CN214424410U - Ground device is bored in construction - Google Patents

Ground device is bored in construction Download PDF

Info

Publication number
CN214424410U
CN214424410U CN202120404923.9U CN202120404923U CN214424410U CN 214424410 U CN214424410 U CN 214424410U CN 202120404923 U CN202120404923 U CN 202120404923U CN 214424410 U CN214424410 U CN 214424410U
Authority
CN
China
Prior art keywords
block
fixedly connected
groove
rectangular
moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120404923.9U
Other languages
Chinese (zh)
Inventor
袁衍发
袁衍波
龚均华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Daban Building Decoration Co ltd
Original Assignee
Chongqing Xianbo Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Xianbo Construction Engineering Co ltd filed Critical Chongqing Xianbo Construction Engineering Co ltd
Priority to CN202120404923.9U priority Critical patent/CN214424410U/en
Application granted granted Critical
Publication of CN214424410U publication Critical patent/CN214424410U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a construction bores ground device, including the carriage, electric telescopic handle and motor, electric telescopic handle fixed mounting is on the top of carriage, motor fixed mounting is on electric telescopic handle's output, all be equipped with elastic mechanism on the relative inner wall in both ends of carriage, the same root protective tube of fixedly connected with between two elastic mechanism, sliding connection has assorted closing plate with it in the protective tube, the output shaft end of motor rotates and runs through the closing plate setting, the intercommunication is equipped with the through-hole on the bottom of carriage, the protective tube activity runs through the through-hole setting, the output shaft end of motor is equipped with the post groove, be equipped with two rectangular channels on the inner wall in post groove, the interpolation of post groove is established and is connected with assorted drilling rod with it, two rectangular blocks of fixedly connected with on the lateral wall of drilling rod. The utility model discloses the staff of not only being convenient for installs and dismantles the drilling rod, and the staff of still being convenient for removes and fixes the device.

Description

Ground device is bored in construction
Technical Field
The utility model relates to a construction equipment technical field especially relates to a construction bores ground device.
Background
In the building construction process, often need drill on subaerial, the in-process soil of drilling can splash along with the operation of drilling rod, and general ground device that bores, it can not prevent soil effectively from splashing, and general ground device that bores, it is not convenient for the staff and removes and fix it, and the drilling rod installation process on the ground device that bores in addition is loaded down with trivial details, and then the staff of being inconvenient for is dismantled it.
The ground drilling device used in the current market is mostly inconvenient for workers to install and disassemble the drill rod, and is inconvenient for the workers to move and fix the device.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art and boring the ground device and mostly not being convenient for the staff to install and dismantle the drilling rod, and the staff of not being convenient for removes and fixed phenomenon to the device, and the building construction that proposes bores the ground device, and it not only is convenient for the staff to install and dismantle the drilling rod, and the staff of still being convenient for removes and fixes the device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a ground drilling device for building construction comprises a supporting frame, an electric telescopic rod and a motor, wherein the electric telescopic rod is fixedly arranged on the top of the supporting frame, the motor is fixedly arranged on the output end of the electric telescopic rod, two ends of the supporting frame are respectively provided with an elastic mechanism on the opposite inner walls, a same protective pipe is fixedly connected between the two elastic mechanisms, the protective pipe is in sliding connection with a sealing plate matched with the protective pipe, the tail end of an output shaft of the motor rotates to penetrate through the sealing plate, the bottom of the supporting frame is communicated with a through hole, the protective pipe movably penetrates through the through hole, the tail end of the output shaft of the motor is provided with a cylindrical groove, the inner wall of the cylindrical groove is provided with two rectangular grooves, a drill rod matched with the cylindrical groove is inserted and connected in the cylindrical groove, the side wall of the drill rod is fixedly connected with two rectangular blocks, the two rectangular blocks are respectively inserted and connected in the two rectangular grooves, one of them be equipped with installation mechanism on the inner wall of rectangular channel, installation mechanism supports the tight contact with the rectangular block of homonymy, be equipped with stabilizing mean and elevating system on the lateral wall of carriage, elevating system and stabilizing mean fixed connection, a plurality of universal wheels of the lower extreme fixedly connected with of carriage.
Preferably, elastic mechanism is including setting up the spout on the carriage inner wall, sliding connection has assorted slider with it in the spout, the one end fixedly connected with connecting block of slider, the lateral wall fixed connection of connecting block and protective tube, the same spring of fixedly connected with between the upper end of slider and the top of spout, elastic mechanism's setting is not only convenient for the staff to remove the protective tube, can also reset the protective tube effectively.
Preferably, the installation mechanism comprises a first moving groove arranged on the inner wall of one of the rectangular grooves, a first moving block is connected in the first moving groove in a sliding manner, one end of the first moving block extends into the rectangular groove on the same side and is abutted against the rectangular block on the same side, a first bolt penetrates through the side wall of the first moving groove in a threaded manner, one end of the first bolt located in the first moving groove is rotatably connected to one end of the first moving block, and the installation mechanism is arranged so that a worker can conveniently install and disassemble the drill rod.
Preferably, stabilizing mean includes that the fixed cover on the carriage lateral wall is located to the slip cap, many inserted bars of lower extreme fixedly connected with of fixed cover, the upper end and the elevating system fixed connection of fixed cover, stabilizing mean's setting, the staff of being convenient for fixes the device.
Preferably, the lifting mechanism comprises a supporting block fixedly connected to the side wall of the supporting frame, a second moving groove is formed in the lower end of the supporting block, a second moving block is connected to the second moving groove in a sliding mode, the lower end of the second moving block is fixedly connected with the upper end of the fixed cover, a second bolt penetrates through the top of the second moving groove in a threaded mode, the lower end of the second bolt is rotatably connected to the second moving block, and the lifting mechanism is arranged to facilitate a worker to adjust the position of the fixed cover, so that the worker can fix and move the device as required.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a set up carriage, electric telescopic handle, motor, protecting tube, closing plate and columnar order groove etc. the staff of being convenient for installs and dismantles the drilling rod, and then the staff of being convenient for changes the drilling rod, and wherein the setting of protecting tube can avoid the drilling rod soil to splash when moving effectively.
2. The utility model discloses a set up carriage, electric telescopic handle, motor, protecting tube, closing plate and columnar order groove etc. the staff of being convenient for removes and fixes the device, and wherein elevating system's setting is convenient for the staff and is adjusted the position of fixed cover, and the setting of inserted bar can improve the stability of device effectively in addition.
Drawings
Fig. 1 is a perspective view of a ground drilling device for building construction according to the present invention;
fig. 2 is an external structural schematic view of a ground drilling device for building construction according to the present invention;
FIG. 3 is an enlarged view of a portion of FIG. 1 at A;
fig. 4 is a partially enlarged view of fig. 1 at B.
In the figure: the device comprises a supporting frame 1, an electric telescopic rod 2, a motor 3, a protective pipe 4, a sealing plate 5, a cylindrical groove 6, a rectangular groove 7, a drill rod 8, a rectangular block 9, a universal wheel 10, a sliding groove 11, a sliding block 12, a connecting block 13, a spring 14, a first moving groove 15, a first moving block 16, a first bolt 17, a fixed cover 18, an inserted link 19, a supporting block 20, a second moving groove 21, a second moving block 22 and a second bolt 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a ground drilling device for building construction comprises a supporting frame 1, an electric telescopic rod 2 and a motor 3, wherein the electric telescopic rod 2 is fixedly arranged on the top of the supporting frame 1, the motor 3 is fixedly arranged on the output end of the electric telescopic rod 2, two opposite inner walls at two ends of the supporting frame 1 are respectively provided with an elastic mechanism, a same protective tube 4 is fixedly connected between the two elastic mechanisms, the protective tube 4 is in sliding connection with a sealing plate 5 matched with the protective tube 4, the tail end of an output shaft of the motor 3 is rotatably arranged to penetrate through the sealing plate 5, the bottom of the supporting frame 1 is communicated with a through hole, the protective tube 4 is movably arranged to penetrate through the through hole, the tail end of the output shaft of the motor 3 is provided with a cylindrical groove 6, the inner wall of the cylindrical groove 6 is provided with two rectangular grooves 7, a drill rod 8 matched with the cylindrical groove 6 is inserted and connected with the cylindrical groove, and two rectangular blocks 9 are fixedly connected on the side wall of the drill rod 8, two rectangular blocks 9 are equally divided and are respectively inserted and connected in two rectangular grooves 7, wherein an installation mechanism is arranged on the inner wall of one rectangular groove 7, the installation mechanism is abutted against and in contact with the rectangular blocks 9 on the same side, a stabilizing mechanism and a lifting mechanism are arranged on the side wall of the supporting frame 1, the lifting mechanism is fixedly connected with the stabilizing mechanism, and a plurality of universal wheels 10 are fixedly connected with the lower end of the supporting frame 1.
Elastic mechanism is including setting up spout 11 on the 1 inner wall of carriage, sliding connection has assorted slider 12 with it in spout 11, the one end fixedly connected with connecting block 13 of slider 12, connecting block 13 and protective tube 4's lateral wall fixed connection, the same root spring 14 of fixedly connected with between the upper end of slider 12 and the top of spout 11, elastic mechanism's setting, the staff of not only being convenient for removes protective tube 4, can also reset protective tube 4 effectively.
The installation mechanism is including setting up the first shifting chute 15 on one of them rectangular channel 7 inner wall, sliding connection has first movable block 16 in first shifting chute 15, the one end of first movable block 16 extends to in the rectangular channel 7 of homonymy and supports the tight contact with the rectangular block 9 of homonymy, screw thread has run through first bolt 17 on the lateral wall of first shifting chute 15, the one end of first bolt 17 that is located first shifting chute 15 rotates to be connected in one of first movable block 16 and serves, the setting of installation mechanism, the staff of being convenient for installs and dismantles drilling rod 8, stabilizing mean includes that the fixed cowling 18 on the carriage 1 lateral wall is located to the slip cap, many inserted bars 19 of lower extreme fixedly connected with of fixed cowling 18, the upper end and the elevating system fixed connection of fixed cowling 18, stabilizing mean's setting, the staff of being convenient for fixes the device.
Elevating system includes supporting shoe 20 of fixed connection on the support frame 1 lateral wall, the lower extreme of supporting shoe 20 is equipped with second shifting chute 21, sliding connection has second movable block 22 in the second shifting chute 21, the lower extreme of second movable block 22 and the upper end fixed connection of fixed cover 18, the screw thread runs through on the top of second shifting chute 21 has second bolt 23, the lower extreme of second bolt 23 rotates to be connected on second movable block 22, elevating system's setting, the staff of being convenient for adjusts the position of fixed cover 18, and then the staff of being convenient for fixes and removes this device as required.
The working principle is as follows: in the utility model, the worker can rotate the second bolt 23, the second bolt 23 is threaded through the second moving groove 21, and further the second moving block 22 moves upwards or downwards under the limit action of the second moving groove 21, so that the fixed cover 18 moves upwards or downwards, the second bolt 23 is rotated until the inserted bars 19 at the lower end of the fixed cover 18 are all separated from the ground, then the worker can move the device to a proper position through a plurality of universal wheels 10, after the movement is finished, the worker can rotate the second bolt 23 until a plurality of inserted bars 19 at the lower end of the fixed cover 18 are all inserted in the ground, so that the device is fixed, when the worker needs to drill the ground, the worker can start the electric telescopic rod 2 and the motor 3 to work, the motor 3 rotates to drive the drill bar 8 to rotate, the electric telescopic rod 2 drives the drill bar 8 to move downwards, thereby realizing the drilling effect on the ground, after the drilling is finished, the electric telescopic rod 2 drives the drill rod 8 to move upwards until the drill rod 8 leaves the ground, the protective pipe 4 can be effectively covered outside the drill rod 8 in the drilling process, thereby effectively avoiding the occurrence of soil splashing in the drilling process, when the worker needs to replace the drill rod 8, the worker can move the protective pipe 4 upwards, then, the worker can manually rotate the first bolt 17, the first bolt 17 rotates to enable the first moving block 16 to horizontally move under the limiting action of the first moving groove 15, the first bolt 17 is rotated until the first moving block 16 is separated from the rectangular block 9 on the same side, when the first moving block 16 is separated from the rectangular block 9 at the same side, the abutting and fixing state of the drill rod 8 is released, a worker can dismount the drill rod 8, and then resetting the new drill rod 8 and the rectangular blocks 9 on the side walls of the new drill rod, and after resetting is finished, rotating the first bolt 17 until the first moving block 16 tightly presses and fixes the rectangular blocks 9 on the same side.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. A ground drilling device for building construction comprises a supporting frame (1), an electric telescopic rod (2) and a motor (3), wherein the electric telescopic rod (2) is fixedly installed on the top of the supporting frame (1), the motor (3) is fixedly installed on the output end of the electric telescopic rod (2), the ground drilling device is characterized in that elastic mechanisms are arranged on the opposite inner walls of the two ends of the supporting frame (1), a same protective tube (4) is fixedly connected between the two elastic mechanisms, a sealing plate (5) matched with the protective tube (4) is connected in the protective tube (4) in a sliding manner, the tail end of an output shaft of the motor (3) rotates to penetrate through the sealing plate (5), a through hole is communicated on the bottom of the supporting frame (1), the protective tube (4) movably penetrates through the through hole, a column-shaped groove (6) is arranged at the tail end of the output shaft of the motor (3), two rectangular grooves (7) are arranged on the inner wall of the column-shaped groove (6), the utility model discloses a drilling rod, including the column slot (6), be connected with assorted drilling rod (8) with it to establish in the interpolation of column slot (6), two rectangular block (9) of fixedly connected with on the lateral wall of drilling rod (8), two rectangular block (9) are equallyd divide and do not are inserted and establish and connect in two rectangular channel (7), one of them be equipped with installation mechanism on the inner wall of rectangular channel (7), installation mechanism supports tight contact with rectangular block (9) of homonymy, be equipped with stabilizing mean and elevating system on the lateral wall of carriage (1), elevating system and stabilizing mean fixed connection, a plurality of universal wheels (10) of lower extreme fixedly connected with of carriage (1).
2. The ground drilling device for building construction according to claim 1, characterized in that the elastic mechanism comprises a sliding groove (11) arranged on the inner wall of the supporting frame (1), a sliding block (12) matched with the sliding groove is connected in the sliding groove (11), one end of the sliding block (12) is fixedly connected with a connecting block (13), the connecting block (13) is fixedly connected with the side wall of the protective pipe (4), and the same spring (14) is fixedly connected between the upper end of the sliding block (12) and the top of the sliding groove (11).
3. The earth boring device for building construction according to claim 1, wherein the mounting mechanism comprises a first moving groove (15) arranged on an inner wall of one of the rectangular grooves (7), a first moving block (16) is slidably connected in the first moving groove (15), one end of the first moving block (16) extends into the rectangular groove (7) on the same side and is in abutting contact with the rectangular block (9) on the same side, a first bolt (17) penetrates through a side wall of the first moving groove (15), and one end of the first bolt (17) in the first moving groove (15) is rotatably connected to one end of the first moving block (16).
4. The ground drilling device for building construction according to claim 1, characterized in that the stabilizing mechanism comprises a fixed cover (18) which is slidably sleeved on the side wall of the supporting frame (1), a plurality of inserted rods (19) are fixedly connected to the lower end of the fixed cover (18), and the upper end of the fixed cover (18) is fixedly connected with the lifting mechanism.
5. The earth boring device for building construction according to claim 4, wherein the lifting mechanism comprises a supporting block (20) fixedly connected to the side wall of the supporting frame (1), a second moving groove (21) is formed in the lower end of the supporting block (20), a second moving block (22) is slidably connected in the second moving groove (21), the lower end of the second moving block (22) is fixedly connected with the upper end of the fixed cover (18), a second bolt (23) penetrates through the top of the second moving groove (21), and the lower end of the second bolt (23) is rotatably connected to the second moving block (22).
CN202120404923.9U 2021-02-24 2021-02-24 Ground device is bored in construction Active CN214424410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120404923.9U CN214424410U (en) 2021-02-24 2021-02-24 Ground device is bored in construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120404923.9U CN214424410U (en) 2021-02-24 2021-02-24 Ground device is bored in construction

Publications (1)

Publication Number Publication Date
CN214424410U true CN214424410U (en) 2021-10-19

Family

ID=78071766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120404923.9U Active CN214424410U (en) 2021-02-24 2021-02-24 Ground device is bored in construction

Country Status (1)

Country Link
CN (1) CN214424410U (en)

Similar Documents

Publication Publication Date Title
CN214424410U (en) Ground device is bored in construction
CN208880936U (en) A kind of wall switch box mounting groove grooving apparatus
CN218598201U (en) Coal mine drilling machine stabilizing and angle adjusting device
CN110080514B (en) Construction hanging basket for building
CN219104403U (en) Geological exploration drilling reaming device
CN116971718A (en) Perforating device for road construction blasting
CN217813539U (en) Coal mine tunnel anchor rod screwing device
CN112706302B (en) Perforating supporting device for building construction
CN211370289U (en) Geotechnical engineering drilling device
CN212674484U (en) Indoor top concrete sampling auxiliary device
CN210436399U (en) Drilling equipment is used in road bridge municipal construction
CN217872877U (en) Underground roadway support safety protection device
CN220487197U (en) Multistage formula adjusting bracket for construction engineering construction
CN112376873A (en) Outdoor decoration safety kit and working method thereof
CN220487484U (en) Engineering blasting punching equipment
CN214886827U (en) Perforating device for fixing foundation support
CN213806464U (en) Construction scaffold frame that can fast assembly
CN211114725U (en) Connect stable scaffold frame
CN219888072U (en) But quick adjustment's support frame
CN217434696U (en) Drilling equipment convenient to drill in floor bottom surface
CN218234269U (en) Lifting type construction stand frame
CN216277723U (en) Novel drilling mechanism for geotechnical engineering construction
CN213710950U (en) Be used for regulator cubicle to assist and open portable cat ladder
CN214699972U (en) Supplementary mapping device of mapping engineering
CN219006561U (en) Security protection construction drilling equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230802

Address after: No. 14, Yinyuan Street, Dadong District, Shenyang, 110000 Liaoning Province

Patentee after: Liaoning Daban Building Decoration Co.,Ltd.

Address before: 409100 4-2, No. 55, Renmin Street, Nanbin Town, Shizhu Tujia Autonomous County, Shizhu Tujia Autonomous County, Chongqing

Patentee before: Chongqing xianbo Construction Engineering Co.,Ltd.

TR01 Transfer of patent right