CN214453143U CN202120594071.4U CN202120594071U CN214453143U CN 214453143 U CN214453143 U CN 214453143U CN 202120594071 U CN202120594071 U CN 202120594071U CN 214453143 U CN214453143 U CN 214453143U
Authority
CN
China
Prior art keywords
installation
clamping
groove
ring
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120594071.4U
Other languages
Chinese (zh)
Inventor
刘伟峰
何威
姚磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dingli Power Technology Co ltd
Original Assignee
Henan Dingli Power Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Dingli Power Technology Co ltd filed Critical Henan Dingli Power Technology Co ltd
Priority to CN202120594071.4U priority Critical patent/CN214453143U/en
Application granted granted Critical
Publication of CN214453143U publication Critical patent/CN214453143U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel-pipe pole auxiliary mounting structure, including the steel pole, be provided with mounting tool mechanism on the steel pole, and mounting tool mechanism including laminating ring, magnetism inhale piece, draw-in groove mouth, hold the vanning, installation baffle, spliced pole, installation slot, hanging piece and installation card hole, the upper end edge of laminating ring installs magnetism and inhales the piece, and the edge side of laminating ring has seted up the draw-in groove mouth, the side of laminating ring is provided with and clamps the spout, and clamps and be connected with on the spout and hold the vanning, the installation slot has been seted up to the equidistance on holding the inner wall of vanning, and installs the installation baffle on the installation slot, hold one side that the vanning is close to laminating ring and install the spliced pole. The utility model discloses simple structure, the inner wall of laminating ring can laminate on the steel pole, and then can accomplish the laminating of placing of mounting tool mechanism on the steel pole, and the magnetism piece of inhaling on the ring of laminating simultaneously can adsorb the instrument of metal material temporarily when the workman is under construction, guarantees the stability in use of mounting tool mechanism.

Description

Steel pipe pole auxiliary mounting structure
Technical Field
The utility model relates to a steel-pipe pole technical field specifically is a steel-pipe pole auxiliary installation structure.
Background
The steel pipe pole is the one of the electric power body of rod, replaced traditional steel frame construction's power transmission framework with its high-quality characteristic, the cross-sectional type of present steel pipe pole mainly has two kinds of types of circular and polygon (regular four, six, eight, twelve, hexadecimal), common cross-section adopts regular eight, regular twelve, hexadecimal, the cross-sectional type of steel pipe pole also mainly is confirmed according to the whole aesthetic measure of system back polygon length of side, the connected mode of mobile jib steel pipe pole mainly has the welded type, cup joint formula and flange connected mode, because so the connected process all belongs to high altitude construction, so need the instrument to carry out supplementary installation to the steel pipe pole.
When installing, current steel-pipe pole needs the workman to bear the saddlebag and scrambles the installation and handles, and the saddlebag has the risk that drops when using simultaneously, can influence the personal safety of other staff of device lower extreme, and its inside instrument stability degree is lower when using the toolbox, has reduced the availability factor of device, influences the result of use simultaneously.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel-pipe pole auxiliary installation structure to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a supplementary mounting structure of steel-pipe pole, includes the steel pole, be provided with mounting tool mechanism on the steel pole, and mounting tool mechanism includes laminating ring, magnetism and inhale piece, draw-in groove mouth, hold the vanning, installation baffle, spliced pole, installation draw-in groove, hanger and installation card hole, the upper end edge of laminating ring installs magnetism and inhales the piece, and the marginal side of laminating ring has seted up the draw-in groove mouth, the side of laminating ring is provided with clamps the spout, and clamps and be connected with on the spout and hold the vanning, the equidistance has seted up installation draw-in groove on holding the inner wall of vanning, and installs the installation baffle on the installation draw-in groove, hold the vanning and paste one side of ring and install the spliced pole, and be provided with the hanger on the spliced pole, the installation card hole has been seted up to the side one end of laminating ring, and is provided with U type pole on the installation card hole.
Preferably, the fit ring is semicircular, the inner wall of the fit ring is in fit connection with the steel rod, and the fit ring and the magnetic block are designed in an integrated mode.
Preferably, the bearing box and the clamping sliding groove are in clamping type sliding connection, the bearing box and the installation clamping groove are integrally designed, and the installation clamping groove and the installation partition plate are in cutting type clamping connection.
Preferably, a triangular groove is mounted on the connecting column, and the triangular groove is in a downward concave triangular shape.
Preferably, the two sides of the hanging block are provided with side wings, the other ends of the side wings are connected with groove-shaped hooks, and the side sections of the groove-shaped hooks are in a gourd shape.
Preferably, the lower extreme of hanging the piece is installed the triangle piece, and the triangle piece is connected for snap-on magnetism with the triangular groove.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses simple structure, the inner wall of laminating ring can laminate on the steel pole, and then can accomplish the placing laminating of mounting tool mechanism on the steel pole, and the magnetism piece that pastes on the ring simultaneously can adsorb the instrument of metal material temporarily when workman's construction, guarantees the stability in use of mounting tool mechanism;
2. the utility model discloses the slip of bearing the case on clamping the spout can increase the adjusting capability of bearing the case on the laminating ring, and then can increase the convenient degree of use of whole device, can provide convenient to the use of whole laminating ring.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic structural diagram of the mounting tool mechanism of the present invention.
Fig. 3 is a schematic view of the structure of the container of the present invention.
Fig. 4 is a schematic view of the connecting column structure of the present invention.
Fig. 5 is a schematic view of the mounting structure of the hanging block of the present invention.
In the figure: 1. a steel rod; 2. mounting a tool mechanism; 21. fitting a ring; 2101. clamping the chute; 22. a magnetic block; 23. a notch; 24. carrying and loading the box; 25. installing a partition plate; 26. connecting columns; 2601. a triangular groove; 27. installing a clamping groove; 28. hanging blocks; 2801. a side wing; 2802. a slot-shaped hook; 2803. a triangular block; 29. installing a clamping hole; 2901. a U-shaped rod.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: the utility model provides a steel-pipe pole auxiliary installation structure, be provided with mounting tool mechanism 2 on steel pole 1, and mounting tool mechanism 2 includes laminating ring 21, magnetism inhales piece 22, draw-in groove mouth 23, hold vanning 24, installation baffle 25, spliced pole 26, installation draw-in groove 27, hanging piece 28 and installation card hole 29, the upper end edge of laminating ring 21 installs magnetism and inhales piece 22, and laminating ring 21's marginal side has seted up draw-in groove mouth 23, laminating ring 21's side is provided with clamps spout 2101, and be connected with on clamping spout 2101 and hold vanning 24, installation draw-in groove 27 has been seted up to the equidistance on holding vanning 24's the inner wall, and install the baffle 25 on the installation draw-in groove 27, hold vanning 24 and install spliced pole 26 near one side of laminating ring 21, and be provided with hanging piece 28 on the spliced pole 26, installation card hole 29 has been seted up to the side one end of laminating ring 21, and be provided with U type 2901 on the installation card hole 29.
The laminating ring 21 is semicircular, the inner wall of the laminating ring 21 is connected with the steel rod 1 in a laminating mode, the laminating ring 21 and the magnetic suction block 22 are integrally designed, the magnetic suction block 22 can stably adsorb a metal tool with adsorbability, and the user can be guaranteed to take the metal tool at any time.
The container 24 and the clamping chute 2101 are in clamping type sliding connection, the container 24 and the installation clamping groove 27 are in integrated design, the installation clamping groove 27 and the installation partition plate 25 are in cutting type clamping connection, the installation partition plate 25 can change the layout of the space in the container 24, and tools with different sizes can be conveniently placed in the container 24.
Triangular groove 2601 is installed on connecting column 26, and triangular groove 2601 sets up to recessed triangle-shaped form, and triangular groove 2601 can guarantee the block stability with it of triangle-shaped block 2803, avoids triangle-shaped block 2803 to rock.
A side wing 2801 is attached to both sides of the hanging block 28, and the other end of the side wing 2801 is connected to a groove-shaped hook 2802, and the groove-shaped hook 2802 is formed in a gourd-shaped side section, so that the groove-shaped hook 2802 can hook a tool.
The triangular block 2803 is installed to the lower extreme of hanging piece 28, and triangular block 2803 and triangular groove 2601 are connected for snap-on magnetism, inhale between triangular block 2803 and the triangular groove 2601 magnetism, can double-fixing the stability of being connected between triangular block 2803 and the triangular groove 2601. The matching use capability of the triangular block 2803 and the triangular groove 2601 is increased.
The working principle is as follows: when the utility model is used, the utility model needs to be understood by a simple structure, firstly, the mounting tool mechanism 2 is taken on the connecting mounting position of the steel rod 1, then two bonding rings 21 are tightly attached, then the U-shaped rod 2901 is taken up and sleeved in the mounting clamp hole 29 to complete the fastening treatment of the two bonding rings 21, then a user takes out the tool in the bearing box 24, at the moment, the mounting treatment of the steel rod is completed through an auxiliary tool, simultaneously, an iron tool is adsorbed on the magnetic suction block 22, simultaneously, the tool to be hung is hung on the clamping notch 23, then the rear bearing box 24 is pushed to be adjusted on the clamping chute 2101, simultaneously, the use is convenient and fast, then, the user can hang the tool in the box through the clamping between the triangular block 2803 on the hanging block 28 and the triangular groove 2601, the groove type hook 2802 on the hanging block 28 is completed, the stable use of the whole steel rod tool is ensured, the use of the whole device is completed at the moment, so that the use of people is more convenient.
The above description is only an example of the present invention, and the common general knowledge of the known specific structures and characteristics of the embodiments is not described herein. It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a steel pipe pole auxiliary installation structure, includes steel pole (1), its characterized in that: the steel rod (1) is provided with an installation tool mechanism (2), the installation tool mechanism (2) comprises a fitting ring (21), a magnetic suction block (22), a clamping groove opening (23), a bearing box (24), an installation partition plate (25), a connecting column (26), an installation clamping groove (27), a hanging block (28) and an installation clamping hole (29), the magnetic suction block (22) is installed at the edge of the upper end of the fitting ring (21), the clamping groove opening (23) is formed in the edge side edge of the fitting ring (21), a clamping sliding groove (2101) is formed in the side edge of the fitting ring (21), the bearing box (24) is connected onto the clamping sliding groove (2101), the installation clamping grooves (27) are formed in the inner wall of the bearing box (24) at equal intervals, the installation partition plate (25) is installed on the installation clamping groove (27), the connecting column (26) is installed on one side, close to the fitting ring (21), of the bearing box (24), and a hanging block (28) is arranged on the connecting column (26), an installation clamping hole (29) is formed in one end of the side edge of the attaching ring (21), and a U-shaped rod (2901) is arranged on the installation clamping hole (29).
2. The auxiliary mounting structure for the steel pipe pole according to claim 1, wherein: the magnetic pole is characterized in that the attaching ring (21) is semicircular, the inner wall of the attaching ring (21) is attached to the steel pole (1), and the attaching ring (21) and the magnetic attraction block (22) are designed in an integrated mode.
3. The auxiliary mounting structure for the steel pipe pole according to claim 1, wherein: the loading box (24) is connected with the clamping sliding groove (2101) in a clamping and sliding mode, the loading box (24) and the installation clamping groove (27) are designed integrally, and the installation clamping groove (27) is connected with the installation partition plate (25) in a cutting and clamping mode.
4. The auxiliary mounting structure for the steel pipe pole according to claim 1, wherein: triangular grooves (2601) are mounted on the connecting columns (26), and the triangular grooves (2601) are in a downward-concave triangular shape.
5. The auxiliary mounting structure for the steel pipe pole according to claim 1, wherein: and side wings (2801) are arranged on two sides of the hanging block (28), the other ends of the side wings (2801) are connected with groove-shaped hooks (2802), and the side sections of the groove-shaped hooks (2802) are in a gourd shape.
6. The auxiliary mounting structure for the steel pipe pole according to claim 1, wherein: the lower end of the hanging block (28) is provided with a triangular block (2803), and the triangular block (2803) and the triangular groove (2601) are connected in a clamping type magnetic attraction manner.
CN202120594071.4U 2021-03-24 2021-03-24 Steel pipe pole auxiliary mounting structure Active CN214453143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120594071.4U CN214453143U (en) 2021-03-24 2021-03-24 Steel pipe pole auxiliary mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120594071.4U CN214453143U (en) 2021-03-24 2021-03-24 Steel pipe pole auxiliary mounting structure

Publications (1)

Publication Number Publication Date
CN214453143U true CN214453143U (en) 2021-10-22

Family

ID=78159773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120594071.4U Active CN214453143U (en) 2021-03-24 2021-03-24 Steel pipe pole auxiliary mounting structure

Country Status (1)

Country Link
CN (1) CN214453143U (en)

Similar Documents

Publication Publication Date Title
CN207303552U (en) Hanging socket device
CN214453143U (en) Steel pipe pole auxiliary mounting structure
CN210480592U (en) Special stone tongs of aluminium alloy
CN216156892U (en) Internet of things movable building partition wall for interior decoration based on ERP
CN210950469U (en) Fire control user information transmission device
CN201261690Y (en) Sling for assembling ac motor stator core and stand
CN209979040U (en) Loader electronic scale with anti-skidding function
CN219344222U (en) Concrete pole with installation base
CN220586133U (en) Motor rotor supporting device
CN215509154U (en) Conveniently-installed fillet end mill
CN204899165U (en) Ceramic tile laminating vibration locating detent
CN213238655U (en) Multifunctional measuring ruler
CN209748532U (en) Emergency electronic communication equipment convenient to install temporarily
CN217115784U (en) Stable base convenient to install motor
CN103967365A (en) Integrated glass fixing hinge
CN210989576U (en) Auxiliary article hanging device
CN210540400U (en) Hanging buckle for photo frame or antithetical couplet frame
CN210901679U (en) Certificate buckle
CN210166516U (en) A hand-held type metal detector for high-speed railway station
CN217701944U (en) Protective sheath is used in welded tube processing protection
CN214614024U (en) Portable steel reinforcement cage positioning fixture
CN210696241U (en) Convenient lock catch
CN215835551U (en) Bluetooth headset shell
CN218682290U (en) A clamping structure for helmet joins externally equipment
CN213999411U (en) Toolbox for engineering cost