CN214449881U - Building engineering manages with engineering progress recorder - Google Patents

Building engineering manages with engineering progress recorder Download PDF

Info

Publication number
CN214449881U
CN214449881U CN202120384425.2U CN202120384425U CN214449881U CN 214449881 U CN214449881 U CN 214449881U CN 202120384425 U CN202120384425 U CN 202120384425U CN 214449881 U CN214449881 U CN 214449881U
Authority
CN
China
Prior art keywords
recording
box
rod
fixed block
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120384425.2U
Other languages
Chinese (zh)
Inventor
席建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Xindongchen Engineering Management Co ltd
Original Assignee
Henan Xindongchen Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Xindongchen Engineering Management Co ltd filed Critical Henan Xindongchen Engineering Management Co ltd
Priority to CN202120384425.2U priority Critical patent/CN214449881U/en
Application granted granted Critical
Publication of CN214449881U publication Critical patent/CN214449881U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Time Recorders, Dirve Recorders, Access Control (AREA)

Abstract

The utility model relates to a project progress recording device for building engineering supervision, which comprises a recording box, wherein two sides of the recording box are both fixed with baffles, a rotating shaft is installed between the baffles, the outer wall of the rotating shaft is fixed with a cover plate, one side of the top of the cover plate is provided with a clamping groove, the top of the outer side of the recording box is fixed with a first fixed block, the inside of the first fixed block is provided with a first pin shaft, the outer wall of the first pin shaft is provided with a movable rod, the end part of the second pin shaft is provided with a second fixed block, the top of the second fixed block is fixedly connected with the bottom of the cover plate, the outer side of the recording box is provided with a handle, the project progress recording device for building engineering supervision guarantees that the recording book does not enter water in rainy days when being carried, and simultaneously avoids the recording book from carelessly falling into the water of a construction site, the phenomenon of water inflow can not occur, and a good protection effect is achieved on the notebook.

Description

Building engineering manages with engineering progress recorder
Technical Field
The utility model relates to a building engineering supervision technical field specifically is a building engineering supervises with engineering progress recorder.
Background
Project supervision refers to a supervision unit with related qualifications entrusted by a party A, a professional service activity for monitoring the project construction implementation of the party B is represented by the party A according to a project construction file approved by the state, laws and regulations related to the project construction and a project construction supervision contract and other project construction contracts, recording the construction progress of a building site is an important link for supervision, and when supervision personnel record the construction progress, a record book needs to be used.
In order to solve the above problems, an innovative design is performed on the basis of the original recording apparatus.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering manages and uses engineering progress recorder to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a project progress recording device for building engineering supervision comprises a recording box, wherein two sides of the recording box are respectively fixed with a baffle plate, a rotating shaft is installed between the baffle plates, an apron plate is fixed on the outer wall of the rotating shaft, a clamping groove is formed in one side of the top of the apron plate, a first fixing block is fixed at the top of the outer side of the recording box, a first pin shaft is arranged in the first fixing block, a movable rod is arranged on the outer wall of the first pin shaft, an inner cavity is formed in the movable rod, a lower end of a loop bar is arranged in the inner cavity, a first spring is nested at the lower end of the loop bar, a clamping rod is fixed at the top of one side of the loop bar, the end of the clamping rod is located in the clamping groove, a groove is formed in the top of the recording box, a rubber sealing element is arranged in the groove, and the top of the rubber sealing element is fixedly connected with the bottom of the apron plate, the inside of record box has been placed the record originally, the top of record originally is provided with the clamp plate, the spout has been seted up to the inside of clamp plate, the inside of spout is provided with the connecting rod, the tip of connecting rod is provided with the second spring, the tip of second spring and the inner wall fixed connection of spout, another tip of connecting rod is provided with the second round pin axle, the tip of second round pin axle is provided with the second fixed block, the top of second fixed block and the bottom fixed connection of apron, the handle is installed in the outside of record box.
Preferably, the loop bar is "T" type structure, the loop bar passes through the inner chamber and first spring constitutes extending structure with the movable rod, the movable rod passes through first round pin axle and first fixed block constitutes revolution mechanic.
Preferably, the clamping rod is of an L-shaped structure, the clamping rod is connected with the cover plate in a clamping mode through the clamping groove, and the cover plate and the recording box form a rotating structure through the rotating shaft and the baffle plate.
Preferably, the end part of the vertical section of the rubber sealing element is of a trapezoidal structure, and the rubber sealing element is connected with the groove in a clamping manner.
Preferably, one end of the connecting rod is of a T-shaped structure, one end of the connecting rod and the sliding groove form a clamping type sliding structure, and the other end of the connecting rod and the second fixed block form a rotating structure through a second pin shaft.
Compared with the prior art, the beneficial effects of the utility model are that: this engineering progress recorder for building engineering supervision, through with this sealed inside at the record box of record, guaranteed this rainy day of record, when carrying, the phenomenon of intaking can not appear, avoided this careless aquatic that drops the job site of record simultaneously, the phenomenon of intaking can not appear yet, has played good guard action to the record originally.
Drawings
Fig. 1 is a schematic view of the front cross-sectional structure of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
FIG. 3 is an enlarged schematic view of the structure of FIG. 1 at B according to the present invention;
fig. 4 is the schematic view of the mounting structure of the connecting rod of the present invention.
In the figure: 1. a recording box; 2. a baffle plate; 3. a rotating shaft; 4. a cover plate; 5. a first fixed block; 6. a first pin shaft; 7. a movable rod; 8. an inner cavity; 9. a loop bar; 10. a first spring; 11. a clamping rod; 12. a card slot; 13. a groove; 14. a rubber seal; 15. a second fixed block; 16. a second pin shaft; 17. a connecting rod; 18. pressing a plate; 19. a chute; 20. a second spring; 21. recording the book; 22. a handle.
Detailed Description
To further illustrate the technical means and effects of the present invention adopted to achieve the objects of the present invention, the following detailed description of the embodiments, structures, features and effects according to the present invention will be made with reference to the accompanying drawings and preferred embodiments.
Referring to fig. 1-4, the present invention provides a technical solution: a project progress recording device for building engineering supervision comprises a recording box 1, wherein two sides of the recording box 1 are respectively fixed with a baffle 2, a rotating shaft 3 is arranged between the baffles 2, the outer wall of the rotating shaft 3 is fixed with a cover plate 4, one side of the top of the cover plate 4 is provided with a clamping groove 12, the top of the outer side of the recording box 1 is fixed with a first fixed block 5, the inside of the first fixed block 5 is provided with a first pin shaft 6, the outer wall of the first pin shaft 6 is provided with a movable rod 7, the inside of the movable rod 7 is provided with an inner cavity 8, the inside of the inner cavity 8 is provided with a lower end of a loop bar 9, the lower end of the loop bar 9 is nested with a first spring 10, the top of one side of the loop bar 9 is fixed with a clamping bar 11, the end part of the clamping bar 11 is positioned inside the clamping groove 12, the top of the recording box 1 is provided with a groove 13, the inside of the groove 13 is provided with a rubber sealing element 14, and the top of the rubber sealing element 14 is fixedly connected with the bottom of the cover plate 4, this 21 of record has been placed to the inside of record box 1, the top of this 21 of record is provided with clamp plate 18, spout 19 has been seted up to clamp plate 18's inside, spout 19's inside is provided with connecting rod 17, connecting rod 17's tip is provided with second spring 20, the tip of second spring 20 and spout 19's inner wall fixed connection, another tip of connecting rod 17 is provided with second round pin axle 16, second round pin axle 16's tip is provided with second fixed block 15, the top of second fixed block 15 and the bottom fixed connection of apron 4, handle 22 is installed in the outside of record box 1.
Loop bar 9 is "T" type structure, and loop bar 9 constitutes extending structure through inner chamber 8 and first spring 10 and movable rod 7, and movable rod 7 constitutes revolution mechanic through first round pin axle 6 and first fixed block 5, and kelly 11 is "L" type structure, and kelly 11 passes through draw-in groove 12 to be connected for the block with apron 4, and apron 4 constitutes revolution mechanic through pivot 3 and baffle 2 and record box 1, convenient dismantlement and installation between kelly 11 and the apron 4.
The end part of the vertical section of the rubber sealing element 14 is of a trapezoidal structure, the rubber sealing element 14 is connected with the groove 13 in a clamping mode, the contact area is increased, and therefore the airtightness between the recording box 1 and the cover plate 4 is improved.
One end of connecting rod 17 is "T" type structure, and the one end of connecting rod 17 constitutes the sliding structure of snap-on with spout 19, and the other end of connecting rod 17 constitutes revolution mechanic through second round pin axle 16 and second fixed block 15, has played the effect of pushing down to record book 21, has avoided rocking of record book 21.
The working principle is as follows: when the record book 21 needs to be taken out from the inside of the record box 1 to record on a construction site, the clamping rod 11 is pulled upwards at the moment, then the clamping rod 11 drives the sleeve rod 9 to move upwards, so that the first spring 10 is further compressed, meanwhile, the clamping rod 11 is separated from the clamping groove 12, then, the clamping rod 11 is rotated forwards, so that the movable rod 7 rotates along with the first pin shaft 6, so that the cover plate 4 is separated from the constraint, then, the cover plate 4 is rotated backwards, so that the cover plate 4 rotates backwards along with the rotating shaft 3, so that the top of the record box 1 is opened, then, the record book 21 is taken out for use, after the record book 21 is used, the record book 21 is placed back to the original position, then, the cover plate 4 is rotated forwards, so that the cover plate 4 is reset, then, the clamping rod 11 is pulled, so that the clamping rod 11 drives the sleeve rod 9 to move outwards, so that the first spring 10 is compressed, then, the clamping rod 11 is rotated backwards, then, the clamping rod 11 is loosened, and at the moment, the clamping rod 11 is tightly clamped with the clamping groove 12 under the action of the first spring 10, make apron 4 fixed, and during the process of apron 4 corotation, make connecting rod 17 remove to the middle part of clamp plate 18 in the inside of spout 19, thereby make second spring 20 compressed, the upper end of connecting rod 17 rotates along with second round pin axle 16 simultaneously, thereby the elasticity that second spring 20 produced, make this 21 stable inside of fixing at record box 1 of record, the in-process of record box 1 carrying has been guaranteed, the impact sound can not appear in this 21 of record, the effect of protection has been played to this 21 of record simultaneously, and recess 13 and rubber seal 14's block are connected, the seal between record box 1 and the apron 4 has been guaranteed, the inside of record box 1 has been avoided the rainwater to enter into, the effect of protection has been played to this 21 of record.
The above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above description, and although the present invention has been disclosed by the preferred embodiment, it is not limited to the present invention, and any person skilled in the art can make modifications or changes equivalent to the equivalent embodiments by utilizing the above disclosed technical contents without departing from the technical scope of the present invention, but all the modifications, changes and changes of the technical spirit of the present invention made to the above embodiments are also within the scope of the technical solution of the present invention.

Claims (5)

1. The utility model provides a building engineering supervision uses engineering progress recorder, includes record box (1), its characterized in that: the recording box is characterized in that baffles (2) are fixed on two sides of the recording box (1), a rotating shaft (3) is installed between the baffles (2), a cover plate (4) is fixed on the outer wall of the rotating shaft (3), a clamping groove (12) is formed in one side of the top of the cover plate (4), a first fixed block (5) is fixed at the top of the outer side of the recording box (1), a first pin shaft (6) is arranged inside the first fixed block (5), a movable rod (7) is arranged on the outer wall of the first pin shaft (6), an inner cavity (8) is formed inside the movable rod (7), the lower end of a sleeve rod (9) is arranged inside the inner cavity (8), a first spring (10) is nested at the lower end of the sleeve rod (9), a clamping rod (11) is fixed at the top of one side of the sleeve rod (9), the end of the clamping rod (11) is located inside the clamping groove (12), and a groove (13) is formed at the top of the recording box (1), a rubber sealing element (14) is arranged in the groove (13), the top of the rubber sealing element (14) is fixedly connected with the bottom of the cover plate (4), a recording book (21) is placed in the recording box (1), a pressing plate (18) is arranged at the top of the recording book (21), a sliding groove (19) is arranged inside the pressing plate (18), a connecting rod (17) is arranged inside the sliding groove (19), a second spring (20) is arranged at the end part of the connecting rod (17), the end part of the second spring (20) is fixedly connected with the inner wall of the sliding groove (19), a second pin shaft (16) is arranged at the other end of the connecting rod (17), a second fixed block (15) is arranged at the end part of the second pin shaft (16), the top of the second fixing block (15) is fixedly connected with the bottom of the cover plate (4), and a handle (22) is installed on the outer side of the recording box (1).
2. The project progress recording device for construction project supervision according to claim 1, characterized in that: loop bar (9) are "T" type structure, loop bar (9) constitute extending structure through inner chamber (8) and first spring (10) and movable rod (7), movable rod (7) constitute rotating-structure through first round pin axle (6) and first fixed block (5).
3. The project progress recording device for construction project supervision according to claim 1, characterized in that: the utility model discloses a recording box, including card pole (11), apron (4), card pole (11) are the card and are connected, card pole (11) are "L" type structure, card pole (11) are connected for the block through draw-in groove (12) and apron (4), apron (4) constitute rotating-structure through pivot (3) and baffle (2) and recording box (1).
4. The project progress recording device for construction project supervision according to claim 1, characterized in that: the end part of the vertical section of the rubber sealing element (14) is of a trapezoidal structure, and the rubber sealing element (14) is connected with the groove (13) in a clamping manner.
5. The project progress recording device for construction project supervision according to claim 1, characterized in that: one end of the connecting rod (17) is of a T-shaped structure, one end of the connecting rod (17) and the sliding groove (19) form a clamping type sliding structure, and the other end of the connecting rod (17) and the second fixed block (15) form a rotating structure through a second pin shaft (16).
CN202120384425.2U 2021-02-22 2021-02-22 Building engineering manages with engineering progress recorder Active CN214449881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120384425.2U CN214449881U (en) 2021-02-22 2021-02-22 Building engineering manages with engineering progress recorder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120384425.2U CN214449881U (en) 2021-02-22 2021-02-22 Building engineering manages with engineering progress recorder

Publications (1)

Publication Number Publication Date
CN214449881U true CN214449881U (en) 2021-10-22

Family

ID=78144301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120384425.2U Active CN214449881U (en) 2021-02-22 2021-02-22 Building engineering manages with engineering progress recorder

Country Status (1)

Country Link
CN (1) CN214449881U (en)

Similar Documents

Publication Publication Date Title
CN214449881U (en) Building engineering manages with engineering progress recorder
CN214674476U (en) Support 65W's wireless sharing charging device
CN207215148U (en) A kind of photoelectric sensor seal protecting device
CN111228906A (en) Dust cover convenient to wash
CN202211560U (en) Rotary cover opening and closing mechanism of pressure cooker
CN212440406U (en) Dust cover convenient to wash
CN210706089U (en) Display screen of 3D printer
CN210201275U (en) Waterproof power distribution cabinet
CN206370894U (en) monitor with cleaning function
CN208437773U (en) Trimming device is used in a kind of production of gas meter housing
CN213298389U (en) Industrial fan capable of preventing dust
CN215015338U (en) Information data collection system for engineering cost
CN217768955U (en) Overvoltage protector of current transformer
CN211344461U (en) Novel flange protection device
CN216209259U (en) Wave recording metering device
CN210605409U (en) High-efficient radiating bender controller
CN214125701U (en) A electrical control box for moulding powder production
CN216565106U (en) Touch intelligent switch
CN216465522U (en) Dust collecting device of rubber internal mixer
CN217358759U (en) Wireless temperature measuring device based on Internet of things
CN212034199U (en) Artificial intelligence camera protection device
CN218298806U (en) Hand-held type building engineering construction progress watch-dog
CN212677563U (en) Adjustable real-name card-punching device for building industry
CN213187045U (en) Heat abstractor for EID
CN216979670U (en) Display control fast iteration hardware device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant