CN214402110U - Steel construction for building connection that can install fast - Google Patents

Steel construction for building connection that can install fast Download PDF

Info

Publication number
CN214402110U
CN214402110U CN202022131552.XU CN202022131552U CN214402110U CN 214402110 U CN214402110 U CN 214402110U CN 202022131552 U CN202022131552 U CN 202022131552U CN 214402110 U CN214402110 U CN 214402110U
Authority
CN
China
Prior art keywords
sleeve
building
hole
steel
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022131552.XU
Other languages
Chinese (zh)
Inventor
陈国龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Design Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022131552.XU priority Critical patent/CN214402110U/en
Application granted granted Critical
Publication of CN214402110U publication Critical patent/CN214402110U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a steel construction for building connection that can install fast relates to and connects with steel construction technical field. The utility model discloses a first sleeve, the second bolt, first nut, second nut and connecting rod, first sleeve left surface is provided with the fixed orifices, second sleeve right flank is provided with the connecting hole, the surface is provided with the fixed plate relatively on first sleeve and the second sleeve, a fixed plate side is provided with spacing hole, the second bolt runs through spacing hole and second nut threaded connection, first sleeve upper surface is provided with the mounting hole, the connecting rod runs through mounting hole and arm-tie fixed connection, a connecting rod side fixedly connected with baffle, connecting rod week side ring has the spring. The utility model discloses a steel construction for building connection that can install fast not only makes the connection and the dismantlement of two convenient steel pipes, can also the steadiness of effectual improvement connection, has improved labor efficiency, has increased the product practicality.

Description

Steel construction for building connection that can install fast
Technical Field
The utility model belongs to the technical field of the steel construction is used in the connection, especially relate to a steel construction for building connection that can install fast.
Background
Nowadays, along with the rapid development of building industry, high-rise building is also increasing day by day, on some building sites, inevitably needs steel frame construction's connection, but the connection between two steel pipes generally adopts welded mode at present, and this kind of connected mode not only can reduce the steadiness of connecting at the welded junction gassing, has increased the potential safety hazard, still inconvenient dismantlement reduces labor efficiency, and used steel pipe also is convenient for recycle, has reduced the practicality of product.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a but steel construction for building connection of quick installation is not convenient for install the unsafe problem when dismantling and using between the current steel pipe of solution.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to a steel structure for building connection that can install fast, including first sleeve, second sleeve, first building steel, second building steel, first bolt, second bolt, first nut, second nut and connecting rod, first sleeve left surface is provided with the fixed orifices, conveniently installs first building steel, second sleeve right surface is provided with the connecting hole, conveniently installs second building steel, first building steel sets up inside the fixed orifices, second building steel sets up inside the connecting hole, first sleeve and second sleeve upper surface all are provided with the through-hole, conveniently installs first bolt, thereby makes first building steel and second building steel fixed, first building steel and second building steel side surface all are provided with the cylinder hole, conveniently fixes first building steel and second building steel, first bolt runs through-hole, cylinder hole and first nut threaded connection respectively, the utility model discloses a bolt, including first sleeve, second sleeve, connecting rod, first sleeve, second sleeve, first sleeve and second sleeve, the lower surface is provided with the fixed plate relatively on first sleeve and the second sleeve, conveniently fixes first sleeve and second sleeve into a whole, a fixed plate side is provided with spacing hole, the second bolt runs through spacing hole and second nut threaded connection, first sleeve upper surface is provided with the mounting hole, and the connecting rod is run through mounting hole and arm-tie fixed connection, conveniently stimulates the arm-tie to compression spring makes the connecting rod shift up, and then takes out the mounting panel, a connecting rod side fixedly connected with baffle, connecting rod week side is around there being the spring, the inside mounting groove that is provided with of first sleeve, the mounting panel of easy to assemble, second sleeve left surface is provided with the mounting panel.
Furthermore, the size of the fixing hole is adaptive to the first building steel, and the size of the connecting hole is adaptive to the second building steel, so that the first building steel and the second building steel are conveniently fixed.
Furthermore, the end face of the connecting rod, which is close to one end of the mounting plate, is an inclined face, the end face of the mounting plate is an inclined face, the connecting rod can be extruded when the mounting plate is conveniently inserted into the mounting groove, the connecting rod is moved upwards, and therefore the mounting plate is fixed.
Furthermore, the size of mounting groove suits with the mounting panel, makes things convenient for mounting groove and mounting panel cooperation, fixes into a whole with first sleeve and second sleeve.
The utility model discloses following beneficial effect has:
the utility model discloses a steel construction for building connection that can install fast, through inserting first sleeve to first building steel, insert the second sleeve to the second building steel, then it is fixed with it with first bolt and first nut, then insert the mounting groove to the mounting panel, fix first sleeve and second sleeve into a whole through second bolt and second nut cooperation, conveniently link together two steel pipes, if part two steel pipes, part second nut and second bolt, then pull the arm-tie again, the mounting panel will separate with the mounting groove, connecting device not only makes things convenient for the connection and the dismantlement of two steel pipes, can also the effectual steadiness of connecting of improvement, labor efficiency is improved, product practicality has been increased.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural view of a steel structure for building connection that can be quickly installed;
FIG. 2 is a schematic structural view of a construction for building connection, which can be installed rapidly, from the front;
FIG. 3 is a schematic top view of a construction for a building joint that can be installed quickly;
fig. 4 is a front structural sectional view of a steel structure for building connection that can be quickly installed.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a first sleeve; 2. a second sleeve; 3. a first construction steel; 4. a second construction steel; 5. a first bolt; 6. a second bolt; 7. a first nut; 8. a fixing plate; 9. a connecting rod; 10. a baffle plate; 11. pulling a plate; 12. a spring; 13. a second nut; 14. mounting grooves; 15. mounting a plate; 16. a fixing hole; 17. and connecting the holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "middle", "outer", "inner", and the like, indicate positional or positional relationships, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the referenced components or elements must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Referring to fig. 1-4, the present invention relates to a steel structure for building connection, which can be quickly installed, and comprises a first sleeve 1, a second sleeve 2, a first building steel 3, a second building steel 4, a first bolt 5, a second bolt 6, a first nut 7, a second nut 13 and a connecting rod 9, wherein the left side of the first sleeve 1 is provided with a fixing hole 16 for facilitating installation of the first building steel 3, the right side of the second sleeve 2 is provided with a connecting hole 17 for facilitating installation of the second building steel 4, the first building steel 3 is disposed inside the fixing hole 16, the second building steel 4 is disposed inside the connecting hole 17, the upper surfaces of the first sleeve 1 and the second sleeve 2 are both provided with through holes for facilitating installation of the first bolt 5, so that the first building steel 3 and the second building steel 4 are fixed, the side surfaces of the first building steel 3 and the second building steel 4 are both provided with cylindrical holes for facilitating fixation of the first building steel 3 and the second building steel 4, first bolt 5 runs through the through-hole respectively, cylinder hole and 7 threaded connection of first nut, the relative fixed plate 8 that is provided with in surface about first sleeve 1 and the second sleeve 2, conveniently fix first sleeve 1 and second sleeve 2 into a whole, 8 a side of fixed plate is provided with spacing hole, second bolt 6 runs through spacing hole and 13 threaded connection of second nut, 1 upper surface of first sleeve is provided with the mounting hole, connecting rod 9 easy to assemble, connecting rod 9 runs through mounting hole and arm-tie 11 fixed connection, conveniently stimulate arm-tie 11, thereby compression spring 12, make connecting rod 9 shift up, and then take out mounting panel 15, 9 a side fixedly connected with baffle 10 of connecting rod, 9 all sides of connecting rod encircle there is spring 12, 1 inside mounting groove 14 that is provided with of first sleeve, easy to assemble mounting panel 15, second sleeve 2 left surface is provided with mounting panel 15.
The size of the fixing hole 16 is matched with that of the first building steel 3, and the size of the connecting hole 17 is matched with that of the second building steel 4, so that the first building steel 3 and the second building steel 4 can be conveniently fixed.
The end face of the connecting rod 9 close to one end of the mounting plate 15 is an inclined face, the end face of the mounting plate 15 is an inclined face, and the connecting rod 9 can be extruded when the mounting plate 15 is inserted into the mounting groove 14 conveniently, so that the connecting rod 9 moves upwards, and the mounting plate 15 is fixed.
The size of mounting groove 14 suits with mounting panel 15, makes things convenient for mounting groove 14 and mounting panel 15 cooperation, fixes into a whole with first sleeve 1 and second sleeve 2.
It should be noted that, the utility model discloses a steel construction for building connection that can install fast, in the use, through inserting first sleeve 1 to first building steel 3, insert second sleeve 2 to second building steel 4, then fix it with first bolt 5 and first nut 7, then insert mounting panel 15 in the mounting groove 14, be fixed into a whole with first sleeve 1 and second sleeve 2 through second bolt 6 and the cooperation of second nut 13, conveniently link together two steel pipes, if part two steel pipes, part second nut 13 and second bolt 6, then stimulate arm-tie 11 again, mounting panel 15 will separate with mounting groove 14.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (4)

1. The utility model provides a steel construction for building connection that can install fast, includes first sleeve (1), second sleeve (2), first building steel (3), second building steel (4), first bolt (5), second bolt (6), first nut (7), second nut (13) and connecting rod (9), its characterized in that: the left side surface of the first sleeve (1) is provided with a fixing hole (16), the right side surface of the second sleeve (2) is provided with a connecting hole (17), the first building steel (3) is arranged in the fixing hole (16), the second building steel (4) is arranged in the connecting hole (17), the upper surfaces of the first sleeve (1) and the second sleeve (2) are respectively provided with a through hole, the side surfaces of the first building steel (3) and the second building steel (4) are respectively provided with a cylindrical hole, the first bolt (5) respectively penetrates through the through hole and the cylindrical hole to be in threaded connection with the first nut (7), the upper and lower surfaces of the first sleeve (1) and the second sleeve (2) are oppositely provided with a fixing plate (8), one side surface of the fixing plate (8) is provided with a limiting hole, the second bolt (6) penetrates through the limiting hole to be in threaded connection with the second nut (13), the upper surface of the first sleeve (1) is provided with a mounting hole, connecting rod (9) run through mounting hole and arm-tie (11) fixed connection, a connecting rod (9) side fixedly connected with baffle (10), connecting rod (9) side all around has spring (12), first sleeve (1) inside is provided with mounting groove (14), second sleeve (2) left surface is provided with mounting panel (15).
2. A quickly installable steel construction for building connection according to claim 1, characterised in that the size of the fixing holes (16) is adapted to the first building steel (3) and the size of the connecting holes (17) is adapted to the second building steel (4).
3. A steel construction for building connection which can be quickly installed according to claim 1, wherein the end surface of the connecting rod (9) near the end of the installation plate (15) is an inclined surface, and the end surface of the installation plate (15) is an inclined surface.
4. A quickly installable steel construction for building connection according to claim 1, characterised in that the installation groove (14) is sized to fit the installation plate (15).
CN202022131552.XU 2020-09-25 2020-09-25 Steel construction for building connection that can install fast Active CN214402110U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022131552.XU CN214402110U (en) 2020-09-25 2020-09-25 Steel construction for building connection that can install fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022131552.XU CN214402110U (en) 2020-09-25 2020-09-25 Steel construction for building connection that can install fast

Publications (1)

Publication Number Publication Date
CN214402110U true CN214402110U (en) 2021-10-15

Family

ID=78017983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022131552.XU Active CN214402110U (en) 2020-09-25 2020-09-25 Steel construction for building connection that can install fast

Country Status (1)

Country Link
CN (1) CN214402110U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114439113A (en) * 2022-03-16 2022-05-06 重庆科创职业学院 Connecting device of building steel structure convenient to dismouting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114439113A (en) * 2022-03-16 2022-05-06 重庆科创职业学院 Connecting device of building steel structure convenient to dismouting

Similar Documents

Publication Publication Date Title
CN214034055U (en) Ready-package steel construction
CN208586762U (en) Flashlight cartridge type integration assembling type steel structure column beam contact composite structure
CN214402110U (en) Steel construction for building connection that can install fast
CN202809912U (en) Curtain wall expansion joint structure
CN203716508U (en) Fork lug pin type anchoring pull cable tensioning device
CN210797914U (en) Connection structure of buckled plate is assembled to inside
CN211232008U (en) Oil gas recovery seal structure
CN212740510U (en) Nondestructive steel column tower crane attachment device
CN211714197U (en) Many high-rise frame steel construction convenient to dismantle
CN211548280U (en) Light and stable mounting structure for curtain wall
CN210827850U (en) Quick detachable temporary building fixed knot constructs
CN214498933U (en) Horizontal disjointing device for oil field pipeline
CN215954059U (en) External continuous connecting piece for butt joint of tubes for screen frame
CN218028431U (en) Assembled wallboard node
CN213806542U (en) Scaffold connecting device for civil engineering
CN218176337U (en) Building steel structure supporting beam
CN205769994U (en) A kind of truss attachment structure of helicopter platform
CN220203377U (en) Novel connecting piece for climbing frame
CN220510741U (en) Lightning protection grounding device for climbing frame
CN216345291U (en) All-round wireless video monitoring device with engineering supervision
CN217984373U (en) Power cable protection pipe with high strength pressure resistance
CN217481729U (en) Spring nut for nuclear power
CN103501583A (en) Support frame combined structure and cabinet body
CN217151176U (en) Connecting pull rod for cantilever beam
CN216130353U (en) Steel pull rod connecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211221

Address after: 330000 No. 199, No. 2799, Tianxiang Avenue, Nanchang high tech Industrial Development Zone, Nanchang City, Jiangxi Province

Patentee after: Huawei Design Group Co.,Ltd.

Address before: No.6, team 6, Xinling village, Dapingshan Town, Xingye County, Yulin City, Guangxi Zhuang Autonomous Region, 537800

Patentee before: Chen Guolong

TR01 Transfer of patent right