CN214415911U - Green building construction is with spraying dust collector - Google Patents

Green building construction is with spraying dust collector Download PDF

Info

Publication number
CN214415911U
CN214415911U CN202022032996.8U CN202022032996U CN214415911U CN 214415911 U CN214415911 U CN 214415911U CN 202022032996 U CN202022032996 U CN 202022032996U CN 214415911 U CN214415911 U CN 214415911U
Authority
CN
China
Prior art keywords
filter
inner cavity
filter tank
cavity
placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022032996.8U
Other languages
Chinese (zh)
Inventor
罗水生
李兴富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Taihong Construction Engineering Co ltd
Original Assignee
Fujian Taihong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Taihong Construction Engineering Co ltd filed Critical Fujian Taihong Construction Engineering Co ltd
Priority to CN202022032996.8U priority Critical patent/CN214415911U/en
Application granted granted Critical
Publication of CN214415911U publication Critical patent/CN214415911U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Special Spraying Apparatus (AREA)

Abstract

The utility model discloses a green construction is with spraying dust collector, the last fixed surface of device base is connected with the fixing base, the upper surface of fixing base is provided with the sprinkler head, the upper surface of device base is located the rear side of fixing base is provided with first rose box, the last fixed surface of first rose box is connected with the second water pump, the outlet pipe of second water pump is linked together with the inner chamber of first rose box, the inner chamber of first rose box transversely is provided with the toper filter, the cross-section of toper filter is the toper, the inner chamber of toper filter is provided with first filter cloth. The utility model relates to a dust collector technical field. This green construction is with spraying dust collector, through the second water pump of first rose box upper surface, can extract the inside that gets into first rose box through the input port to the inside water in pond, the toper filter can filter afterwards, has avoided the problem that the sprinkler head blockked up because of silt.

Description

Green building construction is with spraying dust collector
Technical Field
The utility model relates to a dust collector technical field specifically is a green construction is with spraying dust collector.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on design drawings into real objects in designated places, and a large amount of dust can be generated in the construction process, and the dust is a large enemy of human health, carries a plurality of bacteria, viruses and eggs to fly everywhere, spreads diseases, and usually adopts a dust removal device to remove dust.
Present green construction is with spraying dust collector is owing to can consume a large amount of water in the use, and the water source that has silt can lead to the shower nozzle to block up, consequently seeks the water source comparatively troublesome to and can produce at the removal in-process and rock, make the inside battery of device and device inner wall to collide easily and lead to damaging.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a green construction is with spraying dust collector has solved the water source that has silt and can lead to the shower nozzle to block up, consequently makes to look for the water source comparatively troublesome to and can produce at the removal in-process and rock, make the inside battery of device and device inner wall to collide the problem that leads to the damage easily.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a spraying and dust removing device for green building construction comprises a device base, wherein a fixed seat is fixedly connected to the upper surface of the device base, a first water pump is arranged inside the fixed seat, a spraying head is arranged on the upper surface of the fixed seat, a first filter box is arranged on the upper surface of the device base and positioned on the rear side of the fixed seat, a second water pump is fixedly connected to the upper surface of the first filter box, a water outlet pipe of the second water pump is communicated with an inner cavity of the first filter box, a conical filter plate is transversely arranged in the inner cavity of the first filter box, the section of the conical filter plate is conical, first filter cloth is arranged in the inner cavity of the conical filter plate, second filter boxes are fixedly connected to the outer walls of the two sides of the first filter box, and a water inlet hole communicated with the inside of the first filter box is transversely arranged on one side wall of the inner cavity of the second filter box in a penetrating manner, the inner cavity of the second filter tank is provided with a filter tank, the bottom of the inner cavity of the filter tank is transversely provided with second filter cloth, two sides of the inner wall of the second filter tank are vertically provided with placing blocks for supporting the filter tank, one side wall of the inner cavity of the second filter tank is positioned at the bottom of the filter tank and transversely penetrates through a water outlet hole communicated with the inner part of the first filter tank, the lower surface of the device base is provided with universal wheels, a water storage cavity communicated with the inner cavity of the first filter tank is arranged at the bottom of the device base, the inner cavity of the water storage cavity is provided with a water outlet pipe communicated with the first water pump, a placing cavity is arranged at the front side of the water storage cavity inside the device base, the bottom of the inner cavity of the placing cavity is vertically provided with a telescopic seat, and a telescopic rod is vertically arranged in a sliding manner in the inner cavity of the telescopic seat, the top fixedly connected with of telescopic link places the board, place the lower surface of board and place intracavity wall, between the bottom and be located the vertical buffer spring that is provided with in outer lane of expansion seat, the battery has been placed to the upper surface of placing the board, the inner chamber of placing the board rotationally transversely is provided with the threaded rod, the upper surface of placing the board is seted up and is supplied the shifting chute that the cramping piece was movable, the equal threaded connection in both ends on threaded rod surface has the cramping piece, the vertical extension in top of cramping piece to place the outside of board, the upper surface of placing the board has seted up and has supplied the shifting chute that the cramping piece moved.
Further, the one end of threaded rod outwards extends place the outside of board, the threaded rod is located place the outside one end slidable ground cover of board and be equipped with the rolling disc, the threaded rod is located the one end fixedly connected with removal dish of rolling disc inner chamber, the lateral surface of removal dish with transversely be provided with supporting spring between the inside wall of rolling disc.
Furthermore, the outer side wall of the rotating disc is fixedly connected with a limiting rod, the outer side wall, opposite to the limiting rod, of the placing plate is provided with a ring groove, one end of the limiting rod extends to the inner cavity of the ring groove, and the inner cavity of the ring groove is provided with a rubber pad which is in contact with the limiting rod.
Further, the top of second rose box rotationally transversely is provided with the apron, the top of second rose box inside wall is provided with the sealing washer with apron lower surface contact, the vertical fixedly connected with handle in bottom of filter tank inner wall.
Further, the inner wall of the placing cavity is transversely provided with a buffer seat at the bottom of the placing plate, and the lower surface of the placing plate is transversely provided with a buffer cushion matched with the buffer seat.
Furthermore, the front of the device base and the position corresponding to the water storage cavity are provided with observation windows, and the front of the device base and the position corresponding to the water storage cavity are hinged with maintenance doors.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) this green construction is with spraying dust collector, second water pump through first rose box upper surface, can extract the inside that gets into first rose box through the input port to the inside water in pond, the first filter cloth of toper filter inner chamber filters afterwards, prevent that silt from getting into the inner chamber in retaining chamber, silt after the filtration, accessible rivers and gravity flow in the second filter cloth to filter tank inner chamber bottom and carry out the secondary filter, make silt collect the inside at the rose tank, the sprinkler produces the problem of blockking up the damage when having avoided using, through setting up the apron, can upwards take out the clearance with the rose tank of second rose box inside, prevent that the rose tank from using for a long time and leading to the problem that the rose tank inner chamber silt too much leads to unable normal work.
(2) This green construction is with spraying dust collector, can be through setting up rocking of the reducible board of placing of buffer spring, through setting up flexible seat and telescopic link, can be so that buffer spring more stable work, the problem that the battery of placing the board upper surface and the inner wall collision of device base lead to the battery to damage has been avoided, through setting up blotter and cushion socket, can be when placing the board and moving down, the blotter can laminate the cushion socket and cushion, reduce the wearing and tearing of flexible seat and telescopic link, increase the practical life of flexible seat and telescopic link.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
FIG. 3 is an enlarged view of a portion of the structure shown at B in FIG. 1;
fig. 4 is a schematic front structural view of the present invention.
In the figure: 1-device base, 2-fixed base, 3-sprinkler head, 4-first filter tank, 5-second water pump, 6-conical filter plate, 7-second filter tank, 8-placing block, 9-cover plate, 10-filter tank, 11-maintenance door, 12-water storage chamber, 13-placing chamber, 14-storage battery, 15-placing plate, 16-threaded rod, 17-clamping piece, 18-universal wheel, 19-buffer pad, 20-buffer seat, 21-buffer spring, 22-telescopic seat, 23-telescopic rod, 24-rotating disk, 25-supporting spring, 26-moving disk, 27-limiting rod, 28-annular groove, 29-maintenance door and 30-second water pump.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a green construction is with spraying dust collector, including device base 1, device base 1's last fixed surface is connected with fixing base 2, the inside of fixing base 2 is provided with first water pump 5, the upper surface of fixing base 2 is provided with sprinkler head 3, the upper surface of device base 1 is located the rear side of fixing base 2 and is provided with first rose box 4, the last fixed surface of first rose box 4 is connected with second water pump 30, the outlet pipe of second water pump 30 is linked together with the inner chamber of first rose box 4, the inner chamber of first rose box 4 transversely is provided with toper filter 6, the cross-section of toper filter 6 is the toper, the inner chamber of toper filter 6 is provided with first filter cloth.
By arranging the conical filter plate 6 in the first filter tank 4, when the second water pump 30 pumps the water source in the water tank into the first filter tank 4, the first filter cloth in the inner cavity of the conical filter plate 6 can filter the water source, thereby avoiding the problem that the sprinkler head 3 is blocked due to the inclusion of foreign matters such as silt in the water source,
the equal fixedly connected with second rose box 7 of outer wall of 4 both sides of first rose box, transversely run through on a lateral wall of 7 inner chambers of second rose box and be provided with the inlet opening that communicates to 4 inside of first rose box, the inner chamber of second rose box 7 is provided with filter tank 10, the bottom of filter tank 10 inner chamber transversely is provided with the second filter cloth, the equal vertical piece 8 of placing that supports filter tank 10 that is provided with in both sides of 7 inner walls of second rose box, the bottom that a lateral wall of 7 inner chambers of second rose box and lie in filter tank 10 transversely runs through and is provided with the apopore that communicates to 4 inside of first rose box.
The top of second rose box 7 rotationally transversely is provided with apron 9, and the top of second rose box 7 inside wall is provided with the sealing washer with apron 9 lower surface contact, the vertical fixedly connected with handle in bottom of filter-tank 10 inner wall.
Rivers and silt accessible gravity move, advance the inlet opening and flow into the filter tank 10 to the 7 inner chambers of second rose box, the inside second filter cloth of filter tank 10 can carry out the secondary filter to the silt and the rivers that flow into 7 inside second rose box subsequently, make the rivers flow into water storage chamber 12 inside through the apopore, can prevent that silt from piling up the problem that causes 4 inner chambers of first rose box 4 to block up at the inner chamber of first rose box 4, through setting up apron 9, can make the staff upwards open through first handle of carrying, make filter tank 10 take out, silt inside filter tank 10 is cleared up.
The lower surface of device base 1 is provided with universal wheel 18, the inside of device base 1 and the bottom that is located first rose box 4 set up the water storage chamber 12 that is linked together with first rose box 4 inner chamber, the inner chamber of water storage chamber 12 is provided with the outlet pipe 29 that is linked together with first water pump 5, the inside of device base 1 and the front side that is located water storage chamber 12 open and are equipped with and place chamber 13, the vertical flexible seat 22 that is provided with in bottom of placing chamber 13 inner chamber, the vertical telescopic link 23 that is provided with in inner chamber slidable ground of flexible seat 22, board 15 is placed to the top fixedly connected with of telescopic link 23, place the lower surface of board 15 and place between the bottom of chamber 13 inner wall and be located the vertical buffer spring 21 that is provided with in outer lane of flexible seat 22, the battery 14 has been placed to the upper surface of placing board 15.
The inner wall of the placing cavity 13 is transversely provided with a buffer seat 20 at the bottom of the placing plate 15, the lower surface of the placing plate 15 is transversely provided with a buffer cushion 19 matched with the buffer seat 20, the front of the device base 1 is provided with an observation window at the position corresponding to the water storage cavity 12, and the front of the device base 1 is hinged with a maintenance door 11 at the position corresponding to the water storage cavity 12.
Through setting up buffer spring 21, can support placing board 15, thereby it rocks to make to place board 15 reduction and prevents that battery 14 from colliding with the inner wall of placing chamber 13 and leading to damaging, through setting up telescopic link 23 and flexible seat 22, can make the more stable support of buffer spring 21, prevent buffer spring 21 dislocation, through setting up blotter 19 and buffing pad 20, can be when placing board 15 downstream, drive blotter 19 laminating buffing pad 20 and cushion, reduce the wearing and tearing of telescopic link 23 and flexible seat 22, increase the life of telescopic link 23 and flexible seat 22, through setting up the observation window, can make the audio-visual water yield of observing water storage chamber 12 inner chambers of staff, through setting up maintenance door 11, can take out battery 14.
The inner chamber of placing board 15 rotationally transversely is provided with threaded rod 16, places the upper surface of board 15 and sets up the shifting chute that can supply the activity of holding piece 17, and the equal threaded connection in both ends on threaded rod 16 surface has holding piece 17, and the both ends screw thread on threaded rod 16 surface is two-way screw thread, and the vertical outside that extends to placing board 15 in top of holding piece 17 places the shifting chute that can supply the activity of holding piece 17 on the upper surface of board 15.
One end of threaded rod 16 outwards extends to the outside of placing board 15, threaded rod 16 is located to place the outside one end slidable ground cover of board 15 and is equipped with rolling disc 24, threaded rod 16 is located the one end fixedly connected with shifting disc 26 of 24 inner chambers of rolling disc, transversely be provided with supporting spring 25 between the lateral surface of shifting disc 26 and the inside wall of rolling disc 24, 24 lateral wall fixedly connected with gag lever post 27 of rolling disc, place board 15 and the relative lateral wall of gag lever post 27 and seted up ring channel 28, the one end of gag lever post 27 extends to the inner chamber of ring channel 28, the inner chamber of ring channel 28 is provided with the rubber pad that contacts with gag lever post 27.
Through the two-way screw thread that sets up threaded rod 16, can be when threaded rod 16 rotates, make the holding piece 17 remove and carry out the centre gripping fixedly to battery 14, make supporting spring 25 through the 26 lateral walls of removal dish, can support rolling disc 24, make rolling disc 24 drive the inside and the rubber pad that gag lever post 27 inserted ring channel 28 laminate, make rolling disc 24 fix, prevent that vibrations from leading to threaded rod 16 not hard up, make the problem that battery 14 drops, increase stability.
During the use, the liquid in the inner cavity of the water storage cavity 12 reaches the first water pump 5 inside the fixing seat 2 through the water outlet pipe 29, then the first water pump 5 conveys the liquid to the spraying head 3 to be sprayed out, when a water source is supplemented, the second water pump 30 is started, the water source inside the water tank can enter the first filter cloth inside the conical filter plate 6 through the input port to be filtered, then silt and a small amount of water flow into the second filter cloth inside the inner cavity of the filter tank 10 through gravity, secondary filtering is carried out, the silt stays in the inner cavity of the filter tank 10, the filtered liquid can be used by the spraying head 3, when the silt is cleaned, the cover plate 9 can be opened upwards, then the filter tank 10 is pumped out to be cleaned, and the reverse operation is carried out during installation.
During the removal, place the telescopic link 23 of board 15 bottom and place the flexible seat 22 of intracavity 13 inner wall and can stretch out and draw back, buffer spring 21 supports afterwards, make and place board 15 and reduce and rock, through outside pulling rolling disc 24, can make gag lever post 27 break away from inside ring channel 28, rotate rolling disc 24 afterwards and can drive threaded rod 16 through removal dish 26 and rotate, make threaded rod 16 pass through the screw thread and drive holding piece 17 and remove, can dismantle battery 14, the anti-operation can during the installation.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a green construction is with spraying dust collector, includes device base (1), its characterized in that: the device is characterized in that a fixed seat (2) is fixedly connected to the upper surface of a base (1), a first water pump (5) is arranged inside the fixed seat (2), a sprinkler head (3) is arranged on the upper surface of the fixed seat (2), a first filter box (4) is arranged on the rear side of the fixed seat (2) on the upper surface of the base (1), a second water pump (30) is fixedly connected to the upper surface of the first filter box (4), a water outlet pipe of the second water pump (30) is communicated with an inner cavity of the first filter box (4), a conical filter plate (6) is transversely arranged in the inner cavity of the first filter box (4), the section of the conical filter plate (6) is conical, first filter cloth is arranged in the inner cavity of the conical filter plate (6), and second filter boxes (7) are fixedly connected to the outer walls of the two sides of the first filter box (4), a water inlet communicated with the inner cavity of the first filter tank (4) is transversely arranged on one side wall of the inner cavity of the second filter tank (7) in a penetrating manner, a filter tank (10) is arranged in the inner cavity of the second filter tank (7), second filter cloth is transversely arranged at the bottom of the inner cavity of the filter tank (10), placing blocks (8) for supporting the filter tank (10) are vertically arranged on two sides of the inner wall of the second filter tank (7), a water outlet communicated with the inner cavity of the first filter tank (4) is transversely arranged on one side wall of the inner cavity of the second filter tank (7) and positioned at the bottom of the filter tank (10) in a penetrating manner, a universal wheel (18) is arranged on the lower surface of the device base (1), a water storage cavity (12) communicated with the inner cavity of the first filter tank (4) is arranged in the inner cavity of the device base (1) and positioned at the bottom of the first filter tank (4), the device is characterized in that a water outlet pipe (29) communicated with the first water pump (5) is arranged in an inner cavity of the water storage cavity (12), a placing cavity (13) is formed in the device base (1) and located on the front side of the water storage cavity (12), a telescopic seat (22) is vertically arranged at the bottom of the inner cavity of the placing cavity (13), a telescopic rod (23) is vertically arranged in the inner cavity of the telescopic seat (22) in a sliding mode, a placing plate (15) is fixedly connected to the top end of the telescopic rod (23), a buffer spring (21) is vertically arranged between the lower surface of the placing plate (15) and the bottom of the inner wall of the placing cavity (13) and located on the outer ring of the telescopic seat (22), a storage battery (14) is placed on the upper surface of the placing plate (15), a threaded rod (16) is rotatably and transversely arranged in the inner cavity of the placing plate (15), and a moving groove for moving the clamping piece (17) is formed in the upper surface of the placing plate (15), the equal threaded connection in both ends on threaded rod (16) surface has centre gripping piece (17), the top of centre gripping piece (17) is vertical to extend to place the outside of board (15), place the upper surface of board (15) and seted up and supply the shifting chute of centre gripping piece (17) activity.
2. The spraying and dedusting device for green building construction according to claim 1, characterized in that: the one end of threaded rod (16) outwards extends to place the outside of board (15), threaded rod (16) are located place board (15) outside one end slidable ground cover and be equipped with rolling disc (24), threaded rod (16) are located the one end fixedly connected with of rolling disc (24) inner chamber removes dish (26), remove the lateral surface of dish (26) with transversely be provided with supporting spring (25) between the inside wall of rolling disc (24).
3. The spraying and dedusting device for green building construction as claimed in claim 2, characterized in that: the outer side wall of the rotating disc (24) is fixedly connected with a limiting rod (27), a ring groove (28) is formed in the outer side wall, opposite to the limiting rod (27), of the placing plate (15), one end of the limiting rod (27) extends to the inner cavity of the ring groove (28), and a rubber pad which is in contact with the limiting rod (27) is arranged in the inner cavity of the ring groove (28).
4. The spraying and dedusting device for green building construction according to claim 1, characterized in that: the top of second rose box (7) rotationally transversely is provided with apron (9), the top of second rose box (7) inside wall is provided with the sealing washer with apron (9) lower surface contact, the vertical fixedly connected with handle in bottom of rose tank (10) inner wall.
5. The spraying and dedusting device for green building construction according to claim 1, characterized in that: the inner wall of the placing cavity (13) is transversely provided with a buffer seat (20) at the bottom of the placing plate (15), and the lower surface of the placing plate (15) is transversely provided with a buffer cushion (19) matched with the buffer seat (20).
6. The spraying and dedusting device for green building construction according to claim 1, characterized in that: the front of the device base (1) is provided with an observation window at a position corresponding to the water storage cavity (12), and the front of the device base (1) is hinged with a maintenance door (11) at a position corresponding to the water storage cavity (12).
CN202022032996.8U 2020-09-16 2020-09-16 Green building construction is with spraying dust collector Active CN214415911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022032996.8U CN214415911U (en) 2020-09-16 2020-09-16 Green building construction is with spraying dust collector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022032996.8U CN214415911U (en) 2020-09-16 2020-09-16 Green building construction is with spraying dust collector

Publications (1)

Publication Number Publication Date
CN214415911U true CN214415911U (en) 2021-10-19

Family

ID=78058201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022032996.8U Active CN214415911U (en) 2020-09-16 2020-09-16 Green building construction is with spraying dust collector

Country Status (1)

Country Link
CN (1) CN214415911U (en)

Similar Documents

Publication Publication Date Title
CN110397128B (en) Anti-blocking self-cleaning device for sewer line
CN210187780U (en) Clear up sill device
CN204018309U (en) With the aloe washing machine of automatic pollutant removal
CN214415911U (en) Green building construction is with spraying dust collector
CN109056890B (en) A collect and cyclic utilization system for gardens rainwater
CN107537197A (en) Rapid sewage filtering equipment
CN209696570U (en) Spinning and weaving workshop dust-extraction unit
CN214521176U (en) Cutting device suitable for granite part processing
CN212835158U (en) A road surface cleaning device for highway maintenance
CN210043152U (en) Ramie upset washing device
CN108160609B (en) Cleaning device of part cleaning machine
CN209848473U (en) Solid-liquid separator with belt cleaning device
CN207682683U (en) A kind of makita 4100NH
CN112792015A (en) Spare part cleaning equipment with regulatory function
CN218553273U (en) Water conservancy and hydropower construction diversion device
CN216726278U (en) Air filter
CN213467217U (en) Water curtain dust removal device of polishing machine
CN220955710U (en) Mine tunnel roof infiltration drainage device
CN217911842U (en) Bearing roller cleaning line
CN210358280U (en) Dust removal equipment capable of preventing dust from being raised and provided with cleaner
CN219630864U (en) Waste gas treatment equipment for urea-formaldehyde resin production
CN210643875U (en) Dust collector for manufacturing factory
CN219679690U (en) Impurity-removing and dust-removing equipment for peppers
CN217941096U (en) Maintaining device for sheet metal
CN210613204U (en) Environment-friendly dust removal device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant