CN2144229Y - Combined horizontal pipe propulsion unit with two rails - Google Patents

Combined horizontal pipe propulsion unit with two rails Download PDF

Info

Publication number
CN2144229Y
CN2144229Y CN 92243604 CN92243604U CN2144229Y CN 2144229 Y CN2144229 Y CN 2144229Y CN 92243604 CN92243604 CN 92243604 CN 92243604 U CN92243604 U CN 92243604U CN 2144229 Y CN2144229 Y CN 2144229Y
Authority
CN
China
Prior art keywords
track
tooth
framework
orbit
rails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 92243604
Other languages
Chinese (zh)
Inventor
王松勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 92243604 priority Critical patent/CN2144229Y/en
Application granted granted Critical
Publication of CN2144229Y publication Critical patent/CN2144229Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to a combined type horizontal pipeline propelling device with two rails, which mainly comprises a guide rail, a drilling hole power scaffold installed on the rail, a hydraulic propelling mechanism and a control part, wherein the guide rail is formed by assembling a plurality of bar frames with two rails. Every section of rail frame is provided with a pair of sliding rails and a pair of tooth-shaped propelling rails. The drilling hole power scaffold is arranged on the sliding rails on the rail frames by rollers arranged at the two sides of the drilling hole power scaffold. A hydraulic cylinder of the hydraulic propelling mechanism is arranged on the tooth-shaped propelling rails by the supporting frames arranged at the two ends of the hydraulic cylinder. The propelling device can directly push the pipelines to pass through the ground surface under the condition of not damaging roads and buildings.

Description

Combined horizontal pipe propulsion unit with two rails
The utility model is a kind of combined type two-orbit horizontal pipe advancing means, it is a kind of pipelayer attachment that need pass through road, building laying various pipes, cable that is applicable to, it mainly comprises guide track, in orbit boring power stand, hydraulic-feed mechanism are installed, and the manoeuvre portion composition that grades.
At present, China cities and towns are being passed through road, when building is laid various pipes, are being adopted open drain formula excavation more, or the excavation operation of detouring, and this operating type not only workload is big, but also brings certain destruction can for road or building.It is that the pipe laying hole is passed through in a kind of boring of 90207970.0 that Chinese patent CN2121597 U discloses the patent No., and its major technique feature is: by the boring part that is used to hole, the power section and the operation control section that are used to supply with boring power are formed.Though above-mentioned patented technology has solved the earth drilling problem of passing through road, also need manually pipeline to be headed into.
The purpose of this utility model provides a kind of boring, push pipe to finish by a machine with regard to being to overcome above-mentioned deficiency of the prior art, the combined type two-orbit horizontal pipe advancing means that can directly head into for the less pipeline of diameter.
The purpose of this utility model can adopt following measure to realize: the utility model mainly comprises guide track, in orbit boring power stand, hydraulic-feed mechanism are installed, and the manoeuvre portion critical piece that grades is formed, guide track is to be formed by more piece two-orbit frame combination, every joint track-frame all is provided with a pair of sliding rail and a pair of profile of tooth advances track; Boring power stand is placed on the sliding rail on the track-frame by the roller that is arranged on its both sides; The oil hydraulic cylinder of hydraulic-feed mechanism is placed in profile of tooth by the supporting frame that is arranged on its two ends and advances on the track.
Oil hydraulic cylinder front portion in the utility model combines by hinge and front support stand, is connected with a framework that is used to hole power stand location on the front support stand, is processed with a plurality of positioning holes on two regulating arms of framework; The front end of framework is equipped with a baffle plate that has a groove, its rear portion by with framework combine about two rod rests be placed on sliding rail and profile of tooth advances on the track 1; The rear portion of oil hydraulic cylinder is placed on profile of tooth by the back support frame frame hinged with it and advances on the track.Lay at least one U type carriage on the sliding rail of two-orbit framework, a roller respectively is equipped with in the both sides of U type carriage.
Use advancing means of the present utility model to carry out highway crossing, railway, channel, or building can not influence traffic when laying various pipes, not destroy under the situation of building, pipeline is directly being passed by certain depth requirement pushing tow from subsurface.Not only a large amount of labour forces can be saved, and the fund that excavation back road is laid again can be saved.
The drawing of accompanying drawing is described as follows:
Fig. 1: plan view of the present utility model, can be as the specification digest accompanying drawing.
Fig. 2: A-A sectional view.
Fig. 3: B-B sectional view.
Fig. 4: C is to partial view.
Fig. 5: figure cuts open in D-D office.
The utility model is done with detailed description below with reference to embodiment's (accompanying drawing):
Advancing means of the present utility model mainly comprises guide track, and in orbit boring power stand, hydraulic-feed mechanism are installed, and the manoeuvre portion critical piece that grades; Guide track of the present utility model is to be formed by more piece two-orbit frame combination, and every joint track-frame all is provided with a pair of sliding rail 2 and a pair of profile of tooth that is provided with equidistant propelling tooth advances track 1; Oil hydraulic cylinder 3 front portions of hydraulic-feed mechanism combine by hinge and front support stand, are connected with a framework 6 that is used to hole power stand 4 location on the front support stand, are processed with a plurality of positioning holes on two regulating arms of framework 6; Two regulating arm front ends of framework combine with the baffle plate 7 that has groove by bearing pin, its rear portion by with framework combine about 8 of two poles be placed on sliding rail 2 and profile of tooth and advance on the track 1; The upper end of pole 8 is placed on the sliding rail 2 by roller mounted thereto, and its lower end is placed on profile of tooth and advances on the track 1; The rear portion of oil hydraulic cylinder 3 is placed on profile of tooth by 9 of the back support frames hinged with it and advances on the track 1.Boring power stand 4 is installed on two regulating arms of framework 6, and is placed on the sliding rail on the track-frame by the roller 5 that is arranged on its both sides; Lay boring on the boring power stand 4 and drive speed reducer and oil hydraulic motor, auger stem is installed on the output shaft of speed reducer.The sliding rail of two-orbit framework is laid the U type carriage 10 that is used for frame trustship road, and a roller respectively is equipped with in the both sides of U type carriage 10, and carriage can move along sliding rail by roller.The usage quantity of carriage 10 can be determined according to the length of pipeline.
When using advancing means of the present utility model to carry out pipe laying, device can be placed in the working pit that excavation is good in advance, length according to working pit, two joints or more piece track-frame are coupled together with bolt, again other parts are installed on the track of framework successively, adjust the levelness of complete machine, after the perpendicularity, pipeline can be hung on U type carriage when small-bore pipeline need not holed (if), according to the thickness of pipe diameter adjustment carriage punch pad, connect power source, make baffle plate 7 withstand the propelling pipeline, hydraulic jack moves reciprocatingly by hydraulicdirectional control valve, during propelling, the oil cylinder piston bar stretches out, and dunnage is advanced a distance that advances tooth, when piston rod shrinks, rear bearing sheet is by the inclined-plane that the advances tooth tooth pitch that advances, and action and so forth is till work finishes.Can start drilling rod boring earlier for the pipeline of larger caliber, and then the primer fluid into mechanism of bearing down on one, pipeline and drilling rod are advanced synchronously.

Claims (3)

1, a kind of combined type two-orbit horizontal pipe advancing means, it mainly comprises guide track, in orbit boring power stand, hydraulic-feed mechanism are installed, and actuating element, of the present utility model being characterised in that: guide track is to be formed by more piece two-orbit frame combination, every joint track-frame all is provided with a pair of sliding rail 2 and a pair of profile of tooth advances track 1; Boring power stand 4 is placed on the sliding rail on the track-frame by the roller 5 that is arranged on its both sides; The oil hydraulic cylinder 3 of hydraulic-feed mechanism is placed in profile of tooth by the supporting frame that is arranged on its two ends and advances on the track.
2, combined type two-orbit horizontal pipe advancing means according to claim 1, it is characterized in that: oil hydraulic cylinder 3 front portions combine by hinge and front support stand, be connected with a framework 6 that is used to hole power stand 4 location on the front support stand, be processed with a plurality of positioning holes on two regulating arms of framework 6; The front end of framework is equipped with a baffle plate 7 that has a groove, its rear portion by with framework combine about 8 of two poles be placed on sliding rail 2 and profile of tooth advances on the track 1; The rear portion of oil hydraulic cylinder 3 is placed on profile of tooth by 9 of the back support frames hinged with it and advances on the track 1.
3, combined type two-orbit horizontal pipe advancing means according to claim 1, it is characterized in that: the sliding rail of two-orbit framework is laid at least one U type carriage 10, and a roller respectively is equipped with in the both sides of U type carriage 10.
CN 92243604 1992-12-03 1992-12-03 Combined horizontal pipe propulsion unit with two rails Expired - Fee Related CN2144229Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92243604 CN2144229Y (en) 1992-12-03 1992-12-03 Combined horizontal pipe propulsion unit with two rails

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92243604 CN2144229Y (en) 1992-12-03 1992-12-03 Combined horizontal pipe propulsion unit with two rails

Publications (1)

Publication Number Publication Date
CN2144229Y true CN2144229Y (en) 1993-10-20

Family

ID=33783093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92243604 Expired - Fee Related CN2144229Y (en) 1992-12-03 1992-12-03 Combined horizontal pipe propulsion unit with two rails

Country Status (1)

Country Link
CN (1) CN2144229Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1296646C (en) * 2005-04-04 2007-01-24 常崧鹏 Pipe-jacking bearing truck
CN101845780A (en) * 2010-05-17 2010-09-29 中铁六局集团有限公司 Construction method for reinforcing line of station wide-sleeper railway in blockade point by 5-5 fastening rails
CN102808522A (en) * 2012-08-22 2012-12-05 上海通用金属结构工程有限公司 Overall sliding equipment applicable to ultra-large span frame structure
CN103644368A (en) * 2013-08-13 2014-03-19 沈阳飞研航空设备有限公司 Intelligent pipeline crossing pusher
CN108020650A (en) * 2017-11-28 2018-05-11 山东大学 A kind of miniature tunneling boring for model test drills arrangement apparatus and its application
CN108953759A (en) * 2018-06-27 2018-12-07 广东管博管道技术科技有限公司 Self-balancing is two-way to eat pipe replacement restorative procedure and device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1296646C (en) * 2005-04-04 2007-01-24 常崧鹏 Pipe-jacking bearing truck
CN101845780A (en) * 2010-05-17 2010-09-29 中铁六局集团有限公司 Construction method for reinforcing line of station wide-sleeper railway in blockade point by 5-5 fastening rails
CN101845780B (en) * 2010-05-17 2012-08-01 中铁六局集团有限公司 Construction method for reinforcing line of station wide-sleeper railway in blockade point by 5-5 fastening rails
CN102808522A (en) * 2012-08-22 2012-12-05 上海通用金属结构工程有限公司 Overall sliding equipment applicable to ultra-large span frame structure
CN102808522B (en) * 2012-08-22 2015-06-10 上海通用金属结构工程有限公司 Overall sliding equipment applicable to ultra-large span frame structure
CN103644368A (en) * 2013-08-13 2014-03-19 沈阳飞研航空设备有限公司 Intelligent pipeline crossing pusher
CN108020650A (en) * 2017-11-28 2018-05-11 山东大学 A kind of miniature tunneling boring for model test drills arrangement apparatus and its application
CN108020650B (en) * 2017-11-28 2020-08-25 山东大学 Miniature full-section drilling arrangement device for model test and application thereof
CN108953759A (en) * 2018-06-27 2018-12-07 广东管博管道技术科技有限公司 Self-balancing is two-way to eat pipe replacement restorative procedure and device

Similar Documents

Publication Publication Date Title
CN201513120U (en) Longitudinal and transversal movement device of drilling machine
CN2144229Y (en) Combined horizontal pipe propulsion unit with two rails
CN108678666A (en) A kind of multifunctional drill and pipe canopy mounting device
CN108361040A (en) Anti- pipeline setback device and preparation method thereof and application method in push pipe operation
CN202325225U (en) Railway construction twist drill injection machine
CN110778279A (en) Lifting type synchronous drilling equipment
CN212714583U (en) Synchronous continuous walking device for pushing rhombic hanging basket
CN2519009Y (en) Horizontal drilling pipe-laying drilling device
CN113431597A (en) Construction method for ultra-large diameter circular reinforced concrete pipe soil pressure balance jacking pipe
US6481507B1 (en) Doweling hole drilling machine
CN102305035B (en) Device for adjusting centration of complete vehicle-mounted service machine to wellhead
CN207905807U (en) Anti- pipeline setback device in push pipe operation
CN88212066U (en) Omnibearing full-hydro-driller
CN205479703U (en) Pipeline mounting machine
CN210421166U (en) Large-scale prefabricated piping lane pushes away construction structures
CN210370483U (en) Movable drilling device for side slope
CN202209175U (en) Adjustable irregularly-shaped stepping tunneling machine with soil-rock separating function
CN2291501Y (en) Hammerblow brad driver
CN219994583U (en) Pipe jacking reinforcing device
CN2268121Y (en) Casing-pipe boring machine
CN220581850U (en) Pipe-jacking pipeline support device and pipe-jacking pipeline
CN209927228U (en) Municipal drainage pipeline mud measuring device
CN211647977U (en) Walking type omnibearing rotary hydraulic pile foundation drilling machine
CN218439367U (en) Auxiliary device convenient for shield machine to pass through well
CN221501981U (en) Pile pulling device without water and mud for subway construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee