CN214414725U - Be used for hotel bathroom to cut off and decorate and use steel frame construction - Google Patents

Be used for hotel bathroom to cut off and decorate and use steel frame construction Download PDF

Info

Publication number
CN214414725U
CN214414725U CN202022284097.7U CN202022284097U CN214414725U CN 214414725 U CN214414725 U CN 214414725U CN 202022284097 U CN202022284097 U CN 202022284097U CN 214414725 U CN214414725 U CN 214414725U
Authority
CN
China
Prior art keywords
glass
installation
steel frame
supporting
bathroom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022284097.7U
Other languages
Chinese (zh)
Inventor
朱文俊
高瑜平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Lefu Decoration Engineering Co ltd
Original Assignee
Beijing Lefu Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Lefu Decoration Engineering Co ltd filed Critical Beijing Lefu Decoration Engineering Co ltd
Priority to CN202022284097.7U priority Critical patent/CN214414725U/en
Application granted granted Critical
Publication of CN214414725U publication Critical patent/CN214414725U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Securing Of Glass Panes Or The Like (AREA)

Abstract

The utility model provides a steel frame construction for hotel bathroom cuts off decoration. Be used for hotel bathroom to cut off steel frame construction for decoration including the installation chassis, installation roof-rack and stay tube, the installation chassis is including rotating the lagging, spliced strut and connecting plate, the spliced strut of rotating the lagging has all been cup jointed at the both ends of rotating the lagging, and the equal fixed mounting of both sides wall of two spliced struts has the connecting plate that the specification is the same, set up the glass installation cavity that is used for installing fixed glass on the connecting plate, and the installation roof-rack is the same with installation chassis specification, two stay tubes that the specification is the same are fixed mounting respectively on two spliced struts in the installation chassis, and on two spliced struts in the top of stay tube and the installation roof-rack. The utility model provides a be used for hotel bathroom to cut off and decorate and have the advantage that is suitable for various hotel bathroom types with steel frame construction.

Description

Be used for hotel bathroom to cut off and decorate and use steel frame construction
Technical Field
The utility model relates to a hotel fitment technical field especially relates to a be used for hotel bathroom to cut off steel frame construction for decoration.
Background
The bathroom means hygiene and bathing literally, and the bathroom is commonly called a bathroom mainly used for bathing, and is a space and articles for daily hygiene activities such as defecation, bathing, washing and the like of residents. The hotel bathroom refers to a bathroom used in a hotel.
However, the existing hotel bathrooms are different in type, so that the existing hotel bathrooms are inconvenient to connect with the decorative steel frames, need to be adjusted continuously, and are inconvenient to install and possibly influence the decorative effect of the hotel bathrooms.
Therefore, it is necessary to provide a steel frame structure for hotel bathroom partition decoration to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a be suitable for various hotel bathroom room types be used for hotel bathroom to cut off steel frame construction for decoration.
The utility model provides a be used for hotel bathroom to cut off and decorate and use steel frame construction includes: the installation chassis, installation roof-rack and stay tube, the installation chassis is including rotating the lagging, spliced strut and connecting plate, the spliced strut that rotates the connection has all been cup jointed at the both ends of rotating the lagging, and the equal fixed mounting of both sides wall of two spliced struts has the connecting plate that the specification is the same, set up the glass installation cavity that is used for installing fixed glass on the connecting plate, and the installation roof-rack is the same with installation chassis specification, two stay tubes that the specification is the same are fixed mounting respectively on two spliced struts in the installation chassis, and on two spliced struts in the top of stay tube and the installation roof-rack.
Preferably, install the buffer gear who is used for improving glass anti-seismic performance in the glass installation cavity of seting up in the connecting plate, and buffer gear includes rubber arc and gasbag, and the gomphosis is fixed respectively on the both sides wall of glass installation cavity to the same rubber arc of two sets of specifications, and two sets of rubber arc cambered surfaces set up in opposite directions, and fixed gomphosis has the gasbag in the cavity that rubber arc and connecting plate inside wall constitute.
Preferably, the fixing mechanism is installed on the inner bottom wall of the glass installation cavity formed in the connecting plate and comprises a plastic installation plate which is fixedly installed on the inner bottom wall of the glass installation cavity, and a fixing groove is formed in the plastic installation plate
Preferably, a plurality of groups of sealing mechanisms with the same specification are fixedly installed on the pipe wall of the supporting pipe, each sealing mechanism comprises a rubber ridge, the rubber ridges are fixedly embedded on the pipe wall of the supporting pipe, and embedding grooves are formed in the rubber ridges.
Preferably, the side wall of the connecting plate close to the bathroom is provided with a drain hole communicated with the glass installation cavity, and the drain hole is arranged in a downward inclined mode.
Compared with the prior art, the utility model provides a be used for hotel bathroom to cut off and decorate and use steel frame construction has following beneficial effect:
1. the utility model fixedly installs the connecting plate on one side of the installation underframe in the hotel bathroom, and rotates the connecting plate on the other side of the installation underframe according to the specific room type in the bathroom to make the connecting plate conform to the hotel bathroom type and fix the same by using screws, and the connecting plates on the two sides of the installation roof rack are adjusted according to the connecting plate on the installation underframe and then fixed on the wall surface by using screws, so that the whole steel frame for partition decoration of the bathroom can be flexibly adjusted, and the steel frame is extremely wide in application range of the hotel bathroom type;
2. the utility model discloses insert respectively with the glass board and establish the glass installation intracavity that the connecting plate was seted up in installation chassis and the installation roof-rack and the gomphosis utilizes the screw regulation to the fixed slot that the plastic mounting panel was seted up, and because the elasticity of rubber arc self and the extrusion of embedded gasbag make the glass board installation stable and have certain shock resistance, it is too big to have avoided the glass board to receive the customer amplitude of relying on the back.
Drawings
FIG. 1 is a schematic structural view of a steel frame structure for hotel bathroom partition decoration according to a preferred embodiment of the present invention;
FIG. 2 is a cross-sectional structural view of the connection plate shown in FIG. 1;
fig. 3 is an enlarged schematic view of a portion a shown in fig. 1.
Reference numbers in the figures: 1. the mounting structure comprises a mounting underframe, 11, a rotating sleeve plate, 12, a supporting connecting column, 13, a connecting plate, 131, a glass mounting cavity, 132, a water drainage hole, 2, a mounting top frame, 3, a supporting pipe, 41, a buffer mechanism, 4, a rubber arc-shaped plate, 42, an air bag, 5, a fixing mechanism, 51, a plastic mounting plate, 52, a fixing groove, 6, a sealing mechanism, 61, a rubber edge, 62 and an embedding groove.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1, fig. 2 and fig. 3 in combination, wherein fig. 1 is a schematic structural view of a preferred embodiment of a steel frame structure for hotel bathroom partition decoration according to the present invention; FIG. 2 is a cross-sectional structural view of the connection plate shown in FIG. 1; fig. 3 is an enlarged schematic view of a portion a shown in fig. 1. A steel frame construction for hotel bathroom cuts off to decorate includes: the installation underframe 1, the installation roof-rack 2 and the supporting tube 3.
In the specific implementation process, as shown in fig. 1 and fig. 2, the installation top frame 2 has the same specification as the installation bottom frame 1, the installation bottom frame 1 includes a rotating sleeve plate 11, support connection columns 12 and a connection plate 13, the support connection columns 12 connected in a rotating manner are respectively sleeved at two ends of the rotating sleeve plate 11, the connection plates 13 with the same specification are respectively and fixedly installed on two side walls of the two support connection columns 12, a glass installation cavity 131 for installing fixed glass is formed in the connection plate 13, two support tubes 3 with the same specification are respectively and fixedly installed on the two support connection columns 12 in the installation bottom frame 1, and the tops of the support tubes 3 and the two support connection columns 12 in the installation top frame 2 are respectively and fixedly installed on the two support connection columns.
It should be noted that: the connecting plate 13 of one side on will installing chassis 1 is fixed mounting in the hotel bathroom, and rotate according to the concrete room type in the bathroom and install the connecting plate 13 of opposite side on chassis 1 and make it accord with hotel bathroom room type and utilize the screw to fix it, and the connecting plate 13 of both sides is adjusted well according to the connecting plate 13 on installing chassis 1 on the installation roof-rack 2 and is utilized the screw to fix on the wall, therefore whole bathroom cuts off the steel frame for decoration and can adjust in a flexible way, it is extremely wide to be suitable for hotel bathroom room type.
Wherein, the lateral wall of the connecting plate 13 close to the bathroom is provided with a drain hole 132 mutually communicated with the glass installation cavity 131, and the drain hole 132 is arranged in a downward inclination manner, so as to facilitate the water liquid discharge of the glass installation cavity 131.
Referring to fig. 1, a buffering mechanism 4 for improving the anti-seismic performance of glass is installed in a glass installation cavity 131 formed in a connecting plate 13, the buffering mechanism 4 includes rubber arc plates 41 and air bags 42, two groups of rubber arc plates 41 with the same specification are respectively fixed and embedded on two side walls of the glass installation cavity 131, the two groups of rubber arc plates 41 are arranged in opposite directions, the air bags 42 are fixed and embedded in a cavity formed by the rubber arc plates 41 and the inner side wall of the connecting plate 13, a fixing mechanism 5 is installed on the inner bottom wall of the glass installation cavity 131 formed in the connecting plate 13, the fixing mechanism 5 includes a plastic installation plate 51, the plastic installation plate 51 is fixedly installed on the inner bottom wall of the glass installation cavity 131, and fixing grooves 52 are formed in the plastic installation plate 51.
It should be noted that: the glass plates are respectively inserted into the glass mounting cavities 131 formed in the connecting plates 13 in the mounting underframe 1 and the mounting top frame 2 and are embedded into the fixing grooves 52 formed in the plastic mounting plate 51 by using screws, and the glass plates are stably mounted and have certain shock resistance due to the elasticity of the rubber arc plates 41 and the extrusion of the embedded air bags 42, so that the phenomenon that the amplitude of the glass plates is too large after the glass plates are depended by customers is avoided.
Referring to fig. 1, a plurality of sets of sealing mechanisms 6 with the same specification are fixedly mounted on the tube wall of the support tube 3, each sealing mechanism 6 includes a rubber ridge 61, the rubber ridge 61 is fixedly embedded on the tube wall of the support tube 3, and an embedding groove 62 is formed in the rubber ridge 61.
It should be noted that: the arc-shaped glass is embedded into the embedding grooves 62 formed on the rubber ribs 61 at the proper positions of the two support pipes 3 and is fixed, so that the sealing of the gap between the two support pipes 3 is completed.
The utility model provides a theory of operation for hotel's bathroom cuts off decorates with steel frame construction as follows:
the connecting plate 13 at one side of the installation underframe 1 is fixedly installed in the hotel bathroom, the connecting plate 13 at the other side of the installation underframe 1 is rotatably installed according to the specific bathroom type in the bathroom to ensure that the installation underframe conforms to the hotel bathroom type and is fixed by screws, the connecting plates 13 on the two sides of the mounting top frame 2 are adjusted according to the connecting plates 13 on the mounting bottom frame 1 and then fixed on the wall surface by screws, therefore, the whole steel frame for decorating the bathroom partition can be flexibly adjusted, is suitable for very wide types of hotel bathrooms, glass plates are respectively inserted into the glass installation cavities 131 formed in the connecting plates 13 in the installation underframe 1 and the installation top frame 2 and are embedded into the fixing grooves 52 formed in the plastic installation plates 51 by utilizing the regulation of screws, due to the elasticity of the rubber arc-shaped plate 41 and the extrusion of the embedded air bag 42, the glass plate is stably installed and has certain shock resistance, and the phenomenon that the amplitude of the glass plate is too large after the glass plate is depended by a customer is avoided.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
The above is only the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention can be used in other related technical fields, directly or indirectly, or in the same way as the present invention.

Claims (5)

1. The utility model provides a be used for hotel bathroom to cut off decorates with steel frame construction which characterized in that includes:
the glass fixing device comprises an installation underframe (1), wherein the installation underframe (1) comprises a rotating sleeve plate (11), supporting connecting columns (12) and connecting plates (13), the supporting connecting columns (12) which are rotatably connected are sleeved at two ends of the rotating sleeve plate (11), the connecting plates (13) with the same specification are fixedly installed on two side walls of the two supporting connecting columns (12), and glass installation cavities (131) for installing and fixing glass are formed in the connecting plates (13);
the mounting top frame (2), the mounting top frame (2) and the mounting bottom frame (1) have the same specification;
the supporting pipes (3) are fixedly arranged on two supporting connection columns (12) in the installation underframe (1) respectively, and the tops of the supporting pipes (3) and the two supporting connection columns (12) in the installation top frame (2) are the same in specification.
2. The steel frame structure for hotel bathroom partition decoration according to claim 1, wherein a buffering mechanism (4) for improving glass shock resistance is installed in a glass installation cavity (131) formed in the connecting plate (13), the buffering mechanism (4) comprises rubber arc plates (41) and air bags (42), two groups of rubber arc plates (41) with the same specification are respectively fixedly embedded on two side walls of the glass installation cavity (131), arc surfaces of the two groups of rubber arc plates (41) are oppositely arranged, and the air bags (42) are fixedly embedded in a cavity formed by the rubber arc plates (41) and the inner side walls of the connecting plate (13).
3. The steel frame structure for hotel bathroom partition decoration according to claim 1, wherein the fixing mechanism (5) is installed on the inner bottom wall of the glass installation cavity (131) formed in the connecting plate (13), the fixing mechanism (5) comprises a plastic mounting plate (51), the plastic mounting plate (51) is fixedly installed on the inner bottom wall of the glass installation cavity (131), and the fixing groove (52) is formed in the plastic mounting plate (51).
4. The steel frame structure for hotel bathroom partition decoration according to claim 1, wherein a plurality of sets of sealing mechanisms (6) with the same specification are fixedly installed on the pipe wall of the supporting pipe (3), each sealing mechanism (6) comprises a rubber ridge (61), the rubber ridges (61) are fixedly embedded on the pipe wall of the supporting pipe (3), and the rubber ridges (61) are provided with embedding grooves (62).
5. The steel frame structure for hotel bathroom partition decoration according to claim 1, wherein a drain hole (132) communicating with the glass installation cavity (131) is formed on the side wall of the connection plate (13) close to the bathroom, and the drain hole (132) is inclined downwards.
CN202022284097.7U 2020-10-14 2020-10-14 Be used for hotel bathroom to cut off and decorate and use steel frame construction Active CN214414725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022284097.7U CN214414725U (en) 2020-10-14 2020-10-14 Be used for hotel bathroom to cut off and decorate and use steel frame construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022284097.7U CN214414725U (en) 2020-10-14 2020-10-14 Be used for hotel bathroom to cut off and decorate and use steel frame construction

Publications (1)

Publication Number Publication Date
CN214414725U true CN214414725U (en) 2021-10-19

Family

ID=78058977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022284097.7U Active CN214414725U (en) 2020-10-14 2020-10-14 Be used for hotel bathroom to cut off and decorate and use steel frame construction

Country Status (1)

Country Link
CN (1) CN214414725U (en)

Similar Documents

Publication Publication Date Title
US20200407956A1 (en) Integrally Assembled Sink
CN113700188A (en) Assembly type installation design structure and installation method of free-form surface glass curtain wall
CN100419174C (en) Toilet tank attachment bracket with unitary spring arm
CN214414725U (en) Be used for hotel bathroom to cut off and decorate and use steel frame construction
CN202164833U (en) Frameless corner assembling structure for glass plates of shower compartment
CN212427951U (en) Assembled bathroom ground watertight fittings
CN207988037U (en) A kind of weatherability high glaze artificial stone bathing platform
CN203307971U (en) Unit type energy-saving pottery clay plate curtain wall
CN215069150U (en) Support base capable of adjusting angle of flagpole
CN216921425U (en) Side fascia connecting device convenient to installation
CN112064981A (en) Assembled toilet floor waterproof device and installation method
CN210892208U (en) Solar energy balcony hanging convenient to installation
CN212211563U (en) Easily dismantle concatenation screen of overhauing
CN208251487U (en) A kind of adjustable supporter
KR200344066Y1 (en) Glass support unit
CN220014126U (en) Glass curtain wall periphery decoration aluminum plate installation connection node
CN204175121U (en) A kind of shower cubicle hinge rotation shaft door
CN216122309U (en) Solar energy device
CN214964912U (en) Support-free hanging type hand basin
CN215255561U (en) Door and window structure with improved sealing effect
CN221284936U (en) Novel concatenation formula suspension desk
CN208988640U (en) A kind of hand basin Installation cabinet
CN216202360U (en) Adjustable finished product supporting framework
CN218176772U (en) Shower room with stable structure
CN216331625U (en) Mounting connecting piece for automobile seat

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant