CN214423577U - Integrated assembly type green building component device for steel structure prefabricated component - Google Patents

Integrated assembly type green building component device for steel structure prefabricated component Download PDF

Info

Publication number
CN214423577U
CN214423577U CN202120323945.2U CN202120323945U CN214423577U CN 214423577 U CN214423577 U CN 214423577U CN 202120323945 U CN202120323945 U CN 202120323945U CN 214423577 U CN214423577 U CN 214423577U
Authority
CN
China
Prior art keywords
panel
outside
assembling
assembly panel
green building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120323945.2U
Other languages
Chinese (zh)
Inventor
李至坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhengtian Industry Co ltd
Original Assignee
Henan Zhengtian Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhengtian Industry Co ltd filed Critical Henan Zhengtian Industry Co ltd
Priority to CN202120323945.2U priority Critical patent/CN214423577U/en
Application granted granted Critical
Publication of CN214423577U publication Critical patent/CN214423577U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a steel construction is integrated assembled green building element device for component in advance, including the assembly panel, assembly panel upper end both sides are equipped with first draw-in groove, first draw-in groove one side is equipped with the second bellying, second bellying fixed mounting is in assembly panel intermediate position, second bellying outside is equipped with the cotter hole, the chamfer has been seted up to second bellying upper end, the cotter hole is located the assembly panel inside, cotter downthehole peg graft there is the round pin axle, cotter hole outside both sides have the screw hole, assembly panel outside one side fixed mounting has the third bellying, assembly panel outside opposite side fixed mounting has the third draw-in groove; the pin shaft is inserted into the pin hole of one of the assembling panels, and the other assembling panel is inserted into the pin hole aligned with the external pin shaft through the pin hole, so that the positioning work is completed, the protruding body and the clamping groove are mutually clamped, and finally the assembling can be completed by fixing the bolt.

Description

Integrated assembly type green building component device for steel structure prefabricated component
Technical Field
The utility model relates to a building element technical field specifically is a steel construction is green building element device of integration assembled for component in advance.
Background
Because the steel has higher strength, the steel structure framework formed by connecting (welding and high-strength bolts) the steel sections (including steel plates) and the high-strength steel wires in a combined manner has the characteristics of green buildings. The steel structure has three inherent core values: the lightest structure; the shortest construction period; the best ductility. In the whole life cycle of the building, the building saves the pressure height (energy saving, land saving, water saving and material saving) of the lightest structural hypothetical strength to the utmost extent, protects the environment, reduces pollution, provides healthy, adaptive and efficient use space for people, and is harmoniously symbiotic with the nature. Steel structure houses are classified as green environment-friendly buildings by housing and urban and rural construction departments, and are intensively popularized in China. The experts think that the steel structure house will become the development trend of the house in China in future, and the guide of various national policies and the standardized management of the market become the booster for the development of the steel structure building.
Among the current stainless steel building element, relevant staff discovers when assembling, has more building element and can not be fine assemble, more or less all has some structural position errors, is difficult to assemble, can not assemble completely at all even a bit, leads to the assembly back whole leakproofness not good, and then influences the use of later stage building.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a steel construction is integrated assembled green building element device for component in advance, be equipped with round pin hole and round pin axle, peg graft inside the round pin hole through the round pin axle, the round pin hole generally adopts accurate wire cut electrical discharge machining to cut the hole, when carrying out building element assembly, peg graft inside the round pin hole of one of them assembly panel through the round pin axle, and then peg graft the round pin axle of another assembly panel outside through the alignment of round pin hole, can accomplish positioning work; the problem that the existing building components proposed in the background technology have errors in structure positions more or less, are difficult to assemble, and even cannot be completely assembled at all to cause poor integral sealing performance after assembly is solved.
In order to achieve the above object, the utility model provides a following technical scheme: an integrated assembly type green building component device for a steel structure prefabricated component comprises an assembly panel, wherein two sides of the upper end of the assembly panel are provided with first clamping grooves, one side of each first clamping groove is provided with a second bulge, the second bulge is fixedly arranged at the middle position of the assembly panel, the outer part of the second bulge is provided with a pin hole, the upper end of the second bulge is provided with a chamfer, the pin hole is positioned in the assembly panel, a pin shaft is inserted in the pin hole, two sides of the outer part of the pin hole are provided with threaded holes, two sides of the outer part of the assembly panel are fixedly provided with an activated carbon adsorption plate, one side of the outer part of the activated carbon adsorption plate is fixedly provided with a breathable plate, one side of the outer part of the breathable plate is fixedly provided with a water absorption plate, one side of the outer part of the water absorption plate is fixedly provided with a fireproof plate, one side of the outer part of the assembly panel is fixedly provided with a third bulge, and a third clamping groove is fixedly arranged on the other side of the outer part of the assembling panel.
Preferably, first protruding bodies are fixedly mounted on two sides of the lower end of the assembling panel, and the first protruding bodies correspond to the first clamping grooves in position.
Preferably, a second clamping groove is formed in the middle of the lower end of the assembling panel, and the second clamping groove corresponds to the second protrusion body in position.
Preferably, the first lug bosses are located on one sides of the threaded holes, and the threaded holes are uniformly distributed in the assembling panel.
Preferably, the outer surfaces of the second protrusion body, the first protrusion body and the third protrusion body are provided with chamfers, and the third protrusion body corresponds to the third clamping groove.
Preferably, the pin shaft penetrates through the inside of the assembly panel, and two ends of the pin shaft are located outside the assembly panel.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses seted up pin hole and round pin axle, peg graft inside the pin hole through the round pin axle, the pin hole generally adopts accurate wire cut electrical discharge machining to cut the hole, when carrying out building element assembly, peg graft inside the pin hole of one of them assembly panel through the round pin axle, peg graft another assembly panel through the round pin axle that the pin hole aligns the outside, can accomplish positioning work, and then through the joint of each other between bellying and the draw-in groove, fix through the bolt at last, can accomplish the assembly, if can not the one-to-one joint between bellying and the draw-in groove, it has the machining error to explain, then can not use to avoid the accident condition;
2. the utility model discloses set up ventilative board, active carbon adsorption board, water absorption plate and PLASTIC LAMINATED, can prevent through the PLASTIC LAMINATED that catching fire from burning out building element internal material, the water absorption plate is installed and can prevent that the external moisture of wall from soaking and lead to the wall body to produce the quality problem, the active carbon adsorption board plays the effect of air-purifying, ventilative board can play the guard action to the active carbon adsorption board, prevent that the outer wall damage from directly leading to the damage of active carbon adsorption board;
3. the outer surface of the second protruding body, the outer surface of the first protruding body and the outer surface of the third protruding body are provided with chamfers, when the positioning is finished and the clamping is carried out, the protruding bodies can be better clamped through the chamfers, the chamfers are arranged, and the installation is convenient, time and labor are saved.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
FIG. 2 is a schematic view of the structure of the present invention;
FIG. 3 is a schematic top view of the present invention;
fig. 4 is a schematic side view of the present invention.
In the figure: 1. assembling a panel; 2. an activated carbon adsorption plate; 3. a gas permeable plate; 4. a water absorption plate; 5. a fire-proof plate; 6. a second convex body; 7. a second card slot; 8. a first convex body; 9. a first card slot; 10. a third convex body; 11. a third card slot; 12. a pin hole; 13. a pin shaft; 14. a threaded hole; 16. and (6) chamfering.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: the utility model provides a steel construction is green building element device of integration assembled in advance for component, including assembly panel 1, 1 outside both sides fixed mounting of assembly panel has active carbon adsorption board 2, 2 outside one side fixed mounting of active carbon adsorption board has breather plate 3, 3 outside one side fixed mounting of breather plate has water absorption plate 4, 4 outside one side fixed mounting of water absorption plate has PLASTIC LAMINATED 5, can prevent to catch a fire through PLASTIC LAMINATED 5 and burn out building element internal material, water absorption plate 4 is installed and can be prevented that the outside moisture of wall body from soaking and lead to the wall body to produce quality problems in 5 one side of PLASTIC LAMINATED, active carbon adsorption board 2 plays air-purifying's effect, breather plate 3 can play the guard action to active carbon adsorption board 2, prevent that the outer wall damage directly leads to the damage of active carbon adsorption board 2.
1 upper end both sides of assembly panel are equipped with first draw-in groove 9, 1 lower extreme both sides of assembly panel are equipped with first bellying 8, first bellying 8 corresponds each other with the position of first draw-in groove 9, 1 lower extreme intermediate position of assembly panel is equipped with second draw-in groove 7, 1 upper end intermediate position of assembly panel is equipped with the bellying 6 of second, when carrying out the assembly from top to bottom after the location is ended, can be with first bellying 8 joint inside first draw-in groove 9, 7 joints of second draw-in groove are outside in the bellying 6 of second, the inside screw hole 14 that has seted up of assembly panel 1, after the card is ended, the bolt that uses corresponding size carries out screw thread tightening and can accomplish assembly from top to bottom.
A third bulge body 10 is arranged on one side outside the assembly panel 1, a third clamping groove 11 is arranged on the other side inside the assembly panel 1, the third clamping groove 11 and the third bulge body 10 correspond to each other in position, and when the different assembly panels 1 are assembled left and right, the third clamping groove 11 and the third bulge body 10 are clamped with each other, so that left and right assembly can be completed; the outer surfaces of the second protruding body 6, the first protruding body 8 and the third protruding body 10 are provided with chamfers 16, when the clamping connection is carried out after the positioning is finished, the chamfers 16 are arranged, so that the installation is convenient, and the time and the labor are saved.
The outside of second bellying 6 is equipped with round pin hole 12, round pin 13 has been pegged graft in round pin hole 12 inside, round pin 13 runs through inside assembly panel 1, round pin hole 12 generally adopts accurate wire cut electrical discharge machining to cut the hole, round pin 13 generally is the standard component of the concrete size of corresponding round pin hole 12, when carrying out building element assembly, peg graft inside one of them assembly panel 1's round pin hole 12 through round pin 13, aim at outside round pin 13 with another assembly panel 1 through round pin hole 12 again and peg graft, can accomplish positioning work.
The working principle is as follows: when the building component is assembled, the pin shaft 13 is inserted into the pin hole 12 of one assembling panel 1, and then the other assembling panel 1 is aligned with the pin shaft 13 outside through the pin hole 12 to be inserted, so that the positioning can be completed.
After positioning is finished, vertical assembly is carried out, the first bulge body 8 can be clamped inside the first clamping groove 9, the second clamping groove 7 is clamped outside the second bulge body 6, a threaded hole 14 is formed in the assembly panel 1, and after clamping is finished, vertical assembly can be finished by using bolts with corresponding sizes for threaded fixation; when the left and right assembling of different assembling panels 1 is carried out, the left and right assembling can be finished by mutually clamping the third clamping groove 11 and the third bulge body 10.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a steel construction is green building component device of integration assembled for pre-construction member, includes assembly panel (1), its characterized in that: the assembling panel is characterized in that first clamping grooves (9) are arranged on two sides of the upper end of the assembling panel (1), a second protrusion body (6) is arranged on one side of each first clamping groove (9), the second protrusion body (6) is fixedly arranged at the middle position of the assembling panel (1), a pin hole (12) is arranged outside the second protrusion body (6), a chamfer (16) is formed in the upper end of the second protrusion body (6), the pin hole (12) is located inside the assembling panel (1), a pin shaft (13) is inserted inside the pin hole (12), threaded holes (14) are formed in two sides of the outside of the pin hole (12), activated carbon adsorption plates (2) are fixedly arranged on two sides of the outside of the assembling panel (1), a breathable plate (3) is fixedly arranged on one side of the outside of the activated carbon adsorption plates (2), a water absorption plate (4) is fixedly arranged on one side of the outside of the breathable plate (3), and a fireproof plate (5) is fixedly arranged on one side of the outside of the water absorption plate (4), the assembling panel is characterized in that a third bulge body (10) is fixedly mounted on one side of the outer portion of the assembling panel (1), and a third clamping groove (11) is fixedly mounted on the other side of the outer portion of the assembling panel (1).
2. The integrally assembled green building component device for the steel structure prefabricated component as claimed in claim 1, wherein: the assembling panel is characterized in that first protruding bodies (8) are fixedly mounted on two sides of the lower end of the assembling panel (1), and the first protruding bodies (8) correspond to the first clamping grooves (9) in position.
3. The integrally assembled green building component device for the steel structure prefabricated component as claimed in claim 1, wherein: and a second clamping groove (7) is formed in the middle of the lower end of the assembling panel (1), and the second clamping groove (7) corresponds to the second bulge body (6).
4. The integrally assembled green building component device for the steel structure prefabricated component as claimed in claim 2, wherein: the first protruding body (8) is located on one side of the threaded hole (14), and the threaded hole (14) is uniformly distributed in the assembly panel (1).
5. The integrally assembled green building component device for the steel structure prefabricated component as claimed in claim 1, wherein: the outer surfaces of the second protruding body (6), the first protruding body (8) and the third protruding body (10) are provided with chamfers (16), and the third protruding body (10) corresponds to the third clamping groove (11).
6. The integrally assembled green building component device for the steel structure prefabricated component as claimed in claim 1, wherein: the hinge pin (13) penetrates through the inside of the assembly panel (1), and two ends of the hinge pin (13) are located outside the assembly panel (1).
CN202120323945.2U 2021-02-03 2021-02-03 Integrated assembly type green building component device for steel structure prefabricated component Active CN214423577U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120323945.2U CN214423577U (en) 2021-02-03 2021-02-03 Integrated assembly type green building component device for steel structure prefabricated component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120323945.2U CN214423577U (en) 2021-02-03 2021-02-03 Integrated assembly type green building component device for steel structure prefabricated component

Publications (1)

Publication Number Publication Date
CN214423577U true CN214423577U (en) 2021-10-19

Family

ID=78070303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120323945.2U Active CN214423577U (en) 2021-02-03 2021-02-03 Integrated assembly type green building component device for steel structure prefabricated component

Country Status (1)

Country Link
CN (1) CN214423577U (en)

Similar Documents

Publication Publication Date Title
CN214423577U (en) Integrated assembly type green building component device for steel structure prefabricated component
CN209975736U (en) Lap joint assembly type energy-saving building
CN215630608U (en) Assembly type building fixing device for constructional engineering
CN211228936U (en) Firm in connection's assembled building wall node
CN213572634U (en) Steel construction is assembled wallboard for house
CN212001736U (en) Steel construction assembled wallboard
CN109296078B (en) Assembled bamboo-wood beam-column joint connecting device
CN214117006U (en) Energy-concerving and environment-protective building is with portable worker's room of assembling
CN220451148U (en) Building sound insulation building board convenient to equipment
CN212478170U (en) Energy-saving assembled wall with photovoltaic board
CN216587051U (en) Sound-proof and waterproof light composite board for assembly type building steel frame
CN209854905U (en) Prefabricated component assembly structure for urban construction
CN220978456U (en) Low-energy-consumption wall structure for assembled building
CN219973660U (en) Assembled wallboard connecting device
CN218455197U (en) Solar street lamp with protective structure
CN216948749U (en) Stable connecting device of assembled steel construction building side pipe and pipe
CN213773987U (en) Prefabricated house internal partition wall structure based on composite heat-insulation wallboard
CN216713338U (en) Assembly type warm-keeping steel structure for green building
CN217735960U (en) Connecting piece is used in equipment of wood carving furniture
CN219451155U (en) Sound-absorbing wall
CN221178179U (en) Novel waterproof structure
CN215290590U (en) Detachable combined house
CN214696231U (en) Assembled composite wall
CN220486819U (en) Layered assembly type sound insulation partition wall
CN215644832U (en) Wall-mounted energy storage battery module

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant