on a support frame or a wall surface, or is placed in a protective frame, then a worker watches the project progress display board through a glass plate of the protective frame, if the project progress display board is directly exposed, although the worker can conveniently change the data on the project progress display board according to the project progress, the project progress display board is easy to be wetted by rainwater or blown by wind, if the project progress display board is placed in the protective frame, although the possibility that the project progress display board is wetted by rainwater or blown by wind can be reduced, when the project progress changes, and a user needs to change the data on the project progress display board, because the project progress display board is installed in the protective frame, so that the user is not convenient to change the data on the project progress display board.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a visual display each item engineering progress strip, be convenient for open engineering progress display device for building engineering management of show board change progress value.
In order to realize the above functions, the utility model discloses the technical scheme who takes as follows: an engineering progress display device for building engineering management comprises a base, a cylinder, a pressing handle, an outer frame, a display board, a progress display device and a limiting device, wherein the cylinder is arranged on the base, the pressing handle is arranged on the cylinder, the cylinder can be adjusted to stretch through the pressing handle, the outer frame is arranged on the cylinder, the display board can be slidably arranged in the outer frame, the progress display device is arranged on the display board and used for visually displaying the construction progress, and the limiting device is arranged on the outer frame and used for limiting the display board and preventing the display board from sliding out of the outer frame; progress display device includes progress strip subassembly, progress adjusting part and barb board, progress strip subassembly is located on the show board, the barb board is located on the show board, progress adjusting part slidable locates on the barb board.
Further, progress strip subassembly includes spool, torsional spring, reel and various strip, the spool is rotatable to be located on the show board, the outer lane of spool is located in the torsional spring cup joint, the reel is located on the spool, the outer lane of reel is located in the winding of various strip.
Further, the progress adjusting assembly comprises a sliding rod, a pressing block and a spring I, the sliding rod is slidably arranged on the barb plate, the pressing block is hinged to the sliding rod, one end of the spring is arranged on the sliding rod, and the other end of the spring is arranged on the pressing block.
Furthermore, stop device includes pull rod, stopper and spring two, the pull rod slidable locates on the frame, the stopper is located on the pull rod, spring two locates the outer lane of pull rod, two one ends of spring are located on the stopper and the other end is located on the frame.
Further, be equipped with the pointer on the progress adjustment subassembly, be equipped with the scale on the show board, the scale can be instructed to the pointer, and then the percentage numerical value of demonstration progress.
Furthermore, the display board is provided with a handle, so that the display board can be conveniently pushed and pulled.
Furthermore, the bottom of the base is provided with a self-locking walking wheel, so that the mobile walking is facilitated.
The utility model adopts the above structure to gain beneficial effect as follows: the utility model provides a pair of engineering progress display device for building engineering management can direct-viewing display construction progress through setting up progress adjustment subassembly and progress strip subassembly, and the directional scale of pointer can demonstrate the percentage of progress, through setting up stop device, can spacing show board, prevents show board roll-off frame.
Drawings
Fig. 1 is a schematic view of the overall structure of an engineering progress display device for building engineering management according to the present invention;
fig. 2 is a schematic structural view of a progress display device of the project progress display device for building engineering management according to the present invention;
fig. 3 is a schematic view of a bottom view structure of a progress display device of the project progress display device for building engineering management according to the present invention;
fig. 4 is a partially enlarged view of a portion a in fig. 1.
Wherein, 1, base, 2, cylinder, 3, pressure handle, 4, frame, 5, show board, 6, progress display device, 7, stop device, 8, progress adjusting part, 9, progress strip subassembly, 10, barb board, 11, slide bar, 12, briquetting, 13, spring one, 14, spool, 15, torsional spring, 16, reel, 17, colored bar, 18, pull rod, 19, stopper, 20, spring two, 21, pointer, 22, scale, 23, handle, 24, walking wheel.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1-4, the utility model relates to an engineering progress display device for building engineering management, including base 1, cylinder 2, press 3, frame 4, show board 5, progress display device 6 and stop device 7, the cylinder 2 is located on base 1, the press 3 is located on cylinder 2, the frame 4 is located on cylinder 2, the show board 5 is slidably located inside frame 4, the progress display device 6 is located on show board 5, the stop device 7 is located on frame 4; progress display device 6 includes progress bar subassembly 9, progress adjustment subassembly 8 and barb board 10, progress bar subassembly 9 is located on show board 5, barb board 10 is located on show board 5, progress adjustment subassembly 8 slidable is located on barb board 10.
Progress strip subassembly 9 includes spool 14, torsional spring 15, reel 16 and colored steel 17, spool 14 is rotatable to be located on the show board 5, torsional spring 15 cup joints the outer lane of locating spool 14, on reel 14 was located to reel 16, the outer lane of reel 16 was located in the winding of colored steel 17.
Progress adjusting part 8 includes slide bar 11, briquetting 12 and spring 13, slide bar 11 slidable locates on barb board 10, briquetting 12 articulates locates on slide bar 11, 13 one end of spring is located on slide bar 11 and the other end is located on briquetting 12.
The limiting device 7 comprises a pull rod 18, a limiting block 19 and a second spring 20, the pull rod 18 is slidably arranged on the outer frame 4, the limiting block 19 is arranged on the pull rod 18, the second spring 20 is arranged on the outer ring of the pull rod 18, one end of the second spring 20 is arranged on the limiting block 19, and the other end of the second spring is arranged on the outer frame 4.
The progress adjusting assembly 8 is provided with a pointer 21, and the display board 5 is provided with a graduated scale 22.
The display board 5 is provided with a handle 23.
And the bottom of the base 1 is provided with a self-locking walking wheel 24.
When the device is used specifically, the pull rod 18 is pulled down, the limiting block 19 moves downwards, then the handle 23 is pulled, the display plate 5 can slide out from the outer frame 4, project names can be written in a project name column, construction progress bars display the construction progress of corresponding projects, when the construction progress needs to be adjusted, the press block 12 is pressed down to push the slide rod 11, the press block 12 drives the color bar 17 to move, the corresponding percentage on the scale 22 is corresponding, the pointer 21 can point to the corresponding scale percentage, the press block 12 is loosened, the press block 12 is pressed to the barb plate 10 under the action of the first spring 13, the color bar 17 is in a tightened state under the action of the torsion spring 15, so that the construction progress can be displayed visually, the percentage of the construction progress can be displayed, after the setting is completed, the display plate is pushed into the outer frame 4, the pull rod 18 is loosened, the pull rod 18 pushes the limiting block 19 out under the action of the second spring 20, carry out fixed position to show board 5, when 5 height of needs adjustment show board, press down the pressure 3, the extension capacity of adjustment cylinder 2 can.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (7)

1. The utility model provides a construction progress display device for building engineering management which characterized in that: the display device comprises a base, an air cylinder, a pressing handle, an outer frame, a display board, a progress display device and a limiting device, wherein the air cylinder is arranged on the base, the pressing handle is arranged on the air cylinder, the outer frame is arranged on the air cylinder, the display board is slidably arranged in the outer frame, the progress display device is arranged on the display board, and the limiting device is arranged on the outer frame; progress display device includes progress strip subassembly, progress adjusting part and barb board, progress strip subassembly is located on the show board, the barb board is located on the show board, progress adjusting part slidable locates on the barb board.
2. The project progress display device for building project management according to claim 1, characterized in that: progress strip subassembly includes spool, torsional spring, reel and various strip, the spool is rotatable to be located on the show board, the outer lane of spool is located in the torsional spring cup joint, the reel is located on the spool, the outer lane of reel is located in the winding of various strip.
3. The project progress display device for building project management according to claim 2, characterized in that: the progress adjusting component comprises a sliding rod, a pressing block and a spring I, the sliding rod is slidably arranged on the barb plate, the pressing block is hinged to the sliding rod, one end of the spring is arranged on the sliding rod, and the other end of the spring is arranged on the pressing block.
4. The project progress display device for building project management according to claim 3, characterized in that: the limiting device comprises a pull rod, a limiting block and a second spring, the pull rod is slidably arranged on the outer frame, the limiting block is arranged on the pull rod, the second spring is arranged on an outer ring of the pull rod, one end of the second spring is arranged on the limiting block, and the other end of the second spring is arranged on the outer frame.
5. The project progress display device for building project management according to claim 4, characterized in that: the progress adjusting assembly is provided with a pointer, and the display board is provided with a graduated scale.
6. The project progress display device for building project management according to claim 5, characterized in that: the display board is provided with a handle.
7. The project progress display device for building project management according to claim 6, characterized in that: the bottom of the base is provided with a self-locking travelling wheel.
CN202120564955.5U 2021-03-19 2021-03-19 Engineering progress display device for building engineering management Expired - Fee Related CN214476029U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120564955.5U CN214476029U (en) 2021-03-19 2021-03-19 Engineering progress display device for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120564955.5U CN214476029U (en) 2021-03-19 2021-03-19 Engineering progress display device for building engineering management

Publications (1)

Publication Number Publication Date
CN214476029U true CN214476029U (en) 2021-10-22

Family

ID=78157421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120564955.5U Expired - Fee Related CN214476029U (en) 2021-03-19 2021-03-19 Engineering progress display device for building engineering management

Country Status (1)

Country Link
CN (1) CN214476029U (en)

Similar Documents

Publication Publication Date Title
CN104692286A (en) Lift truck and height display mechanism thereof
CN214476029U (en) Engineering progress display device for building engineering management
CN206862365U (en) A kind of degree of gravity vertical forwall surface detection means
CN206179412U (en) Panel of intelligence economic management teaching usefulness
CN209685074U (en) A kind of architectural design wrap-up for conveniently checking drawing
CN204748602U (en) Snapping line ink marker support
CN209543862U (en) A kind of Destination Management information displaying propagandizing device
CN201559227U (en) Automatic saw blade scale display device capable of tilting saw blade arbitrarily
CN112823717A (en) Multifunctional support for garment design
CN206480246U (en) Mathematical education graph demonstration device
CN209741812U (en) Soil and water conservation device convenient to installation and disassembly
CN212721439U (en) Fixed point marking device for engineering measurement
CN214065889U (en) Special measuring device of town and country planning and design
CN219223556U (en) Concrete thickness measuring tool
CN214476295U (en) Municipal garden engineering cost is procedure bulletin board for management
CN2802622Y (en) Locator for mounting number plate
CN212965429U (en) GPS equipment with portable support for topographic survey
CN214207341U (en) Adjusting base of model frame for clothing design
CN2400778Y (en) Novel tape measure
CN204791878U (en) Portable bill -board support
CN2412755Y (en) Multi-purpose teaching ruler
CN211065776U (en) Building engineering cost analytical equipment
CN212990540U (en) Cost presentation device that building engineering used
CN212415124U (en) Portable planning board for garden city
CN219607922U (en) Be applied to building construction's smart dress furred ceiling fossil fragments measuring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211022

CF01 Termination of patent right due to non-payment of annual fee