CN214422165U - New energy automobile fills electric pile maintenance platform - Google Patents

New energy automobile fills electric pile maintenance platform Download PDF

Info

Publication number
CN214422165U
CN214422165U CN202120477550.8U CN202120477550U CN214422165U CN 214422165 U CN214422165 U CN 214422165U CN 202120477550 U CN202120477550 U CN 202120477550U CN 214422165 U CN214422165 U CN 214422165U
Authority
CN
China
Prior art keywords
fixed
gear
electric pile
maintenance platform
new energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120477550.8U
Other languages
Chinese (zh)
Inventor
贺希
任城龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120477550.8U priority Critical patent/CN214422165U/en
Application granted granted Critical
Publication of CN214422165U publication Critical patent/CN214422165U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a new energy automobile fills electric pile maintenance platform relates to and fills electric pile maintenance technical field. The utility model discloses a two backup pads and operation panel, two backup pad symmetries set up in the below at operation panel both ends, the equal symmetry in top of two backup pads is fixed with lift adjustment mechanism, lift adjustment mechanism all includes the motor, first gear, the second gear, the transfer line, two worms, two turbines, two first sliders, two lifting screw and two sleeves, the motor is fixed in the top of backup pad, first gear is fixed in the output of motor, the meshing of second gear is connected in the one end of first gear, the transfer line is fixed in the inboard of second gear. The utility model discloses a structural design of lift adjustment mechanism for the maintenance platform can satisfy different maintenance personal to the demand of co-altitude, through fixed establishment's structural design, makes the maintenance platform can carry out effectual fixing to not unidimensional electric pile that fills.

Description

New energy automobile fills electric pile maintenance platform
Technical Field
The utility model belongs to the technical field of fill electric pile maintenance, especially, relate to a new energy automobile fills electric pile maintenance platform.
Background
Along with people to environmental protection's the degree of importance is bigger and bigger, new energy automobile has obtained quick development, the demand well that new energy automobile filled electric pile has been brought along therewith spouts formula growth, because new energy automobile fills electric pile's mounted position and is mostly public place, this just makes and fills electric pile and have the damage of different degree easily, just from this need use new energy automobile to fill electric pile maintenance platform, but traditional maintenance platform can not carry out altitude mixture control according to different maintainer's demand, and can not carry out effectual fixed to the not unidimensional electric pile that fills.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a new energy automobile fills electric pile maintenance platform to current problem has been solved: conventional service platforms cannot be height adjusted according to the needs of different service personnel.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to a new energy automobile charging pile maintenance platform, which comprises two supporting plates and an operating platform, wherein the two supporting plates are symmetrically arranged below two ends of the operating platform, the top of the two supporting plates is symmetrically fixed with a lifting adjusting mechanism, the lifting adjusting mechanism comprises a motor, a first gear, a second gear, a transmission rod, two worms, two turbines, two first sliders, two lifting screws and two sleeves, the motor is fixed at the top of the supporting plates, the first gear is fixed at the output end of the motor, the second gear is engaged and connected with one end of the first gear, the transmission rod is fixed at the inner side of the second gear, the two worms are symmetrically fixed at the outer sides of two sides of the transmission rod, the two turbines are respectively engaged and connected with one ends of the two worms, the two first sliders are respectively fixed at two sides of one end of the operating platform, the two lifting screw rods are rotatably connected to the inner side of the first sliding block, the two turbines are respectively fixed to the outer sides of the bottoms of the two lifting screw rods and located above the supporting plate, the two sleeves are respectively arranged on the outer sides of the two lifting screw rods, and the first sliding block is slidably connected to the other ends of the sleeves;
two the equal symmetrical welding in both sides at backup pad top has first mounting, the transfer line rotates with first mounting to be connected, the bottom of lifting screw all rotates with the top of backup pad to be connected, the equal symmetrical welding in bottom of sleeve both sides has the second mounting, the second mounting all is fixed in the top of backup pad.
Further, the inside of operation panel one end is rotated and is connected with the translation screw rod, one side of translation screw rod is fixed with the rolling disc, one side at operation panel top is fixed with decides the baffle, the opposite side sliding connection at operation panel top has the movable baffle, the bottom welding of movable baffle one end has the second slider, the second slider rotates with the translation screw rod to be connected, one side at operation panel other end top is fixed with the toolbox.
Furthermore, a threaded hole is formed in the top of the supporting plate, and the motor penetrates through the threaded hole through a screw to be fixed with the supporting plate.
Further, the sleeve is close to the one end of first slider and has been seted up the spout, first slider all passes through spout and sleeve sliding connection.
Further, bearings are sleeved on two sides of the translation screw rod, and the translation screw rod is rotatably connected with the operating platform through the bearings.
Furthermore, the other side of the fixed baffle and one side of the movable baffle are both coated with soft material layers.
The utility model discloses following beneficial effect has:
1. the utility model discloses a structural design of lift adjustment mechanism for the maintenance platform can satisfy different maintenance personal to the demand of co-altitude.
2. The utility model discloses a fixed establishment's structural design for the maintenance platform can carry out effectual fixing to not unidimensional electric pile that fills.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic overall structure diagram of a new energy vehicle charging pile maintenance platform of the present invention;
fig. 2 is a schematic top view of the new energy vehicle charging pile maintenance platform of the present invention;
fig. 3 is the utility model relates to a new energy automobile fills electric pile maintenance platform's local section structure schematic diagram.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a support plate; 2. an operation table; 3. a motor; 4. a first gear; 5. a second gear; 6. a transmission rod; 7. a first fixing member; 8. a worm; 9. a turbine; 10. a first slider; 11. a lifting screw; 12. a sleeve; 13. a second fixing member; 14. translating the screw rod; 15. rotating the disc; 16. fixing a baffle plate; 17. a movable baffle plate; 18. a second slider; 19. a tool box.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the utility model relates to a new energy automobile charging pile maintenance platform, which comprises two supporting plates 1 and an operating platform 2, wherein the two supporting plates 1 are symmetrically arranged below two ends of the operating platform 2, lifting adjusting mechanisms are symmetrically fixed on the tops of the two supporting plates 1, each lifting adjusting mechanism comprises a motor 3, a first gear 4, a second gear 5, a transmission rod 6, two worms 8, two turbines 9, two first sliders 10, two lifting screws 11 and two sleeves 12, the motor 3 is fixed on the top of the supporting plate 1, a threaded hole is formed in the top of the supporting plate 1, the motor 3 is fixed with the supporting plate 1 through a threaded hole, the first gear 4 is fixed on the output end of the motor 3, the second gear 5 is connected with one end of the first gear 4 in a meshing manner, the transmission rod 6 is fixed on the inner side of the second gear 5, the two worms 8 are symmetrically fixed on the outer sides of two sides of the transmission rod 6, the two turbines 9 are respectively meshed and connected to one ends of the two worms 8, the two first sliding blocks 10 are respectively fixed to two sides of one end of the operating platform 2, the two lifting screws 11 are rotatably connected to the inner sides of the first sliding blocks 10, the two turbines 9 are respectively fixed to the outer sides of the bottoms of the two lifting screws 11 and located above the supporting plate 1, the two sleeves 12 are respectively arranged on the outer sides of the two lifting screws 11, the first sliding blocks 10 are slidably connected to the other ends of the sleeves 12, one ends of the sleeves 12, which are close to the first sliding blocks 10, are provided with sliding grooves, and the first sliding blocks 10 are both slidably connected with the sleeves 12 through the sliding grooves;
first fixing parts 7 are symmetrically welded on two sides of the tops of the two supporting plates 1, the transmission rod 6 is rotatably connected with the first fixing parts 7, the bottoms of the lifting screw rods 11 are rotatably connected with the tops of the supporting plates 1, second fixing parts 13 are symmetrically welded on the bottoms of two sides of the sleeve 12, and the second fixing parts 13 are fixed on the tops of the supporting plates 1;
the inside of 2 one ends of operation panel is rotated and is connected with translation screw 14, the bearing has all been cup jointed to translation screw 14's both sides, translation screw 14 passes through the bearing and is connected with 2 rotations of operation panel, can reduce the frictional force between translation screw 14 and the operation panel 2 like this, one side of translation screw 14 is fixed with rolling disc 15, one side at 2 tops of operation panel is fixed with decides baffle 16, the opposite side sliding connection at 2 tops of operation panel has movable baffle 17, the opposite side of deciding baffle 16 and the one side of moving baffle 17 all have the cladding of soft material layer, can give the certain protection in surface of filling electric pile like this, it has second slider 18 to move the bottom welding of baffle 17 one end, second slider 18 rotates with translation screw 14 to be connected, one side at 2 other end tops of operation panel is fixed with toolbox 19.
One specific application of this embodiment is: firstly, a maintenance platform is electrically connected with an external power supply through a lead, a charging pile to be maintained is placed at the top of an operation platform 2, then a rotating disc 15 is manually rotated, the rotating disc 15 drives a translation screw 14 to rotate, a second sliding block 18 is driven to move through the rotation of the translation screw 14, then the moving of the second sliding block 18 drives a movable baffle 17 to move, and the charging pile to be maintained is firmly fixed between the movable baffle 17 and a fixed baffle 16 through the movement of the movable baffle 17;
after the charging pile to be maintained is fixed, the requirements of different maintenance personnel on different heights are met through the lifting adjusting mechanism, the motor 3 is started, the output end of the motor 3 rotates, the first gear 4 is driven to rotate through the rotation of the output end of the motor 3, so that the rotation of the first gear 4 drives the second gear 5 to rotate, the second gear 5 drives the worm 8 to rotate through the transmission rod 6, the worm 8 drives the worm wheel 9 to rotate, so that the rotation of the turbine 9 drives the lifting screw 11 to rotate, the rotation of the lifting screw 11 drives the first slide block 10 to move upwards or downwards, so that the upward or downward movement of the first slider 10 drives the operation table 2 to move upward or downward, reach the purpose that satisfies different maintenance personal to the demand of co-altitude from this, treat that altitude mixture control is good after, maintenance personal can follow the repair tools of selection difference in the toolbox 19 and maintain charging pile.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. The utility model provides a new energy automobile fills electric pile maintenance platform, includes two backup pads (1) and operation panel (2), two backup pad (1) symmetry sets up in the below at operation panel (2) both ends, its characterized in that: the top of the two support plates (1) is symmetrically fixed with a lifting adjusting mechanism, the lifting adjusting mechanism comprises a motor (3), a first gear (4), a second gear (5), a transmission rod (6), two worms (8), two turbines (9), two first sliders (10), two lifting screws (11) and two sleeves (12), the motor (3) is fixed at the top of the support plates (1), the first gear (4) is fixed at the output end of the motor (3), the second gear (5) is connected to one end of the first gear (4) in a meshing manner, the transmission rod (6) is fixed at the inner side of the second gear (5), the two worms (8) are symmetrically fixed at the outer sides of the two sides of the transmission rod (6), the two turbines (9) are respectively connected to one ends of the two worms (8) in a meshing manner, the two first sliders (10) are respectively fixed at the two sides of one end of the operating platform (2), the two lifting screw rods (11) are rotatably connected to the inner side of the first sliding block (10), the two turbines (9) are respectively fixed to the outer sides of the bottoms of the two lifting screw rods (11) and located above the supporting plate (1), the two sleeves (12) are respectively arranged on the outer sides of the two lifting screw rods (11), and the first sliding block (10) is slidably connected to the other end of each sleeve (12);
two the equal symmetrical welding in both sides at backup pad (1) top has first mounting (7), transfer line (6) are rotated with first mounting (7) and are connected, the bottom of lifting screw (11) all rotates with the top of backup pad (1) to be connected, the equal symmetrical welding in bottom of sleeve (12) both sides has second mounting (13), second mounting (13) all are fixed in the top of backup pad (1).
2. The new energy automobile fills electric pile maintenance platform of claim 1, its characterized in that: the inside of operation panel (2) one end is rotated and is connected with translation screw rod (14), one side of translation screw rod (14) is fixed with rolling disc (15), one side at operation panel (2) top is fixed with decides baffle (16), the opposite side sliding connection at operation panel (2) top has movable baffle (17), the bottom welding of moving baffle (17) one end has second slider (18), second slider (18) rotate with translation screw rod (14) and are connected, one side at operation panel (2) other end top is fixed with toolbox (19).
3. The new energy automobile fills electric pile maintenance platform of claim 1, its characterized in that: the top of the supporting plate (1) is provided with a threaded hole, and the motor (3) penetrates through the threaded hole through a screw to be fixed with the supporting plate (1).
4. The new energy automobile fills electric pile maintenance platform of claim 1, its characterized in that: the sleeve (12) is close to one end of the first sliding block (10) and is provided with a sliding groove, and the first sliding block (10) is connected with the sleeve (12) in a sliding mode through the sliding groove.
5. The new energy automobile fills electric pile maintenance platform of claim 2, its characterized in that: the two sides of the translation screw rod (14) are sleeved with bearings, and the translation screw rod (14) is rotatably connected with the operating platform (2) through the bearings.
6. The new energy automobile fills electric pile maintenance platform of claim 2, its characterized in that: the other side of the fixed baffle (16) and one side of the movable baffle (17) are coated with soft material layers.
CN202120477550.8U 2021-03-05 2021-03-05 New energy automobile fills electric pile maintenance platform Expired - Fee Related CN214422165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120477550.8U CN214422165U (en) 2021-03-05 2021-03-05 New energy automobile fills electric pile maintenance platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120477550.8U CN214422165U (en) 2021-03-05 2021-03-05 New energy automobile fills electric pile maintenance platform

Publications (1)

Publication Number Publication Date
CN214422165U true CN214422165U (en) 2021-10-19

Family

ID=78072643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120477550.8U Expired - Fee Related CN214422165U (en) 2021-03-05 2021-03-05 New energy automobile fills electric pile maintenance platform

Country Status (1)

Country Link
CN (1) CN214422165U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113772588A (en) * 2021-11-09 2021-12-10 杭州赛奇机械股份有限公司 New energy automobile maintains lifting device
CN115072631A (en) * 2022-05-30 2022-09-20 商丘师范学院 Extensible lifting platform for urban rail vehicle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113772588A (en) * 2021-11-09 2021-12-10 杭州赛奇机械股份有限公司 New energy automobile maintains lifting device
CN115072631A (en) * 2022-05-30 2022-09-20 商丘师范学院 Extensible lifting platform for urban rail vehicle
CN115072631B (en) * 2022-05-30 2024-01-26 商丘师范学院 Extensible lifting platform for urban rail vehicle

Similar Documents

Publication Publication Date Title
CN214422165U (en) New energy automobile fills electric pile maintenance platform
CN112296424A (en) Municipal road engineering pipeline cutting device
CN214889973U (en) On-spot mapping device of municipal works cost
CN208135834U (en) A kind of electric power overhaul operating platform
CN212635395U (en) Mirror plate grinding support adjusting device
CN111584192B (en) Transformer
CN211278320U (en) Angle-adjustable translation type lifting device
CN114710105A (en) Umbrella-shaped opening-closing type photovoltaic mechanism unfolding and folding device
CN218402426U (en) Gear distribution and transmission device
CN220565093U (en) Electric automatic lifting type warning device for municipal road construction
CN218560587U (en) Color printing bag production is with mechanism that flattens
CN217658683U (en) Adjustable optical instrument platform
CN210780646U (en) Adjustable base for new energy power generation equipment
CN213937814U (en) Photovoltaic support that direction was adjusted can carry out
CN110700628A (en) Steel bearing structure that stability is high
CN215897669U (en) Stable photovoltaic solar power generation device
CN217759870U (en) Liftable support for construction engineering construction
CN221517693U (en) Automatic operation panel of stable regulation
CN213799719U (en) Zeolite transfer device is used in zeolite filler construction
CN220684374U (en) Integrated cylindrical buffer for elevator
CN214615334U (en) High-efficient stagnant water overhauls operation device for building
CN219661342U (en) Rotatory show platform of low energy consumption
CN213929619U (en) Limiting and supporting device of electric valve
CN220109492U (en) Cinema customer repair consultation platform
CN221502607U (en) Offshore wind power construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211019

CF01 Termination of patent right due to non-payment of annual fee