CN214462593U - Building outer wall floor connects stubble position concrete placement correcting unit - Google Patents
Building outer wall floor connects stubble position concrete placement correcting unit Download PDFInfo
- Publication number
- CN214462593U CN214462593U CN202022914365.9U CN202022914365U CN214462593U CN 214462593 U CN214462593 U CN 214462593U CN 202022914365 U CN202022914365 U CN 202022914365U CN 214462593 U CN214462593 U CN 214462593U
- Authority
- CN
- China
- Prior art keywords
- template
- wall
- building outer
- steel pipe
- connecting steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007789 sealing Methods 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 28
- 239000010959 steel Substances 0.000 claims description 28
- 230000003014 reinforcing effect Effects 0.000 claims description 25
- 238000009415 formwork Methods 0.000 claims description 7
- 239000007788 liquid Substances 0.000 abstract description 13
- 238000010276 construction Methods 0.000 abstract description 5
- 230000008878 coupling Effects 0.000 abstract 5
- 238000010168 coupling process Methods 0.000 abstract 5
- 238000005859 coupling reaction Methods 0.000 abstract 5
- 230000002787 reinforcement Effects 0.000 abstract 2
- 239000002390 adhesive tape Substances 0.000 description 7
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 229910052500 inorganic mineral Inorganic materials 0.000 description 2
- 239000011707 mineral Substances 0.000 description 2
- 239000002966 varnish Substances 0.000 description 2
- 229920002472 Starch Polymers 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 235000019698 starch Nutrition 0.000 description 1
- 239000008107 starch Substances 0.000 description 1
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model provides a building outer wall floor connects stubble position concrete placement correcting unit, including first template and second template, first template and second template are installed respectively on the building outer wall, first template is connected with the second template through first coupling mechanism, the second template is connected with the building outer wall through second coupling mechanism and second coupling mechanism pre-buries in the building outer wall, install the reinforcement mechanism between first coupling mechanism and the second coupling mechanism, the reinforcement mechanism is connected with the second template; and a sealing mechanism is arranged between the second template and the building outer wall. The utility model discloses structural design is simple, and construction convenience has significantly reduced the floor and has connect the stubble position dislocation to appear, has avoided running thick liquid to leak the thick liquid scene, guarantees to connect the concrete of stubble department and sees the sense.
Description
Technical Field
The utility model relates to a technical field of construction especially relates to a building outer wall floor connects stubble position concrete placement correcting unit.
Background
The condition of dislocation, hourglass thick liquid and running thick liquid often appears in building construction outer wall connects stubble position, and floor outer wall connects stubble position quality poor, not only influences the pleasing to the eye of building, causes the difficulty to the outer heat retaining of later stage pasting in addition, needs the manual work to pick the chisel, is difficult to guarantee the perpendicular roughness of heated board, influences the real mineral varnish effect of later stage to the manual work volume of picking the chisel is big, consumes a large amount of manpower and materials financial resources, causes engineering construction cost to improve, influences project economic benefits.
SUMMERY OF THE UTILITY MODEL
The condition of dislocation, hourglass thick liquid and running thick liquid often appears in connecing the stubble position to building outer wall, needs the manual work to pick the chisel to guarantee the perpendicular roughness of heated board, influence the technical problem of the real mineral varnish effect in later stage, the utility model provides a building outer wall floor connects stubble position concrete placement correcting unit.
In order to solve the above problem, the technical scheme of the utility model is so realized:
a concrete pouring correction device for a connecting position of a building outer wall floor comprises a first template and a second template, wherein the first template and the second template are respectively installed on the building outer wall; and a sealing mechanism is arranged between the second template and the building outer wall.
Preferably, the first connecting mechanism comprises a first pair of pull bolts and a first connecting steel pipe, and the first template is connected with the second template through the first pair of pull bolts and the first connecting steel pipe; and a reinforcing mechanism is arranged between the first connecting steel pipe and the second connecting mechanism.
Preferably, the second connecting mechanism comprises a second split bolt and a second connecting steel pipe, the second split bolt is embedded in the building outer wall, the second module is connected with the building outer wall through the second split bolt and the second connecting steel pipe, a reinforcing mechanism is installed between the second connecting steel pipe and the first connecting steel pipe, and the reinforcing mechanism is fixedly connected with the second template.
Preferably, the reinforcing mechanism comprises a U-shaped reinforcing frame, the U-shaped reinforcing frame covers the first connecting steel pipe and the second connecting steel pipe, and the U-shaped reinforcing frame is connected with the second template.
Preferably, the sealing mechanism comprises a sponge rubber strip, and the sponge rubber strip is installed between the second template and the building outer wall.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses structural design is simple, installs on the building outer wall through first template and second template to it has the sponge adhesive tape to paste between second template and building outer wall, utilizes the sponge adhesive tape to sealed between second template and the building outer wall, reduces the building outer wall and connects the condition that the stubble position leaks to starch and runs thick liquid, and whole construction convenience has significantly reduced the floor and has connect the stubble position dislocation to appear, has avoided running thick liquid and has leaked the thick liquid scene, guarantees to connect stubble department concrete impression.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural diagram of the second template in fig. 1.
In the figure, 1 is a first template, 2 is a second template, 3 is a first pair of pull bolts, 4 is a sponge adhesive tape, 5 is a second pair of pull bolts, 6 is a U-shaped reinforcing frame, and 7 is a first connecting steel pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in fig. 1, the concrete pouring correction device for the connecting position of the building outer wall floor comprises a first template 1 and a second template 2, wherein the first template 1 and the second template 2 are respectively installed on the building outer wall, the installation height of the bottom of the first template is larger than that of the bottom of the second template, the first template 1 is connected with the second template 2 through a first connecting mechanism, the first connecting mechanism comprises a first counter bolt 3 and a first connecting steel pipe 7, and the first template 1 is connected with the second template 2 through the first counter bolt 3 and the first connecting steel pipe 7.
As shown in fig. 2, the second formwork 2 is connected with the building outer wall through a second connecting mechanism and the second connecting mechanism is pre-embedded in the building outer wall, a reinforcing mechanism is installed between the first connecting steel pipe 7 and the second connecting mechanism, a reinforcing mechanism is installed between the first connecting mechanism and the second connecting mechanism, and the reinforcing mechanism is connected with the second formwork 2; the second connecting mechanism comprises a second split bolt 5 and a second connecting steel pipe, the second split bolt 5 is embedded in the building outer wall, the second template 2 is connected with the building outer wall through the second split bolt 5 and the second connecting steel pipe, a reinforcing mechanism is installed between the second connecting steel pipe and the first connecting steel pipe 7 and fixedly connected with the second template 2, the reinforcing mechanism comprises a U-shaped reinforcing frame 6, the U-shaped reinforcing frame 6 covers the first connecting steel pipe 7 and the second connecting steel pipe, and the U-shaped reinforcing frame 6 is connected with the second template
Be provided with sealing mechanism between second template 2 and the building outer wall, sealing mechanism includes sponge adhesive tape 4, sponge adhesive tape 4 is installed between second template 2 and the building outer wall, first template and second template are installed on the building outer wall, and it has sponge adhesive tape to paste between second template and the building outer wall, utilize sponge adhesive tape to the sealed between second template and the building outer wall, reduce the condition that the building outer wall connects the stubble position to leak thick liquid and run thick liquid, whole construction convenience, the floor that has significantly reduced connects the stubble position to appear the dislocation, avoided running thick liquid and leaking the thick liquid scene, guarantee to connect stubble department concrete impression.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. A concrete pouring correction device for a connecting position of a building outer wall floor comprises a first template (1) and a second template (2), wherein the first template (1) and the second template (2) are respectively installed on the building outer wall, and the concrete pouring correction device is characterized in that the first template (1) is connected with the second template (2) through a first connecting mechanism, the second template (2) is connected with the building outer wall through a second connecting mechanism, the second connecting mechanism is embedded in the building outer wall, a reinforcing mechanism is installed between the first connecting mechanism and the second connecting mechanism, and the reinforcing mechanism is connected with the second template (2); and a sealing mechanism is arranged between the second template (2) and the building outer wall.
2. The concrete pouring correction device for the connecting position of the floors of the outer walls of the buildings according to the claim 1 is characterized in that the first connecting mechanism comprises a first pair of pull bolts (3) and a first connecting steel pipe (7), and the first formwork (1) is connected with the second formwork (2) through the first pair of pull bolts (3) and the first connecting steel pipe (7); and a reinforcing mechanism is arranged between the first connecting steel pipe (7) and the second connecting mechanism.
3. The concrete pouring correction device for the floor connecting position of the building outer wall is characterized in that the second connecting mechanism comprises a second split bolt (5) and a second connecting steel pipe, the second split bolt (5) is embedded in the building outer wall, the second formwork (2) is connected with the building outer wall through the second split bolt (5) and the second connecting steel pipe, a reinforcing mechanism is installed between the second connecting steel pipe and the first connecting steel pipe (7), and the reinforcing mechanism is fixedly connected with the second formwork (2).
4. The device for correcting concrete pouring at the connecting position of the building outer wall floor according to claim 1 or 3, wherein the reinforcing mechanism comprises a U-shaped reinforcing frame (6), the U-shaped reinforcing frame (6) is covered on the first connecting steel pipe (7) and the second connecting steel pipe, and the U-shaped reinforcing frame (6) is connected with the second formwork.
5. The concrete pouring correction device for the building outer wall floor connecting position is characterized in that the sealing mechanism comprises a sponge rubber strip (4), and the sponge rubber strip (4) is installed between the second template (2) and the building outer wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022914365.9U CN214462593U (en) | 2020-12-08 | 2020-12-08 | Building outer wall floor connects stubble position concrete placement correcting unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022914365.9U CN214462593U (en) | 2020-12-08 | 2020-12-08 | Building outer wall floor connects stubble position concrete placement correcting unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214462593U true CN214462593U (en) | 2021-10-22 |
Family
ID=78186138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022914365.9U Active CN214462593U (en) | 2020-12-08 | 2020-12-08 | Building outer wall floor connects stubble position concrete placement correcting unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214462593U (en) |
-
2020
- 2020-12-08 CN CN202022914365.9U patent/CN214462593U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214462593U (en) | Building outer wall floor connects stubble position concrete placement correcting unit | |
CN212802545U (en) | Whole design construction templates of steel closed stair | |
CN207332369U (en) | A kind of assembled integral vacuum toilet | |
CN109057097B (en) | Flexible connection structure of dry-type ductile wallboard and door and window and construction method thereof | |
CN215330562U (en) | Connecting component between concrete laminated slab and shear wall external wall panel | |
CN217998618U (en) | Novel slurry leakage prevention superposed secondary beam suitable for assembly type frame concrete building | |
CN211622615U (en) | Aluminum template for preventing leakage of window part | |
CN212836288U (en) | Steel frame light energy-saving roof board roof deformation joint connecting structure | |
CN201428182Y (en) | Easy installing movable board room | |
CN212896954U (en) | Composite assembly type building outer wall | |
CN214497920U (en) | Novel energy-efficient building outer wall insulation construction | |
CN210767394U (en) | Corner-free vertical frame unit curtain wall system | |
CN214697463U (en) | Steel construction wall maintains system banding structure | |
CN209958530U (en) | Vertical receipts limit seam waterproof node of horizontal board of steel construction | |
CN211817159U (en) | Precast concrete wallboard convenient to construction installation | |
CN210396493U (en) | Fixing device for aluminum alloy window | |
CN210395774U (en) | Box type integral assembling building curtain wall | |
CN213268398U (en) | Water leakage prevention structure at deformation joint of atrium glass | |
CN211598237U (en) | Outer wall window frame installation heat preservation device | |
CN217128553U (en) | Novel waterproof construction of new and old building concrete bottom plate linking department | |
CN219604648U (en) | Novel container house furred ceiling subassembly | |
CN218509299U (en) | Energy-saving aluminum alloy door and window auxiliary frame mounting structure | |
CN219773623U (en) | Box culvert deformation joint end template supporting structure | |
CN211229544U (en) | Aluminum alloy template profile connected with prefabricated part | |
CN216948804U (en) | Deformation joint node structure of outer wall surface of color steel composite board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |