CN214472599U - Green concrete anti-permeability equipment - Google Patents

Green concrete anti-permeability equipment Download PDF

Info

Publication number
CN214472599U
CN214472599U CN202022832219.1U CN202022832219U CN214472599U CN 214472599 U CN214472599 U CN 214472599U CN 202022832219 U CN202022832219 U CN 202022832219U CN 214472599 U CN214472599 U CN 214472599U
Authority
CN
China
Prior art keywords
plate
fixed plate
fixing plate
fixed mounting
rubber ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022832219.1U
Other languages
Chinese (zh)
Inventor
王学兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Hongsheng Building Material Co ltd
Original Assignee
Shenzhen Hongsheng Building Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hongsheng Building Material Co ltd filed Critical Shenzhen Hongsheng Building Material Co ltd
Priority to CN202022832219.1U priority Critical patent/CN214472599U/en
Application granted granted Critical
Publication of CN214472599U publication Critical patent/CN214472599U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a green concrete anti-permeability equipment, comprises a workbench, workstation lower extreme four corners department fixed mounting backup pad, be equipped with the controller on the workstation front end, the controller position is in workstation middle part right side, workstation upper end fixed mounting work table, the through hole is seted up to work table upper end left and right sides symmetry, work table through hole is equipped with the bolt, work table upper end is equipped with fixed plate four, the non-through hole is seted up to four upper end left and right sides symmetries of fixed plate, and the fixed plate does not correspond the setting with the bolt four non-through holes, a plurality of circular recess is seted up to four upper ends of fixed plate, and four circular recess correspondences of fixed plate are equipped with the examination mould, the examination mould lower extreme is equipped with the rubber ring, rubber ring fixed mounting is in four circular recess of fixed plate, the rubber ring middle part is equipped with the mouth of leading. The utility model discloses during the use, through the rubber ring that sets up in four recesses of large-scale electronic pole and fixed plate, there is better protection to the leakproofness in the examination mould, increases the experiment accuracy, provides better experimental data.

Description

Green concrete anti-permeability equipment
Technical Field
The utility model relates to an impervious equipment specifically is a green concrete impervious equipment.
Background
The concrete impermeability appearance is exactly the equipment that inspects about concrete permeability, and the concrete impermeability appearance is usually including examination mould and base, through placing the concrete test block inside the examination mould, through the base upwards blowout steam, observes the infiltration degree of concrete test block again after a period to detect the permeability of concrete. The concrete impermeability instrument comprises an impermeability instrument main body and a test mold, and when the concrete impermeability instrument is used, water is firstly injected into the impermeability instrument main body; then coating a molten sealing material (fire paint or sealing wax) on the side surface of the test piece which is well cured according to the standard; heating the test mold to 40 ℃, then installing the test mold, which is provided with the pressed test piece, on a workbench of the impermeability instrument, aligning the test mold with a mold base, and uniformly screwing the screw caps; and finally, opening the control valve, namely feeding water pressure to the corresponding test body. However, after the test is finished, the test block and the die are transported and circulated for many times, the die filling and the die stripping processes are complicated to operate, and the working strength is high. Therefore, the utility model provides a green concrete anti-permeability equipment to solve the above-mentioned problem of proposing.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a green concrete anti-permeability equipment to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a green concrete anti-permeability device comprises a workbench, wherein a working table plate is fixedly installed at the upper end of the workbench, through holes are symmetrically formed in the left side and the right side of the upper end of the working table plate, bolts are arranged in the through holes of the working table plate, a fixing plate IV is arranged at the upper end of the working table plate, non-through holes are symmetrically formed in the left side and the right side of the upper end of the fixing plate IV, the non-through holes of the fixing plate IV are arranged corresponding to the bolts, a plurality of circular grooves are formed in the upper end of the fixing plate IV, test patterns are correspondingly arranged on the four circular grooves of the fixing plate IV, a plurality of buckles are arranged on the peripheral side of each test pattern, a clamping device is arranged in each buckle and is trapezoidal, a pull rod is fixedly installed in the middle of the outer end of each clamping device, penetrates through each buckle, each spring is arranged in each buckle and is sleeved on each pull rod, a plurality of clamping ports are formed in the peripheral side of each test pattern, each clamping port is arranged corresponding to each buckle, and a fixing plate is fixedly installed on the upper end of each test pattern, the inner wall of the test die is provided with a push plate, a rotating rod is fixedly installed at the upper end of the push plate, the rotating rod penetrates out of the test die and a fifth fixing plate, the rotating rod is meshed with the test die and the fifth fixing plate through threads, handles are symmetrically and fixedly installed on the left side and the right side of the rotating rod, a second fixing plate is fixedly installed at the rear end of the working table plate, and a first fixing plate is fixedly installed at the upper part of the front end of the second fixing plate.
As a further aspect of the present invention, the workbench lower end four corners department fixed mounting support plate.
As the utility model discloses further scheme again, be equipped with the controller on the workstation front end, the controller position is in workstation middle part right side.
As the utility model discloses scheme further again, the examination mould lower extreme is equipped with the rubber ring, and rubber ring fixed mounting is equipped with the mouth of a river in the middle part of the rubber ring in four circular recess of fixed plate.
As the utility model discloses scheme further again, electronic pole of a fixed plate lower extreme middle part fixed mounting, electronic pole lower extreme fixed mounting fixed plate is three, three lower extreme fixed mounting limiting plates of fixed plate.
As the utility model discloses still further scheme, the lower left corner fixed mounting water tank in the workstation, the upper right corner of water tank front end are equipped with the water filling port, water tank right-hand member fixed mounting inlet tube, upper end fixed mounting booster compressor in the workstation, booster compressor and inlet tube right-hand member intercommunication, booster compressor upper end fixed mounting outlet pipe, outlet pipe upper end fixed mounting pressure cell, pressure cell upper end fixed mounting pipe, the pipe other end fixed connection water guide mouth.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses during the use, through the rubber ring that sets up in four recesses of large-scale electronic pole and fixed plate, there is better protection to the leakproofness in the examination mould, increases the experiment accuracy, provides better experimental data.
2. The utility model discloses during the use, through setting up bolt device and fixed plate five, when trying the mould dress, can change different position and do the correspondence and transfer to the setting to and the installation setting, wait to accomplish and experiment again after loading, reduced because all sorts of inconveniences that back-off examination mould brought, reduce the experiment operation degree of difficulty.
3. The utility model discloses during the use, utilize the buckle to replace traditional bolt installation, to dismantling convenient more convenient, reduced operating time simultaneously, increase work experiment efficiency.
4. The utility model discloses during the use, directly set up the push rod inside the examination mould, during follow-up dismantlement module, can directly utilize the push pedal, produce the promotion to the test piece, generally get the piece relatively, need not strike and get, remain the test piece intact, dismantle also very simple to further reduce experiment operation.
Drawings
Fig. 1 is a schematic structural view of a green concrete impermeability device.
Fig. 2 is a schematic structural view of a test mold in green concrete anti-permeability equipment.
Fig. 3 is a schematic view showing the construction of a guide pipe in a green concrete impermeability apparatus.
Fig. 4 is a schematic structural view of a buckle in a green concrete impermeability device.
In the figure: 1. a work table; 2. a first fixing plate; 3. an electric rod; 4. a second fixing plate; 5. a third fixing plate; 6. a limiting plate; 7. testing a mold; 8. a bolt; 9. a support plate; 10. a grip; 11. a rotating rod; 12. a fifth fixing plate; 13. buckling; 14. a pull rod; 15. a controller; 16. pushing the plate; 17. a rubber ring; 18. a conduit; 19. a water tank; 20. a water inlet pipe; 21. a supercharger; 22. a water outlet pipe; 23. a pressure gauge; 24. a water guide port; 25. fixing a plate IV; 26. a work table plate; 27. a card interface; 28. a spring; 29. a latch; 30. a water injection port.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, in the embodiment of the present invention, a green concrete anti-permeability apparatus comprises a workbench 1, wherein a supporting plate 9 is fixedly installed at four corners of the lower end of the workbench 1, a controller 15 is installed on the front end of the workbench 1, the controller 15 is located at the right side of the middle of the workbench 1, a workbench plate 26 is fixedly installed at the upper end of the workbench 1, through holes are symmetrically formed at the left and right sides of the upper end of the workbench plate 26, pins 8 are installed in the through holes of the workbench plate 26, a fixing plate four 25 is installed at the upper end of the workbench plate 26, unperforated holes are symmetrically formed at the left and right sides of the upper end of the fixing plate four 25, unperforated holes of the fixing plate four 25 are arranged corresponding to the pins 8, a plurality of circular grooves are formed at the upper end of the fixing plate four 25, a test mold 7 is correspondingly arranged in the circular grooves of the fixing plate four 25, a rubber ring 17 is installed at the lower end of the test mold 7, the rubber ring 17 is fixedly installed in the circular grooves of the fixing plate four 25, a water guide 24 is arranged in the middle of the rubber ring 17, a plurality of buckles 13 are arranged on the periphery of the test mold 7, the buckles 13 are fixedly arranged at the upper end of a fourth fixing plate 25, a clamping device 29 is arranged in each buckle 13, each clamping device 29 is trapezoidal, a pull rod 14 is fixedly arranged in the middle of the outer end of each clamping device 29, each pull rod 14 penetrates through each buckle 13, a spring 28 is arranged in each buckle 13, each spring 28 is sleeved on each pull rod 14, a plurality of clamping ports 27 are formed in the periphery of each test mold 7, each clamping port 27 corresponds to each buckle 13, a fixing plate five 12 is fixedly arranged at the upper end of each test mold 7, a push plate 16 is arranged on the inner wall of each test mold 7, a rotating rod 11 is fixedly arranged at the upper end of each push plate 16, each rotating rod 11 penetrates through each test mold 7 and each fixing plate five 12, each rotating rod 11 is in threaded engagement with the test molds 7 and the fixing plates five 12, grips 10 are symmetrically and fixedly arranged on the left and right sides of each rotating rod 11, a fixing plate two fixing plates 4 is fixedly arranged at the rear ends of the working table plates 26, a first fixing plate 2, an electric rod 3 is fixedly arranged at the middle of the first fixing plate 2, three 5 of 3 lower extreme fixed mounting fixed plates of electric pole, three 5 lower extreme fixed mounting limiting plates 6 of fixed plate, lower left corner fixed mounting water tank 19 in the workstation 1, the upper right corner of 19 front ends of water tank is equipped with water filling port 30, 19 right-hand member fixed mounting intake pipe 20 of water tank, upper end fixed mounting booster compressor 21 in the workstation 1, booster compressor 21 and the 20 right-hand members of inlet tube intercommunication, booster compressor 21 upper end fixed mounting outlet pipe 22, outlet pipe 22 upper end fixed mounting pressure gauge 23, pressure gauge 23 upper end fixed mounting pipe 18, pipe 18 other end fixed connection water guide 24.
The utility model discloses a theory of operation is:
the utility model discloses during the use, need to pack into the die cavity of examination mould 7 with the test piece that scribbles sealing material, set up circular spout on 7 calibration fixed plate four 25 of examination mould, examination mould 7 inserts the upper end of fixed plate four 25, make rubber ring 17 seal with 7 lower extremes of examination mould, 7 week sides of examination mould set up joint mouth 27 and buckle 13 in the joint ware 29 that is equipped with carry out the joint this moment, fixed examination mould 7 opens electronic pole 3, pushes down limiting plate 6, limiting plate 6 drives pressure for fixed plate five 12, thereby make examination mould 7 sealed inseparabler, open booster compressor 21, carry water pressure to all test pieces; after the test is completed, the die is removed, the bolt 8 is pulled out, the electric rod 3 is opened to ascend, the pressure is bound, all the test dies 7 on the fixing plate four 25 are moved out, all the pull rods 14 are pulled, all the test dies 7 are disassembled, the handle 10 is rotated, the test piece is taken out by utilizing the thrust, the test piece is generally taken out relatively, the knocking is not needed, the test piece is kept intact, and the disassembling is very simple.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A green concrete anti-permeability device comprises a workbench (1) and is characterized in that a working table plate (26) is fixedly mounted at the upper end of the workbench (1), through holes are symmetrically formed in the left side and the right side of the upper end of the working table plate (26), bolts (8) are arranged in the through holes of the working table plate (26), a fixing plate four (25) is arranged at the upper end of the working table plate (26), non-through holes are symmetrically formed in the left side and the right side of the upper end of the fixing plate four (25), the non-through holes of the fixing plate four (25) are arranged corresponding to the bolts (8), a plurality of circular grooves are formed in the upper end of the fixing plate four (25), test molds (7) are correspondingly arranged in the circular grooves of the fixing plate four (25), a plurality of buckles (13) are arranged on the periphery side of the test molds (7), the buckles (13) are fixedly mounted at the upper ends of the fixing plate four (25), a clamping connector (29) is arranged inside the buckles (13), and the clamping connector (29) is trapezoidal, clamping device (29) leans on outer end middle part fixed mounting pull rod (14), buckle (13) are worn out in pull rod (14), spring (28) are established in buckle (13), spring (28) and cover are established on pull rod (14), a plurality of joint mouth (27) are seted up to examination mould (7) week side, joint mouth (27) correspond the setting with buckle (13), a plurality of examination mould (7) upper end fixed mounting fixed plate five (12), examination mould (7) inner wall is equipped with push pedal (16), push pedal (16) upper end fixed mounting bull stick (11), examination mould (7) and fixed plate five (12) are worn out to bull stick (11), bull stick (11) and examination mould (7) and fixed plate five (12) threaded engagement, bull stick (11) left and right sides symmetry fixed mounting handle (10), work table board (26) rear end fixed mounting fixed plate two (4), fixed plate one (2) is fixed mounting fixed plate two (4) front end upper portion.
2. A green concrete impermeability equipment according to claim 1, wherein the working platform (1) is fixedly installed with supporting plates (9) at the four corners of the lower end.
3. A green concrete impermeability equipment according to claim 1, wherein the controller (15) is arranged on the front end of the working platform (1), the controller (15) is located on the right side of the middle of the working platform (1).
4. The green concrete anti-permeability device according to claim 1, wherein a rubber ring (17) is arranged at the lower end of the test mold (7), the rubber ring (17) is fixedly installed in a circular groove of the four fixing plates (25), and a water guide port (24) is arranged in the middle of the rubber ring (17).
5. The green concrete anti-permeability device according to claim 1, wherein the electric rod (3) is fixedly installed in the middle of the lower end of the first fixing plate (2), the third fixing plate (5) is fixedly installed at the lower end of the electric rod (3), and the limiting plate (6) is fixedly installed at the lower end of the third fixing plate (5).
6. The green concrete anti-permeability device according to claim 1, characterized in that a water tank (19) is fixedly mounted at the lower left corner in the workbench (1), a water filling port (30) is arranged at the upper right corner of the front end of the water tank (19), a water inlet pipe (20) is fixedly mounted at the right end of the water tank (19), a supercharger (21) is fixedly mounted at the upper end in the workbench (1), the supercharger (21) is communicated with the right end of the water inlet pipe (20), a water outlet pipe (22) is fixedly mounted at the upper end of the supercharger (21), a pressure gauge (23) is fixedly mounted at the upper end of the water outlet pipe (22), a guide pipe (18) is fixedly mounted at the upper end of the pressure gauge (23), and a water guide port (24) is fixedly communicated with the other end of the guide pipe (18).
CN202022832219.1U 2020-12-01 2020-12-01 Green concrete anti-permeability equipment Active CN214472599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022832219.1U CN214472599U (en) 2020-12-01 2020-12-01 Green concrete anti-permeability equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022832219.1U CN214472599U (en) 2020-12-01 2020-12-01 Green concrete anti-permeability equipment

Publications (1)

Publication Number Publication Date
CN214472599U true CN214472599U (en) 2021-10-22

Family

ID=78185090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022832219.1U Active CN214472599U (en) 2020-12-01 2020-12-01 Green concrete anti-permeability equipment

Country Status (1)

Country Link
CN (1) CN214472599U (en)

Similar Documents

Publication Publication Date Title
CN214472599U (en) Green concrete anti-permeability equipment
CN108749033A (en) A kind of precast body reinforcing plate class universal vacuum mould closing mould
CN213412817U (en) Efficient automobile parts injection mold
CN208681994U (en) One kind, which has, to be easy to be opened injection mold
CN219466929U (en) High strength pressure pipe is along with shape cooling injection mold
CN212536773U (en) Sand shooting valve for core shooting machine
CN210309119U (en) RTM (resin transfer molding) forming die for manufacturing three-dimensional textile composite material
CN209247484U (en) A kind of cold inlaying device of metallographic using photosensitive resin
CN206153535U (en) Metal pressure casting mould of utensil flow control and leak protection function
CN203527641U (en) Resistance-free jacking gypsum block making machine
CN113459449A (en) Injection molding device and process for middle frame of liquid crystal curved screen
CN106626256A (en) In-mould decoration injection moulding mould
CN207643634U (en) A kind of simulation of injection molding machine is risen mould test cylinder apparatus
CN206201155U (en) A kind of interior grouting device of ceramic utensil
CN221271879U (en) Injection molding die for cylindrical lithium battery cell bracket
CN215095230U (en) Household appliance injection mold convenient for taking out plastic part
CN212748193U (en) Battery case airtightness detection tool
CN217621195U (en) Forming device is used in building fragment of brick production
CN217494874U (en) Vulcanizer drawing of patterns discharging device
CN205120541U (en) Concrete anti -permeability apparatus
CN116274862B (en) Corrosion-resistant pump cover processing die and pump cover
CN211363305U (en) Injection mold of plastic cell phone case production usefulness
CN221475904U (en) Precise injection mold for rubber parts
CN218256594U (en) Full-automatic injection vulcanizer of porcelain composite insulator is exclusively used in
CN205343712U (en) Novel student tests special injection molding machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant